Do Capacity Markets 
Send a Signal for New-build Generation? 
Peter Maloney, Senior Writer, Platts Power Group 
Platts Commodity Week, Houston 
October 9, 2013 
© 2013 Platts, McGraw Hill Financial. All rights reserved.
Do Capacity Markets 
Send a New-build Signal? 
• What are capacity markets and why were they 
created? 
• To ensure reliability by providing the “missing money” 
• The “missing money” problem 
• In markets with capped energy prices and mandated adequacy 
requirements, returns from energy and ancillary services will not 
provide sufficient compensation to support the cost of new 
generation. – Dr. Roy Shanker 
2
Do Capacity Markets 
Send a New-build Signal? 
There are two types of electricity: 
• Energy – keeps the lights on 
• Capacity – makes sure they stay on 
3
Do Capacity Markets 
Send a New-build Signal? 
• How do you pay for something that is not used, i.e., capacity? 
• Assign a value to capacity via a competitive auction 
• There are four organized capacity auctions: 
– ISO-NE 
– NY ISO 
– PJM Interconnection 
– Midcontinent ISO 
4
Do Capacity Markets 
Send a New-build Signal? 
5
Do Capacity Markets 
Send a New-build Signal? 
6 
• Peak Load (MW – 7/2011) 163,848 
• Capacity (MW) 185,600 
• Energy (GW - 2012) 832,331 
• Members 800+ 
• Generation Sources 1,365 
• Millions - people served 61 
• Area Served (Sq Miles) 214,000 
• States served 13 + DC 
• Transmission Lines (Miles) 62,000+
Do Capacity Markets 
Send a New-build Signal? 
7 
• Peak (7/23/12) 98,576 MW 
• Capacity 131,522 MW 
• Annual billing 526 TWh 
• 11 states, one Canadian province
Do Capacity Markets 
Send a New-build Signal? 
8 
• Peak demand (7/19/13) 33,956 MW 
• Capacity 37,925 MW 
• Transmission 11,005 miles 
• Total power usage (2012) 162,842 GWh 
• Peak demand (8/2/06) 28,130 MW 
• Capacity 32,000 MW 
• Generators 350 
• Customers served 6.5 million 
• RTO population 14 million 
• Interconnections to N.Y., Canada 13 
• High voltage transmission (miles) 8,000 miles
Do Capacity Markets 
Send a New-build Signal? 
• Distinctive features of capacity markets: 
– Demand curves 
– CONE (cost of new entry) 
– Mitigation 
9
Do Capacity Markets 
Send a New-build Signal? 
Demand curves: vertical vs. sloped 
Demand Curves for PJM, NYISO, and ISO-NE (Source: Brattle Group) 10
Do Capacity Markets 
Send a New-build Signal? 
• CONE 
– The levelized capital costs and annual 
fixed O&M costs for a hypothetical gas-fired 
combustion turbine or combined-cycle 
unit in the delivery year for that 
capacity market. 
11
Do Capacity Markets 
Send a New-build Signal? 
• Mitigation 
– Supply side: 
pivotal supplier test (PJM, NYISO) 
de-list bids (ISO-NE) 
– Demand side: 
MOPR (minimum offer price rule) 
(& exemptions to MOPR) 
12
Do Capacity Markets 
Send a New-build Signal? 
Capacity market comparisons 
` 
PJM NYISO ISO-NE MISO 
Auction name base residual market (BRA) installed capacity market 
(ICAP) 
forward capacity 
auction (FCA) 
planning 
resource auction 
(PRA) 
Type uniform price uniform price descending clock uniform price 
Forward commitment period three years six months three years two months 
Delivery period one year one month or six months one year one year 
Unit price MW-day kW-month kW-month MW-day 
Replacement auction three annually no annual & monthly no 
Demand curve 
downward slope downward slope vertical vertical 
Generation must offer? yes only pivotal suppliers only new resources only previously 
cleared resources
Do Capacity Markets 
Send a New-build Signal? 
14 
Capacity Clearing Prices in Each RTO and Select Sub-Regions for 
Commitment Periods between 2006 – 2017
Do Capacity Markets 
Send a New-build Signal? 
15 
NERC 2013 Summer Reliability Report 
NYISO MISO PJM ISO-NE 
projected demand (MW) 33,279 91,532 145,029 26,690 
anticipated resources (MW) 39,592 108,742 187,531 32,458 
anticipated reserve (%) 18.8 18.8 29.3 21.6 
NERC reference reserve (%) 17 14.2 15.9 15
Do Capacity Markets 
Send a New-build Signal? 
16 
200,000 
180,000 
160,000 
140,000 
120,000 
100,000 
80,000 
60,000 
40,000 
20,000 
0 
2007 2008 2009 2010 2011 2012 2013 
Installed Capacity 
Forecast Peak 
Reserve Margin 
PJM Interconnection reliability metrics
Do Capacity Markets 
Send a New-build Signal? 
17 
45,000 
40,000 
35,000 
30,000 
25,000 
20,000 
15,000 
10,000 
5,000 
0 
New York ISO reliability metrics 
41,898 42,159 43,686 
38,970 
37,782 38,622 38,936 
33,452 33,865 
32,439 33,279 
18,665 18,645 18,538 18,705 
2010 2011 2012 2013 
41,452 
Megawatts 
Available Resources 
Required Resources 
Peak Load 
Average Demand
Do Capacity Markets 
Send a New-build Signal? 
18 
PJM and ISO-NE: new generation additions (MW) 
6,000 
5,000 
4,000 
3,000 
2,000 
1,000 
0 
ISO-NE 
PJM
Do Capacity Markets 
Send a New-build Signal? 
19 
Capacity Additions in PJM auctions, 2014-15 (Source: Brattle Group)
Do Capacity Markets 
Send a New-build Signal? 
20 
• PJM’s 2016-17 Base Residual Auction drove investment in: 
– New generation 
– Imports 
– Retirements 
– Demand Response
Do Capacity Markets 
Send a New-build Signal? 
21 
200 
180 
160 
140 
120 
100 
80 
60 
40 
20 
0 
2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 
MW-day 
PJM price signals
Do Capacity Markets 
Send a New-build Signal? 
New generation in PJM’s 20116-17 BRA 
New 
Generation 
Generation 
Uprates 
Imports 
Demand 
Response 
Energy 
Efficiency 
2016/2017 4,282 1,181 7,483 12,408 1,117 
2015/2016 4,899 447 3,935 14,833 923 
2014/2015 416 341 3,017 14,118 822 
• Panda-Moxie Liberty 829 MW gas plant in Bradford County, Pennsylvania 
22 
• Based on $2/MMBtu nat. gas in Marcellus vs. $4/MMBtu at Henry Hub
Do Capacity Markets 
Send a New-build Signal? 
23 
Capacity imports into PJM, 2016-17 BRA 
2015-16 2016-17 
west of PJM 3,621 7,070 
other 314 413 
total 3,953 7,483 
• Only 4,788 MW (64%) of the cleared imports 
had confirmed firm transmission service 
• MISO auction: $1.05/MW-day 
• PJM auction: $59.37/MW-day 
• Ameren increased exports to PJM 100 to 900 MW 
• Dynegy is looking to export up to 3 GW into PJM
Do Capacity Markets 
Send a New-build Signal? 
24 
Retirements 
• FirstEnergy to close another 2,080 MW of coal plants in 
PJM 
• A second wave of retirements? 
• NRG Energy to close Norwalk Harbor plant in Connecticut 
• Another 6 GW of plants at risk of retirement?
Do Capacity Markets 
Send a New-build Signal? 
25 
• Issues facing capacity markets: 
– Demand Response 
– Gas-electric integration 
– Imports 
– Mitigation (MOPR)
Do Capacity Markets 
Send a New-build Signal? 
26 
Issues: Demand response 
• PJM is looking at changes to its demand curve
Do Capacity Markets 
Send a New-build Signal? 
27 
Issues: Gas-electric integration 
• ISO-NE – gas used for heating; lack of natural gas pipelines 
• MISO – looming coal retirements 
Issues: Capacity imports 
• Ameren increased 100 MW to 900 ME 
• Dynegy looking to export up to 3,000 MW 
• Will PJM limit imports? 
Issues: MOPR 
• New Jersey – 2,000 MW LCAAP program 
• Maryland – PSC solicitation for in-state generation
Do Capacity Markets 
Send a New-build Signal? 
28 
ERCOT’s dwindling reserve margins 
Panda in Texas 
Temple: 1,200 MW 
Sherman: 1,200 MW 
ERCOT’s footprint 
2014 13.80% 
2015 11.60% 
2016 10.40% 
2017 10.50% 
2018 9.40% 
2019 7.40% 
2020 6.50% 
2021 6.00% 
2022 5.20% 
2023 4.50%
Questions? 
© 2013 Platts, McGraw Hill Financial. All rights reserved.

More Related Content

What's hot

Future of the Indian power sector
Future of the Indian power sectorFuture of the Indian power sector
Future of the Indian power sector
Sayan Aich PE, MIET(UK)
 
Electricity market 2030_presentation_long_new
Electricity market 2030_presentation_long_newElectricity market 2030_presentation_long_new
Electricity market 2030_presentation_long_new
Energiateollisuus ry - Finnish Energy Industries
 
Getting Smart About Smart Energy
Getting Smart About Smart EnergyGetting Smart About Smart Energy
Getting Smart About Smart Energy
Robert Cormia
 
Electricity Act 2003 and its proposed amendments
Electricity Act 2003 and its proposed amendmentsElectricity Act 2003 and its proposed amendments
Electricity Act 2003 and its proposed amendments
Amitava Nag
 
India smart grid can it become a reality-
India smart grid  can it become a reality-India smart grid  can it become a reality-
India smart grid can it become a reality-
Mirdul Amin Sarkar
 
Large Scale Grid Integration of Renewable Energy Sources - Way Forward
Large Scale Grid Integration of Renewable Energy Sources - Way ForwardLarge Scale Grid Integration of Renewable Energy Sources - Way Forward
Large Scale Grid Integration of Renewable Energy Sources - Way Forward
Spark Network
 
Make in india and future of renewable energy
Make in india and future of renewable energyMake in india and future of renewable energy
Make in india and future of renewable energy
Manoj Bhambu
 
Energy audit ppt
Energy audit  pptEnergy audit  ppt
Energy audit ppt
nehachandel23
 
IEEE 1547
IEEE 1547IEEE 1547
UNDP_Energy Audits_2015
UNDP_Energy Audits_2015UNDP_Energy Audits_2015
UNDP_Energy Audits_2015
UNDPhr
 
Renewable energy economics
Renewable energy economicsRenewable energy economics
Renewable energy economics
Alsian Brown-Perry
 
Kolar solar pv plant a case study of
Kolar solar pv plant a case study ofKolar solar pv plant a case study of
Kolar solar pv plant a case study of
Savitha PB savitha
 
Energy audit 1
Energy audit 1Energy audit 1
Energy audit 1
Batsaikhan Battsetseg
 
Market Outlook for Energy Storage in India
Market Outlook for Energy Storage in IndiaMarket Outlook for Energy Storage in India
Market Outlook for Energy Storage in India
Gensol Engineering Limited
 
Electric markets
Electric marketsElectric markets
Electric markets
Karthik Krishna
 
Fundamentals on Renewable Energy Sources - Juan Manuel Gers
Fundamentals on Renewable Energy Sources - Juan Manuel GersFundamentals on Renewable Energy Sources - Juan Manuel Gers
Fundamentals on Renewable Energy Sources - Juan Manuel Gers
Cámara Colombiana de la Energía
 
Energy management & audit
Energy management & auditEnergy management & audit
Energy management & audit
PINAKI ROY
 
Micro-grid
Micro-gridMicro-grid
Micro-grid
aditya Burhade
 
Energy audit
Energy auditEnergy audit
Energy audit
Saifullah Memon
 
Energy adit microproject of chemical engineering
Energy adit microproject of chemical engineeringEnergy adit microproject of chemical engineering
Energy adit microproject of chemical engineering
Mr.pradip Waghmare
 

What's hot (20)

Future of the Indian power sector
Future of the Indian power sectorFuture of the Indian power sector
Future of the Indian power sector
 
Electricity market 2030_presentation_long_new
Electricity market 2030_presentation_long_newElectricity market 2030_presentation_long_new
Electricity market 2030_presentation_long_new
 
Getting Smart About Smart Energy
Getting Smart About Smart EnergyGetting Smart About Smart Energy
Getting Smart About Smart Energy
 
Electricity Act 2003 and its proposed amendments
Electricity Act 2003 and its proposed amendmentsElectricity Act 2003 and its proposed amendments
Electricity Act 2003 and its proposed amendments
 
India smart grid can it become a reality-
India smart grid  can it become a reality-India smart grid  can it become a reality-
India smart grid can it become a reality-
 
Large Scale Grid Integration of Renewable Energy Sources - Way Forward
Large Scale Grid Integration of Renewable Energy Sources - Way ForwardLarge Scale Grid Integration of Renewable Energy Sources - Way Forward
Large Scale Grid Integration of Renewable Energy Sources - Way Forward
 
Make in india and future of renewable energy
Make in india and future of renewable energyMake in india and future of renewable energy
Make in india and future of renewable energy
 
Energy audit ppt
Energy audit  pptEnergy audit  ppt
Energy audit ppt
 
IEEE 1547
IEEE 1547IEEE 1547
IEEE 1547
 
UNDP_Energy Audits_2015
UNDP_Energy Audits_2015UNDP_Energy Audits_2015
UNDP_Energy Audits_2015
 
Renewable energy economics
Renewable energy economicsRenewable energy economics
Renewable energy economics
 
Kolar solar pv plant a case study of
Kolar solar pv plant a case study ofKolar solar pv plant a case study of
Kolar solar pv plant a case study of
 
Energy audit 1
Energy audit 1Energy audit 1
Energy audit 1
 
Market Outlook for Energy Storage in India
Market Outlook for Energy Storage in IndiaMarket Outlook for Energy Storage in India
Market Outlook for Energy Storage in India
 
Electric markets
Electric marketsElectric markets
Electric markets
 
Fundamentals on Renewable Energy Sources - Juan Manuel Gers
Fundamentals on Renewable Energy Sources - Juan Manuel GersFundamentals on Renewable Energy Sources - Juan Manuel Gers
Fundamentals on Renewable Energy Sources - Juan Manuel Gers
 
Energy management & audit
Energy management & auditEnergy management & audit
Energy management & audit
 
Micro-grid
Micro-gridMicro-grid
Micro-grid
 
Energy audit
Energy auditEnergy audit
Energy audit
 
Energy adit microproject of chemical engineering
Energy adit microproject of chemical engineeringEnergy adit microproject of chemical engineering
Energy adit microproject of chemical engineering
 

Viewers also liked

Capacity mechanisms as means for energy supply security (Mechanism design and...
Capacity mechanisms as means for energy supply security (Mechanism design and...Capacity mechanisms as means for energy supply security (Mechanism design and...
Capacity mechanisms as means for energy supply security (Mechanism design and...
Igor Pipkin, PhD
 
Electricity Market Day 2015 - Colas Chabanne, ENTSO-E WG Market Design and ...
Electricity Market Day 2015 -  Colas Chabanne, ENTSO-E  WG Market Design and ...Electricity Market Day 2015 -  Colas Chabanne, ENTSO-E  WG Market Design and ...
Electricity Market Day 2015 - Colas Chabanne, ENTSO-E WG Market Design and ...
Fingrid Oyj
 
Capacity Market Survey
Capacity Market SurveyCapacity Market Survey
Capacity Market Survey
Fredrik Lundkvist
 
Essays on the Russian Electricity and Capacity Market (PhD defense presentation)
Essays on the Russian Electricity and Capacity Market (PhD defense presentation)Essays on the Russian Electricity and Capacity Market (PhD defense presentation)
Essays on the Russian Electricity and Capacity Market (PhD defense presentation)
Igor Pipkin, PhD
 
Electricity Markets Regulation - Lesson 2 - Market Design
Electricity Markets Regulation - Lesson 2 - Market DesignElectricity Markets Regulation - Lesson 2 - Market Design
Electricity Markets Regulation - Lesson 2 - Market Design
Leonardo ENERGY
 
Electricity Market Design at a crossroad
Electricity Market Design at a crossroadElectricity Market Design at a crossroad
Electricity Market Design at a crossroad
Fingrid Oyj
 
Innovaatiokulttuuria kehittämässä
Innovaatiokulttuuria kehittämässäInnovaatiokulttuuria kehittämässä
Innovaatiokulttuuria kehittämässä
Fingrid Oyj
 
Completing the Internal Energy Market
Completing the Internal Energy Market Completing the Internal Energy Market
Completing the Internal Energy Market
Florence Shool of Regulation
 

Viewers also liked (8)

Capacity mechanisms as means for energy supply security (Mechanism design and...
Capacity mechanisms as means for energy supply security (Mechanism design and...Capacity mechanisms as means for energy supply security (Mechanism design and...
Capacity mechanisms as means for energy supply security (Mechanism design and...
 
Electricity Market Day 2015 - Colas Chabanne, ENTSO-E WG Market Design and ...
Electricity Market Day 2015 -  Colas Chabanne, ENTSO-E  WG Market Design and ...Electricity Market Day 2015 -  Colas Chabanne, ENTSO-E  WG Market Design and ...
Electricity Market Day 2015 - Colas Chabanne, ENTSO-E WG Market Design and ...
 
Capacity Market Survey
Capacity Market SurveyCapacity Market Survey
Capacity Market Survey
 
Essays on the Russian Electricity and Capacity Market (PhD defense presentation)
Essays on the Russian Electricity and Capacity Market (PhD defense presentation)Essays on the Russian Electricity and Capacity Market (PhD defense presentation)
Essays on the Russian Electricity and Capacity Market (PhD defense presentation)
 
Electricity Markets Regulation - Lesson 2 - Market Design
Electricity Markets Regulation - Lesson 2 - Market DesignElectricity Markets Regulation - Lesson 2 - Market Design
Electricity Markets Regulation - Lesson 2 - Market Design
 
Electricity Market Design at a crossroad
Electricity Market Design at a crossroadElectricity Market Design at a crossroad
Electricity Market Design at a crossroad
 
Innovaatiokulttuuria kehittämässä
Innovaatiokulttuuria kehittämässäInnovaatiokulttuuria kehittämässä
Innovaatiokulttuuria kehittämässä
 
Completing the Internal Energy Market
Completing the Internal Energy Market Completing the Internal Energy Market
Completing the Internal Energy Market
 

Similar to Capacity markets overview

Electric ship market
Electric ship marketElectric ship market
Electric ship market
RadhikaNawale
 
M-CEP final
M-CEP finalM-CEP final
M-CEP final
Matt Floyd
 
Morales_PES_GM_2015.pdf
Morales_PES_GM_2015.pdfMorales_PES_GM_2015.pdf
Morales_PES_GM_2015.pdf
DavidAndrsBessalleRe
 
Anurandha Annaswamy: Computation Model of the Nexus Between Natural Gas and E...
Anurandha Annaswamy: Computation Model of the Nexus Between Natural Gas and E...Anurandha Annaswamy: Computation Model of the Nexus Between Natural Gas and E...
Anurandha Annaswamy: Computation Model of the Nexus Between Natural Gas and E...
EnergyTech2015
 
The 4 Key Issues Shaping Latin America's Solar Market
The 4 Key Issues Shaping Latin America's Solar MarketThe 4 Key Issues Shaping Latin America's Solar Market
The 4 Key Issues Shaping Latin America's Solar Market
Mike Munsell
 
Filippo Del Grosso - Transition to I-SEM
Filippo Del Grosso - Transition to I-SEMFilippo Del Grosso - Transition to I-SEM
Filippo Del Grosso - Transition to I-SEM
Filippo Del Grosso
 
Fundamentals of the Power Grid and Electricity Pricing
Fundamentals of the Power Grid and Electricity PricingFundamentals of the Power Grid and Electricity Pricing
Fundamentals of the Power Grid and Electricity Pricing
EnergyCAP, Inc.
 
Power Sector In Bangladesh
Power Sector In BangladeshPower Sector In Bangladesh
Power Sector In Bangladesh
Sayanton Vhaduri
 
Fundamentals of the Power Grid and Electricity Pricing
Fundamentals of the Power Grid and Electricity PricingFundamentals of the Power Grid and Electricity Pricing
Fundamentals of the Power Grid and Electricity Pricing
EnergyCAP, Inc.
 
2015 New York Energy Industry Briefing
2015 New York Energy Industry Briefing 2015 New York Energy Industry Briefing
2015 New York Energy Industry Briefing
Black & Veatch
 
GB Energy storage market update and supply chain opportunities Johnny Gowdy
GB Energy storage market update and supply chain opportunities Johnny GowdyGB Energy storage market update and supply chain opportunities Johnny Gowdy
GB Energy storage market update and supply chain opportunities Johnny Gowdy
Invest Northern Ireland
 
Energy Debate
Energy DebateEnergy Debate
Energy Debate
watsonburton
 
Blockchain in Energy Market Share, 2024
Blockchain in Energy Market Share, 2024Blockchain in Energy Market Share, 2024
Blockchain in Energy Market Share, 2024
BIS Research Inc.
 
Trends in photovoltaic markets and industry - 2018
Trends in photovoltaic markets and industry - 2018Trends in photovoltaic markets and industry - 2018
Trends in photovoltaic markets and industry - 2018
Leonardo ENERGY
 
BPR CASE- PUNJAB STATE ELECTRICTY BOARD
BPR CASE- PUNJAB STATE ELECTRICTY BOARDBPR CASE- PUNJAB STATE ELECTRICTY BOARD
BPR CASE- PUNJAB STATE ELECTRICTY BOARD
Nisheeth Srivastava
 
BPR CASE- PUNJAB STATE ELECTRICTY BOARD
BPR CASE- PUNJAB STATE ELECTRICTY BOARDBPR CASE- PUNJAB STATE ELECTRICTY BOARD
BPR CASE- PUNJAB STATE ELECTRICTY BOARD
Nisheeth Srivastava
 
On-Board Charger Market Report, 2029
On-Board Charger Market Report, 2029On-Board Charger Market Report, 2029
On-Board Charger Market Report, 2029
BIS Research Inc.
 
Uk approach – Matching demand to inflexible generation
Uk approach – Matching demand to inflexible generationUk approach – Matching demand to inflexible generation
Uk approach – Matching demand to inflexible generation
IEA DSM Implementing Agreement (IA)
 
The Role of Energy Storage in the Future Electricity System
The Role of Energy Storage in the Future Electricity SystemThe Role of Energy Storage in the Future Electricity System
The Role of Energy Storage in the Future Electricity System
Lorenzo Kristov
 
Photovoltaic market and industry trends 2020 IEA PVPS
Photovoltaic market and industry trends 2020 IEA PVPSPhotovoltaic market and industry trends 2020 IEA PVPS
Photovoltaic market and industry trends 2020 IEA PVPS
Leonardo ENERGY
 

Similar to Capacity markets overview (20)

Electric ship market
Electric ship marketElectric ship market
Electric ship market
 
M-CEP final
M-CEP finalM-CEP final
M-CEP final
 
Morales_PES_GM_2015.pdf
Morales_PES_GM_2015.pdfMorales_PES_GM_2015.pdf
Morales_PES_GM_2015.pdf
 
Anurandha Annaswamy: Computation Model of the Nexus Between Natural Gas and E...
Anurandha Annaswamy: Computation Model of the Nexus Between Natural Gas and E...Anurandha Annaswamy: Computation Model of the Nexus Between Natural Gas and E...
Anurandha Annaswamy: Computation Model of the Nexus Between Natural Gas and E...
 
The 4 Key Issues Shaping Latin America's Solar Market
The 4 Key Issues Shaping Latin America's Solar MarketThe 4 Key Issues Shaping Latin America's Solar Market
The 4 Key Issues Shaping Latin America's Solar Market
 
Filippo Del Grosso - Transition to I-SEM
Filippo Del Grosso - Transition to I-SEMFilippo Del Grosso - Transition to I-SEM
Filippo Del Grosso - Transition to I-SEM
 
Fundamentals of the Power Grid and Electricity Pricing
Fundamentals of the Power Grid and Electricity PricingFundamentals of the Power Grid and Electricity Pricing
Fundamentals of the Power Grid and Electricity Pricing
 
Power Sector In Bangladesh
Power Sector In BangladeshPower Sector In Bangladesh
Power Sector In Bangladesh
 
Fundamentals of the Power Grid and Electricity Pricing
Fundamentals of the Power Grid and Electricity PricingFundamentals of the Power Grid and Electricity Pricing
Fundamentals of the Power Grid and Electricity Pricing
 
2015 New York Energy Industry Briefing
2015 New York Energy Industry Briefing 2015 New York Energy Industry Briefing
2015 New York Energy Industry Briefing
 
GB Energy storage market update and supply chain opportunities Johnny Gowdy
GB Energy storage market update and supply chain opportunities Johnny GowdyGB Energy storage market update and supply chain opportunities Johnny Gowdy
GB Energy storage market update and supply chain opportunities Johnny Gowdy
 
Energy Debate
Energy DebateEnergy Debate
Energy Debate
 
Blockchain in Energy Market Share, 2024
Blockchain in Energy Market Share, 2024Blockchain in Energy Market Share, 2024
Blockchain in Energy Market Share, 2024
 
Trends in photovoltaic markets and industry - 2018
Trends in photovoltaic markets and industry - 2018Trends in photovoltaic markets and industry - 2018
Trends in photovoltaic markets and industry - 2018
 
BPR CASE- PUNJAB STATE ELECTRICTY BOARD
BPR CASE- PUNJAB STATE ELECTRICTY BOARDBPR CASE- PUNJAB STATE ELECTRICTY BOARD
BPR CASE- PUNJAB STATE ELECTRICTY BOARD
 
BPR CASE- PUNJAB STATE ELECTRICTY BOARD
BPR CASE- PUNJAB STATE ELECTRICTY BOARDBPR CASE- PUNJAB STATE ELECTRICTY BOARD
BPR CASE- PUNJAB STATE ELECTRICTY BOARD
 
On-Board Charger Market Report, 2029
On-Board Charger Market Report, 2029On-Board Charger Market Report, 2029
On-Board Charger Market Report, 2029
 
Uk approach – Matching demand to inflexible generation
Uk approach – Matching demand to inflexible generationUk approach – Matching demand to inflexible generation
Uk approach – Matching demand to inflexible generation
 
The Role of Energy Storage in the Future Electricity System
The Role of Energy Storage in the Future Electricity SystemThe Role of Energy Storage in the Future Electricity System
The Role of Energy Storage in the Future Electricity System
 
Photovoltaic market and industry trends 2020 IEA PVPS
Photovoltaic market and industry trends 2020 IEA PVPSPhotovoltaic market and industry trends 2020 IEA PVPS
Photovoltaic market and industry trends 2020 IEA PVPS
 

Recently uploaded

一比一原版(UoB毕业证)伯明翰大学毕业证如何办理
一比一原版(UoB毕业证)伯明翰大学毕业证如何办理一比一原版(UoB毕业证)伯明翰大学毕业证如何办理
一比一原版(UoB毕业证)伯明翰大学毕业证如何办理
nexop1
 
一比一原版(IC毕业证)帝国理工大学毕业证如何办理
一比一原版(IC毕业证)帝国理工大学毕业证如何办理一比一原版(IC毕业证)帝国理工大学毕业证如何办理
一比一原版(IC毕业证)帝国理工大学毕业证如何办理
conose1
 
Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designs
egoetzinger
 
falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...
falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...
falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...
Falcon Invoice Discounting
 
The Impact of GST Payments on Loan Approvals
The Impact of GST Payments on Loan ApprovalsThe Impact of GST Payments on Loan Approvals
The Impact of GST Payments on Loan Approvals
Vighnesh Shashtri
 
What's a worker’s market? Job quality and labour market tightness
What's a worker’s market? Job quality and labour market tightnessWhat's a worker’s market? Job quality and labour market tightness
What's a worker’s market? Job quality and labour market tightness
Labour Market Information Council | Conseil de l’information sur le marché du travail
 
STREETONOMICS: Exploring the Uncharted Territories of Informal Markets throug...
STREETONOMICS: Exploring the Uncharted Territories of Informal Markets throug...STREETONOMICS: Exploring the Uncharted Territories of Informal Markets throug...
STREETONOMICS: Exploring the Uncharted Territories of Informal Markets throug...
sameer shah
 
Tdasx: Unveiling the Trillion-Dollar Potential of Bitcoin DeFi
Tdasx: Unveiling the Trillion-Dollar Potential of Bitcoin DeFiTdasx: Unveiling the Trillion-Dollar Potential of Bitcoin DeFi
Tdasx: Unveiling the Trillion-Dollar Potential of Bitcoin DeFi
nimaruinazawa258
 
Tumelo-deep-dive-into-pass-through-voting-Feb23 (1).pdf
Tumelo-deep-dive-into-pass-through-voting-Feb23 (1).pdfTumelo-deep-dive-into-pass-through-voting-Feb23 (1).pdf
Tumelo-deep-dive-into-pass-through-voting-Feb23 (1).pdf
Henry Tapper
 
1. Elemental Economics - Introduction to mining.pdf
1. Elemental Economics - Introduction to mining.pdf1. Elemental Economics - Introduction to mining.pdf
1. Elemental Economics - Introduction to mining.pdf
Neal Brewster
 
SWAIAP Fraud Risk Mitigation Prof Oyedokun.pptx
SWAIAP Fraud Risk Mitigation   Prof Oyedokun.pptxSWAIAP Fraud Risk Mitigation   Prof Oyedokun.pptx
SWAIAP Fraud Risk Mitigation Prof Oyedokun.pptx
Godwin Emmanuel Oyedokun MBA MSc PhD FCA FCTI FCNA CFE FFAR
 
一比一原版(UCSB毕业证)圣芭芭拉分校毕业证如何办理
一比一原版(UCSB毕业证)圣芭芭拉分校毕业证如何办理一比一原版(UCSB毕业证)圣芭芭拉分校毕业证如何办理
一比一原版(UCSB毕业证)圣芭芭拉分校毕业证如何办理
bbeucd
 
一比一原版(UCL毕业证)伦敦大学|学院毕业证如何办理
一比一原版(UCL毕业证)伦敦大学|学院毕业证如何办理一比一原版(UCL毕业证)伦敦大学|学院毕业证如何办理
一比一原版(UCL毕业证)伦敦大学|学院毕业证如何办理
otogas
 
Detailed power point presentation on compound interest and how it is calculated
Detailed power point presentation on compound interest  and how it is calculatedDetailed power point presentation on compound interest  and how it is calculated
Detailed power point presentation on compound interest and how it is calculated
KishanChaudhary23
 
falcon-invoice-discounting-a-strategic-approach-to-optimize-investments
falcon-invoice-discounting-a-strategic-approach-to-optimize-investmentsfalcon-invoice-discounting-a-strategic-approach-to-optimize-investments
falcon-invoice-discounting-a-strategic-approach-to-optimize-investments
Falcon Invoice Discounting
 
Solution Manual For Financial Accounting, 8th Canadian Edition 2024, by Libby...
Solution Manual For Financial Accounting, 8th Canadian Edition 2024, by Libby...Solution Manual For Financial Accounting, 8th Canadian Edition 2024, by Libby...
Solution Manual For Financial Accounting, 8th Canadian Edition 2024, by Libby...
Donc Test
 
一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查
一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查
一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查
taqyea
 
Who Is the Largest Producer of Soybean in India Now.pdf
Who Is the Largest Producer of Soybean in India Now.pdfWho Is the Largest Producer of Soybean in India Now.pdf
Who Is the Largest Producer of Soybean in India Now.pdf
Price Vision
 
OAT_RI_Ep20 WeighingTheRisks_May24_Trade Wars.pptx
OAT_RI_Ep20 WeighingTheRisks_May24_Trade Wars.pptxOAT_RI_Ep20 WeighingTheRisks_May24_Trade Wars.pptx
OAT_RI_Ep20 WeighingTheRisks_May24_Trade Wars.pptx
hiddenlevers
 
快速办理(SMU毕业证书)南卫理公会大学毕业证毕业完成信一模一样
快速办理(SMU毕业证书)南卫理公会大学毕业证毕业完成信一模一样快速办理(SMU毕业证书)南卫理公会大学毕业证毕业完成信一模一样
快速办理(SMU毕业证书)南卫理公会大学毕业证毕业完成信一模一样
5spllj1l
 

Recently uploaded (20)

一比一原版(UoB毕业证)伯明翰大学毕业证如何办理
一比一原版(UoB毕业证)伯明翰大学毕业证如何办理一比一原版(UoB毕业证)伯明翰大学毕业证如何办理
一比一原版(UoB毕业证)伯明翰大学毕业证如何办理
 
一比一原版(IC毕业证)帝国理工大学毕业证如何办理
一比一原版(IC毕业证)帝国理工大学毕业证如何办理一比一原版(IC毕业证)帝国理工大学毕业证如何办理
一比一原版(IC毕业证)帝国理工大学毕业证如何办理
 
Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designs
 
falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...
falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...
falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...
 
The Impact of GST Payments on Loan Approvals
The Impact of GST Payments on Loan ApprovalsThe Impact of GST Payments on Loan Approvals
The Impact of GST Payments on Loan Approvals
 
What's a worker’s market? Job quality and labour market tightness
What's a worker’s market? Job quality and labour market tightnessWhat's a worker’s market? Job quality and labour market tightness
What's a worker’s market? Job quality and labour market tightness
 
STREETONOMICS: Exploring the Uncharted Territories of Informal Markets throug...
STREETONOMICS: Exploring the Uncharted Territories of Informal Markets throug...STREETONOMICS: Exploring the Uncharted Territories of Informal Markets throug...
STREETONOMICS: Exploring the Uncharted Territories of Informal Markets throug...
 
Tdasx: Unveiling the Trillion-Dollar Potential of Bitcoin DeFi
Tdasx: Unveiling the Trillion-Dollar Potential of Bitcoin DeFiTdasx: Unveiling the Trillion-Dollar Potential of Bitcoin DeFi
Tdasx: Unveiling the Trillion-Dollar Potential of Bitcoin DeFi
 
Tumelo-deep-dive-into-pass-through-voting-Feb23 (1).pdf
Tumelo-deep-dive-into-pass-through-voting-Feb23 (1).pdfTumelo-deep-dive-into-pass-through-voting-Feb23 (1).pdf
Tumelo-deep-dive-into-pass-through-voting-Feb23 (1).pdf
 
1. Elemental Economics - Introduction to mining.pdf
1. Elemental Economics - Introduction to mining.pdf1. Elemental Economics - Introduction to mining.pdf
1. Elemental Economics - Introduction to mining.pdf
 
SWAIAP Fraud Risk Mitigation Prof Oyedokun.pptx
SWAIAP Fraud Risk Mitigation   Prof Oyedokun.pptxSWAIAP Fraud Risk Mitigation   Prof Oyedokun.pptx
SWAIAP Fraud Risk Mitigation Prof Oyedokun.pptx
 
一比一原版(UCSB毕业证)圣芭芭拉分校毕业证如何办理
一比一原版(UCSB毕业证)圣芭芭拉分校毕业证如何办理一比一原版(UCSB毕业证)圣芭芭拉分校毕业证如何办理
一比一原版(UCSB毕业证)圣芭芭拉分校毕业证如何办理
 
一比一原版(UCL毕业证)伦敦大学|学院毕业证如何办理
一比一原版(UCL毕业证)伦敦大学|学院毕业证如何办理一比一原版(UCL毕业证)伦敦大学|学院毕业证如何办理
一比一原版(UCL毕业证)伦敦大学|学院毕业证如何办理
 
Detailed power point presentation on compound interest and how it is calculated
Detailed power point presentation on compound interest  and how it is calculatedDetailed power point presentation on compound interest  and how it is calculated
Detailed power point presentation on compound interest and how it is calculated
 
falcon-invoice-discounting-a-strategic-approach-to-optimize-investments
falcon-invoice-discounting-a-strategic-approach-to-optimize-investmentsfalcon-invoice-discounting-a-strategic-approach-to-optimize-investments
falcon-invoice-discounting-a-strategic-approach-to-optimize-investments
 
Solution Manual For Financial Accounting, 8th Canadian Edition 2024, by Libby...
Solution Manual For Financial Accounting, 8th Canadian Edition 2024, by Libby...Solution Manual For Financial Accounting, 8th Canadian Edition 2024, by Libby...
Solution Manual For Financial Accounting, 8th Canadian Edition 2024, by Libby...
 
一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查
一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查
一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查
 
Who Is the Largest Producer of Soybean in India Now.pdf
Who Is the Largest Producer of Soybean in India Now.pdfWho Is the Largest Producer of Soybean in India Now.pdf
Who Is the Largest Producer of Soybean in India Now.pdf
 
OAT_RI_Ep20 WeighingTheRisks_May24_Trade Wars.pptx
OAT_RI_Ep20 WeighingTheRisks_May24_Trade Wars.pptxOAT_RI_Ep20 WeighingTheRisks_May24_Trade Wars.pptx
OAT_RI_Ep20 WeighingTheRisks_May24_Trade Wars.pptx
 
快速办理(SMU毕业证书)南卫理公会大学毕业证毕业完成信一模一样
快速办理(SMU毕业证书)南卫理公会大学毕业证毕业完成信一模一样快速办理(SMU毕业证书)南卫理公会大学毕业证毕业完成信一模一样
快速办理(SMU毕业证书)南卫理公会大学毕业证毕业完成信一模一样
 

Capacity markets overview

  • 1. Do Capacity Markets Send a Signal for New-build Generation? Peter Maloney, Senior Writer, Platts Power Group Platts Commodity Week, Houston October 9, 2013 © 2013 Platts, McGraw Hill Financial. All rights reserved.
  • 2. Do Capacity Markets Send a New-build Signal? • What are capacity markets and why were they created? • To ensure reliability by providing the “missing money” • The “missing money” problem • In markets with capped energy prices and mandated adequacy requirements, returns from energy and ancillary services will not provide sufficient compensation to support the cost of new generation. – Dr. Roy Shanker 2
  • 3. Do Capacity Markets Send a New-build Signal? There are two types of electricity: • Energy – keeps the lights on • Capacity – makes sure they stay on 3
  • 4. Do Capacity Markets Send a New-build Signal? • How do you pay for something that is not used, i.e., capacity? • Assign a value to capacity via a competitive auction • There are four organized capacity auctions: – ISO-NE – NY ISO – PJM Interconnection – Midcontinent ISO 4
  • 5. Do Capacity Markets Send a New-build Signal? 5
  • 6. Do Capacity Markets Send a New-build Signal? 6 • Peak Load (MW – 7/2011) 163,848 • Capacity (MW) 185,600 • Energy (GW - 2012) 832,331 • Members 800+ • Generation Sources 1,365 • Millions - people served 61 • Area Served (Sq Miles) 214,000 • States served 13 + DC • Transmission Lines (Miles) 62,000+
  • 7. Do Capacity Markets Send a New-build Signal? 7 • Peak (7/23/12) 98,576 MW • Capacity 131,522 MW • Annual billing 526 TWh • 11 states, one Canadian province
  • 8. Do Capacity Markets Send a New-build Signal? 8 • Peak demand (7/19/13) 33,956 MW • Capacity 37,925 MW • Transmission 11,005 miles • Total power usage (2012) 162,842 GWh • Peak demand (8/2/06) 28,130 MW • Capacity 32,000 MW • Generators 350 • Customers served 6.5 million • RTO population 14 million • Interconnections to N.Y., Canada 13 • High voltage transmission (miles) 8,000 miles
  • 9. Do Capacity Markets Send a New-build Signal? • Distinctive features of capacity markets: – Demand curves – CONE (cost of new entry) – Mitigation 9
  • 10. Do Capacity Markets Send a New-build Signal? Demand curves: vertical vs. sloped Demand Curves for PJM, NYISO, and ISO-NE (Source: Brattle Group) 10
  • 11. Do Capacity Markets Send a New-build Signal? • CONE – The levelized capital costs and annual fixed O&M costs for a hypothetical gas-fired combustion turbine or combined-cycle unit in the delivery year for that capacity market. 11
  • 12. Do Capacity Markets Send a New-build Signal? • Mitigation – Supply side: pivotal supplier test (PJM, NYISO) de-list bids (ISO-NE) – Demand side: MOPR (minimum offer price rule) (& exemptions to MOPR) 12
  • 13. Do Capacity Markets Send a New-build Signal? Capacity market comparisons ` PJM NYISO ISO-NE MISO Auction name base residual market (BRA) installed capacity market (ICAP) forward capacity auction (FCA) planning resource auction (PRA) Type uniform price uniform price descending clock uniform price Forward commitment period three years six months three years two months Delivery period one year one month or six months one year one year Unit price MW-day kW-month kW-month MW-day Replacement auction three annually no annual & monthly no Demand curve downward slope downward slope vertical vertical Generation must offer? yes only pivotal suppliers only new resources only previously cleared resources
  • 14. Do Capacity Markets Send a New-build Signal? 14 Capacity Clearing Prices in Each RTO and Select Sub-Regions for Commitment Periods between 2006 – 2017
  • 15. Do Capacity Markets Send a New-build Signal? 15 NERC 2013 Summer Reliability Report NYISO MISO PJM ISO-NE projected demand (MW) 33,279 91,532 145,029 26,690 anticipated resources (MW) 39,592 108,742 187,531 32,458 anticipated reserve (%) 18.8 18.8 29.3 21.6 NERC reference reserve (%) 17 14.2 15.9 15
  • 16. Do Capacity Markets Send a New-build Signal? 16 200,000 180,000 160,000 140,000 120,000 100,000 80,000 60,000 40,000 20,000 0 2007 2008 2009 2010 2011 2012 2013 Installed Capacity Forecast Peak Reserve Margin PJM Interconnection reliability metrics
  • 17. Do Capacity Markets Send a New-build Signal? 17 45,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 0 New York ISO reliability metrics 41,898 42,159 43,686 38,970 37,782 38,622 38,936 33,452 33,865 32,439 33,279 18,665 18,645 18,538 18,705 2010 2011 2012 2013 41,452 Megawatts Available Resources Required Resources Peak Load Average Demand
  • 18. Do Capacity Markets Send a New-build Signal? 18 PJM and ISO-NE: new generation additions (MW) 6,000 5,000 4,000 3,000 2,000 1,000 0 ISO-NE PJM
  • 19. Do Capacity Markets Send a New-build Signal? 19 Capacity Additions in PJM auctions, 2014-15 (Source: Brattle Group)
  • 20. Do Capacity Markets Send a New-build Signal? 20 • PJM’s 2016-17 Base Residual Auction drove investment in: – New generation – Imports – Retirements – Demand Response
  • 21. Do Capacity Markets Send a New-build Signal? 21 200 180 160 140 120 100 80 60 40 20 0 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 MW-day PJM price signals
  • 22. Do Capacity Markets Send a New-build Signal? New generation in PJM’s 20116-17 BRA New Generation Generation Uprates Imports Demand Response Energy Efficiency 2016/2017 4,282 1,181 7,483 12,408 1,117 2015/2016 4,899 447 3,935 14,833 923 2014/2015 416 341 3,017 14,118 822 • Panda-Moxie Liberty 829 MW gas plant in Bradford County, Pennsylvania 22 • Based on $2/MMBtu nat. gas in Marcellus vs. $4/MMBtu at Henry Hub
  • 23. Do Capacity Markets Send a New-build Signal? 23 Capacity imports into PJM, 2016-17 BRA 2015-16 2016-17 west of PJM 3,621 7,070 other 314 413 total 3,953 7,483 • Only 4,788 MW (64%) of the cleared imports had confirmed firm transmission service • MISO auction: $1.05/MW-day • PJM auction: $59.37/MW-day • Ameren increased exports to PJM 100 to 900 MW • Dynegy is looking to export up to 3 GW into PJM
  • 24. Do Capacity Markets Send a New-build Signal? 24 Retirements • FirstEnergy to close another 2,080 MW of coal plants in PJM • A second wave of retirements? • NRG Energy to close Norwalk Harbor plant in Connecticut • Another 6 GW of plants at risk of retirement?
  • 25. Do Capacity Markets Send a New-build Signal? 25 • Issues facing capacity markets: – Demand Response – Gas-electric integration – Imports – Mitigation (MOPR)
  • 26. Do Capacity Markets Send a New-build Signal? 26 Issues: Demand response • PJM is looking at changes to its demand curve
  • 27. Do Capacity Markets Send a New-build Signal? 27 Issues: Gas-electric integration • ISO-NE – gas used for heating; lack of natural gas pipelines • MISO – looming coal retirements Issues: Capacity imports • Ameren increased 100 MW to 900 ME • Dynegy looking to export up to 3,000 MW • Will PJM limit imports? Issues: MOPR • New Jersey – 2,000 MW LCAAP program • Maryland – PSC solicitation for in-state generation
  • 28. Do Capacity Markets Send a New-build Signal? 28 ERCOT’s dwindling reserve margins Panda in Texas Temple: 1,200 MW Sherman: 1,200 MW ERCOT’s footprint 2014 13.80% 2015 11.60% 2016 10.40% 2017 10.50% 2018 9.40% 2019 7.40% 2020 6.50% 2021 6.00% 2022 5.20% 2023 4.50%
  • 29. Questions? © 2013 Platts, McGraw Hill Financial. All rights reserved.