Cloud Computing 101 (Sample)




Issue 1
May 28th 2011
www.alanquayle.com/blog
                          © 2011 Alan Quayle Business and Service Development
Objectives

•    Comparing and contrasting the available delivery models of cloud computing
•    Evaluating the benefits of cloud products, including global and regional service
     providers, Salesforce.com, Microsoft Azure, Google, and Amazon
•    Understanding the underlying technologies of Data Centers and Virtualization
•    Understanding the role of operators and web service providers
•    Deploying Software as a Service (SaaS) to optimize productivity and
     collaboration
•    Deploying Platform as a Service (PaaS) to streamline application deployment
•    Examining the cost benefits of deploying Infrastructure as a Service (IaaS)
•    Understanding implementation issues across security, compliance and business
     continuity
•    Integrating multivendor cloud products and services
•    Focusing on the first two steps, initial business case and pilot project

6/2/2011                       © 2010 Alan Quayle Business and Service Development      2
Outline

•   Cloud Computing Introduction
    o   Defining cloud computing
    o   Definitions: IaaS (Infrastructure as a Service), PaaS (Platform as a Service), SaaS
        (Software as a Service), BPaaS (Business Process as a Service)
    o   The benefits of cloud computing
    o   Cloud computing components
    o   Suppliers and market size
    o   Types of clouds: public, private, hybrid, community
    o   Cloud trends and vendor solutions
    o   Emerging standards and regulations
•   Understanding the Components: Data Center History and Economics
    o   History and the drive for efficiency and availability
    o   Changes and pressures on DC – drive for DC management
    o   Capex and opex DC costs
    o   DC economics drives cloud computing



                                    © 2011 Alan Quayle Business and Service Development       3
Outline

•   Understanding the Components: Data Center Types and Comparison to Google’s Data Center
    o   Reviewing the 3 types of DC (Data Center)
    o   DC Environment
    o   Internet DC Architecture
    o   Enterprise DC Legacy / Current
    o   Google perimeter and DC Overview
    o   Comparison
•   Understanding the Components: Virtualization Technology
    o   Understanding the role of Virtualization in terms of Commercial or technology
    o   The life cycle of Virtualization’s components and key technology
    o   Technology Hotspot analysis of Virtualization
•   Understanding the Components: Customer needs and Virtualization
    o   Analyze the pain points and key requirements (reduce the cost through servers consolidation;
        Dynamic scheduling to save energy; Increase the efficiency of management, etc...) in Virtualization
    o   Analyze the opinion of customers in Virtualization, like usage, maturity...
    o   The technology trend for customers to choose Virtualization, like VMware, Hyper-v, Xen, KVM...




                                       © 2011 Alan Quayle Business and Service Development                    4
Outline

•   Understanding the Components: Virtualization Competitive Analysis
    o   How many main competitors (VMware, Citrix, Microsoft, Oracle, Redhat) we have?
    o   What about their business models?
    o   How to win a profit of Virtualization?
    o   Each competitor’s plans to construct their Virtualization platform?
    o   SWOT analysis
•   Understand the Internet Companies Drivers in Cloud Computing
    o   Mapping Force, Google and Amazon’s offers
    o   Cloud Economics, definitions, taxonomy and market size
    o   Comparison to total IT market
    o   Cloud Business Case
•   Understanding Web Service Providers Focus on Cloud / DCs
    o   Cloud Hype
    o   Industry requirements
    o   Industry Transition
    o   Data Center Operating System
    o   DC programming models (PaaS)
    o   Example providers, PaaS services and pricing
    o   Deep dive on Force.com, Google App Engine and Microsoft Azure
    o   What it all means




                                            © 2011 Alan Quayle Business and Service Development   5
Outline

•   Implementing SaaS
    o   Minimizing administration costs
    o   Improving productivity and collaboration
    o   Replacing capital investments with pay-per-use
•   Implementing IaaS
    o   Leveraging on-demand servers
    o   Eliminating software license costs with preconfigured servers
    o   Migrating existing machine images to the cloud
    o   Cost-effective, scalable and reliable data storage with Amazon Simple Storage Solution (S3)
•   Implementing to minimize risk
    o   Immediate response to market demands
    o   Elastically scaling infrastructure capacity to meet organizational demands
    o   Evaluating operating systems and software with pay-per-use
•   Implementing Security in the cloud
    o   Analyzing security concerns
    o   Maintaining privacy of proprietary data
    o   Achieving acceptable reliability and service-level agreements
    o   Overcoming the risks of public clouds
    o   Scoping the role: SaaS, PaaS, IaaS




                                             © 2011 Alan Quayle Business and Service Development      6
Outline

•   Implementing Virtual Private Cloud (VPC)
    o   Simulating a private cloud in a public environment
    o   Google secure data connector
    o   Amazon VPC
    o   Industry-standard, VPN-encrypted connections
•   Implementing cloud governance
    o   Retaining responsibility for the accuracy of the data
    o   Verifying integrity in stored and transmitted data
    o   Demonstrating due care and due diligence
    o   Supporting electronic discovery
    o   Preserving a chain of evidence
•   Implementing compliance with government certification and accreditation regulations
    o   HIPAA, Sarbanes-Oxley and the Data Protection Act
    o   Following standards for auditing information systems
    o   Negotiating third-party provider audits
•   Implementing business continuity
    o   Avoiding vendor lock-in
    o   Exploiting multiple cloud providers for cross-platform interoperability
    o   Evaluating the impact on employee skill requirements
•   Implementing cloud computing in your organization
    o   Building a business case
    o   Selecting a pilot project




                                                  © 2011 Alan Quayle Business and Service Development   7
Cloud Computing
Introduction
What is cloud computing?
We Live in Hyped Times!
•   “Amazon and PSN outages won't halt cloud revolution.” source The Register
•   “SURVEY: Future-proofing the cloud.” source Network World
•   “Virtualization, cloud computing to dominate Interop.” source Network World
•   “Is Your Data Center Ready for Cloud Computing?” source Web Buyers Guide
•   “Demystifying the Cloud – A Conversation with Dell’s CIO and CTO!” source Baseline Briefing
•   “Cloud-enabled Wi-Fi: Less Dollars, More Sense” source Network World
•   “Apple’s new services are expected to include a "digital locker" solution enabling consumers to
    store their iTunes music, movie and television libraries on Apple servers for access on multiple
    iOS-based devices.” source Fierce Mobile Content.
•   “Brocade Unveils CloudPlex cloud architecture, an open framework for building virtualized data
    centers, and offered a look at new technologies coming up in the near future to help make such
    data centers possible. “ source CRN
•   “CenturyLink goes from local to global player with Savvis acquisition.” source Fierce


          Free Software Foundation founder Richard Stallman called cloud computing,
                                        “worse than stupidity.”

        Bottom-line: If you’re systems are down or you loose customer data its not the Cloud
       Provider that suffers / goes out of business – they just issue a credit for the disruption.
First Phase of Cloud Consolidation
•   Verizon acquired Terremark, a Infrastructure / Platform as a Service (I/PaaS)
    provider, for $1.4 billion, to provide IT infrastructure services targeting the
    enterprise market.
•   Dell spent more than $2 billion in six months acquiring cloud technologies,
    including PaaS provider Boomi, and is investing another $1 billion in a group of
    global data centers.
•   IBM acquired Cast Iron, Boomi’s competitor.
•   Time Warner Cable acquired NaviSite.
•   CenturyLink acquired Savvis
•   Microsoft and Toyota forged a strategic partnership to build a global platform
    for Toyota Telematics Services using Windows Azure.
•   CA Technologies and Unisys entered into a joint venture that combines CA’s
    virtualization and service management products with Unisys’ virtualization and
    cloud advisory, planning, design and implementation services.


Likely see further consolidation as Telcos realizes their weaknesses in selling Cloud into
                    enterprise – particularly small medium enterprise
Telstra spending $600M on cloud-based UC for
businesses
•   Telstra said it plans to invest $600 million to upgrade communications options
    for 90 percent of the country's businesses and, in partnership with Microsoft and
    Cisco, provide them with cloud-based unified communications.
•   The QoS upgrades will encompass 1,6000 exchanges and take the telco until
    September to complete.
•   The Digital Business package will cost businesses $120 a month and include a
    basic ADSL2+ connection to businesses, a Cisco Router and a Cisco digital
    phone. Customers can pay an additional $15 a month to have their Internet and
    voice connection switch over to the Telstra NextG network automatically if the
    ADSL connection fails.
•   Telstra said VoIP service would likely follow the QoS upgrade, once it "can give
    all the reliability and also the technical backup we think the product needs, then
    we will bring it to market."

    Everything becomes labelled as Cloud. Really the $600M is on a network upgrade…
Evolution

•   Cloud computing has evolved through a number of
    phases which include grid and utility computing,
    application service provision (ASP), and Software as a
    Service (SaaS).
•   But the overarching concept of delivering computing
    resources through a global network is rooted in the
    sixties.

               Those
               Sixties!!!
John McCarthy, 1961




“computation may
someday be
organized as a
public utility.”
The Dream of Cloud Computing
      Integrated Circuit                          Utility Computing
          Foundries




 •   Semiconductor Fabs Expensive       •   New Datacenters Very Expensive
     – Typically > $1 Billion               –   Only a Few Companies Can
     – Too Much for Most Designers              Afford Huge Datacenters
 •   Fabs Take Outside Work             •   Utility Computing  Datacenter
     – Fabs Amortize Cost                   Owners Amortize Costs
     – Other Designers Make Chips           –   Utility Computing Users Get
                                                Advantages of Elasticity
 •   Allowed Explosion of Designs
                                            –   Datacenter Resources Shared
     – More Players Afford Rented Fab           Across Many Users

                  But a private cloud doesn’t deliver scale?
What is Cloud Computing?
•   Wikipedia - Cloud computing is Internet ('Cloud') based development and use of computer technology ('Computing'). The
    cloud is a metaphor for the Internet (based on how it is depicted in computer network diagrams) and is an abstraction for
    the complex infrastructure it conceals[1]. It is a style of computing where IT-related capabilities are provided “as a
    service”[2], allowing users to access technology-enabled services from the Internet ("in the cloud")[3] without knowledge
    of, expertise with, or control over the technology infrastructure that supports them[4]. According to the IEEE Computer
    Society "It is a paradigm in which information is permanently stored in servers on the Internet and cached temporarily on
    clients that include desktops, entertainment centers, table computers, notebooks, wall computers, handhelds, etc."[5]. “


•   No Consensus in the industry for a good definition of “Cloud computing” . Today anything and everything internet will
    come with a cloud computing logo


•   Simple Definition: If the time difference between - your application needs more capacity and gets more capacity is greater
    than instantly it is not cloud computing. i.e. if there is no programmatic way to provision hardware, no pooled capacity and
    even worst a purchase order to get new hardware/software.


•   The Bottom-line
    o   Changes the economics of Computing from being a Capital investment to Utilities (You buy electricity you don’t buy generators )
    o   Changes the way software is developed – Hardware provisioning , Deployment and Scaling now part of developer lifecycle as a
        Program / script as compared to a Purchase order
    o   Automates a whole bunch of infrastructure related tasks and activities leading efficiencies and cost savings
What is Cloud Computing?

     •       A user experience and a business model
             o    Standardized offerings
             o    Rapidly provisioned
             o    Flexibly priced


     •       An infrastructure management and
             services delivery method
                                                               Banking
             o    Virtualized resources
             o    Managed as a single large resource
             o    Delivering services with elastic scaling
                                                                          IT
     •   Similar to Banking ATMs and Retail Point of
         Sale, Cloud is Driven by:
         o       Self-Service
         o       Economies of Scale
                                                                 Retail
         o       Technology Advancement
19                                          IBM Confidential
The NIST Definition of Cloud Computing
o   Cloud computing is a model for enabling convenient, on-demand network access to a
    shared pool of configurable computing resources (e.g., networks, servers, storage,
    applications, and services) that can be rapidly provisioned and released with minimal
    management effort or service provider interaction. This cloud model promotes availability
    and is composed of five essential characteristics, three service models, and four deployment
    models.


          Characteristics
    1.   On-demand self-service                                        Service models
    2.   Broad network access                            1.   Cloud Software as a Service (SaaS)
    3.   Resource pooling                                2.   Cloud Platform as a Service (PaaS)
    4.   Rapid elasticity                                3.   Cloud Infrastructure as a Service (IaaS)
    5.   Measured service



                                       Deployment models
                                  1.   Private cloud
                                  2.   Community cloud
                                  3.   Public cloud
                                  4.   Hybrid cloud
Why Now?




  From T-Systems, who has delivered SAP dynamic services since 2004
NIST 3 Cloud Service Models

•   Cloud Software as a Service (SaaS)
    o   Use provider’s applications over a network
•   Cloud Platform as a Service (PaaS)
    o   Deploy customer-created applications to a cloud
•   Cloud Infrastructure as a Service (IaaS)
    o   Rent processing, storage, network capacity, and other fundamental computing
        resources


•   To be considered “cloud” they must be deployed on top of cloud
    infrastructure that has the key characteristics



                                                                               22
Service Model Architectures

    Cloud Infrastructure   Cloud Infrastructure   Cloud Infrastructure
                                                         IaaS            Software as a Service
                                  PaaS                   PaaS                   (SaaS)
           SaaS                   SaaS                   SaaS                Architectures



    Cloud Infrastructure   Cloud Infrastructure
                                  IaaS             Platform as a Service (PaaS)
           PaaS                   PaaS                     Architectures




    Cloud Infrastructure
           IaaS                Infrastructure as a Service (IaaS)
                                          Architectures


                                                                                           23
Mapping the Cloud Types




I use this to simply show the lock-in nature of PaaS / SaaS providers model –
         Amazon is more focused on a business model based on scale.
IT Cloud Services Taxonomy
          IT Cloud Services

                        Cloud
           Applications
               (Apps-as-a-service)


         App Dev/Test                   App Deploy
                        Cloud
                        (Application)

               Platforms
             (Platform-as-a-Service)


                        Cloud
          Infrastructure
          (Infrastructure-as-a-Service)
Cloud Computing Technologies
                Technologies                        Cloud Services
             Applications                         SaaS

             Dev Platforms

             Multi-Tenant,                         PaaS + Support
             Deployment & Cluster                  services (Storage, DB,
             Management                            Security, Aggregation)

             Virtualization,
             Infrastructure
             Management and Grid
             Engines                               IaaS

             Processing Hardware

I use this to simply show technologies associated with each layer – when we discuss
     data center design and architecture we’ll come back to these components.
The NIST Cloud Definition Framework
                                     Hybrid Clouds
Deployment
Models            Private            Community
                                                                   Public Cloud
                  Cloud                Cloud

Service           Software as a              Platform as a          Infrastructure as a
Models            Service (SaaS)             Service (PaaS)           Service (IaaS)

                                      On Demand Self-Service
Essential
                     Broad Network Access                     Rapid Elasticity
Characteristics
                        Resource Pooling                      Measured Service


                            Massive Scale                Resilient Computing

Common                      Homogeneity                Geographic Distribution
Characteristics             Virtualization                Service Orientation
                       Low Cost Software                  Advanced Security
                                                                                          27
Benefit 1) Elastic Capacity
Predicting Infrastructure Needs

                         Actual Usage



                                          Customer
                                        Dissatisfaction
Compute Power




                                                    Predicted Usage




                 Waste


                           Time
Elasticity, Risk, and User Incentives
  Services Will Prefer Utility Computing to a Private Cloud When:

 Demand Varies over Time               Demand Unknown in Advance

  Provisioning for Peak Leads to        Web Startup May Experience a
  Underutilization at Other Times      Huge Spike If It Becomes Popular

           Pay by the Hour             Pay as You Go Does Not Require
 (Even if the Hourly Rate is Higher)      Commitment in Advance




       The Value of Cost Associativity
UserHourscloud × (revenue – Costcloud) ≥

             UserHoursdatacenter × (revenue – Costdatacenter        )
                                              Utilization
Cloud Is Mostly Driven by Money

 Economics of Cloud Computing Are
   Very Attractive to Some Users
Cloud Computing Will
                       Predicting Application
 Track Cost Changes
                           Growth Hard
Better than In-House



Investment Risks May    In-House, You Must
     Be Reduced          Provision for Peak
Benefit 2) Faster time to market
Benefit 3) No initial investment (No CapEx)
Benefit 4) Pay as you go, pay for what you use
Benefit 5) Focus on your business
The 70/30 switch


                   30%                    70%

On-Premise         Your           Managing All of the
Infrastructure   Business   “Undifferentiated Heavy Lifting”
Cloud’s goal: flip this equation

                   30%                      70%

On-Premise         Your           Managing All of the
Infrastructure   Business   “Undifferentiated Heavy Lifting”


                                                Configuring
Cloud-Based         More Time to Focus on
                                                Your Cloud
Infrastructure          Your Business
                                                  Assets

                            70%                    30%
Companies have different motivations for leveraging cloud




  Analytics &              Time to Value                Employee                   Risk &
   Security                                            Productivity              Compliance
Operations support 9
major commands,            Creates an                Enable collaboration       34,000-employee
nearly 100 bases, &        ecosystem for PayPal      across 300K global         bank deploying a
700,000 active military    3rd Party developers      employees as well as its   private cloud from
personnel around the                                 network of customers,      IBM to centralize
world. Design secure       Reduces developer         partners and suppliers.    management of
cloud infrastructure for   effort to deploy a work   Saving 30 minutes per      desktops via an
defense & intelligence     environment with          day or 120hr per year      enterprise class data
networks; insights         seamless PayPal Test      per person.                center rather than at
about cyber attacks,       Sandbox access
                                                                                the user stations,
network, system or                                   IBM LotusLive has 18       Gets greater remote
application failures,                                million users in 99        flexibility without
while automatically                                  countries                  sacrificing control to
preventing disruptions.                                                         improve efficiency.
Gartner view: hype cycle
Why Be a Cloud Provider?
                    Huge datacenters cost 5-7X less for computation, storage, and
 Make a Lot of
                    networking. Fixed software & deployment amortized over many users.
   Money
                    Large company can leverage economies of scale and make money.

Leverage Existing   Web companies had to build software and datacenters anyway. Adding
  Investments       a new revenue stream at (hopefully) incremental cost.

                    What happens as conventional server and enterprise apps embrace
   Defend a
                    cloud computing? Application vendors will want a cloud offering. For
   Franchise
                    example, MSFT Azure should make cloud migration easy.

    Attack an       A large company (with software & datacenter) will want a beachhead
   Incumbent        before someone else dominates in the cloud provider space.

   Leverage         For example, IBM Global Services may offer a branded Cloud
  Customer          Computing offering. IBM and their Global Services customers would
 Relationships      preserve their existing relationship and trust.

   Become a
                    Facebook offers plug-in apps. Google App-Engine…
   Platform
Full Cloud Taxonomy
 Level Of
 Sharing

Public          IaaS           PaaS           SaaS BPaaS                       PURE
Cloud                                                                          CLOUD
@ Global                                                                       MARKET
Provider

Virtual
Private          Dynamic      Integration-    Dynamic        Dynamic
Cloud         Infrastructure as-a-Service      Apps           BPO
@
Dedicated
                 Services                     Services       Services
Provider
                                                                             EXTENDED
                                                                             CLOUD
              Infrastructure Middleware         Apps            BP           MARKET
Private
Cloud
              Virtualization Virtualization Virtualization Virtualization
@ In-house         Tools         Tools          Tools          Tools
Data Center

              Infrastructure   Middleware    Applications    Business       Business
                                                             Processes      Value
Terminology on XaaS: SaaS, PaaS, IaaS, CaaS and EaaS


•   SaaS a.k.a Software As A Service (wikipedia):
    o   “software that is deployed over the internet and/or is deployed to run behind a
        firewall on a local area network or personal computer. With SaaS, a provider
        licenses an application to customers as a service on demand, through a
        subscription or a "pay-as-you-go" model.”

•   SaaS can be seen as the end user consumable service, and
    what is usually meant by “cloud computing”.
•   Microsoft classifies SaaS into four "maturity levels," whose key
    attributes are configurability, multi-tenant efficiency, and
    scalability.
•   The SaaS model maturity is usually vendor specific.
IaaS: Infrastructure As   •   IaaS is scalable IT infrastructure readily attached to
A Service                     a suitable communication media (Internet in case
                              of “public cloud” or corporate network in case of
                              “private cloud”), controlled through appropriate
                              APIs, and is available to its users in form of an on-
                              demand service typically with “pay-per-use”
                              charging model
                          •   IaaS is a provision model in which an organization
                              outsources the equipment used to support
                              operations, including storage, hardware, servers
                              and networking components. The service provider
                              owns the equipment and is responsible for housing,
                              running and maintaining it.
                          •   The consuming entity does not manage or control
                              the underlying cloud infrastructure but has control
                              over operating systems, storage, deployed
                              applications, and possibly limited control of select
                              networking components (e.g., host firewalls).
                          •   IaaS: Amazon EC, IBM computing on demand,
                              Rackspace
IaaS bases on scale

•   IaaS customer promise is about CAPEX and OPEX avoidance, streamlined operations, lower TCO
    and lower entry barrier:
    o   Margins as per offered resources are usually pretty thin
    o   Revenue is generated by scale and volume
    o   Scale requires capability to economically cater for low-traffic customers and subsequently scale up to
        high volumes
    o   Business processes for infrastructure operations and management needs to streamlined and mature
    o   Capability to obtain and cater for scale requirements issues a relatively high entry barrier for a new
        entrant in IaaS offering business due to needed investments.
•   Usually (but not necessarily always), IaaS players do have existing business, of which IaaS is a by-
    plot:
    o   CSPs, ecommerce, SaaS providers, data-center and hosting business.
    o   The target is to create revenue from existing under-utilized data center resources.
•   Additionally, with the ever-tightening legislation, competition, technology requirements,
    efficiency requirements etc., operating own data center requires more and more of specific
    competences (e.g. design for energy efficiency, design for compliancy, ...)
    o   Capability development requires investments and takes focus out of the core business of the company.
PaaS: Platform as a Service
                              •   PaaS: a capability provided to the user to
                                  deploy onto the cloud infrastructure user-
                                  created or acquired applications created using
                                  programming languages and tools supported
                                  by the provider.
                              •   All cloud computing characteristic apply.
                              •   Usually PaaS model includes an application
                                  level framework, e.g. plug-ins for IDE
                                  o   Easier application development
                                  o   Implied lock-in with the provider
                              •   Focus of PaaS is the developer and respective
                                  ecosystem: Successful PaaS offerings have
                                  tendency of attracting loyal,
                                  open communities of developers.
                              •   PaaS implies leverage of domain specific value,
                                  e.g. business applications and force.com.
                              •   Example: Google Apps, force.com, Facebook
PaaS: an outsourced application server platform?
•   It appears that the PaaS providers offering holds similarities to what an
    application server stands for
    o   Obviously, an application server platform is part of PaaS, despite the proprietary nature of
        implementations.

•   PaaS can be seen as a service, where as an application server (“platform”) is
    a technology to implement that service.
•   PaaS can be regarded as a application development ecosystem:
    o   Implementation approach can vary and is not the core consideration: JEE, .NET, LAMP,
        Python, Ruby...
    o   Middleware and connectivity services, elasticity, multi-tenancy
    o   Collaborative and integrated supporting ecosystem for the applications that are deployed on
        PaaS platforms and need to be offered as services to the customers/consumers.

•   IaaS scales the infrastructure, whereas PaaS scales the application
    development ecosystem.
•   For PaaS a key consideration is the risk of lock-in.
CaaS and EaaS

•   CaaS a.k.a Communications As A Service (zimbio.com)
    o   “Delivering telecommunications, instant messaging etc. as a service over
        the Internet. Telephony as a service, also known as “Voice as a service”,
        employs VOIP (Voice Over Internet Protocol). Software and hardware can
        be provided as a service by providers.”
    o   CaaS is specialized SaaS.


•   EaaS a.k.a Everything As A Services
    o   Another buzz-word, and to some extent even more marketing spin: SaaS,
        PaaS and IaaS bundled together as multiple instances.
More Scoping
Framing for cloud computing delivery model
                                                          User interface layer
instances
Application




                                                                                                                    management
                                                                                                                    application
                                                                Partners’         Third party        Third party




                                                                                                                      Shared
                                         Customized
                 Applications                                   standard           standard          customized
                                         applications
                                                               applications       applications       applications

                                                  Application integration layer




                                                                                                                                                  SAAS
                                                   Platform abstraction layer
platform
Middleware




                                                                                                                     Platform O&M
                 Content         Web                       Identity      Dev.       Protocol       UI
                                             BPMS                                                            etc.
                 services       portal                     services      tools       stacks      frame.




                                                                                                                          tools
                                                  High availability framework




                                                                                                                                           PAAS
                            Application server containers and database management systems
Infrastructure
Computing




                                                           Operating system




                                                                                                                     management




                                                                                                                                    IAAS
                                             Computing and storage virtualization




                                                                                                                       System
                                                                                                                        tools
                                         Physical computing and storage environment

                                                        Connectivity and access

                     The service models are separate: e.g. creating a SaaS offering
                     by no means requires bundling IaaS or PaaS with it.
Some Myth’s and perceptions
•   Isn’t it all about hardware provisioning?
    o   Not Really – It is also about changing of Software Development Lifecycle
        with scaling up , hardware provisioning and deployment all under the
        control of developer written programs


•   What about Security and Enterprise Adoption ?
    o   Two answers
           • Private Clouds – Starting seeing the adoption of the cloud computing
             paradigm come into the corporate data center. Big iron vendors are selling
             Private Cloud Products and Hybrid Solutions.
           • The Question: “Just as Banks became a safe place to keep your money away
             from your safe-box in your grandfathers home , The Cloud will become the
             default place to keep your data in the future.” – an analogy I prefer is home
             security, you can outsource to ADT, but in the limit you still need to do some
             of it yourself.
Some Myth’s and perceptions

•   Isn’t this similar to Time Sharing?
    o   Yes to some extent.
    o   But it is not all about sharing of resources. It really boils down to cost savings
        as a result of automation and changing the software development lifecycle


•   How is it different from ASP?
    o   The ASP value-add was the typical value you get from an outsourcing
        company. Leverage knowledge base, trained manpower and some shared
        infrastructure to guarantee reliability of operations and potential cost savings
    o   Cloud Computing is taking the ASP concept to the next level with zero to little
        amount of “People Services” and focus on the computing as a utility.
Public Clouds

•   Public Clouds are good when
    o   Have low bandwidth and latency requirements
    o   Starting with test or development workloads
    o   Running collaboration applications
    o   Don’t have an upfront capital budget

                                                             Committing tightly to a
•   Not so good when                                        single provider without a
    o   You need strict performance SLAs                    proper plan B is a no-go.
    o   Uptime is critical – no control over recovery
    o   Privacy or security is a concern, i.e.
           • 3rd party has your data, auditors complain
           • Can you review vendor’s security procedures?
    o   Costs per CPU hour can be larger than that of in-house server deployments.
Internal Private Clouds
•   Positives of internal private clouds      •   Negatives vs. public clouds
    o   Anticipated reduction of TCO              o   Requires up front capital
    o   Better hardware capacity                      expenditure due to IT investments
        utilization                                   in own CAPEX
    o   Elasticity                                o   Not as useful for small and
           • Easy self service provisioning           medium businesses and
           • More efficient system
             management                               departmental solutions due to
    o   IT retains control of SLAs                    needed investments
           • Data security and privacy
           • High performance
           • High availability                •   Negatives vs. dedicated hardware
    o   Capability to provide spot-on             o   Performance tax
        chargeback reports as per need            o   Not capable for massive parallel
                                                      processing
Cost elements: SaaS versus traditional on-premises SW

•   On-premises / in-house                •   SaaS
    o   License payments at acquisition       o   Configuration and systems
        phase and recurring fees                  integration costs
    o   Customization and systems             o   Business process adaptation costs
        integration costs
                                              o   Sign-up fees
    o   Implementation and deployment
                                              o   Recurring subscription fees
        costs for roll-out
                                              o   Care and support fees
    o   Local IT and systems support
                                              o   Training costs (of a standard
        arrangements, either own head-
                                                  application)
        count or outsourced
    o   Training costs for end users          o   Internet connectivity costs
    o   Computing, storage, backup and        o   (undefined price tag for potential
        network costs                             strategic transition costs)
    o   Support and maintenance costs
Cloud service provider space remains fragmented

                         Cloud
                        native
                        players
                        Amazon,
                       Salesforce;
                         Google




          Telecom                    IT Service
          providers     Cloud        providers
          AT&T, BT,
          FT, DT/ T-
                        based        Accenture,
           Systems,    services      Capgemini,
                                       Wipro
           Verizon




                       Large tech
                        vendors
                       Cisco, Dell
                        HP, IBM
Why CSPs have a strategic fit for cloud computing
•   Shared infrastructure
          • CSPs have long history of infrastructure, which is networked and
            interoperable via well-defined interfaces.
•   Managed and hosted IT and communications services
          • For a longer time CSPs have relied on vendors’ managed services type of
            professional services, which means that there is no inherent fear of
            outsourcing operative responsibilities.
•   Data centers
          • Data centers operations have been for long time the core of CSP production
            machines.
•   Security, data integrity and trust
          • These are the traditional key characteristics of telco business.
•   Managed network services and end-to-end SLAs.
          • CSPs are familiar with end-to-end SLA thinking and KPI based operations.
•   Communications as a service
          • Communications and connectivity is the bread and butter of CSPs.
•   SME customer base
          • The customer base of CSPs does cover SME, which means that they are
            familiar with the problems and issue within the segment.
What is Cloud Computing For Telcos
                       New
                    consumer-
                   centric Cloud
                     Services




   Delivery
                    Cloud
  Strength of
    trusted
                 Computing           Infra-
                                   structure
   services
  e.g. Billing
                 Engagement        Network-
                                    Centric
                  for Telcos
                                       Where Is The Cloud Opportunity For
                      Mass                           Telcos?
                    Adoption
                    Consumer
                      Reach              CONSUMER vs ENTERPRISE
Telco’s Enterprise – Consumer Pendulum
           Consumer                                          Enterprise
                                                           • 65’s:
                                                             Mainframes in Data Centers
                          75’s: •                            Enterprise drives Tech Awareness
               ISDN Telephony
 1st   Gen. Remote Home Workers
                                                           • 80’s:
                                                             PC on corporate desktop
                         90’s: •                             IT education of working
Multimedia PCs, Cell Phones                                  generation
Digital Kids, Consumerization IT                           • 2005’s:
                                                             Cloud Computing/SaaS
                       2010’s: •                             Tech. Populism, Pay/Use, Web 2.0
       Managed Devices, Media
                 Convergence                               • 2015’s:
 Managed Desktops, X-Internet                                Enterprise 3.0
                                                             Collaborative Business Models
                                                             Cloud federated master data and
                                Innovators                   distributed business transactions
                                 Converged Personas 
                       Mass Adoptors
                       Consumer  Specific Personas  Enterprise
Implementing Security
Security is the Major Issue




                              60
Security Trend – Virtual Firewalls and Additional
     Procedures Part 1
• Virtualization is essentially adding an operating system.
    –   So there are now two operating systems to monitor and patch, instead of one. This
        increases the chances of patches not being up to date creating security risks
    –   Procedures within the data centers running cloud services must be stricter then regular
        data center procedures
• Traditional intrusion detection doesn’t work on virtual servers.
    –   Intrusion detection (and intrusion prevention) monitors network traffic (between physical
        servers) and raises a red flag if there’s a traffic spike or type of traffic not explained by
        legitimate operations.
    –   But there’s no way to monitor traffic between virtual servers on one physical host, -
        emergence of virtual firewalls
• Malware can spread among virtual servers.
    –   Traditional intrusion detection is blind to activity between virtual servers, it’s easy for a
        virus or other malignant software to spread from one virtual server to another.
    –   And beyond -- because virtualization is often used in conjunction with clustering that
        moves data and applications among two or more physical servers, to provide load-
        balancing and “failover” in case one server in the cluster encounters a problem.
    –   A network monitoring system can not analyze this threat. Emergence of virtual firewalls
        that protect virtual servers.
    –   VMWare and Citrix have created Hypervisor based solutions that work with existing
        security vendor solutions
• Confidential data can be compromised because there’s no way to monitor traffic flow
 between virtual servers sharing the same physical server,
    –   There’s no way to tell whether confidential or legally protected data (such as medical
        records or credit card numbers) have been compromised.
    –   Today this is managed by segregating data on a separate physical sever – and generally not
        allowed outside of the internal corporate cloud.
Security Trend – Virtual Firewalls and Additional
   Procedures Part 2
• Malware is now virtual-aware.
    –   “Virtual-aware” viruses can tell when they’re running in a virtual
        environment. Though they’ve mostly used this knowledge to hide so far, they
        could easily be adjusted to attack virtual servers’ vulnerabilities instead.
    –   According to research by the antivirus company ESET, more than 200,000
        virtual-aware malwares were at large in November 2008.
• Other methods of security management include structuring the resource
 pools to match network segments, and force traffic among pools to pass
 through the existing network security infrastructure.
    –   Generally use virtual LANs to achieve this, which results in lower resource
        utilization and less flexibility in matching workloads to resources.
• VM Ware publishes security guidelines
    –   Limiting VM functionality to only those capabilities required by the
        application
    –   General access controls to virtual console and management functions
    –   Quite complex and generally push operators towards partnering with an
        established IT integrator in the virtualization space, e.g. HP or IBM
• A Cloud Service is only as strong as its weakest link
    –   Must ensure all VMs implement extra protections – recent Gartner surveys
        show less than 20% of enterprise implementations include additional
        protections for security in virtualization implementations
Security Standards: SAS 70

•   SAS 70 is the most commonly adopted security standard among
    cloud service providers.
•   Roughly 67 percent of cloud service providers follow SAS 70
    (Statement on Auditing Standards No. 70), which is an
    internationally recognized auditing standard developed by the
    American Institute of Certified Public Accountants (AICPA) that
    defines the standards an auditor must employ in order to assess the
    contracted internal controls of a service organization like a hosted
    data center, insurance claims processor or credit processing
    company, or a company that provides outsourcing services that can
    affect the operation of the contracting enterprise.
Security Standards: PCI DSS & SOX

•   PCI DSS
    o   About 42 percent of cloud service providers follow the PCI DSS (Payment Card Industry Data Security
        Standard) standard, a global security standard that applies to all organizations that hold, process or
        exchange credit card or credit card holder information.
    o   The standard was created to give the payment card industry increased controls around data and to
        ensure it is not exposed. It is also designed to ensure that consumers are not exposed to potential
        financial or identity fraud and theft when using a credit card.
•   Sarbanes-Oxley
    o   Sarbanes-Oxley (SOX) is a security standard that defines specific mandates and requirements for
        financial reporting. SOX spanned from legislation in response to major financial scandals and is
        designed to protect shareholders and the public from account errors and fraudulent practices.
    o   Administered by the SEC, SOX dictates what records are to be stored and for how long. It affects IT
        departments that store electronic records by stating that all business records, which include e-mails
        and other electronic records, are to be saved for no less than five years. Failure to comply can result in
        fines and/or imprisonment.
    o   About 33 percent of cloud service providers follow SOX.
Security Standards: ISO 27001 and Safe Habor

•   ISO 27001
    o   About 33 percent of cloud service providers adhere to ISO 27001, a standard published in 2005 that is
        the specification for an Information Security Management System (ISMS).
    o   The objective of ISO 27001 is to provide a model for establishing, implementing, operating,
        monitoring, reviewing, maintaining and improving ISMS, which is a framework of policies and
        procedures that includes all legal, physical and technical controls involved in an organization's
        information risk management processes.
•   Safe Harbor
    o   About one-fourth of cloud service providers adhere to Safe Harbor principles, a process for
        organizations in the U.S. and European Union that store customer data.
    o   Safe Harbor was designed to prevent accidental information disclosure or loss. Companies are certified
        under Safe Harbor by following seven guidelines: Notice, through which individuals must be informed
        that their data is being collected and how it will be used; choice, that individuals have the ability to opt
        out of data collection and transfer data to third parties; onward transfer, or transfer data to third parts
        that can only occur to organizations that follow adequate data protection principles; security, or
        reasonable efforts to prevent loss of collected data; data integrity, that relevant data is collected and
        that the data is reliable for the purpose for which it was collected; access, which gives individuals
        access to information about themselves and that they can correct and delete it if it is inaccurate; and
        enforcement, which requires the rules are enforced.
Security Standards: NIST and HIPAA

•   NIST
    o   National Institute of Standards and Technology (NIST) standards, originally designed for
        federal agencies, emphasize the importance of security controls and how to implement them.
        The NIST standards started out being aimed specifically at the government, but have recently
        been adopted by the private sector as well.
    o   NIST covers what should be included in an IT security policy and what can be done to boost
        security, how to manage a secure environment, and applying a risk management framework.
        The goal is to make systems more secure. About 25 percent of cloud service providers adhere to
        NIST standards.
•   HIPAA
    o   The U.S. Health Insurance Portability and Accountability Act (HIPAA) is followed by roughly
        16 percent of cloud service providers.
    o   The HIPAA standard seeks to standardize the handling, security and confidentiality of health-
        care-related data. It mandates standard practices for patient health, administrative and
        financial data to ensure security, confidentiality and data integrity for patent information.
Security Standards: FISMA and COBIT

•   FISMA
    o   FISMA, or the Federal Information Security Management Act, was passed in 2002 and created
        process for federal agencies to certify and accredit the security of information management
        systems.
    o   FISMA certification and accreditation indicate that a federal agency has approved particular
        solutions for use within its security requirements. In its research. About 16 percent of cloud
        service providers have obtained FISMA certifications.
•   COBIT
    o   Control Objectives for Information Related Technology is an international standard that
        defines the requirements for the security and control of sensitive data. It also provides a
        reference framework.
    o   COBIT is a set of best practices for controlling and security sensitive data that measures
        security program effectiveness and benchmarks for auditing. The open standard comprises an
        executive summary, management guidelines, a framework, control objectives, an
        implementation toolset and audit guidelines. About 8 percent of cloud service providers follow
        the COBIT security standard.
Security Standards: Data Protection Directive

•   The Data Protection Directive is a directive adopted by the European
    Union that was designed to protect the privacy of all personal data
    collected for or about EU citizens, especially as it relates to
    processing, using or exchanging that data.
•   Similar to Safe Harbor in the U.S., Data Protection Directive makes
    recommendations based on seven principles: Notice, purpose,
    consent, security, disclosure, access and accountability. About 8
    percent of cloud service providers adhere to the Data Protection
    Directive.
In Some Ways, "Cloud Computing Security"
Is No Different Than "Regular Security"
•   For example, many applications interface with end users via the web. All the
    normal OWASP (Open Web Application Security Project) web security
    vulnerabilities
    -- things like SQL injection, cross site scripting, cross site request forgeries,
    etc., -- all of those vulnerabilities are just as relevant to applications running
    on the cloud as they are to applications running on conventional hosting.


•   Similarly, consider physical security. A data center full of servers supporting
    cloud computing is internally and externally indistinguishable from a data
    center full of "regular" servers. In each case, it will be important for the data
    center to be physically secure against unauthorized access or potential natural
    disasters, but there are no special new physical security requirements which
    suddenly appear simply because one of those facilities is supporting cloud
    computing
Bitbucket, DDoS'd Off The Air
Maintenance Induced Cascading Failures
It's Not Just The Network: Storage Is Key, Too




     See http://www.engadget.com/2009/10/10/t-mobile-we-probably-lost-all-your-sidekick-data/

     However, see also: Microsoft Confirms Data Recovery for Sidekick Users
     http://www.microsoft.com/Presspass/press/2009/oct09/10-15sidekick.mspx
                                                                                                73
And Let's Not Forget About Power Issues




                                          74
Implementing in Your
Organization
Project Plan
Today’s IT infrastructure is under tremendous pressure and is
finding it difficult to keep up…
It will reach a breaking point




      In distributed computing          Percentage of executives who report
      environments, up to 85 percent    a security breach and aren’t confident
      of computing capacity sits idle   they can prevent future breaches




      70 percent is spent on            Percentage of CIOs who want
      maintaining current IT            to improve the way they use
      infrastructures versus adding     and manage their data
      new capabilities




76
Create a roadmap for cloud as part of the existing IT
optimization strategy

                                                          Standardize
                                                          and automate
                                                          Standardize services
                                 Virtualize               Reduce deployment
                                                           cycles
                                 Remove physical         Enable scalability
                                  resource boundaries     Flexible delivery
      Consolidate                Increase hardware
     Reduce infrastructure       utilization
      complexity                 Reduce hardware
     Reduce staffing             costs
      requirements               Simplify deployments
     Manage fewer things
      better
     Lower operational costs
Adoption of cloud computing will be workload driven
• Workload characteristics determine standardization


Test for Standardization           Examine for Risk             Explore New Workloads
 Web infrastructure              Database                       High volume, low cost
  applications                    Transaction processing          analytics
 Collaborative infrastructure    ERP workloads                  Collaborative Business
 Development and test                                             Networks
                                  Highly regulated workloads
 High Performance                                                Industry scale “smart”
  Computing                      ...                              applications
...                                                             ...
Workloads ready for cloud computing
           •    Analytics                              •   Desktop and devices
                 – Data mining, text mining or              – Desktop
                     other analytics                        – Service/help desk
                 – Data warehouses or data marts       •   Development and test
                 – Transactional databases                  – Development environment
           •    Business services                           – Test environment
                 – Customer relationship               •   Infrastructure
                     management                             – Application servers
                     (CRM) or sales force automation        – Application streaming
                 –   E-mail                                 – Business continuity/
                 –   Enterprise resource planning               disaster recovery
                     (ERP) applications                     –   Data archiving
                 – Industry-specific applications           –   Data backup
           •    Collaboration                               –   Data center network capacity
                 – Audio/video/Web conferencing             –   Security
                 – Unified communications                   –   Servers
                 – VoIP infrastructure                      –   Storage
                                                            –   Training infrastructure
                                                            –   Wide area network (WAN)
                                                                capacity




   Source: IBM Market Insights, Cloud Computing Research, July 2009.
Public and Private Clouds are preferred for different workloads


           Top private workloads                                                 Top public workloads

    Data mining, text mining, or other analytics                      Audio/video/Web conferencing
    Security                                                          Service help desk
    Data warehouses or data marts                                     Infrastructure for training and
    Business continuity and disaster recovery                          demonstration
    Test environment infrastructure                                   WAN capacity, VOIP Infrastructure
    Long-term data archiving/preservation                             Desktop
    Transactional databases                                           Test environment infrastructure
    Industry-specific applications                                    Storage
    ERP applications                                                  Data center network capacity
                                                                       Server



Database- and application-oriented                                  Infrastructure workloads
workloads emerge as most appropriate                                emerge as most appropriate


     Source: IBM Market Insights, Cloud Computing Research, July 2009. n=1,090
There is a spectrum of deployment options for cloud computing
                     Third-party     Third-party hosted
                      operated         and operated

  Enterprise          Enterprise         Enterprise
                                                          Enterprise   Enterprise          Users
                                                              A            B
  data center         data center                                                      A           B



 Private cloud         Managed         Hosted private        Shared cloud              Public cloud
                     private cloud         cloud               services                 services

  Private                                Hybrid                                            Public
  IT capabilities are                 Internal and                                  IT activities /
  provided “as a service,”            external service                              functions are
  over an intranet, within            delivery                                     provided “as a
  the enterprise and                  methods are                               service,” over the
  behind the firewall                 integrated                                          Internet
There is a spectrum of deployment options for cloud computing
                    Third-party        Third-party hosted
                     operated            and operated

  Enterprise         Enterprise            Enterprise
                                                            Enterprise   Enterprise         Users
                                                                A            B
  data center        data center                                                        A           B



  Private cloud       Managed            Hosted private        Shared cloud             Public cloud
                    private cloud            cloud               services                services

 Private          Third-party         Third-party         Mix of shared            Shared
 Implemented       operated             owned and            and dedicated             resources
  on client        Enterprise           operated             resources                Elastic scaling
  premises          owned               Standardization     Shared facility          Pay as you go
 Client runs/     Mission critical    Centralization       and staff
                                                                                       Public Internet
  manages          Packaged            Security            Virtual private
                    applications        Internal             network (VPN)
                                                              access
                   High                 network
                    compliancy                               Subscription or
                   Internal network                          membership
                                                              based
Security is among a top concern with cloud computing...
Security Framework provides a structure to address this concern
                                                   Application and process
        People and identity                        Help keep applications secure,
        Mitigate the risks                         protected from malicious or
        associated with user                       fraudulent use, and hardened
        access to corporate                        against failure
        resources                                  Network, server and end point
                                                   Optimize service availability by
        Data and information                       mitigating risks to network
        Understand, deploy and                     components
        properly test controls for
        access to and usage of                     Physical infrastructure
        sensitive data                             Provide actionable intelligence on the
                                                   desired state of physical infrastructure
                                                   security and make improvements


       Professional                  Managed services           Hardware and
         services                                                 software
Movement from Traditional Environments to Cloud Can be
in One Step or an Evolution
Clients will make workload-driven
trade offs among functions such as
security, degree of customization,
control and economics
Businesses that implement cloud computing are seeing
significant results

                                      Reduced IT labor cost by 50
                                      percent in configuration,
                                      operations, management and
                                      monitoring
                                      Improved capital utilization by
                                      75 percent, significantly
                                      reducing license costs
                                      Reduced provisioning cycle
                                      times from weeks to minutes
                                      Improved quality, eliminating
                                      30 percent of software defects
                                      Reduced end user IT support
                                      costs by up to 40 percent
                                      Simplified security
                                      management
Concluding Remarks
Gartner view: hype cycle
But it does make sense for some functions within some organizations….
The NIST Cloud Definition Framework
                                     Hybrid Clouds
Deployment
Models            Private            Community
                                                                   Public Cloud
                  Cloud                Cloud

Service           Software as a              Platform as a          Infrastructure as a
Models            Service (SaaS)             Service (PaaS)           Service (IaaS)

                                      On Demand Self-Service
Essential
                     Broad Network Access                     Rapid Elasticity
Characteristics
                        Resource Pooling                      Measured Service


                            Massive Scale                Resilient Computing

Common                      Homogeneity                Geographic Distribution
Characteristics             Virtualization                Service Orientation
                       Low Cost Software                  Advanced Security
                                                                                          89
Elasticity, Risk, and User Incentives
  Services Will Prefer Utility Computing to a Private Cloud When:

 Demand Varies over Time               Demand Unknown in Advance

  Provisioning for Peak Leads to        Web Startup May Experience a
  Underutilization at Other Times      Huge Spike If It Becomes Popular

           Pay by the Hour             Pay as You Go Does Not Require
 (Even if the Hourly Rate is Higher)      Commitment in Advance




       The Value of Cost Associativity
UserHourscloud × (revenue – Costcloud) ≥

             UserHoursdatacenter × (revenue – Costdatacenter        )
                                              Utilization
Cloud Is Mostly Driven by Money

 Economics of Cloud Computing Are
   Very Attractive to Some Users
Cloud Computing Will
                       Predicting Application
 Track Cost Changes
                           Growth Hard
Better than In-House



Investment Risks May    In-House, You Must
     Be Reduced          Provision for Peak
Cloud’s goal: flip this equation

                   30%                      70%

On-Premise         Your           Managing All of the
Infrastructure   Business   “Undifferentiated Heavy Lifting”


                                                Configuring
Cloud-Based         More Time to Focus on
                                                Your Cloud
Infrastructure          Your Business
                                                  Assets

                            70%                    30%
IBM Cloud Business Model
                           ROI Analysis                                                        Impact:
                                                                              Reduction of Total Cost of Ownership of
                                                                                    Data Center Infrastructure
             New
100%         Development                     Liberated                              Reduced Capital Expenditure
                                             funding for                      - Improved utilization reduces requirement for
                Software                     new                                         new capital purchases
                Costs                        development,     Strategic
                                             transformatio    Change              Reduced Operations Expenditure
                                             n investment     Capacity          - Lower facilities, maintenance, energy, IT
                Power                        or direct                               service delivery and labor costs
                Costs
                                             saving
                                                                                          Additional Benefits
                                             Deployment (1-                    - Reduced risk, less idle time, more efficient
Curren                                       time)                               use of energy, acceleration of innovation
   t IT      Labor Costs
                                                                                  projects, enhanced customer service
 Spend       (Operations                        Software
             and                                Costs
             Maintenance)
                                                                             Business Case Results
                                              Power Costs     Hardware,
                                                              labor &
                                                                             Annual savings: $3.3M (84%)
                                              (88.8%)
                                                              power              from $3.9M to $0.6M
             Hardware                        Labor Costs      savings
             Costs                           ( - 80.7%)       reduced
                                                                             Payback Period: 73 days
             (annualized)                                     annual cost
                                             Hardware Costs   of operation   Net Present Value (NPV): $7.5M
                                             ( - 88.7%)       by 83.8%       Internal Rate of Return (IRR): 496%
       Note: 3-Year Depreciation Period with 10% Discount                    Return On Investment (ROI): 1039%
       Rate
CSPs and cloud computing
•   The large CSPs have long history in running large scale data-centers and
    respective operations.
•   Hence, it is natural for CSPs to offer services via cloud paradigm, and
    enter into the domain of providing enterprise grade cloud computing
    services.
    o   From history perspective the focus has been in IaaS.
    o   This will most probably continue, since the infrastructure services continue to be a lucrative
        necessity.
•   Analyst (e.g. Ovum) reports indicate that SaaS/CaaS roadmaps are
    evolving within major telco CSPs.
    o   This is logical growth path, as cloud computing model leverages the telco core competences.
    o   CSPs already have strong foothold on connectivity, which is essential for XaaS.
    o   Trend seems to be that IaaS remains the core focus, and SaaS is developed in an opportunistic
        way, i.e. develop a solution to a problem, and see whether it could be reapplied for a general
        business case according to SaaS.
•   Most often CaaS appears to represent communication as a service or
    collaboration as a service or unified communications as a services.
Why CSPs have a strategic fit for cloud computing
•   Shared infrastructure
          • CSPs have long history of infrastructure, which is networked and
            interoperable via well-defined interfaces.
•   Managed and hosted IT and communications services
          • For a longer time CSPs have relied on vendors’ managed services type of
            professional services, which means that there is no inherent fear of
            outsourcing operative responsibilities.
•   Data centers
          • Data centers operations have been for long time the core of CSP production
            machines.
•   Security, data integrity and trust
          • These are the traditional key characteristics of telco business.
•   Managed network services and end-to-end SLAs.
          • CSPs are familiar with end-to-end SLA thinking and KPI based operations.
•   Communications as a service
          • Communications and connectivity is the bread and butter of CSPs.
•   SME customer base
          • The customer base of CSPs does cover SME, which means that they are
            familiar with the problems and issue within the segment.
Workloads ready for cloud computing
           •    Analytics                              •   Desktop and devices
                 – Data mining, text mining or              – Desktop
                     other analytics                        – Service/help desk
                 – Data warehouses or data marts       •   Development and test
                 – Transactional databases                  – Development environment
           •    Business services                           – Test environment
                 – Customer relationship               •   Infrastructure
                     management                             – Application servers
                     (CRM) or sales force automation        – Application streaming
                 –   E-mail                                 – Business continuity/
                 –   Enterprise resource planning               disaster recovery
                     (ERP) applications                     –   Data archiving
                 – Industry-specific applications           –   Data backup
           •    Collaboration                               –   Data center network capacity
                 – Audio/video/Web conferencing             –   Security
                 – Unified communications                   –   Servers
                 – VoIP infrastructure                      –   Storage
                                                            –   Training infrastructure
                                                            –   Wide area network (WAN)
                                                                capacity




   Source: IBM Market Insights, Cloud Computing Research, July 2009.
Enterprise Cloud Computing




      Consumption, EA & DCA                                                         Portfolio of
      Planning,             Standards &
      Improvements          Policies                                                Virtualized
                                                       System Lifecycles         APPLICATION                Private Clouds
                                                     Hyperlinked Models           RESOURCES
        IT OPS MGT              APP ARCH
                                                             & Metadata
        Improved                                     End-to-End Policies
        Service Delivery OPS   Policy-Based
                     IT        Design with
        with Control
                               Flexibility                                    Dynamic Availability         Public Clouds
                                                                            Efficient Consumption




                                                                                             Metering    Servers           Application
                                                                                             & Billing             Storage VMs




IT-CONTROLLED CLOUD COMPUTING
• Accelerate application delivery
• Improve IT service management
• Business obtains flexibility while IT maintains control


 Treat Cloud just like any IT project: focus, don't believe the hype, and take it step by step
Mind the SLA Gap!


              Data Center SLA




                    MPLS SLA
Beware Lock-In
Conclusions
          Business
        Applications             Mobile      CRM

                Analytics                            Data
                                                     Center
      VPN
                                        Email
                  Infrastructure                      Desktop
                     Software




Its what your mother told you, “Don’t put all your eggs in one basket”

Cloud Computing 101 Issue 1 (Sample)

  • 1.
    Cloud Computing 101(Sample) Issue 1 May 28th 2011 www.alanquayle.com/blog © 2011 Alan Quayle Business and Service Development
  • 2.
    Objectives • Comparing and contrasting the available delivery models of cloud computing • Evaluating the benefits of cloud products, including global and regional service providers, Salesforce.com, Microsoft Azure, Google, and Amazon • Understanding the underlying technologies of Data Centers and Virtualization • Understanding the role of operators and web service providers • Deploying Software as a Service (SaaS) to optimize productivity and collaboration • Deploying Platform as a Service (PaaS) to streamline application deployment • Examining the cost benefits of deploying Infrastructure as a Service (IaaS) • Understanding implementation issues across security, compliance and business continuity • Integrating multivendor cloud products and services • Focusing on the first two steps, initial business case and pilot project 6/2/2011 © 2010 Alan Quayle Business and Service Development 2
  • 3.
    Outline • Cloud Computing Introduction o Defining cloud computing o Definitions: IaaS (Infrastructure as a Service), PaaS (Platform as a Service), SaaS (Software as a Service), BPaaS (Business Process as a Service) o The benefits of cloud computing o Cloud computing components o Suppliers and market size o Types of clouds: public, private, hybrid, community o Cloud trends and vendor solutions o Emerging standards and regulations • Understanding the Components: Data Center History and Economics o History and the drive for efficiency and availability o Changes and pressures on DC – drive for DC management o Capex and opex DC costs o DC economics drives cloud computing © 2011 Alan Quayle Business and Service Development 3
  • 4.
    Outline • Understanding the Components: Data Center Types and Comparison to Google’s Data Center o Reviewing the 3 types of DC (Data Center) o DC Environment o Internet DC Architecture o Enterprise DC Legacy / Current o Google perimeter and DC Overview o Comparison • Understanding the Components: Virtualization Technology o Understanding the role of Virtualization in terms of Commercial or technology o The life cycle of Virtualization’s components and key technology o Technology Hotspot analysis of Virtualization • Understanding the Components: Customer needs and Virtualization o Analyze the pain points and key requirements (reduce the cost through servers consolidation; Dynamic scheduling to save energy; Increase the efficiency of management, etc...) in Virtualization o Analyze the opinion of customers in Virtualization, like usage, maturity... o The technology trend for customers to choose Virtualization, like VMware, Hyper-v, Xen, KVM... © 2011 Alan Quayle Business and Service Development 4
  • 5.
    Outline • Understanding the Components: Virtualization Competitive Analysis o How many main competitors (VMware, Citrix, Microsoft, Oracle, Redhat) we have? o What about their business models? o How to win a profit of Virtualization? o Each competitor’s plans to construct their Virtualization platform? o SWOT analysis • Understand the Internet Companies Drivers in Cloud Computing o Mapping Force, Google and Amazon’s offers o Cloud Economics, definitions, taxonomy and market size o Comparison to total IT market o Cloud Business Case • Understanding Web Service Providers Focus on Cloud / DCs o Cloud Hype o Industry requirements o Industry Transition o Data Center Operating System o DC programming models (PaaS) o Example providers, PaaS services and pricing o Deep dive on Force.com, Google App Engine and Microsoft Azure o What it all means © 2011 Alan Quayle Business and Service Development 5
  • 6.
    Outline • Implementing SaaS o Minimizing administration costs o Improving productivity and collaboration o Replacing capital investments with pay-per-use • Implementing IaaS o Leveraging on-demand servers o Eliminating software license costs with preconfigured servers o Migrating existing machine images to the cloud o Cost-effective, scalable and reliable data storage with Amazon Simple Storage Solution (S3) • Implementing to minimize risk o Immediate response to market demands o Elastically scaling infrastructure capacity to meet organizational demands o Evaluating operating systems and software with pay-per-use • Implementing Security in the cloud o Analyzing security concerns o Maintaining privacy of proprietary data o Achieving acceptable reliability and service-level agreements o Overcoming the risks of public clouds o Scoping the role: SaaS, PaaS, IaaS © 2011 Alan Quayle Business and Service Development 6
  • 7.
    Outline • Implementing Virtual Private Cloud (VPC) o Simulating a private cloud in a public environment o Google secure data connector o Amazon VPC o Industry-standard, VPN-encrypted connections • Implementing cloud governance o Retaining responsibility for the accuracy of the data o Verifying integrity in stored and transmitted data o Demonstrating due care and due diligence o Supporting electronic discovery o Preserving a chain of evidence • Implementing compliance with government certification and accreditation regulations o HIPAA, Sarbanes-Oxley and the Data Protection Act o Following standards for auditing information systems o Negotiating third-party provider audits • Implementing business continuity o Avoiding vendor lock-in o Exploiting multiple cloud providers for cross-platform interoperability o Evaluating the impact on employee skill requirements • Implementing cloud computing in your organization o Building a business case o Selecting a pilot project © 2011 Alan Quayle Business and Service Development 7
  • 8.
  • 9.
    What is cloudcomputing?
  • 11.
    We Live inHyped Times! • “Amazon and PSN outages won't halt cloud revolution.” source The Register • “SURVEY: Future-proofing the cloud.” source Network World • “Virtualization, cloud computing to dominate Interop.” source Network World • “Is Your Data Center Ready for Cloud Computing?” source Web Buyers Guide • “Demystifying the Cloud – A Conversation with Dell’s CIO and CTO!” source Baseline Briefing • “Cloud-enabled Wi-Fi: Less Dollars, More Sense” source Network World • “Apple’s new services are expected to include a "digital locker" solution enabling consumers to store their iTunes music, movie and television libraries on Apple servers for access on multiple iOS-based devices.” source Fierce Mobile Content. • “Brocade Unveils CloudPlex cloud architecture, an open framework for building virtualized data centers, and offered a look at new technologies coming up in the near future to help make such data centers possible. “ source CRN • “CenturyLink goes from local to global player with Savvis acquisition.” source Fierce Free Software Foundation founder Richard Stallman called cloud computing, “worse than stupidity.” Bottom-line: If you’re systems are down or you loose customer data its not the Cloud Provider that suffers / goes out of business – they just issue a credit for the disruption.
  • 12.
    First Phase ofCloud Consolidation • Verizon acquired Terremark, a Infrastructure / Platform as a Service (I/PaaS) provider, for $1.4 billion, to provide IT infrastructure services targeting the enterprise market. • Dell spent more than $2 billion in six months acquiring cloud technologies, including PaaS provider Boomi, and is investing another $1 billion in a group of global data centers. • IBM acquired Cast Iron, Boomi’s competitor. • Time Warner Cable acquired NaviSite. • CenturyLink acquired Savvis • Microsoft and Toyota forged a strategic partnership to build a global platform for Toyota Telematics Services using Windows Azure. • CA Technologies and Unisys entered into a joint venture that combines CA’s virtualization and service management products with Unisys’ virtualization and cloud advisory, planning, design and implementation services. Likely see further consolidation as Telcos realizes their weaknesses in selling Cloud into enterprise – particularly small medium enterprise
  • 13.
    Telstra spending $600Mon cloud-based UC for businesses • Telstra said it plans to invest $600 million to upgrade communications options for 90 percent of the country's businesses and, in partnership with Microsoft and Cisco, provide them with cloud-based unified communications. • The QoS upgrades will encompass 1,6000 exchanges and take the telco until September to complete. • The Digital Business package will cost businesses $120 a month and include a basic ADSL2+ connection to businesses, a Cisco Router and a Cisco digital phone. Customers can pay an additional $15 a month to have their Internet and voice connection switch over to the Telstra NextG network automatically if the ADSL connection fails. • Telstra said VoIP service would likely follow the QoS upgrade, once it "can give all the reliability and also the technical backup we think the product needs, then we will bring it to market." Everything becomes labelled as Cloud. Really the $600M is on a network upgrade…
  • 15.
    Evolution • Cloud computing has evolved through a number of phases which include grid and utility computing, application service provision (ASP), and Software as a Service (SaaS). • But the overarching concept of delivering computing resources through a global network is rooted in the sixties. Those Sixties!!!
  • 16.
    John McCarthy, 1961 “computationmay someday be organized as a public utility.”
  • 17.
    The Dream ofCloud Computing Integrated Circuit Utility Computing Foundries • Semiconductor Fabs Expensive • New Datacenters Very Expensive – Typically > $1 Billion – Only a Few Companies Can – Too Much for Most Designers Afford Huge Datacenters • Fabs Take Outside Work • Utility Computing  Datacenter – Fabs Amortize Cost Owners Amortize Costs – Other Designers Make Chips – Utility Computing Users Get Advantages of Elasticity • Allowed Explosion of Designs – Datacenter Resources Shared – More Players Afford Rented Fab Across Many Users But a private cloud doesn’t deliver scale?
  • 18.
    What is CloudComputing? • Wikipedia - Cloud computing is Internet ('Cloud') based development and use of computer technology ('Computing'). The cloud is a metaphor for the Internet (based on how it is depicted in computer network diagrams) and is an abstraction for the complex infrastructure it conceals[1]. It is a style of computing where IT-related capabilities are provided “as a service”[2], allowing users to access technology-enabled services from the Internet ("in the cloud")[3] without knowledge of, expertise with, or control over the technology infrastructure that supports them[4]. According to the IEEE Computer Society "It is a paradigm in which information is permanently stored in servers on the Internet and cached temporarily on clients that include desktops, entertainment centers, table computers, notebooks, wall computers, handhelds, etc."[5]. “ • No Consensus in the industry for a good definition of “Cloud computing” . Today anything and everything internet will come with a cloud computing logo • Simple Definition: If the time difference between - your application needs more capacity and gets more capacity is greater than instantly it is not cloud computing. i.e. if there is no programmatic way to provision hardware, no pooled capacity and even worst a purchase order to get new hardware/software. • The Bottom-line o Changes the economics of Computing from being a Capital investment to Utilities (You buy electricity you don’t buy generators ) o Changes the way software is developed – Hardware provisioning , Deployment and Scaling now part of developer lifecycle as a Program / script as compared to a Purchase order o Automates a whole bunch of infrastructure related tasks and activities leading efficiencies and cost savings
  • 19.
    What is CloudComputing? • A user experience and a business model o Standardized offerings o Rapidly provisioned o Flexibly priced • An infrastructure management and services delivery method Banking o Virtualized resources o Managed as a single large resource o Delivering services with elastic scaling IT • Similar to Banking ATMs and Retail Point of Sale, Cloud is Driven by: o Self-Service o Economies of Scale Retail o Technology Advancement 19 IBM Confidential
  • 20.
    The NIST Definitionof Cloud Computing o Cloud computing is a model for enabling convenient, on-demand network access to a shared pool of configurable computing resources (e.g., networks, servers, storage, applications, and services) that can be rapidly provisioned and released with minimal management effort or service provider interaction. This cloud model promotes availability and is composed of five essential characteristics, three service models, and four deployment models. Characteristics 1. On-demand self-service Service models 2. Broad network access 1. Cloud Software as a Service (SaaS) 3. Resource pooling 2. Cloud Platform as a Service (PaaS) 4. Rapid elasticity 3. Cloud Infrastructure as a Service (IaaS) 5. Measured service Deployment models 1. Private cloud 2. Community cloud 3. Public cloud 4. Hybrid cloud
  • 21.
    Why Now? From T-Systems, who has delivered SAP dynamic services since 2004
  • 22.
    NIST 3 CloudService Models • Cloud Software as a Service (SaaS) o Use provider’s applications over a network • Cloud Platform as a Service (PaaS) o Deploy customer-created applications to a cloud • Cloud Infrastructure as a Service (IaaS) o Rent processing, storage, network capacity, and other fundamental computing resources • To be considered “cloud” they must be deployed on top of cloud infrastructure that has the key characteristics 22
  • 23.
    Service Model Architectures Cloud Infrastructure Cloud Infrastructure Cloud Infrastructure IaaS Software as a Service PaaS PaaS (SaaS) SaaS SaaS SaaS Architectures Cloud Infrastructure Cloud Infrastructure IaaS Platform as a Service (PaaS) PaaS PaaS Architectures Cloud Infrastructure IaaS Infrastructure as a Service (IaaS) Architectures 23
  • 24.
    Mapping the CloudTypes I use this to simply show the lock-in nature of PaaS / SaaS providers model – Amazon is more focused on a business model based on scale.
  • 25.
    IT Cloud ServicesTaxonomy IT Cloud Services Cloud Applications (Apps-as-a-service) App Dev/Test App Deploy Cloud (Application) Platforms (Platform-as-a-Service) Cloud Infrastructure (Infrastructure-as-a-Service)
  • 26.
    Cloud Computing Technologies Technologies Cloud Services Applications SaaS Dev Platforms Multi-Tenant, PaaS + Support Deployment & Cluster services (Storage, DB, Management Security, Aggregation) Virtualization, Infrastructure Management and Grid Engines IaaS Processing Hardware I use this to simply show technologies associated with each layer – when we discuss data center design and architecture we’ll come back to these components.
  • 27.
    The NIST CloudDefinition Framework Hybrid Clouds Deployment Models Private Community Public Cloud Cloud Cloud Service Software as a Platform as a Infrastructure as a Models Service (SaaS) Service (PaaS) Service (IaaS) On Demand Self-Service Essential Broad Network Access Rapid Elasticity Characteristics Resource Pooling Measured Service Massive Scale Resilient Computing Common Homogeneity Geographic Distribution Characteristics Virtualization Service Orientation Low Cost Software Advanced Security 27
  • 28.
  • 29.
    Predicting Infrastructure Needs Actual Usage Customer Dissatisfaction Compute Power Predicted Usage Waste Time
  • 30.
    Elasticity, Risk, andUser Incentives Services Will Prefer Utility Computing to a Private Cloud When: Demand Varies over Time Demand Unknown in Advance Provisioning for Peak Leads to Web Startup May Experience a Underutilization at Other Times Huge Spike If It Becomes Popular Pay by the Hour Pay as You Go Does Not Require (Even if the Hourly Rate is Higher) Commitment in Advance The Value of Cost Associativity UserHourscloud × (revenue – Costcloud) ≥ UserHoursdatacenter × (revenue – Costdatacenter ) Utilization
  • 31.
    Cloud Is MostlyDriven by Money Economics of Cloud Computing Are Very Attractive to Some Users Cloud Computing Will Predicting Application Track Cost Changes Growth Hard Better than In-House Investment Risks May In-House, You Must Be Reduced Provision for Peak
  • 32.
    Benefit 2) Fastertime to market
  • 33.
    Benefit 3) Noinitial investment (No CapEx)
  • 34.
    Benefit 4) Payas you go, pay for what you use
  • 35.
    Benefit 5) Focuson your business
  • 36.
    The 70/30 switch 30% 70% On-Premise Your Managing All of the Infrastructure Business “Undifferentiated Heavy Lifting”
  • 37.
    Cloud’s goal: flipthis equation 30% 70% On-Premise Your Managing All of the Infrastructure Business “Undifferentiated Heavy Lifting” Configuring Cloud-Based More Time to Focus on Your Cloud Infrastructure Your Business Assets 70% 30%
  • 38.
    Companies have differentmotivations for leveraging cloud Analytics & Time to Value Employee Risk & Security Productivity Compliance Operations support 9 major commands, Creates an Enable collaboration 34,000-employee nearly 100 bases, & ecosystem for PayPal across 300K global bank deploying a 700,000 active military 3rd Party developers employees as well as its private cloud from personnel around the network of customers, IBM to centralize world. Design secure Reduces developer partners and suppliers. management of cloud infrastructure for effort to deploy a work Saving 30 minutes per desktops via an defense & intelligence environment with day or 120hr per year enterprise class data networks; insights seamless PayPal Test per person. center rather than at about cyber attacks, Sandbox access the user stations, network, system or IBM LotusLive has 18 Gets greater remote application failures, million users in 99 flexibility without while automatically countries sacrificing control to preventing disruptions. improve efficiency.
  • 39.
  • 40.
    Why Be aCloud Provider? Huge datacenters cost 5-7X less for computation, storage, and Make a Lot of networking. Fixed software & deployment amortized over many users. Money Large company can leverage economies of scale and make money. Leverage Existing Web companies had to build software and datacenters anyway. Adding Investments a new revenue stream at (hopefully) incremental cost. What happens as conventional server and enterprise apps embrace Defend a cloud computing? Application vendors will want a cloud offering. For Franchise example, MSFT Azure should make cloud migration easy. Attack an A large company (with software & datacenter) will want a beachhead Incumbent before someone else dominates in the cloud provider space. Leverage For example, IBM Global Services may offer a branded Cloud Customer Computing offering. IBM and their Global Services customers would Relationships preserve their existing relationship and trust. Become a Facebook offers plug-in apps. Google App-Engine… Platform
  • 41.
    Full Cloud Taxonomy Level Of Sharing Public IaaS PaaS SaaS BPaaS PURE Cloud CLOUD @ Global MARKET Provider Virtual Private Dynamic Integration- Dynamic Dynamic Cloud Infrastructure as-a-Service Apps BPO @ Dedicated Services Services Services Provider EXTENDED CLOUD Infrastructure Middleware Apps BP MARKET Private Cloud Virtualization Virtualization Virtualization Virtualization @ In-house Tools Tools Tools Tools Data Center Infrastructure Middleware Applications Business Business Processes Value
  • 42.
    Terminology on XaaS:SaaS, PaaS, IaaS, CaaS and EaaS • SaaS a.k.a Software As A Service (wikipedia): o “software that is deployed over the internet and/or is deployed to run behind a firewall on a local area network or personal computer. With SaaS, a provider licenses an application to customers as a service on demand, through a subscription or a "pay-as-you-go" model.” • SaaS can be seen as the end user consumable service, and what is usually meant by “cloud computing”. • Microsoft classifies SaaS into four "maturity levels," whose key attributes are configurability, multi-tenant efficiency, and scalability. • The SaaS model maturity is usually vendor specific.
  • 43.
    IaaS: Infrastructure As • IaaS is scalable IT infrastructure readily attached to A Service a suitable communication media (Internet in case of “public cloud” or corporate network in case of “private cloud”), controlled through appropriate APIs, and is available to its users in form of an on- demand service typically with “pay-per-use” charging model • IaaS is a provision model in which an organization outsources the equipment used to support operations, including storage, hardware, servers and networking components. The service provider owns the equipment and is responsible for housing, running and maintaining it. • The consuming entity does not manage or control the underlying cloud infrastructure but has control over operating systems, storage, deployed applications, and possibly limited control of select networking components (e.g., host firewalls). • IaaS: Amazon EC, IBM computing on demand, Rackspace
  • 44.
    IaaS bases onscale • IaaS customer promise is about CAPEX and OPEX avoidance, streamlined operations, lower TCO and lower entry barrier: o Margins as per offered resources are usually pretty thin o Revenue is generated by scale and volume o Scale requires capability to economically cater for low-traffic customers and subsequently scale up to high volumes o Business processes for infrastructure operations and management needs to streamlined and mature o Capability to obtain and cater for scale requirements issues a relatively high entry barrier for a new entrant in IaaS offering business due to needed investments. • Usually (but not necessarily always), IaaS players do have existing business, of which IaaS is a by- plot: o CSPs, ecommerce, SaaS providers, data-center and hosting business. o The target is to create revenue from existing under-utilized data center resources. • Additionally, with the ever-tightening legislation, competition, technology requirements, efficiency requirements etc., operating own data center requires more and more of specific competences (e.g. design for energy efficiency, design for compliancy, ...) o Capability development requires investments and takes focus out of the core business of the company.
  • 45.
    PaaS: Platform asa Service • PaaS: a capability provided to the user to deploy onto the cloud infrastructure user- created or acquired applications created using programming languages and tools supported by the provider. • All cloud computing characteristic apply. • Usually PaaS model includes an application level framework, e.g. plug-ins for IDE o Easier application development o Implied lock-in with the provider • Focus of PaaS is the developer and respective ecosystem: Successful PaaS offerings have tendency of attracting loyal, open communities of developers. • PaaS implies leverage of domain specific value, e.g. business applications and force.com. • Example: Google Apps, force.com, Facebook
  • 46.
    PaaS: an outsourcedapplication server platform? • It appears that the PaaS providers offering holds similarities to what an application server stands for o Obviously, an application server platform is part of PaaS, despite the proprietary nature of implementations. • PaaS can be seen as a service, where as an application server (“platform”) is a technology to implement that service. • PaaS can be regarded as a application development ecosystem: o Implementation approach can vary and is not the core consideration: JEE, .NET, LAMP, Python, Ruby... o Middleware and connectivity services, elasticity, multi-tenancy o Collaborative and integrated supporting ecosystem for the applications that are deployed on PaaS platforms and need to be offered as services to the customers/consumers. • IaaS scales the infrastructure, whereas PaaS scales the application development ecosystem. • For PaaS a key consideration is the risk of lock-in.
  • 47.
    CaaS and EaaS • CaaS a.k.a Communications As A Service (zimbio.com) o “Delivering telecommunications, instant messaging etc. as a service over the Internet. Telephony as a service, also known as “Voice as a service”, employs VOIP (Voice Over Internet Protocol). Software and hardware can be provided as a service by providers.” o CaaS is specialized SaaS. • EaaS a.k.a Everything As A Services o Another buzz-word, and to some extent even more marketing spin: SaaS, PaaS and IaaS bundled together as multiple instances.
  • 48.
  • 49.
    Framing for cloudcomputing delivery model User interface layer instances Application management application Partners’ Third party Third party Shared Customized Applications standard standard customized applications applications applications applications Application integration layer SAAS Platform abstraction layer platform Middleware Platform O&M Content Web Identity Dev. Protocol UI BPMS etc. services portal services tools stacks frame. tools High availability framework PAAS Application server containers and database management systems Infrastructure Computing Operating system management IAAS Computing and storage virtualization System tools Physical computing and storage environment Connectivity and access The service models are separate: e.g. creating a SaaS offering by no means requires bundling IaaS or PaaS with it.
  • 50.
    Some Myth’s andperceptions • Isn’t it all about hardware provisioning? o Not Really – It is also about changing of Software Development Lifecycle with scaling up , hardware provisioning and deployment all under the control of developer written programs • What about Security and Enterprise Adoption ? o Two answers • Private Clouds – Starting seeing the adoption of the cloud computing paradigm come into the corporate data center. Big iron vendors are selling Private Cloud Products and Hybrid Solutions. • The Question: “Just as Banks became a safe place to keep your money away from your safe-box in your grandfathers home , The Cloud will become the default place to keep your data in the future.” – an analogy I prefer is home security, you can outsource to ADT, but in the limit you still need to do some of it yourself.
  • 51.
    Some Myth’s andperceptions • Isn’t this similar to Time Sharing? o Yes to some extent. o But it is not all about sharing of resources. It really boils down to cost savings as a result of automation and changing the software development lifecycle • How is it different from ASP? o The ASP value-add was the typical value you get from an outsourcing company. Leverage knowledge base, trained manpower and some shared infrastructure to guarantee reliability of operations and potential cost savings o Cloud Computing is taking the ASP concept to the next level with zero to little amount of “People Services” and focus on the computing as a utility.
  • 52.
    Public Clouds • Public Clouds are good when o Have low bandwidth and latency requirements o Starting with test or development workloads o Running collaboration applications o Don’t have an upfront capital budget Committing tightly to a • Not so good when single provider without a o You need strict performance SLAs proper plan B is a no-go. o Uptime is critical – no control over recovery o Privacy or security is a concern, i.e. • 3rd party has your data, auditors complain • Can you review vendor’s security procedures? o Costs per CPU hour can be larger than that of in-house server deployments.
  • 53.
    Internal Private Clouds • Positives of internal private clouds • Negatives vs. public clouds o Anticipated reduction of TCO o Requires up front capital o Better hardware capacity expenditure due to IT investments utilization in own CAPEX o Elasticity o Not as useful for small and • Easy self service provisioning medium businesses and • More efficient system management departmental solutions due to o IT retains control of SLAs needed investments • Data security and privacy • High performance • High availability • Negatives vs. dedicated hardware o Capability to provide spot-on o Performance tax chargeback reports as per need o Not capable for massive parallel processing
  • 54.
    Cost elements: SaaSversus traditional on-premises SW • On-premises / in-house • SaaS o License payments at acquisition o Configuration and systems phase and recurring fees integration costs o Customization and systems o Business process adaptation costs integration costs o Sign-up fees o Implementation and deployment o Recurring subscription fees costs for roll-out o Care and support fees o Local IT and systems support o Training costs (of a standard arrangements, either own head- application) count or outsourced o Training costs for end users o Internet connectivity costs o Computing, storage, backup and o (undefined price tag for potential network costs strategic transition costs) o Support and maintenance costs
  • 55.
    Cloud service providerspace remains fragmented Cloud native players Amazon, Salesforce; Google Telecom IT Service providers Cloud providers AT&T, BT, FT, DT/ T- based Accenture, Systems, services Capgemini, Wipro Verizon Large tech vendors Cisco, Dell HP, IBM
  • 56.
    Why CSPs havea strategic fit for cloud computing • Shared infrastructure • CSPs have long history of infrastructure, which is networked and interoperable via well-defined interfaces. • Managed and hosted IT and communications services • For a longer time CSPs have relied on vendors’ managed services type of professional services, which means that there is no inherent fear of outsourcing operative responsibilities. • Data centers • Data centers operations have been for long time the core of CSP production machines. • Security, data integrity and trust • These are the traditional key characteristics of telco business. • Managed network services and end-to-end SLAs. • CSPs are familiar with end-to-end SLA thinking and KPI based operations. • Communications as a service • Communications and connectivity is the bread and butter of CSPs. • SME customer base • The customer base of CSPs does cover SME, which means that they are familiar with the problems and issue within the segment.
  • 57.
    What is CloudComputing For Telcos New consumer- centric Cloud Services Delivery Cloud Strength of trusted Computing Infra- structure services e.g. Billing Engagement Network- Centric for Telcos Where Is The Cloud Opportunity For Mass Telcos? Adoption Consumer Reach CONSUMER vs ENTERPRISE
  • 58.
    Telco’s Enterprise –Consumer Pendulum Consumer Enterprise • 65’s: Mainframes in Data Centers 75’s: • Enterprise drives Tech Awareness ISDN Telephony 1st Gen. Remote Home Workers • 80’s: PC on corporate desktop 90’s: • IT education of working Multimedia PCs, Cell Phones generation Digital Kids, Consumerization IT • 2005’s: Cloud Computing/SaaS 2010’s: • Tech. Populism, Pay/Use, Web 2.0 Managed Devices, Media Convergence • 2015’s: Managed Desktops, X-Internet Enterprise 3.0 Collaborative Business Models Cloud federated master data and Innovators distributed business transactions  Converged Personas  Mass Adoptors Consumer  Specific Personas  Enterprise
  • 59.
  • 60.
    Security is theMajor Issue 60
  • 61.
    Security Trend –Virtual Firewalls and Additional Procedures Part 1 • Virtualization is essentially adding an operating system. – So there are now two operating systems to monitor and patch, instead of one. This increases the chances of patches not being up to date creating security risks – Procedures within the data centers running cloud services must be stricter then regular data center procedures • Traditional intrusion detection doesn’t work on virtual servers. – Intrusion detection (and intrusion prevention) monitors network traffic (between physical servers) and raises a red flag if there’s a traffic spike or type of traffic not explained by legitimate operations. – But there’s no way to monitor traffic between virtual servers on one physical host, - emergence of virtual firewalls • Malware can spread among virtual servers. – Traditional intrusion detection is blind to activity between virtual servers, it’s easy for a virus or other malignant software to spread from one virtual server to another. – And beyond -- because virtualization is often used in conjunction with clustering that moves data and applications among two or more physical servers, to provide load- balancing and “failover” in case one server in the cluster encounters a problem. – A network monitoring system can not analyze this threat. Emergence of virtual firewalls that protect virtual servers. – VMWare and Citrix have created Hypervisor based solutions that work with existing security vendor solutions • Confidential data can be compromised because there’s no way to monitor traffic flow between virtual servers sharing the same physical server, – There’s no way to tell whether confidential or legally protected data (such as medical records or credit card numbers) have been compromised. – Today this is managed by segregating data on a separate physical sever – and generally not allowed outside of the internal corporate cloud.
  • 62.
    Security Trend –Virtual Firewalls and Additional Procedures Part 2 • Malware is now virtual-aware. – “Virtual-aware” viruses can tell when they’re running in a virtual environment. Though they’ve mostly used this knowledge to hide so far, they could easily be adjusted to attack virtual servers’ vulnerabilities instead. – According to research by the antivirus company ESET, more than 200,000 virtual-aware malwares were at large in November 2008. • Other methods of security management include structuring the resource pools to match network segments, and force traffic among pools to pass through the existing network security infrastructure. – Generally use virtual LANs to achieve this, which results in lower resource utilization and less flexibility in matching workloads to resources. • VM Ware publishes security guidelines – Limiting VM functionality to only those capabilities required by the application – General access controls to virtual console and management functions – Quite complex and generally push operators towards partnering with an established IT integrator in the virtualization space, e.g. HP or IBM • A Cloud Service is only as strong as its weakest link – Must ensure all VMs implement extra protections – recent Gartner surveys show less than 20% of enterprise implementations include additional protections for security in virtualization implementations
  • 63.
    Security Standards: SAS70 • SAS 70 is the most commonly adopted security standard among cloud service providers. • Roughly 67 percent of cloud service providers follow SAS 70 (Statement on Auditing Standards No. 70), which is an internationally recognized auditing standard developed by the American Institute of Certified Public Accountants (AICPA) that defines the standards an auditor must employ in order to assess the contracted internal controls of a service organization like a hosted data center, insurance claims processor or credit processing company, or a company that provides outsourcing services that can affect the operation of the contracting enterprise.
  • 64.
    Security Standards: PCIDSS & SOX • PCI DSS o About 42 percent of cloud service providers follow the PCI DSS (Payment Card Industry Data Security Standard) standard, a global security standard that applies to all organizations that hold, process or exchange credit card or credit card holder information. o The standard was created to give the payment card industry increased controls around data and to ensure it is not exposed. It is also designed to ensure that consumers are not exposed to potential financial or identity fraud and theft when using a credit card. • Sarbanes-Oxley o Sarbanes-Oxley (SOX) is a security standard that defines specific mandates and requirements for financial reporting. SOX spanned from legislation in response to major financial scandals and is designed to protect shareholders and the public from account errors and fraudulent practices. o Administered by the SEC, SOX dictates what records are to be stored and for how long. It affects IT departments that store electronic records by stating that all business records, which include e-mails and other electronic records, are to be saved for no less than five years. Failure to comply can result in fines and/or imprisonment. o About 33 percent of cloud service providers follow SOX.
  • 65.
    Security Standards: ISO27001 and Safe Habor • ISO 27001 o About 33 percent of cloud service providers adhere to ISO 27001, a standard published in 2005 that is the specification for an Information Security Management System (ISMS). o The objective of ISO 27001 is to provide a model for establishing, implementing, operating, monitoring, reviewing, maintaining and improving ISMS, which is a framework of policies and procedures that includes all legal, physical and technical controls involved in an organization's information risk management processes. • Safe Harbor o About one-fourth of cloud service providers adhere to Safe Harbor principles, a process for organizations in the U.S. and European Union that store customer data. o Safe Harbor was designed to prevent accidental information disclosure or loss. Companies are certified under Safe Harbor by following seven guidelines: Notice, through which individuals must be informed that their data is being collected and how it will be used; choice, that individuals have the ability to opt out of data collection and transfer data to third parties; onward transfer, or transfer data to third parts that can only occur to organizations that follow adequate data protection principles; security, or reasonable efforts to prevent loss of collected data; data integrity, that relevant data is collected and that the data is reliable for the purpose for which it was collected; access, which gives individuals access to information about themselves and that they can correct and delete it if it is inaccurate; and enforcement, which requires the rules are enforced.
  • 66.
    Security Standards: NISTand HIPAA • NIST o National Institute of Standards and Technology (NIST) standards, originally designed for federal agencies, emphasize the importance of security controls and how to implement them. The NIST standards started out being aimed specifically at the government, but have recently been adopted by the private sector as well. o NIST covers what should be included in an IT security policy and what can be done to boost security, how to manage a secure environment, and applying a risk management framework. The goal is to make systems more secure. About 25 percent of cloud service providers adhere to NIST standards. • HIPAA o The U.S. Health Insurance Portability and Accountability Act (HIPAA) is followed by roughly 16 percent of cloud service providers. o The HIPAA standard seeks to standardize the handling, security and confidentiality of health- care-related data. It mandates standard practices for patient health, administrative and financial data to ensure security, confidentiality and data integrity for patent information.
  • 67.
    Security Standards: FISMAand COBIT • FISMA o FISMA, or the Federal Information Security Management Act, was passed in 2002 and created process for federal agencies to certify and accredit the security of information management systems. o FISMA certification and accreditation indicate that a federal agency has approved particular solutions for use within its security requirements. In its research. About 16 percent of cloud service providers have obtained FISMA certifications. • COBIT o Control Objectives for Information Related Technology is an international standard that defines the requirements for the security and control of sensitive data. It also provides a reference framework. o COBIT is a set of best practices for controlling and security sensitive data that measures security program effectiveness and benchmarks for auditing. The open standard comprises an executive summary, management guidelines, a framework, control objectives, an implementation toolset and audit guidelines. About 8 percent of cloud service providers follow the COBIT security standard.
  • 68.
    Security Standards: DataProtection Directive • The Data Protection Directive is a directive adopted by the European Union that was designed to protect the privacy of all personal data collected for or about EU citizens, especially as it relates to processing, using or exchanging that data. • Similar to Safe Harbor in the U.S., Data Protection Directive makes recommendations based on seven principles: Notice, purpose, consent, security, disclosure, access and accountability. About 8 percent of cloud service providers adhere to the Data Protection Directive.
  • 69.
    In Some Ways,"Cloud Computing Security" Is No Different Than "Regular Security" • For example, many applications interface with end users via the web. All the normal OWASP (Open Web Application Security Project) web security vulnerabilities -- things like SQL injection, cross site scripting, cross site request forgeries, etc., -- all of those vulnerabilities are just as relevant to applications running on the cloud as they are to applications running on conventional hosting. • Similarly, consider physical security. A data center full of servers supporting cloud computing is internally and externally indistinguishable from a data center full of "regular" servers. In each case, it will be important for the data center to be physically secure against unauthorized access or potential natural disasters, but there are no special new physical security requirements which suddenly appear simply because one of those facilities is supporting cloud computing
  • 71.
  • 72.
  • 73.
    It's Not JustThe Network: Storage Is Key, Too See http://www.engadget.com/2009/10/10/t-mobile-we-probably-lost-all-your-sidekick-data/ However, see also: Microsoft Confirms Data Recovery for Sidekick Users http://www.microsoft.com/Presspass/press/2009/oct09/10-15sidekick.mspx 73
  • 74.
    And Let's NotForget About Power Issues 74
  • 75.
  • 76.
    Today’s IT infrastructureis under tremendous pressure and is finding it difficult to keep up… It will reach a breaking point In distributed computing Percentage of executives who report environments, up to 85 percent a security breach and aren’t confident of computing capacity sits idle they can prevent future breaches 70 percent is spent on Percentage of CIOs who want maintaining current IT to improve the way they use infrastructures versus adding and manage their data new capabilities 76
  • 77.
    Create a roadmapfor cloud as part of the existing IT optimization strategy Standardize and automate  Standardize services Virtualize  Reduce deployment cycles  Remove physical  Enable scalability resource boundaries  Flexible delivery Consolidate  Increase hardware  Reduce infrastructure utilization complexity  Reduce hardware  Reduce staffing costs requirements  Simplify deployments  Manage fewer things better  Lower operational costs
  • 78.
    Adoption of cloudcomputing will be workload driven • Workload characteristics determine standardization Test for Standardization Examine for Risk Explore New Workloads  Web infrastructure  Database  High volume, low cost applications  Transaction processing analytics  Collaborative infrastructure  ERP workloads  Collaborative Business  Development and test Networks  Highly regulated workloads  High Performance  Industry scale “smart” Computing ... applications ... ...
  • 79.
    Workloads ready forcloud computing • Analytics • Desktop and devices – Data mining, text mining or – Desktop other analytics – Service/help desk – Data warehouses or data marts • Development and test – Transactional databases – Development environment • Business services – Test environment – Customer relationship • Infrastructure management – Application servers (CRM) or sales force automation – Application streaming – E-mail – Business continuity/ – Enterprise resource planning disaster recovery (ERP) applications – Data archiving – Industry-specific applications – Data backup • Collaboration – Data center network capacity – Audio/video/Web conferencing – Security – Unified communications – Servers – VoIP infrastructure – Storage – Training infrastructure – Wide area network (WAN) capacity Source: IBM Market Insights, Cloud Computing Research, July 2009.
  • 80.
    Public and PrivateClouds are preferred for different workloads Top private workloads Top public workloads  Data mining, text mining, or other analytics  Audio/video/Web conferencing  Security  Service help desk  Data warehouses or data marts  Infrastructure for training and  Business continuity and disaster recovery demonstration  Test environment infrastructure  WAN capacity, VOIP Infrastructure  Long-term data archiving/preservation  Desktop  Transactional databases  Test environment infrastructure  Industry-specific applications  Storage  ERP applications  Data center network capacity  Server Database- and application-oriented Infrastructure workloads workloads emerge as most appropriate emerge as most appropriate Source: IBM Market Insights, Cloud Computing Research, July 2009. n=1,090
  • 81.
    There is aspectrum of deployment options for cloud computing Third-party Third-party hosted operated and operated Enterprise Enterprise Enterprise Enterprise Enterprise Users A B data center data center A B Private cloud Managed Hosted private Shared cloud Public cloud private cloud cloud services services Private Hybrid Public IT capabilities are Internal and IT activities / provided “as a service,” external service functions are over an intranet, within delivery provided “as a the enterprise and methods are service,” over the behind the firewall integrated Internet
  • 82.
    There is aspectrum of deployment options for cloud computing Third-party Third-party hosted operated and operated Enterprise Enterprise Enterprise Enterprise Enterprise Users A B data center data center A B Private cloud Managed Hosted private Shared cloud Public cloud private cloud cloud services services  Private  Third-party  Third-party  Mix of shared  Shared  Implemented operated owned and and dedicated resources on client  Enterprise operated resources  Elastic scaling premises owned  Standardization  Shared facility  Pay as you go  Client runs/  Mission critical  Centralization and staff  Public Internet manages  Packaged  Security  Virtual private applications  Internal network (VPN) access  High network compliancy  Subscription or  Internal network membership based
  • 83.
    Security is amonga top concern with cloud computing... Security Framework provides a structure to address this concern Application and process People and identity Help keep applications secure, Mitigate the risks protected from malicious or associated with user fraudulent use, and hardened access to corporate against failure resources Network, server and end point Optimize service availability by Data and information mitigating risks to network Understand, deploy and components properly test controls for access to and usage of Physical infrastructure sensitive data Provide actionable intelligence on the desired state of physical infrastructure security and make improvements Professional Managed services Hardware and services software
  • 84.
    Movement from TraditionalEnvironments to Cloud Can be in One Step or an Evolution Clients will make workload-driven trade offs among functions such as security, degree of customization, control and economics
  • 85.
    Businesses that implementcloud computing are seeing significant results Reduced IT labor cost by 50 percent in configuration, operations, management and monitoring Improved capital utilization by 75 percent, significantly reducing license costs Reduced provisioning cycle times from weeks to minutes Improved quality, eliminating 30 percent of software defects Reduced end user IT support costs by up to 40 percent Simplified security management
  • 86.
  • 87.
  • 88.
    But it doesmake sense for some functions within some organizations….
  • 89.
    The NIST CloudDefinition Framework Hybrid Clouds Deployment Models Private Community Public Cloud Cloud Cloud Service Software as a Platform as a Infrastructure as a Models Service (SaaS) Service (PaaS) Service (IaaS) On Demand Self-Service Essential Broad Network Access Rapid Elasticity Characteristics Resource Pooling Measured Service Massive Scale Resilient Computing Common Homogeneity Geographic Distribution Characteristics Virtualization Service Orientation Low Cost Software Advanced Security 89
  • 90.
    Elasticity, Risk, andUser Incentives Services Will Prefer Utility Computing to a Private Cloud When: Demand Varies over Time Demand Unknown in Advance Provisioning for Peak Leads to Web Startup May Experience a Underutilization at Other Times Huge Spike If It Becomes Popular Pay by the Hour Pay as You Go Does Not Require (Even if the Hourly Rate is Higher) Commitment in Advance The Value of Cost Associativity UserHourscloud × (revenue – Costcloud) ≥ UserHoursdatacenter × (revenue – Costdatacenter ) Utilization
  • 91.
    Cloud Is MostlyDriven by Money Economics of Cloud Computing Are Very Attractive to Some Users Cloud Computing Will Predicting Application Track Cost Changes Growth Hard Better than In-House Investment Risks May In-House, You Must Be Reduced Provision for Peak
  • 92.
    Cloud’s goal: flipthis equation 30% 70% On-Premise Your Managing All of the Infrastructure Business “Undifferentiated Heavy Lifting” Configuring Cloud-Based More Time to Focus on Your Cloud Infrastructure Your Business Assets 70% 30%
  • 93.
    IBM Cloud BusinessModel ROI Analysis Impact: Reduction of Total Cost of Ownership of Data Center Infrastructure New 100% Development Liberated Reduced Capital Expenditure funding for - Improved utilization reduces requirement for Software new new capital purchases Costs development, Strategic transformatio Change Reduced Operations Expenditure n investment Capacity - Lower facilities, maintenance, energy, IT Power or direct service delivery and labor costs Costs saving Additional Benefits Deployment (1- - Reduced risk, less idle time, more efficient Curren time) use of energy, acceleration of innovation t IT Labor Costs projects, enhanced customer service Spend (Operations Software and Costs Maintenance) Business Case Results Power Costs Hardware, labor & Annual savings: $3.3M (84%) (88.8%) power from $3.9M to $0.6M Hardware Labor Costs savings Costs ( - 80.7%) reduced Payback Period: 73 days (annualized) annual cost Hardware Costs of operation Net Present Value (NPV): $7.5M ( - 88.7%) by 83.8% Internal Rate of Return (IRR): 496% Note: 3-Year Depreciation Period with 10% Discount Return On Investment (ROI): 1039% Rate
  • 94.
    CSPs and cloudcomputing • The large CSPs have long history in running large scale data-centers and respective operations. • Hence, it is natural for CSPs to offer services via cloud paradigm, and enter into the domain of providing enterprise grade cloud computing services. o From history perspective the focus has been in IaaS. o This will most probably continue, since the infrastructure services continue to be a lucrative necessity. • Analyst (e.g. Ovum) reports indicate that SaaS/CaaS roadmaps are evolving within major telco CSPs. o This is logical growth path, as cloud computing model leverages the telco core competences. o CSPs already have strong foothold on connectivity, which is essential for XaaS. o Trend seems to be that IaaS remains the core focus, and SaaS is developed in an opportunistic way, i.e. develop a solution to a problem, and see whether it could be reapplied for a general business case according to SaaS. • Most often CaaS appears to represent communication as a service or collaboration as a service or unified communications as a services.
  • 95.
    Why CSPs havea strategic fit for cloud computing • Shared infrastructure • CSPs have long history of infrastructure, which is networked and interoperable via well-defined interfaces. • Managed and hosted IT and communications services • For a longer time CSPs have relied on vendors’ managed services type of professional services, which means that there is no inherent fear of outsourcing operative responsibilities. • Data centers • Data centers operations have been for long time the core of CSP production machines. • Security, data integrity and trust • These are the traditional key characteristics of telco business. • Managed network services and end-to-end SLAs. • CSPs are familiar with end-to-end SLA thinking and KPI based operations. • Communications as a service • Communications and connectivity is the bread and butter of CSPs. • SME customer base • The customer base of CSPs does cover SME, which means that they are familiar with the problems and issue within the segment.
  • 97.
    Workloads ready forcloud computing • Analytics • Desktop and devices – Data mining, text mining or – Desktop other analytics – Service/help desk – Data warehouses or data marts • Development and test – Transactional databases – Development environment • Business services – Test environment – Customer relationship • Infrastructure management – Application servers (CRM) or sales force automation – Application streaming – E-mail – Business continuity/ – Enterprise resource planning disaster recovery (ERP) applications – Data archiving – Industry-specific applications – Data backup • Collaboration – Data center network capacity – Audio/video/Web conferencing – Security – Unified communications – Servers – VoIP infrastructure – Storage – Training infrastructure – Wide area network (WAN) capacity Source: IBM Market Insights, Cloud Computing Research, July 2009.
  • 98.
    Enterprise Cloud Computing Consumption, EA & DCA Portfolio of Planning, Standards & Improvements Policies Virtualized System Lifecycles APPLICATION Private Clouds Hyperlinked Models RESOURCES IT OPS MGT APP ARCH & Metadata Improved End-to-End Policies Service Delivery OPS Policy-Based IT Design with with Control Flexibility  Dynamic Availability Public Clouds  Efficient Consumption Metering Servers Application & Billing Storage VMs IT-CONTROLLED CLOUD COMPUTING • Accelerate application delivery • Improve IT service management • Business obtains flexibility while IT maintains control Treat Cloud just like any IT project: focus, don't believe the hype, and take it step by step
  • 99.
    Mind the SLAGap! Data Center SLA MPLS SLA
  • 100.
  • 101.
    Conclusions Business Applications Mobile CRM Analytics Data Center VPN Email Infrastructure Desktop Software Its what your mother told you, “Don’t put all your eggs in one basket”