LEARNING OUTCOMES

1. To work out on material requirement in
producing a product.
2. To calculate cost per unit, selling
price, and profit margin.
3. To construct process flow of
production.
ACTIVITY 1

Work in group. Assuming that you are
about to start a selling burger business
via roadside stall at Taman Seroja.
List down all the raw materials needed to
produce burger.
ACTIVITY 2
Assuming the following list of raw materials,
work out on cost per unit of your burger.
Suggest your selling price and calculate your
profit margin.
• Burger Bun – 40pcs @ RM15.00
• Tomato Sos – 340g @ RM2.20 (enough for 40 pcs of finished burger)
• Chili Sos – 330g @ RM2.00 (enough for 40 pcs of finished burger)
• Beef Paste – RM4.20 of 10 pcs of Ramly beef paste.
• Mayonaise – 230g @ RM3.30. (enough for 40 pcs of finished burger)
• Cucumber – RM0.60 per piece. (enough for 70 pcs of finished burger)
ACTIVITY 2

Work in group. Assuming that you are
about to start a selling burger business
via roadside stall at Taman Seroja.
List down all the raw materials needed to
produce burger.
Operation Management
1.
2.
3.
4.
5.
6.
7.

The Transformation Process
Productivity Index
Process Planning
Material Requirement Planning
Layout Plan
Selection of Location
Calculation of Operational Costs
1. The Transformation Process
External Environment Forces

INPUT______
• LABOUR
• RAW MATERIALS
• MACHINES &
EQUIPMENTS
• TECHNOLOGY &
METHODS
• CAPITAL

OUTPUT___
TRANSFORMATION
PROCESS

SERVICES
OR
PRODUCTS
2. Productivity Index
Total Value of Output
Productivity Index =
Total Value of Input

The productivity index (P.I) can be more or
less than 1.
P.I > 1 = business running efficiently
P.I < 1 = business running inefficiently
3. Process Planning
Symbol

Type of
Activities

Description

Operation

Activities that modify, transform or give
values to the output

Transportation

When materials are transported from
one point to another.

Inspection

Measures standard of the in-process
material, finished product or services

Delay

When in-process material is restrained in
a location waiting for next activity

Storage

When in-process materials or finished
products are stored in the storage area.
4. Material Requirement
Planning
Step I :
Step II :
Step III:
Step IV:

Identify and list down the raw
materials required
Prepare the bill of materials
Calculate the quantity of raw
material required
Identify supplier
Step I
Identify and list all the raw materials required
to manufacture the product or provide the
service.
– Restaurant: the raw materials required depend
on the menu for the day
– Cleaning service: the materials required include
consumable items like detergents and scrubbing
pads.
– Retail business: fresh goods, sundry goods,
canned goods.
– Burger Stall: the raw materials used are
proportionate to each layer of ingredients inside
the burger.
Step II
• Prepare a bill of
materials required for
a unit of product.
Ingredient Amount required for
100 cookies
Flour
2 kg
Margarine 0.5 kg
Sugar

1 kg

Eggs

4 units

Water

0.5 litre
• Therefore, the bill of materials
for a unit of cookies will be:
Ingredient

Amount Required/Cookie

Flour

0.02 kg

Margarine
Sugar

0.005 kg
0.01 kg

Eggs

0.04 of an eggs
(1 egg for 25 cookies)
0.005 litre

Water
Step III
• Estimate the raw material requirement
by multiplying the bill of materials with
the total number of cookies to be
produced monthly.
• The number of units to be produced
must be based on the sales forecast in
the marketing plan.
Example:
If the forecast demand per month is 50,000
units of cookies.
If the amount of stock at the end of the
month is 5% of the amount.
= 50,000 + 5%(50,000)
= 50,000 + 2,500
= 52,500 cookies/month
The materials required for the month:
Ingredient

Amount Required/Month

Flour

0.02kg/unit x 52,500 = 1050kg

Margarine

0.005kg/unit x 52,500 = 2025kg

Sugar

0.01kg/unit x 52,500 = 525kg

Eggs

0.04/unit x 52,500 = 2100 units

Water

0.005litre/unit x 52,500 = 262.5 litre
Step IV
Identify supplier
• Look through internet/publications/survey by
trade associations, and seek quotations
from suitable suppliers.
1.
2.
3.
4.

Price and discount
offered
Quality of materials
Sales terms & conditions
e.g payment terms
After sale service and
warranty

5.

6.
7.

Lead time i.e the time
between orders and
delivery
Delivery terms e.g free
transportation
Reliability of supplier
Capacity Planning
• The capacity of any production
operation refers to the amount of
output that can be produced within a
specified time.
• It is a method to calculate machinery
and manpower requirements so that
production demand based on sales
forecast can be met.
• Based on monthly sales forecast, the
daily production capacity can be
determine by dividing it by the number
of working days per month.
• This capacity should be divided by the
number of working hours per day to
give the capacity per hour.
• If sales forecast is 520 units of ‘tudung’
per month.
• If working days per month is assumed
to be 26 days per month, the daily
production rate is:

910
days = 35 ' tudung' per day
26

35
hours = 5 ' tudung' per hour
7
Purchasing of
‘tudung’ materials
Storage of ‘tudung’
materials
Cutting of raw materials to size.
i.e large, medium and small
Quality inspection
Transport the materials that
have been cut to tailor’s
table

Sewing by
tailors

Ironing

Packaging

Storage before
shipping out
Activity: ‘Tudung’ cutting
If one cutter can cut 1 ‘tudung’ in 1/3
hour, the reciprocal of this is:
= the cutter’s capacity to cut per hour
= 3 ‘tudung’ per hour
Therefore, the number of cutter required
is:
= Production capacity per
hour/cutter’s capacity per hour
= 5/3 = 1.67 (needs 2 cutters)
Manpower Requirement
Determine the number of workers required
If one tailor can sew 1 ‘tudung’ in ½ hour,
then his hourly capacity is:
= 1/0.5 hr
= 2 ‘tudung’ per hour
Therefore, the number of tailors required
is:
= 5/2
= 2.5 tailors (3 tailors) and also, at least 3
sewing machines + 1 (standby)
If one tailor requires a working space
of 8 ft by 10 ft, than the total space
required for 4 tailors is:
= 8ft x 10 ft x 4 tailors
= 320 square ft
5. Layout
• Layout refers to the arrangement of
machinery, equipment, workers and other
facilities used in the operation.
• The arrangement should be made in such a
way that the production of goods and
services can be done efficiently.
• It should take into consideration the
integration of several factors including work
station, tool room, store, office, prayer room
and toilet.
Types of layout
Layout based on product
– The design is done according to the
sequence of activity to produce the
product.
Layout based on process
– The design is based on the production
process.
– It is suitable for a factory producing
several products that undergo a similar
process.
Layout based on marketing
– The layout is designed to utilise the
available space to display goods.
– Example: retailed shop and bookshop.
•Arrangement of goods are
interactive
•Goods are easily accessible and
convenient for the customers
•It is easy for the entrepreneur to
protect goods from theft
•The entrepreneur can maximize the
return of investment form the space
used.
6. Physical Location
• It is crucial to choose the right location
for the business because a strategic
location can contribute to the success
of the business.
• The choice of location will depend on
the following factors:
– Distance of operation centre/factory
is near from the source of raw
materials
– Near to the source of manpower
– Easy access to transportation facilities.
•Highways e.g. LPT
•Port e.g. Klang
•Airport e.g. Sepang
– Distance from targeted customers.
– Other factors
•Basic infrastructure, Utilities, banks,
schools and housing, government
policies and safety of surrounding.
7. Operations Costs
• It is essential to determine the total
operational cost in order to calculate
the cost per unit of the goods
produced.
• Operations costs include costs of
direct material, direct labour and
overheads
• Direct materials costs
– Money spend on materials that are
directly used to produce the products
or services.
• Direct labour costs
– The money paid as wages, salaries and
benefits to the workers involved directly
in the production of the products and
services.
• Overhead costs
– Include electricity, water, rents,
insurance, wages of indirect labour,
maintenance and depreciation.
Operations Costs = Direct material + Direct labour + Overhead
Total Operations Cost (RM)
Cost per Unit =
Total Number of Output (Units)
Q&A
THANK YOU!!

More Related Content

What's hot

Operations Management CHAPTER 1
Operations Management CHAPTER 1Operations Management CHAPTER 1
Operations Management CHAPTER 1Alvaro Alvarez
 
Operations management
Operations managementOperations management
Operations managementPrithvi Ghag
 
Operations management forecasting
Operations management   forecastingOperations management   forecasting
Operations management forecastingTwinkle Constantino
 
Operation management History
Operation management HistoryOperation management History
Operation management HistoryQC Labs
 
Chapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_servicesChapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_servicesNên Trần Ngọc
 
Operations - Managing Quality
Operations - Managing QualityOperations - Managing Quality
Operations - Managing Qualitytutor2u
 
Introduction to Logistics Management
Introduction to Logistics ManagementIntroduction to Logistics Management
Introduction to Logistics ManagementLitunya Laurean
 
Entrepreneurial Management (EM 01) - Entrepreneurship
Entrepreneurial Management (EM 01) - EntrepreneurshipEntrepreneurial Management (EM 01) - Entrepreneurship
Entrepreneurial Management (EM 01) - EntrepreneurshipSuhas Dutta
 
operation management chapter 2
operation management chapter 2operation management chapter 2
operation management chapter 2jhoy1221
 
6. process selection and facility layout
6. process selection and facility layout6. process selection and facility layout
6. process selection and facility layoutSudipta Saha
 
Production and operations management
Production and operations management Production and operations management
Production and operations management Shilpi Panchal
 
Operation management intro
Operation management  introOperation management  intro
Operation management introStudsPlanet.com
 
Entrepreneurial competencies, By Dr. Parul Chotalia
Entrepreneurial competencies, By Dr. Parul ChotaliaEntrepreneurial competencies, By Dr. Parul Chotalia
Entrepreneurial competencies, By Dr. Parul ChotaliaDr. Parul Chotalia
 
Chapter 5 service design
Chapter 5  service designChapter 5  service design
Chapter 5 service designalpha flores
 
Product and service design
Product and service designProduct and service design
Product and service designGrace Falcis
 

What's hot (20)

Operations Management CHAPTER 1
Operations Management CHAPTER 1Operations Management CHAPTER 1
Operations Management CHAPTER 1
 
Operations management
Operations managementOperations management
Operations management
 
Operations management forecasting
Operations management   forecastingOperations management   forecasting
Operations management forecasting
 
Operation management History
Operation management HistoryOperation management History
Operation management History
 
Chapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_servicesChapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_services
 
Operations - Managing Quality
Operations - Managing QualityOperations - Managing Quality
Operations - Managing Quality
 
Introduction to Logistics Management
Introduction to Logistics ManagementIntroduction to Logistics Management
Introduction to Logistics Management
 
Entrepreneurial Management (EM 01) - Entrepreneurship
Entrepreneurial Management (EM 01) - EntrepreneurshipEntrepreneurial Management (EM 01) - Entrepreneurship
Entrepreneurial Management (EM 01) - Entrepreneurship
 
operation management chapter 2
operation management chapter 2operation management chapter 2
operation management chapter 2
 
6. process selection and facility layout
6. process selection and facility layout6. process selection and facility layout
6. process selection and facility layout
 
Ch 1
Ch 1Ch 1
Ch 1
 
Production and Operation Management
Production and Operation ManagementProduction and Operation Management
Production and Operation Management
 
Production and operations management
Production and operations management Production and operations management
Production and operations management
 
Introduction To Operation Management
Introduction To Operation ManagementIntroduction To Operation Management
Introduction To Operation Management
 
Operation management intro
Operation management  introOperation management  intro
Operation management intro
 
CUSTOMER SERVICE IN LOGISTICS
CUSTOMER SERVICE IN LOGISTICSCUSTOMER SERVICE IN LOGISTICS
CUSTOMER SERVICE IN LOGISTICS
 
Entrepreneurial competencies, By Dr. Parul Chotalia
Entrepreneurial competencies, By Dr. Parul ChotaliaEntrepreneurial competencies, By Dr. Parul Chotalia
Entrepreneurial competencies, By Dr. Parul Chotalia
 
Chapter 5 service design
Chapter 5  service designChapter 5  service design
Chapter 5 service design
 
Product and service design
Product and service designProduct and service design
Product and service design
 
Operations management
Operations managementOperations management
Operations management
 

Similar to Chapter 5 operation management

Operation Management KG Ousl
Operation Management KG Ousl Operation Management KG Ousl
Operation Management KG Ousl Upananda Witta
 
WEEK 10- 4MS OF OPERATION- METHOD.pptx
WEEK 10- 4MS OF  OPERATION- METHOD.pptxWEEK 10- 4MS OF  OPERATION- METHOD.pptx
WEEK 10- 4MS OF OPERATION- METHOD.pptxMaamLyca
 
IV. System Design and Optimization .pptx
IV. System Design and Optimization .pptxIV. System Design and Optimization .pptx
IV. System Design and Optimization .pptxCaptainPats
 
WEEK 10- 4MS OF OPERATION- METHOD.pptx
WEEK 10- 4MS OF  OPERATION- METHOD.pptxWEEK 10- 4MS OF  OPERATION- METHOD.pptx
WEEK 10- 4MS OF OPERATION- METHOD.pptxMaamLyca
 
OPERATIONS MANAGEMENT- Full Slides.pptx
OPERATIONS MANAGEMENT- Full Slides.pptxOPERATIONS MANAGEMENT- Full Slides.pptx
OPERATIONS MANAGEMENT- Full Slides.pptxThusharaVinay
 
introduction to operation management
introduction to operation managementintroduction to operation management
introduction to operation managementSanjay Thakur
 
Job shop production system final
Job shop production system finalJob shop production system final
Job shop production system finalar9530
 
PRODUCTION AND OPERATION RESEARCH (2).pptx
PRODUCTION AND OPERATION RESEARCH (2).pptxPRODUCTION AND OPERATION RESEARCH (2).pptx
PRODUCTION AND OPERATION RESEARCH (2).pptxprasadv6796
 
What is the difference between production planning and scheduling
What is the difference between production planning and schedulingWhat is the difference between production planning and scheduling
What is the difference between production planning and schedulingMRPeasy
 
Layout and flow by sir taj mohammad tamkeen
Layout and flow by sir taj mohammad tamkeenLayout and flow by sir taj mohammad tamkeen
Layout and flow by sir taj mohammad tamkeenTaj Mohammad Tamkeen
 
Lupin summer training report, Ankleshwar
Lupin summer training report, AnkleshwarLupin summer training report, Ankleshwar
Lupin summer training report, AnkleshwarRajat Gandhi
 
PPT Term 1 Week 1 Day 1 July 26 - 27, 2023.pptx
PPT Term 1 Week 1 Day 1 July 26 - 27, 2023.pptxPPT Term 1 Week 1 Day 1 July 26 - 27, 2023.pptx
PPT Term 1 Week 1 Day 1 July 26 - 27, 2023.pptxGraceCordita2
 
Muthuraja.ppt
Muthuraja.pptMuthuraja.ppt
Muthuraja.pptMbabba2
 

Similar to Chapter 5 operation management (20)

Operation Management KG Ousl
Operation Management KG Ousl Operation Management KG Ousl
Operation Management KG Ousl
 
Pm1
Pm1Pm1
Pm1
 
WEEK 10- 4MS OF OPERATION- METHOD.pptx
WEEK 10- 4MS OF  OPERATION- METHOD.pptxWEEK 10- 4MS OF  OPERATION- METHOD.pptx
WEEK 10- 4MS OF OPERATION- METHOD.pptx
 
IV. System Design and Optimization .pptx
IV. System Design and Optimization .pptxIV. System Design and Optimization .pptx
IV. System Design and Optimization .pptx
 
WEEK 10- 4MS OF OPERATION- METHOD.pptx
WEEK 10- 4MS OF  OPERATION- METHOD.pptxWEEK 10- 4MS OF  OPERATION- METHOD.pptx
WEEK 10- 4MS OF OPERATION- METHOD.pptx
 
OPERATIONS MANAGEMENT- Full Slides.pptx
OPERATIONS MANAGEMENT- Full Slides.pptxOPERATIONS MANAGEMENT- Full Slides.pptx
OPERATIONS MANAGEMENT- Full Slides.pptx
 
Act 333
Act 333Act 333
Act 333
 
Good Manufacturing Practices - Forest Smallholders
Good Manufacturing Practices - Forest SmallholdersGood Manufacturing Practices - Forest Smallholders
Good Manufacturing Practices - Forest Smallholders
 
introduction to operation management
introduction to operation managementintroduction to operation management
introduction to operation management
 
Job shop production system final
Job shop production system finalJob shop production system final
Job shop production system final
 
ABCD.pptx
ABCD.pptxABCD.pptx
ABCD.pptx
 
PRODUCTION AND OPERATION RESEARCH (2).pptx
PRODUCTION AND OPERATION RESEARCH (2).pptxPRODUCTION AND OPERATION RESEARCH (2).pptx
PRODUCTION AND OPERATION RESEARCH (2).pptx
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
What is the difference between production planning and scheduling
What is the difference between production planning and schedulingWhat is the difference between production planning and scheduling
What is the difference between production planning and scheduling
 
Layout and flow by sir taj mohammad tamkeen
Layout and flow by sir taj mohammad tamkeenLayout and flow by sir taj mohammad tamkeen
Layout and flow by sir taj mohammad tamkeen
 
Lupin summer training report, Ankleshwar
Lupin summer training report, AnkleshwarLupin summer training report, Ankleshwar
Lupin summer training report, Ankleshwar
 
Om ibs-1
Om ibs-1Om ibs-1
Om ibs-1
 
Unit 3
Unit 3Unit 3
Unit 3
 
PPT Term 1 Week 1 Day 1 July 26 - 27, 2023.pptx
PPT Term 1 Week 1 Day 1 July 26 - 27, 2023.pptxPPT Term 1 Week 1 Day 1 July 26 - 27, 2023.pptx
PPT Term 1 Week 1 Day 1 July 26 - 27, 2023.pptx
 
Muthuraja.ppt
Muthuraja.pptMuthuraja.ppt
Muthuraja.ppt
 

More from Izah Asmadi

Aircraft Communication Topic 10 instrument landing systems
Aircraft Communication Topic 10 instrument landing systemsAircraft Communication Topic 10 instrument landing systems
Aircraft Communication Topic 10 instrument landing systemsIzah Asmadi
 
Aircraft Communication Topic 9 vhf omni range (vor)
Aircraft Communication  Topic 9 vhf omni range (vor)Aircraft Communication  Topic 9 vhf omni range (vor)
Aircraft Communication Topic 9 vhf omni range (vor)Izah Asmadi
 
Aircraft Communication Topic 8 automatic direction finder
Aircraft Communication  Topic 8 automatic direction finderAircraft Communication  Topic 8 automatic direction finder
Aircraft Communication Topic 8 automatic direction finderIzah Asmadi
 
Aircraft Communication Topic 7 elt, cvr and fdr
Aircraft Communication  Topic 7 elt, cvr and fdrAircraft Communication  Topic 7 elt, cvr and fdr
Aircraft Communication Topic 7 elt, cvr and fdrIzah Asmadi
 
Aircraft Communication Topic 6 pa system
Aircraft Communication  Topic 6 pa systemAircraft Communication  Topic 6 pa system
Aircraft Communication Topic 6 pa systemIzah Asmadi
 
Aircraft Communication Topic 5 selcal and data link system
Aircraft Communication  Topic 5 selcal and data link systemAircraft Communication  Topic 5 selcal and data link system
Aircraft Communication Topic 5 selcal and data link systemIzah Asmadi
 
Aircraft Communication Topic 4 vhf communication system
Aircraft Communication  Topic 4 vhf communication systemAircraft Communication  Topic 4 vhf communication system
Aircraft Communication Topic 4 vhf communication systemIzah Asmadi
 
Aircraft Communication Topic 4 hf communication system
Aircraft Communication  Topic 4 hf communication systemAircraft Communication  Topic 4 hf communication system
Aircraft Communication Topic 4 hf communication systemIzah Asmadi
 
Aircraft Communication Topic 2 modulation and propagation of radio waves
Aircraft Communication  Topic 2 modulation and propagation of radio wavesAircraft Communication  Topic 2 modulation and propagation of radio waves
Aircraft Communication Topic 2 modulation and propagation of radio wavesIzah Asmadi
 
Topic 1 basic radio wave properties
Topic 1 basic radio wave propertiesTopic 1 basic radio wave properties
Topic 1 basic radio wave propertiesIzah Asmadi
 
Aircraft Communication Topic 3 radio components
Aircraft Communication  Topic 3 radio componentsAircraft Communication  Topic 3 radio components
Aircraft Communication Topic 3 radio componentsIzah Asmadi
 
Business ethics C8 -ethics_technology
Business ethics C8  -ethics_technologyBusiness ethics C8  -ethics_technology
Business ethics C8 -ethics_technologyIzah Asmadi
 
Business ethics C7 -business_ethics_environmental_issues
Business ethics C7  -business_ethics_environmental_issuesBusiness ethics C7  -business_ethics_environmental_issues
Business ethics C7 -business_ethics_environmental_issuesIzah Asmadi
 
C6 -ethics_and_government_compatibility_mode_
C6  -ethics_and_government_compatibility_mode_C6  -ethics_and_government_compatibility_mode_
C6 -ethics_and_government_compatibility_mode_Izah Asmadi
 
Business ethics C5 -organizational_ethics_compatibility_mode_
Business ethics C5  -organizational_ethics_compatibility_mode_Business ethics C5  -organizational_ethics_compatibility_mode_
Business ethics C5 -organizational_ethics_compatibility_mode_Izah Asmadi
 
Business ethics C4 -corporate_social_responsibility_compatibility_mode_
Business ethics C4  -corporate_social_responsibility_compatibility_mode_Business ethics C4  -corporate_social_responsibility_compatibility_mode_
Business ethics C4 -corporate_social_responsibility_compatibility_mode_Izah Asmadi
 
Business ethics C3 theories principles in_business_ethics
Business ethics C3 theories principles in_business_ethicsBusiness ethics C3 theories principles in_business_ethics
Business ethics C3 theories principles in_business_ethicsIzah Asmadi
 
Business ethics C1 -moral_ethics_ethical_dilemma
Business ethics C1  -moral_ethics_ethical_dilemmaBusiness ethics C1  -moral_ethics_ethical_dilemma
Business ethics C1 -moral_ethics_ethical_dilemmaIzah Asmadi
 
Business ethics C2 -business_and_society
Business ethics C2  -business_and_societyBusiness ethics C2  -business_and_society
Business ethics C2 -business_and_societyIzah Asmadi
 
Project Management Ch11 Project Scheduling Critical Chain
Project Management Ch11 Project Scheduling Critical ChainProject Management Ch11 Project Scheduling Critical Chain
Project Management Ch11 Project Scheduling Critical ChainIzah Asmadi
 

More from Izah Asmadi (20)

Aircraft Communication Topic 10 instrument landing systems
Aircraft Communication Topic 10 instrument landing systemsAircraft Communication Topic 10 instrument landing systems
Aircraft Communication Topic 10 instrument landing systems
 
Aircraft Communication Topic 9 vhf omni range (vor)
Aircraft Communication  Topic 9 vhf omni range (vor)Aircraft Communication  Topic 9 vhf omni range (vor)
Aircraft Communication Topic 9 vhf omni range (vor)
 
Aircraft Communication Topic 8 automatic direction finder
Aircraft Communication  Topic 8 automatic direction finderAircraft Communication  Topic 8 automatic direction finder
Aircraft Communication Topic 8 automatic direction finder
 
Aircraft Communication Topic 7 elt, cvr and fdr
Aircraft Communication  Topic 7 elt, cvr and fdrAircraft Communication  Topic 7 elt, cvr and fdr
Aircraft Communication Topic 7 elt, cvr and fdr
 
Aircraft Communication Topic 6 pa system
Aircraft Communication  Topic 6 pa systemAircraft Communication  Topic 6 pa system
Aircraft Communication Topic 6 pa system
 
Aircraft Communication Topic 5 selcal and data link system
Aircraft Communication  Topic 5 selcal and data link systemAircraft Communication  Topic 5 selcal and data link system
Aircraft Communication Topic 5 selcal and data link system
 
Aircraft Communication Topic 4 vhf communication system
Aircraft Communication  Topic 4 vhf communication systemAircraft Communication  Topic 4 vhf communication system
Aircraft Communication Topic 4 vhf communication system
 
Aircraft Communication Topic 4 hf communication system
Aircraft Communication  Topic 4 hf communication systemAircraft Communication  Topic 4 hf communication system
Aircraft Communication Topic 4 hf communication system
 
Aircraft Communication Topic 2 modulation and propagation of radio waves
Aircraft Communication  Topic 2 modulation and propagation of radio wavesAircraft Communication  Topic 2 modulation and propagation of radio waves
Aircraft Communication Topic 2 modulation and propagation of radio waves
 
Topic 1 basic radio wave properties
Topic 1 basic radio wave propertiesTopic 1 basic radio wave properties
Topic 1 basic radio wave properties
 
Aircraft Communication Topic 3 radio components
Aircraft Communication  Topic 3 radio componentsAircraft Communication  Topic 3 radio components
Aircraft Communication Topic 3 radio components
 
Business ethics C8 -ethics_technology
Business ethics C8  -ethics_technologyBusiness ethics C8  -ethics_technology
Business ethics C8 -ethics_technology
 
Business ethics C7 -business_ethics_environmental_issues
Business ethics C7  -business_ethics_environmental_issuesBusiness ethics C7  -business_ethics_environmental_issues
Business ethics C7 -business_ethics_environmental_issues
 
C6 -ethics_and_government_compatibility_mode_
C6  -ethics_and_government_compatibility_mode_C6  -ethics_and_government_compatibility_mode_
C6 -ethics_and_government_compatibility_mode_
 
Business ethics C5 -organizational_ethics_compatibility_mode_
Business ethics C5  -organizational_ethics_compatibility_mode_Business ethics C5  -organizational_ethics_compatibility_mode_
Business ethics C5 -organizational_ethics_compatibility_mode_
 
Business ethics C4 -corporate_social_responsibility_compatibility_mode_
Business ethics C4  -corporate_social_responsibility_compatibility_mode_Business ethics C4  -corporate_social_responsibility_compatibility_mode_
Business ethics C4 -corporate_social_responsibility_compatibility_mode_
 
Business ethics C3 theories principles in_business_ethics
Business ethics C3 theories principles in_business_ethicsBusiness ethics C3 theories principles in_business_ethics
Business ethics C3 theories principles in_business_ethics
 
Business ethics C1 -moral_ethics_ethical_dilemma
Business ethics C1  -moral_ethics_ethical_dilemmaBusiness ethics C1  -moral_ethics_ethical_dilemma
Business ethics C1 -moral_ethics_ethical_dilemma
 
Business ethics C2 -business_and_society
Business ethics C2  -business_and_societyBusiness ethics C2  -business_and_society
Business ethics C2 -business_and_society
 
Project Management Ch11 Project Scheduling Critical Chain
Project Management Ch11 Project Scheduling Critical ChainProject Management Ch11 Project Scheduling Critical Chain
Project Management Ch11 Project Scheduling Critical Chain
 

Recently uploaded

Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCRsoniya singh
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 

Recently uploaded (20)

Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 

Chapter 5 operation management

  • 1.
  • 2. LEARNING OUTCOMES 1. To work out on material requirement in producing a product. 2. To calculate cost per unit, selling price, and profit margin. 3. To construct process flow of production.
  • 3. ACTIVITY 1 Work in group. Assuming that you are about to start a selling burger business via roadside stall at Taman Seroja. List down all the raw materials needed to produce burger.
  • 4. ACTIVITY 2 Assuming the following list of raw materials, work out on cost per unit of your burger. Suggest your selling price and calculate your profit margin. • Burger Bun – 40pcs @ RM15.00 • Tomato Sos – 340g @ RM2.20 (enough for 40 pcs of finished burger) • Chili Sos – 330g @ RM2.00 (enough for 40 pcs of finished burger) • Beef Paste – RM4.20 of 10 pcs of Ramly beef paste. • Mayonaise – 230g @ RM3.30. (enough for 40 pcs of finished burger) • Cucumber – RM0.60 per piece. (enough for 70 pcs of finished burger)
  • 5. ACTIVITY 2 Work in group. Assuming that you are about to start a selling burger business via roadside stall at Taman Seroja. List down all the raw materials needed to produce burger.
  • 6. Operation Management 1. 2. 3. 4. 5. 6. 7. The Transformation Process Productivity Index Process Planning Material Requirement Planning Layout Plan Selection of Location Calculation of Operational Costs
  • 7. 1. The Transformation Process External Environment Forces INPUT______ • LABOUR • RAW MATERIALS • MACHINES & EQUIPMENTS • TECHNOLOGY & METHODS • CAPITAL OUTPUT___ TRANSFORMATION PROCESS SERVICES OR PRODUCTS
  • 8. 2. Productivity Index Total Value of Output Productivity Index = Total Value of Input The productivity index (P.I) can be more or less than 1. P.I > 1 = business running efficiently P.I < 1 = business running inefficiently
  • 9. 3. Process Planning Symbol Type of Activities Description Operation Activities that modify, transform or give values to the output Transportation When materials are transported from one point to another. Inspection Measures standard of the in-process material, finished product or services Delay When in-process material is restrained in a location waiting for next activity Storage When in-process materials or finished products are stored in the storage area.
  • 10.
  • 11. 4. Material Requirement Planning Step I : Step II : Step III: Step IV: Identify and list down the raw materials required Prepare the bill of materials Calculate the quantity of raw material required Identify supplier
  • 12. Step I Identify and list all the raw materials required to manufacture the product or provide the service. – Restaurant: the raw materials required depend on the menu for the day – Cleaning service: the materials required include consumable items like detergents and scrubbing pads. – Retail business: fresh goods, sundry goods, canned goods. – Burger Stall: the raw materials used are proportionate to each layer of ingredients inside the burger.
  • 13. Step II • Prepare a bill of materials required for a unit of product. Ingredient Amount required for 100 cookies Flour 2 kg Margarine 0.5 kg Sugar 1 kg Eggs 4 units Water 0.5 litre
  • 14. • Therefore, the bill of materials for a unit of cookies will be: Ingredient Amount Required/Cookie Flour 0.02 kg Margarine Sugar 0.005 kg 0.01 kg Eggs 0.04 of an eggs (1 egg for 25 cookies) 0.005 litre Water
  • 15. Step III • Estimate the raw material requirement by multiplying the bill of materials with the total number of cookies to be produced monthly. • The number of units to be produced must be based on the sales forecast in the marketing plan.
  • 16. Example: If the forecast demand per month is 50,000 units of cookies. If the amount of stock at the end of the month is 5% of the amount. = 50,000 + 5%(50,000) = 50,000 + 2,500 = 52,500 cookies/month
  • 17. The materials required for the month: Ingredient Amount Required/Month Flour 0.02kg/unit x 52,500 = 1050kg Margarine 0.005kg/unit x 52,500 = 2025kg Sugar 0.01kg/unit x 52,500 = 525kg Eggs 0.04/unit x 52,500 = 2100 units Water 0.005litre/unit x 52,500 = 262.5 litre
  • 18. Step IV Identify supplier • Look through internet/publications/survey by trade associations, and seek quotations from suitable suppliers. 1. 2. 3. 4. Price and discount offered Quality of materials Sales terms & conditions e.g payment terms After sale service and warranty 5. 6. 7. Lead time i.e the time between orders and delivery Delivery terms e.g free transportation Reliability of supplier
  • 19. Capacity Planning • The capacity of any production operation refers to the amount of output that can be produced within a specified time. • It is a method to calculate machinery and manpower requirements so that production demand based on sales forecast can be met.
  • 20. • Based on monthly sales forecast, the daily production capacity can be determine by dividing it by the number of working days per month. • This capacity should be divided by the number of working hours per day to give the capacity per hour.
  • 21. • If sales forecast is 520 units of ‘tudung’ per month. • If working days per month is assumed to be 26 days per month, the daily production rate is: 910 days = 35 ' tudung' per day 26 35 hours = 5 ' tudung' per hour 7
  • 22. Purchasing of ‘tudung’ materials Storage of ‘tudung’ materials Cutting of raw materials to size. i.e large, medium and small Quality inspection Transport the materials that have been cut to tailor’s table Sewing by tailors Ironing Packaging Storage before shipping out
  • 23. Activity: ‘Tudung’ cutting If one cutter can cut 1 ‘tudung’ in 1/3 hour, the reciprocal of this is: = the cutter’s capacity to cut per hour = 3 ‘tudung’ per hour Therefore, the number of cutter required is: = Production capacity per hour/cutter’s capacity per hour = 5/3 = 1.67 (needs 2 cutters)
  • 24. Manpower Requirement Determine the number of workers required If one tailor can sew 1 ‘tudung’ in ½ hour, then his hourly capacity is: = 1/0.5 hr = 2 ‘tudung’ per hour Therefore, the number of tailors required is: = 5/2 = 2.5 tailors (3 tailors) and also, at least 3 sewing machines + 1 (standby)
  • 25. If one tailor requires a working space of 8 ft by 10 ft, than the total space required for 4 tailors is: = 8ft x 10 ft x 4 tailors = 320 square ft
  • 26. 5. Layout • Layout refers to the arrangement of machinery, equipment, workers and other facilities used in the operation. • The arrangement should be made in such a way that the production of goods and services can be done efficiently. • It should take into consideration the integration of several factors including work station, tool room, store, office, prayer room and toilet.
  • 27. Types of layout Layout based on product – The design is done according to the sequence of activity to produce the product.
  • 28.
  • 29. Layout based on process – The design is based on the production process. – It is suitable for a factory producing several products that undergo a similar process.
  • 30.
  • 31. Layout based on marketing – The layout is designed to utilise the available space to display goods. – Example: retailed shop and bookshop. •Arrangement of goods are interactive •Goods are easily accessible and convenient for the customers •It is easy for the entrepreneur to protect goods from theft •The entrepreneur can maximize the return of investment form the space used.
  • 32. 6. Physical Location • It is crucial to choose the right location for the business because a strategic location can contribute to the success of the business. • The choice of location will depend on the following factors: – Distance of operation centre/factory is near from the source of raw materials – Near to the source of manpower
  • 33. – Easy access to transportation facilities. •Highways e.g. LPT •Port e.g. Klang •Airport e.g. Sepang – Distance from targeted customers. – Other factors •Basic infrastructure, Utilities, banks, schools and housing, government policies and safety of surrounding.
  • 34. 7. Operations Costs • It is essential to determine the total operational cost in order to calculate the cost per unit of the goods produced. • Operations costs include costs of direct material, direct labour and overheads
  • 35. • Direct materials costs – Money spend on materials that are directly used to produce the products or services. • Direct labour costs – The money paid as wages, salaries and benefits to the workers involved directly in the production of the products and services. • Overhead costs – Include electricity, water, rents, insurance, wages of indirect labour, maintenance and depreciation.
  • 36. Operations Costs = Direct material + Direct labour + Overhead Total Operations Cost (RM) Cost per Unit = Total Number of Output (Units)