SlideShare a Scribd company logo
SYED MUHAMMED ANWAR
Nationality Pakistani
Year of Birth 1967
Profession Site Engineer (Civil)
Field Buildings, Quality Control , industrial Projects, Oil & Gas Field
Year of Start of Field 1988
Experience 26 – Years
Mailing Address House #, E-245-246 Kausar Town Malir
Extension, Colony, Karachi.
Contact # 92-21-4519783, 0300-3718818
E-Mail: Syed_manwar@yahoo.com
Technical Education
Diploma of Associates Engineer, From Jamia Millia Polytechnic in 1987
________________________________________________________________
EXPERIENCE RECORD:
From June 2013 to Date M/S UNITED ENERGY OF PKISTAN
(OIL & Gas)
Project: - Turk Amine Plant (30 million MMCFD)
Naimat Phase IV (40 million MMCFD)
Naimat Phase 5A, B (160 million MMCFD)
 Position: CONSTRUCTION SITE INCHARGE
 Responsibility:
Responsible for all activities relating to Management and Construction of CCR Building, Equipment
Foundations, MCC Room and pipe support foundations
 Major Activities Include:
Survey, Location and Layout of Building, Equipment Foundations
Supervision of Earth works.
Supervision of Construction works.
Quality control and Co-ordination
From June 2001 to June 2013 M/S TOTAL CONSTRUCTION
Project: - Lever Brothers Head Office
(Interior Finishing)
Indus Dying Head Office
(Interior Finishing)
Standard Charted Bank
Boat Basin Branch
TABBA Heart Institute
(Structure and Interior)
Saya Weaving Mill Karachi
(Structure)
South City Hospital Clifton
(Structure and Interior)
National Institute Of Kidney
& Urological Desies.
(Structure)
Meezan Bank New Head office Building
(Structure and Interior)
Baitul Salam Mosque (D.H.A Phase IV)
(Structure and Interior)
Tetra pak Lahore
(Interior)
Mercedes Benz Show Room (Clifton)
(Steel Structure)
Masjid Baitus-salam(D.H.A phase-4)
(Structure and Finishing)
 Position: Site Engineer /Project Manager
 Responsibility:
Responsible for all activities relating to Management and Construction of Residential Multi- Storied
Building.
 Major Activities Include:
Survey, Location and Layout of Buildings.
Supervision of Earth works.
Supervision of Construction works.
Supervision of Finishing works.
Quality control and Co-ordination.
Management of Site Supervision, Laborers and sub-contractors i-e Masons,
Carpenters, Steel Fixers, Pouring foreman and Material Suppliers, Tendering, Making
of Work Schedule.
From November 2000 To June 2001 M/s Shamsi Builders Limited
Project: Pakistan Housing Programme
Project Cost: 223,000,000
 Responsibility:
Responsible for all activities relating to Management and Construction of Residential Multi- Storied
Building.
 Major Activities Include:
Survey, Location and Layout of Buildings.
Supervision of Earth works.
Supervision of Construction works.
Supervision of Finishing works.
Quality control and Co-ordination.
Management of Site Supervision, Laborers and sub-contractors i-e Masons,
Carpenters, Steel Fixers, Pouring foreman and Material Suppliers.
May 1998 to Nov 2000 M/S Abad & Co.
Project: Slag Converting Processing Plant
Project Cost: 100,000,000
 Position: Site Engineer
 Major Activities Include:
Survey and Layout of Buildings.
Supervision of Construction works.
Supervision of Finishing works.
Management of Labour at Site.
Billing of site Sub Contractor.
Preparation of bar bending schedule.
Fixing of embedded items and heavy machine foundations.
Sept. 1997 to April 1998. Guarantee Engineer (pvt) Ltd.
Project: Textile University at Port Qasim
Project Cost: 130,000,000
 Position: Site Engineer
 Major Activities Include:
Survey and Layout of Buildings.
Supervision of Earth works.
Supervision of Construction of Building, Under Ground Water Tank and Boundary Wall.
Management of Supervisors and Labourers at site.
Co-Ordination and Quality Control Activities.
Finishing External Activities (Envicrete Tiles).
Aug. 1996 to July 1997. M/s Encom Engineers (pvt) Ltd.
Project: Al Noor Fertilizer Port Qasim
Project Cost: 220,000,000
 Position: Asst. Site Engineer
 Major Activities Include:
Base- Line Survey.
Supervision of Construction of Structures.
Supervision of Rock Dumping and Stone Pitching.
Quality Controlling.
Inspection and Reporting
Final Measurement and Assessment.
Jan. 1995 to June 1996 M/S ABC (PVT) Ltd.
Project: Saadi Cement Factory Hattar Indust.
Projects Cost: 130,000,000
 Position: Site Incharge.
 Major Activities Include:
Base- Line Survey.
Supervision of Construction of Structure.
Supervision of Rock Dumping.
Quality Controlling.
Inspection and Reporting.
Final Measurement and Assessment.
Finalization of heavy foundation and embedded items.
PROJECT:-
a. Gypsum crusher.
b. Lime stone crusher.
c. Pre- Blending yard (Incharge).
d. Secondary crusher (Incharge).
FEB. 1993 to JAN 1995 M.A Construction Company
Projects: Gul Ahmed Textile Mills.
Projects Cost: 500,000,00
Position: Asst. Site Incharge.
INDUSTRIAL PROJECTS:-
a. Loom shed.
b. Service bay.
c. Re- Beamer Building.
d. Beam store.
e. Sizing department.
f. Indigo department.
Nov. 1988 to Dec. 1992 NATIONAL CONSTRUCTION TD.
Projects: Billet Caster at Pakistan Steel
Project Cost: 220,000,00
Project: Thermal Power Plant at Pakistan Steel.
Project Cost: 300,000,0
Project: Pak Suzuki Plant at Pakistan Steel.
Project Cost: 50,000,00
 Position: Site Supervisor.
 Major Activities Include
Base- Line Survey.
Supervision of Construction of Structure.
Supervision of Rock Dumping.
Quality Controlling.
Embedded item fixing.
Ten dish lining.
Ladle lining.
PROFESSIONAL STRENGTH:
• Maintaining smooth flow of activities for progress of progress.
• Develop e-coordination between Site & Head Office.
• Developing construction schedule for planning and execution of project.
• Preparing Progress Reports during execution of project.
• Doing site survey and investigation for collecting of project.
• Preparing Bar Bending Schedule & B.O.Q from approved drawing.
• Preparing demand & Request for the required material.
• Preparing status of Progress and Material.
• Providing reports for Reconciliation.
• Land Survey of Roads for reconciliation.
• Land Survey of Roads and Sewerage.
• Construction Supervision of all types of R.C.C works.
• Management of Labourers and sub-contractors at site.
• Making Running bill of sub-contractor.
• Checking strength of given sample to ensure the quality of materials.
• Material procurement and other related activities.
• Observe leakage and other irregularities during execution of projects.
• Supervise material procurement associated with any increase or decrease with change order.
References:
Provide as per Requirement.
Interests:
Studying engineering Books, cricket and
Familiar with Out-Door Construction relative Activities.
Familiar with Out-Door Construction relative Activities.

More Related Content

What's hot

Nazmy Nabil Nazmy
Nazmy Nabil NazmyNazmy Nabil Nazmy
Nazmy Nabil NazmyNazmy Nabil
 
final resume Rakesh kumar
final resume Rakesh kumarfinal resume Rakesh kumar
final resume Rakesh kumarrakesh kumar
 
RESUME (AjitDas)
RESUME (AjitDas)RESUME (AjitDas)
RESUME (AjitDas)Ajit Das
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015Ahmed Yehia
 
CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.zaid Abbas
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)AHMED SAKR
 
CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)zeeshan Ali
 
Cv (engr. asif raza)
Cv (engr. asif raza)Cv (engr. asif raza)
Cv (engr. asif raza)
Asif Raza
 
Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016Diaa Anwar
 

What's hot (19)

RESUME VICTOR
RESUME VICTORRESUME VICTOR
RESUME VICTOR
 
Nazmy Nabil Nazmy
Nazmy Nabil NazmyNazmy Nabil Nazmy
Nazmy Nabil Nazmy
 
paramasivam resume
paramasivam resume paramasivam resume
paramasivam resume
 
Resume(1)(1) - Copy
Resume(1)(1) - CopyResume(1)(1) - Copy
Resume(1)(1) - Copy
 
final resume Rakesh kumar
final resume Rakesh kumarfinal resume Rakesh kumar
final resume Rakesh kumar
 
RESUME (AjitDas)
RESUME (AjitDas)RESUME (AjitDas)
RESUME (AjitDas)
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015
 
aminCV 2016
aminCV 2016aminCV 2016
aminCV 2016
 
Resume-up-Aug-16
Resume-up-Aug-16Resume-up-Aug-16
Resume-up-Aug-16
 
Hossam 2006 - English CV
Hossam 2006 - English CVHossam 2006 - English CV
Hossam 2006 - English CV
 
CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.
 
shishir_cv
shishir_cvshishir_cv
shishir_cv
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)
 
CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)
 
shoukat buildings and Roads -
shoukat buildings and Roads -shoukat buildings and Roads -
shoukat buildings and Roads -
 
Cv (engr. asif raza)
Cv (engr. asif raza)Cv (engr. asif raza)
Cv (engr. asif raza)
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 
2016 CV_LININGTON, Andrew
2016 CV_LININGTON, Andrew2016 CV_LININGTON, Andrew
2016 CV_LININGTON, Andrew
 
Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016
 

Viewers also liked

Case studies
Case studiesCase studies
Case studies
Ramkumar ,PMP
 
Radu cinamar misterul din-egipt-primul-tunel
Radu cinamar misterul din-egipt-primul-tunelRadu cinamar misterul din-egipt-primul-tunel
Radu cinamar misterul din-egipt-primul-tunel
viola_ro
 
Kai_droplet_impinging
Kai_droplet_impingingKai_droplet_impinging
Kai_droplet_impingingkai zhang
 
Global private equity trends in the 1 st quarter of 2013
Global private equity trends in the 1 st quarter of 2013Global private equity trends in the 1 st quarter of 2013
Global private equity trends in the 1 st quarter of 2013
Ramkumar ,PMP
 
acaros Agropuli cctd 01 adultos (2)
acaros Agropuli cctd 01 adultos (2)acaros Agropuli cctd 01 adultos (2)
acaros Agropuli cctd 01 adultos (2)
Tierra Diatomeas
 
Future tenses
Future tensesFuture tenses
Future tenses
Carla Carla
 
Каталог 03/2017
Каталог 03/2017Каталог 03/2017
Каталог 03/2017
SvetaAvon
 
GigaSpaces Cloudify - The PaaS Jailbreaker
GigaSpaces Cloudify - The PaaS Jailbreaker GigaSpaces Cloudify - The PaaS Jailbreaker
GigaSpaces Cloudify - The PaaS Jailbreaker
Uri Cohen
 
Comprobantes de pago electronico
Comprobantes de pago electronicoComprobantes de pago electronico
Comprobantes de pago electronico
vavacara
 
One Does Not Simply Walk Into Devops
One Does Not Simply Walk Into Devops One Does Not Simply Walk Into Devops
One Does Not Simply Walk Into Devops
Uri Cohen
 
Question words
Question wordsQuestion words
Question words
Josefina Von der Wettern
 
SPT15 To the Cloud! Utilizing AWS and Azure as Cloud Hosting Providers for Sh...
SPT15 To the Cloud! Utilizing AWS and Azure as Cloud Hosting Providers for Sh...SPT15 To the Cloud! Utilizing AWS and Azure as Cloud Hosting Providers for Sh...
SPT15 To the Cloud! Utilizing AWS and Azure as Cloud Hosting Providers for Sh...
Scott Hoag
 
Каталог 05/2016
Каталог 05/2016Каталог 05/2016
Каталог 05/2016
SvetaAvon
 

Viewers also liked (19)

MARIANITO CV
MARIANITO CVMARIANITO CV
MARIANITO CV
 
Case studies
Case studiesCase studies
Case studies
 
Radu cinamar misterul din-egipt-primul-tunel
Radu cinamar misterul din-egipt-primul-tunelRadu cinamar misterul din-egipt-primul-tunel
Radu cinamar misterul din-egipt-primul-tunel
 
Kai_droplet_impinging
Kai_droplet_impingingKai_droplet_impinging
Kai_droplet_impinging
 
Company profile
Company profileCompany profile
Company profile
 
Refin Avantgarde
Refin AvantgardeRefin Avantgarde
Refin Avantgarde
 
Resumé marwa
Resumé marwaResumé marwa
Resumé marwa
 
Global private equity trends in the 1 st quarter of 2013
Global private equity trends in the 1 st quarter of 2013Global private equity trends in the 1 st quarter of 2013
Global private equity trends in the 1 st quarter of 2013
 
acaros Agropuli cctd 01 adultos (2)
acaros Agropuli cctd 01 adultos (2)acaros Agropuli cctd 01 adultos (2)
acaros Agropuli cctd 01 adultos (2)
 
Future tenses
Future tensesFuture tenses
Future tenses
 
Каталог 03/2017
Каталог 03/2017Каталог 03/2017
Каталог 03/2017
 
GigaSpaces Cloudify - The PaaS Jailbreaker
GigaSpaces Cloudify - The PaaS Jailbreaker GigaSpaces Cloudify - The PaaS Jailbreaker
GigaSpaces Cloudify - The PaaS Jailbreaker
 
Comprobantes de pago electronico
Comprobantes de pago electronicoComprobantes de pago electronico
Comprobantes de pago electronico
 
One Does Not Simply Walk Into Devops
One Does Not Simply Walk Into Devops One Does Not Simply Walk Into Devops
One Does Not Simply Walk Into Devops
 
Question words
Question wordsQuestion words
Question words
 
SPT15 To the Cloud! Utilizing AWS and Azure as Cloud Hosting Providers for Sh...
SPT15 To the Cloud! Utilizing AWS and Azure as Cloud Hosting Providers for Sh...SPT15 To the Cloud! Utilizing AWS and Azure as Cloud Hosting Providers for Sh...
SPT15 To the Cloud! Utilizing AWS and Azure as Cloud Hosting Providers for Sh...
 
SAMS
SAMSSAMS
SAMS
 
1. Introduction to mis
1. Introduction to mis1. Introduction to mis
1. Introduction to mis
 
Каталог 05/2016
Каталог 05/2016Каталог 05/2016
Каталог 05/2016
 

Similar to SYED MUHAMMED ANWAR

Cv 01
Cv 01Cv 01
V.BASKAR CV
V.BASKAR CVV.BASKAR CV
V.BASKAR CVBaskar v
 
My Fresh Cv.pdf
My Fresh Cv.pdfMy Fresh Cv.pdf
My Fresh Cv.pdf
tauqeerarain9211
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-NewManish Sabane
 
internship review .pdf
internship review .pdfinternship review .pdf
internship review .pdf
PAYALINAMDAR
 
Saravanan CV 2015.1
Saravanan CV 2015.1Saravanan CV 2015.1
Saravanan CV 2015.1Bob Vanan
 
Akhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docAkhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).doc
ShahbazAhmad953994
 
Ahmed Mousa Resume
Ahmed Mousa ResumeAhmed Mousa Resume
Ahmed Mousa ResumeAhmed Mousa
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWAhmed Senosy
 
CV-Bhat 2016
CV-Bhat 2016CV-Bhat 2016
CV-Bhat 2016bhat gb
 

Similar to SYED MUHAMMED ANWAR (20)

MCV
MCVMCV
MCV
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Cv 01
Cv 01Cv 01
Cv 01
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
V.BASKAR CV
V.BASKAR CVV.BASKAR CV
V.BASKAR CV
 
Rajbir Singh-2
Rajbir Singh-2Rajbir Singh-2
Rajbir Singh-2
 
My Fresh Cv.pdf
My Fresh Cv.pdfMy Fresh Cv.pdf
My Fresh Cv.pdf
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
Farman Ali Rao
Farman Ali RaoFarman Ali Rao
Farman Ali Rao
 
internship review .pdf
internship review .pdfinternship review .pdf
internship review .pdf
 
Abdul Hameed Civil supervisor
Abdul Hameed Civil supervisorAbdul Hameed Civil supervisor
Abdul Hameed Civil supervisor
 
Saravanan CV 2015.1
Saravanan CV 2015.1Saravanan CV 2015.1
Saravanan CV 2015.1
 
Akhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docAkhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).doc
 
CV Updated
CV UpdatedCV Updated
CV Updated
 
Ahmed Mousa Resume
Ahmed Mousa ResumeAhmed Mousa Resume
Ahmed Mousa Resume
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 
Ahmed Aboul Azm
Ahmed Aboul AzmAhmed Aboul Azm
Ahmed Aboul Azm
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
CV-Bhat 2016
CV-Bhat 2016CV-Bhat 2016
CV-Bhat 2016
 

SYED MUHAMMED ANWAR

  • 1. SYED MUHAMMED ANWAR Nationality Pakistani Year of Birth 1967 Profession Site Engineer (Civil) Field Buildings, Quality Control , industrial Projects, Oil & Gas Field Year of Start of Field 1988 Experience 26 – Years Mailing Address House #, E-245-246 Kausar Town Malir Extension, Colony, Karachi. Contact # 92-21-4519783, 0300-3718818 E-Mail: Syed_manwar@yahoo.com Technical Education Diploma of Associates Engineer, From Jamia Millia Polytechnic in 1987 ________________________________________________________________ EXPERIENCE RECORD: From June 2013 to Date M/S UNITED ENERGY OF PKISTAN (OIL & Gas) Project: - Turk Amine Plant (30 million MMCFD) Naimat Phase IV (40 million MMCFD) Naimat Phase 5A, B (160 million MMCFD)  Position: CONSTRUCTION SITE INCHARGE  Responsibility: Responsible for all activities relating to Management and Construction of CCR Building, Equipment Foundations, MCC Room and pipe support foundations  Major Activities Include: Survey, Location and Layout of Building, Equipment Foundations Supervision of Earth works. Supervision of Construction works. Quality control and Co-ordination
  • 2. From June 2001 to June 2013 M/S TOTAL CONSTRUCTION Project: - Lever Brothers Head Office (Interior Finishing) Indus Dying Head Office (Interior Finishing) Standard Charted Bank Boat Basin Branch TABBA Heart Institute (Structure and Interior) Saya Weaving Mill Karachi (Structure) South City Hospital Clifton (Structure and Interior) National Institute Of Kidney & Urological Desies. (Structure) Meezan Bank New Head office Building (Structure and Interior) Baitul Salam Mosque (D.H.A Phase IV) (Structure and Interior) Tetra pak Lahore (Interior) Mercedes Benz Show Room (Clifton) (Steel Structure) Masjid Baitus-salam(D.H.A phase-4) (Structure and Finishing)  Position: Site Engineer /Project Manager  Responsibility: Responsible for all activities relating to Management and Construction of Residential Multi- Storied Building.  Major Activities Include: Survey, Location and Layout of Buildings. Supervision of Earth works. Supervision of Construction works. Supervision of Finishing works. Quality control and Co-ordination. Management of Site Supervision, Laborers and sub-contractors i-e Masons, Carpenters, Steel Fixers, Pouring foreman and Material Suppliers, Tendering, Making of Work Schedule. From November 2000 To June 2001 M/s Shamsi Builders Limited Project: Pakistan Housing Programme Project Cost: 223,000,000  Responsibility: Responsible for all activities relating to Management and Construction of Residential Multi- Storied Building.
  • 3.  Major Activities Include: Survey, Location and Layout of Buildings. Supervision of Earth works. Supervision of Construction works. Supervision of Finishing works. Quality control and Co-ordination. Management of Site Supervision, Laborers and sub-contractors i-e Masons, Carpenters, Steel Fixers, Pouring foreman and Material Suppliers. May 1998 to Nov 2000 M/S Abad & Co. Project: Slag Converting Processing Plant Project Cost: 100,000,000  Position: Site Engineer  Major Activities Include: Survey and Layout of Buildings. Supervision of Construction works. Supervision of Finishing works. Management of Labour at Site. Billing of site Sub Contractor. Preparation of bar bending schedule. Fixing of embedded items and heavy machine foundations. Sept. 1997 to April 1998. Guarantee Engineer (pvt) Ltd. Project: Textile University at Port Qasim Project Cost: 130,000,000  Position: Site Engineer  Major Activities Include: Survey and Layout of Buildings. Supervision of Earth works. Supervision of Construction of Building, Under Ground Water Tank and Boundary Wall. Management of Supervisors and Labourers at site. Co-Ordination and Quality Control Activities. Finishing External Activities (Envicrete Tiles). Aug. 1996 to July 1997. M/s Encom Engineers (pvt) Ltd. Project: Al Noor Fertilizer Port Qasim Project Cost: 220,000,000  Position: Asst. Site Engineer  Major Activities Include: Base- Line Survey. Supervision of Construction of Structures. Supervision of Rock Dumping and Stone Pitching. Quality Controlling.
  • 4. Inspection and Reporting Final Measurement and Assessment. Jan. 1995 to June 1996 M/S ABC (PVT) Ltd. Project: Saadi Cement Factory Hattar Indust. Projects Cost: 130,000,000  Position: Site Incharge.  Major Activities Include: Base- Line Survey. Supervision of Construction of Structure. Supervision of Rock Dumping. Quality Controlling. Inspection and Reporting. Final Measurement and Assessment. Finalization of heavy foundation and embedded items. PROJECT:- a. Gypsum crusher. b. Lime stone crusher. c. Pre- Blending yard (Incharge). d. Secondary crusher (Incharge). FEB. 1993 to JAN 1995 M.A Construction Company Projects: Gul Ahmed Textile Mills. Projects Cost: 500,000,00 Position: Asst. Site Incharge. INDUSTRIAL PROJECTS:- a. Loom shed. b. Service bay. c. Re- Beamer Building. d. Beam store. e. Sizing department. f. Indigo department. Nov. 1988 to Dec. 1992 NATIONAL CONSTRUCTION TD. Projects: Billet Caster at Pakistan Steel Project Cost: 220,000,00 Project: Thermal Power Plant at Pakistan Steel. Project Cost: 300,000,0 Project: Pak Suzuki Plant at Pakistan Steel. Project Cost: 50,000,00  Position: Site Supervisor.
  • 5.  Major Activities Include Base- Line Survey. Supervision of Construction of Structure. Supervision of Rock Dumping. Quality Controlling. Embedded item fixing. Ten dish lining. Ladle lining. PROFESSIONAL STRENGTH: • Maintaining smooth flow of activities for progress of progress. • Develop e-coordination between Site & Head Office. • Developing construction schedule for planning and execution of project. • Preparing Progress Reports during execution of project. • Doing site survey and investigation for collecting of project. • Preparing Bar Bending Schedule & B.O.Q from approved drawing. • Preparing demand & Request for the required material. • Preparing status of Progress and Material. • Providing reports for Reconciliation. • Land Survey of Roads for reconciliation. • Land Survey of Roads and Sewerage. • Construction Supervision of all types of R.C.C works. • Management of Labourers and sub-contractors at site. • Making Running bill of sub-contractor. • Checking strength of given sample to ensure the quality of materials. • Material procurement and other related activities. • Observe leakage and other irregularities during execution of projects. • Supervise material procurement associated with any increase or decrease with change order. References: Provide as per Requirement. Interests: Studying engineering Books, cricket and
  • 6. Familiar with Out-Door Construction relative Activities.
  • 7. Familiar with Out-Door Construction relative Activities.