This presentation discussed OSHA's Subpart Q regulations for concrete and masonry construction. It covered general requirements for equipment, formwork, shoring, precast concrete, and lift-slab operations. Specific hazards were reviewed, such as falling, being struck by concrete buckets or materials, electrocution from bull floats, and wall collapse. The definitions, standards, and safety procedures in Subpart Q aim to protect workers from these dangers during concrete and masonry projects.
In this presentation i have gone through about various prospects and challenges that have been faced at the time of installation,its types,method of installation &its application.
The main outcome of this project is the construction sequence of HMR which primarily starts with excavation, erection of piers, launching girder process and assembling of segments. This project clearly gives a brief knowledge on how the post tensioning and pre stressing works are held at off site and onsite. This project enlightens about the safety requirements and measures taken during the pre-casting works and at on site works.
A. This Section includes removal of existing escalators and design, fabrication, and installation of heavy-duty escalators, designed specifically for transportation system usage, for the Washington Metropolitan Area Transit Authority (WMATA). This involves the installation of new escalators in the existing wellways at stations within the WMATA Metro Rail System. Work performed under this Section will provide new escalators complete and ready for use in compliance with all applicable Codes and the requirements of this Section.
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
In this presentation i have gone through about various prospects and challenges that have been faced at the time of installation,its types,method of installation &its application.
The main outcome of this project is the construction sequence of HMR which primarily starts with excavation, erection of piers, launching girder process and assembling of segments. This project clearly gives a brief knowledge on how the post tensioning and pre stressing works are held at off site and onsite. This project enlightens about the safety requirements and measures taken during the pre-casting works and at on site works.
A. This Section includes removal of existing escalators and design, fabrication, and installation of heavy-duty escalators, designed specifically for transportation system usage, for the Washington Metropolitan Area Transit Authority (WMATA). This involves the installation of new escalators in the existing wellways at stations within the WMATA Metro Rail System. Work performed under this Section will provide new escalators complete and ready for use in compliance with all applicable Codes and the requirements of this Section.
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
Water billing management system project report.pdfKamal Acharya
Our project entitled “Water Billing Management System” aims is to generate Water bill with all the charges and penalty. Manual system that is employed is extremely laborious and quite inadequate. It only makes the process more difficult and hard.
The aim of our project is to develop a system that is meant to partially computerize the work performed in the Water Board like generating monthly Water bill, record of consuming unit of water, store record of the customer and previous unpaid record.
We used HTML/PHP as front end and MYSQL as back end for developing our project. HTML is primarily a visual design environment. We can create a android application by designing the form and that make up the user interface. Adding android application code to the form and the objects such as buttons and text boxes on them and adding any required support code in additional modular.
MySQL is free open source database that facilitates the effective management of the databases by connecting them to the software. It is a stable ,reliable and the powerful solution with the advanced features and advantages which are as follows: Data Security.MySQL is free open source database that facilitates the effective management of the databases by connecting them to the software.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Literature Review Basics and Understanding Reference Management.pptxDr Ramhari Poudyal
Three-day training on academic research focuses on analytical tools at United Technical College, supported by the University Grant Commission, Nepal. 24-26 May 2024
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Using recycled concrete aggregates (RCA) for pavements is crucial to achieving sustainability. Implementing RCA for new pavement can minimize carbon footprint, conserve natural resources, reduce harmful emissions, and lower life cycle costs. Compared to natural aggregate (NA), RCA pavement has fewer comprehensive studies and sustainability assessments.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesChristina Lin
Traditionally, dealing with real-time data pipelines has involved significant overhead, even for straightforward tasks like data transformation or masking. However, in this talk, we’ll venture into the dynamic realm of WebAssembly (WASM) and discover how it can revolutionize the creation of stateless streaming pipelines within a Kafka (Redpanda) broker. These pipelines are adept at managing low-latency, high-data-volume scenarios.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
2. Objectives
In this course, we will discuss the following:
OSHA’s minimum requirements for concrete and
masonry work in construction
General requirements, equipment, tools, formwork,
shoring, precast concrete, and lift-slab operations
Hazards associated with concrete and masonry
construction operations
Abatement methods
3. Subpart Q – Concrete and Masonry
Construction
1926.700 – Scope, application, and definitions
1926.701 – General requirements
1926.702 – Requirements for equipment and tools
1926.703 – Requirements for cast-in-place concrete
1926.704 – Requirements for precast concrete
1926.705 – Requirements for lift-slab operations
1926.706 – Requirements for masonry construction
4. Definitions
Bull float
A tool used to spread out and smooth concrete.
Formwork
The total system of support for freshly placed or
partially cured concrete.
Lift slab
A method of concrete construction in which floor
and roof slabs are cast on or at ground level and,
using jacks, lifted into position.
1926.700(b)
5. Limited access zone
An area alongside a masonry wall, which is under
construction, and is clearly demarcated to limit access
by employees.
Precast concrete
Concrete members which have been formed, cast, and
cured prior to final placement in a structure.
Reshoring
The construction operation in which shoring equipment
is placed, as original forms and shores are removed, to
support partially cured concrete and construction loads.
Definitions 1926.700(b)
6. Shore
A supporting member that resists a compressive force
imposed by a load.
Vertical slipforms
These forms are jacked vertically during placement of
concrete.
Jacking operation
The task of lifting a slab during the construction of a
building where the lift-slab process is being used.
Definitions 1926.700(b)
9. Reinforcing Steel
Guard protruding, reinforcing steel
Letter of interpretation: 05/29/1997
» [Addresses use of small plastic rebar caps]
Letter of interpretation: 03/10/2006
» [Horizontal protection
from impalement]
1926.701(b)
10. Rebar Protection
The following images are from video shot
during an investigation of an actual rebar
accident.
Courtesy of Utah Occupational Safety and Health Division
11. Post-Tensioning Operations
Method of reinforcing concrete, masonry, and other
structural elements
Strands ½″ diameter are stressed to a force of 33,000
lbs. using a hydraulic jack
1926.701(c)
12. Post-Tensioning Operations
No non-essential employees allowed in hazard
zone.
Use signs and barriers to limit employees
access to work zone.
1926.701(c)(1)-(2)
Jack
14. Employees must not be permitted under
concrete buckets while they are being elevated
or lowered into position.
1926.701(e)(1)
Working Under Loads
16. Personal Protective Equipment
Employees must wear protective head and face
equipment when applying cement, sand, and water
mixture through a pneumatic hose.
1926.701(f)
17. Bulk Cement Storage
Bins, containers, and silos
must be equipped with:
Conical or tapered bottoms
Mechanical or pneumatic means
to start flow of material.
Ejection system must be shut
down, locked and tagged out
prior to entry.
1926.702(a)(1)-(2)
18. Concrete Mixers
Concrete mixers with one cubic yard or larger
loading skips must be equipped with:
Mechanical device to clear skip of materials
Guardrails installed on each side of the skip
1926.702(b)(1)-(2)
19. Power Concrete Trowels
Manually guided concrete troweling machine
must be equipped with:
Automatic control switches shut off power when
hands are removed.
1926.702(c)
21. Concrete Buggies
Concrete buggy handles must not extend
beyond the wheels on either side of the
buggy.
1926.702(d)
22. Discharge pipes must be provided with pipe supports
designed for 100 percent overload.
Compressed air hoses must be provided with positive
fail-safe joint connectors.
1926.702(e)(1)-(2)
Concrete Pumping System
23. Concrete Buckets
Concrete buckets equipped with hydraulic or
pneumatic gates:
Must have positive safety latches or similar devices
to prevent accidental dumping
Designed to prevent concrete from hanging up on
top and sides
1926.702(f)(1)-(2)
24. Tremie Sections
Sections of tremie and
similar concrete
conveyances must be
secured with wire rope
(or equivalent materials)
in addition to the regular
couplings or
connections.
1926.702(g)
25. Bull Floats
Bull float handles must
be constructed of
nonconductive material
or insulated.
When used where they
may contact energized
electrical conductors
1926.702(h)
26. Masonry Saws
Masonry saws must be
guarded with a
semicircular enclosure
over the blade.
Method for retaining
blade fragments must be
incorporated in the
design of the enclosure.
1926.702(i)(1)-(2)
27. Lockout/Tagout Procedures
Employees must not be allowed to perform
maintenance or repair activity on equipment.
Unless hazardous energy sources have locked out or
tagged out.
1926.702(j)(1)
28. General Requirements
Formwork must be
designed, fabricated,
erected, supported,
braced, and maintained.
Must support without failure
all vertical and lateral loads
applied to it
1926.703(a)(1)
29. General Requirements
Drawings or plans for the jack layout, formwork,
working decks, and scaffolds must be available
at the jobsite.
1926.703(a)(2)
30. Inspected prior to erection.
Damaged equipment shall not be used.
Inspected immediately
prior to, during, and
immediately after concrete
placement.
Shoring and Reshoring 1926.703(b)(1)-(3)
31. Equipment found to be damaged or weakened
must be immediately reinforced.
Sills must be sound,
rigid, and capable of
carrying maximum
intended load.
1926.703(b)(4)-(5)
Shoring and Reshoring
32. Shoring and Reshoring
All base plates, shore heads, extension
devices, and adjustment screws must be in
firm contact, and secured when necessary,
with the foundation and form.
1926.703(b)(6)
33. Adjustment of single
post shores to raise
formwork must not be
made after the
placement of concrete.
Shoring and Reshoring 1926.703(b)(9)
34. Reshoring must be
erected:
As the original forms
and shores are
removed.
Whenever the concrete
is required to support
loads in excess of its
capacity.
1926.703(b)(10)
Shoring and Reshoring
35. Form steel rods or pipes
on which jacks climb
must be:
Designed for that purpose
and adequately braced
when not encased in
concrete.
Provided with scaffolds or
work platform where
employees required to
pass.
1926.703(c)(1)-(3)
Vertical Slipforms
36. Vertical Slipforms
Jacks and lifting devices must be provided with
mechanical dogs or other automatic holding
devices.
1926.703(c)(5)
38. Forms and shores
must not be removed
until employer
determines concrete
has gained sufficient
strength.
1926.703(e)(1)
Removal of Formwork
39. Wall units, structural
framing, and tilt-up
wall panels must be
adequately supported
to prevent
overturning.
1926.704(a)
Precast Concrete
40. Precast Concrete
Tilt-up precast concrete members
Lifting inserts embedded or otherwise attached must
be capable of supporting at least two times the
maximum intended load.
1926.704(b)
41. Precast Concrete 1926.704(c)
Precast concrete
members
Other than tilt-up
members.
» Lifting inserts
capable of
supporting at least
four times maximum
intended load.
42. Precast Concrete 1926.704(d)
Lifting hardware must be capable of supporting
at least five times maximum intended load.
43. Precast Concrete
No employees permitted under precast
concrete members being lifted or tilted into
position.
Except employees
required for the
erection of those
members.
1926.704(e)
44. Fall Protection
Each employee engaged in the erection of
precast concrete members and related
operations who is 6 feet or more above lower
levels shall be protected from falling.
1926.501(b)(12)
45. Precast Concrete
Precast walls can be installed quickly.
Foundations can be backfilled as soon as the
slab is in placed, enhancing jobsite safety.
46. Designed by a registered professional engineer
Plans and designs implemented by employer must
include:
Detailed instructions
Sketches indicating method of erection
1926.705(a)
Lift-Slab Operations
47. Marked to indicate rated
capacity
Not loaded beyond capacity
Synchronized lifting to ensure
uniform lifting
Manual controls located in
central location—attended by
competent person (must be
experienced)
1926.705(b), (c), (g), (i)
Jack/Lifting Unit
48. No employees permitted in the building or
structure while any jacking operation is taking
place.
Except essential personnel
1926.705(k)(1)
Lift-Slab Operations
49. L’Ambiance Plaza, Bridgeport, Conn.
Lift slab construction project
28 workers killed
Multiple failures in design system and
construction practices
50. Established prior to the start of construction
Equal to the height of the wall plus four feet
Unscaffolded side of wall
Restricted to entry by employees constructing the wall
Remain until adequately supported
1926.706(a)(1)-(5)
Limited Access Zone
51. Masonry walls over 8 feet in
height must be adequately
braced.
Bracing must remain in place
until permanent supporting
elements of the structure are in
place.
1926.706(b)
Limited Access Zone
55. Summary
We covered the following information during this
presentation:
OSHA’s minimum requirements for concrete and
masonry work in construction
General requirements for equipment, tools,
formwork, shoring, precast concrete, and lift-slab
operations
Hazards associated with concrete
and masonry construction
operations
Abatement methods