A maturity level specifies the level of performance expected from an
         organization




                           Maturity
                            Level




                           Level of
                         Performance
High-Quality but Slow to Market
          Not a Leader


                              Fast to Market but Low Quality
 uality



                              Low Customer
                              Satisfaction
Q




                                     pe ed
                                 S
C Capability
                            M Maturity
                            M Model
                            I Integration




                                         Integrated
   System           Software                                Software
                                           Product
 Engineering       Engineering                             Acquisition
                                          Training



•CMMI stands for Capability Maturity Model Integration.

•It is a process improvement approach that provides companies with the
essential elements of an effective process
Systems engineering: This covers development of total systems.
System engineers concentrate on converting customer needs to
product solutions and supports them throughout the product
lifecycle.




Software engineering: Software engineers concentrate on the
application of systematic, disciplined, and quantifiable
approaches to the development, operation, and maintenance of
software.
.


Integrated Product and Process Development (IPPD): Integrated Product and
Process Development (IPPD) This section mostly concentrates on the
integration part of the project for different processes. For instance, it's
possible that your project is using services of some other third party
component. In such situations the integration is a big task itself, and if
approached in a systematic manner, can be handled with ease




Software acquisition: Many times an organization has to acquire products
from other organizations. Acquisition is itself a big step for any organization
and if not handled in a proper manner means a disaster is sure to happen.
LEVEL-5
                                  (<2%)
                                                 OPTIMIZING
                           LEVEL-4
                            (<5%)
                                            MANAGED
                LEVEL-3
                 (<10%)
                                      DEFINED
      LEVEL-2
       (15%)
                               PRODUCT BASED


LEVEL-1
 (70%)           INITIAL
• Undocumented and in a state of dynamic change
             • Unstable environment for the processes


                                         •Peer reviews
•Software configuration management
                                         •Intergroup Coordination
•Quality assurance
                                         •Software Product Engineering
•Project tracking and Oversight
                                         •Integrated Soft Management
•Project Planning
                                         •Training Program
•Requirements management
                                         •Organization Process Definition
                                         •Organization Process Focus


                  •Software Quality Management
                  •Quantitative Process Management


                   •Process Change Management
                   •Technology Change Management
                   •Defect Prevention Management

Cmmi real

  • 2.
    A maturity levelspecifies the level of performance expected from an organization Maturity Level Level of Performance
  • 3.
    High-Quality but Slowto Market Not a Leader Fast to Market but Low Quality uality Low Customer Satisfaction Q pe ed S
  • 4.
    C Capability M Maturity M Model I Integration Integrated System Software Software Product Engineering Engineering Acquisition Training •CMMI stands for Capability Maturity Model Integration. •It is a process improvement approach that provides companies with the essential elements of an effective process
  • 5.
    Systems engineering: Thiscovers development of total systems. System engineers concentrate on converting customer needs to product solutions and supports them throughout the product lifecycle. Software engineering: Software engineers concentrate on the application of systematic, disciplined, and quantifiable approaches to the development, operation, and maintenance of software.
  • 6.
    . Integrated Product andProcess Development (IPPD): Integrated Product and Process Development (IPPD) This section mostly concentrates on the integration part of the project for different processes. For instance, it's possible that your project is using services of some other third party component. In such situations the integration is a big task itself, and if approached in a systematic manner, can be handled with ease Software acquisition: Many times an organization has to acquire products from other organizations. Acquisition is itself a big step for any organization and if not handled in a proper manner means a disaster is sure to happen.
  • 7.
    LEVEL-5 (<2%) OPTIMIZING LEVEL-4 (<5%) MANAGED LEVEL-3 (<10%) DEFINED LEVEL-2 (15%) PRODUCT BASED LEVEL-1 (70%) INITIAL
  • 8.
    • Undocumented andin a state of dynamic change • Unstable environment for the processes •Peer reviews •Software configuration management •Intergroup Coordination •Quality assurance •Software Product Engineering •Project tracking and Oversight •Integrated Soft Management •Project Planning •Training Program •Requirements management •Organization Process Definition •Organization Process Focus •Software Quality Management •Quantitative Process Management •Process Change Management •Technology Change Management •Defect Prevention Management