Transportation engineering involves planning, designing, operating and managing transportation facilities to efficiently move people and goods. The document discusses the history and development of roads in India including recommendations from committees that guided road development plans. It describes classifications of roads from national highways and state highways to rural roads. Ancient Roman and modern construction techniques are compared.
DAVV IET_ TraNSPORTATION [PPT LECTURES ALL 501.pptxprtaap1
(Established by the Government of India under NITSER Act,)
P.O. ICHCHHANATH, SURAT-395 007, GUJARAT, INDIA
Website: http://www.svnit.ac.in
Advt No. Estt. /2022/Gr_A1/2002 Date: October 17, 2022
RECRUITMENT FOR NON-TEACHING POSITIONS
Sardar Vallabhbhai National Institute of Technology Surat (SVNIT) was established by the
Government of India by an Act of Parliament, offering UG, PG and Ph.D. Programs in Engineering/
Technology and Sciences. The Institute is in search of bright, dynamic, experienced, qualified, and
suitable Indian Nationals to cater the Institute’s requirement. The Institute invites online
applications for the following Non-teaching positions on direct recruitment in various departments/
sections of the Institute:
Sl.
No
Name of the Post (s)
& Specialization/
Relevant Field
Pay Level
(as per 7 CPC)
No of Vacant Posts* Total* Upper
Age
Limit
UR SC ST OBCNCL
EWS
1 Librarian Pay Level 14
[PB-4 & GP Rs
10000]
1 - - - - 1 56
2 Scientific Officer /
Technical Officer
(MIS)
Pay Level 10
[PB-3 & GP Rs
5400]
1 - - - - 1 35
3 Executive Engineer
(Civil-01, Electrical-
01)
Pay Level 10
[PB-3 & GP Rs
5400]
2 - - - - 2 35
Total 4 0 0 0 0 4
*One post will be filled up from the identified person with benchmark disabilities, if found suitable
The eligibility criteria for the above posts is as per Recruitment Rules of NITs (2019) and as
updated from time to time by Ministry of Education, Govt. of India. For details regarding the
online Application Form, Educational Qualifications, Experience, other requirements and terms &
conditions for these positions, please visit the Institute website http://www.svnit.ac.in. The
number of Posts may vary at the time of final selection / recruitment.
The recruitment notice for the post advertised vide advertisement no. Estt./2021/Gr_A/3051
dated 02.03.2021 & Estt./2021/2021/EE/678 dated 07.06.2021 for which the recruitment process
has not been completed is cancelled vide Notice No.E/Rect.(2021)/1165 dated 14.10.2022. The
interested applicant who has applied earlier may apply afresh.
The interested candidates may apply online through the Institute website http://www.svnit.ac.in
and send the filled in downloaded online application form duly singed alongwith self-attested
documents viz. relevant testimonials, certificates, payment receipts etc. by speed/ registered
posts to the Deputy Registrar (Establishment), Sardar Vallabhbhi National Institute of
Technology, Ichchhanath, Dumas Road, Surat – 395 007, Gujarat, The applications received
through any other mode shall not be accepted and summarily rejected. The last date for
submission of online application is December 02, 2022 till 5.00 p.m. and receipt of
downloaded signed completed application at SVNIT Surat is December 12, 2022.
-sd/-
REGISTRAR
1
(Established by the Government of India under NITSER Act,)
P.O. ICHCHHANATH, SURAT-395 007, GUJARAT, INDIA
Website: http://www.svnit.ac.in
Advt No. Estt. /2022/Gr_A1/2002 Date: October 17, 2022
RECRUITMENT FOR NON-TEACHING P
DAVV IET_ TraNSPORTATION [PPT LECTURES ALL 501.pptxprtaap1
(Established by the Government of India under NITSER Act,)
P.O. ICHCHHANATH, SURAT-395 007, GUJARAT, INDIA
Website: http://www.svnit.ac.in
Advt No. Estt. /2022/Gr_A1/2002 Date: October 17, 2022
RECRUITMENT FOR NON-TEACHING POSITIONS
Sardar Vallabhbhai National Institute of Technology Surat (SVNIT) was established by the
Government of India by an Act of Parliament, offering UG, PG and Ph.D. Programs in Engineering/
Technology and Sciences. The Institute is in search of bright, dynamic, experienced, qualified, and
suitable Indian Nationals to cater the Institute’s requirement. The Institute invites online
applications for the following Non-teaching positions on direct recruitment in various departments/
sections of the Institute:
Sl.
No
Name of the Post (s)
& Specialization/
Relevant Field
Pay Level
(as per 7 CPC)
No of Vacant Posts* Total* Upper
Age
Limit
UR SC ST OBCNCL
EWS
1 Librarian Pay Level 14
[PB-4 & GP Rs
10000]
1 - - - - 1 56
2 Scientific Officer /
Technical Officer
(MIS)
Pay Level 10
[PB-3 & GP Rs
5400]
1 - - - - 1 35
3 Executive Engineer
(Civil-01, Electrical-
01)
Pay Level 10
[PB-3 & GP Rs
5400]
2 - - - - 2 35
Total 4 0 0 0 0 4
*One post will be filled up from the identified person with benchmark disabilities, if found suitable
The eligibility criteria for the above posts is as per Recruitment Rules of NITs (2019) and as
updated from time to time by Ministry of Education, Govt. of India. For details regarding the
online Application Form, Educational Qualifications, Experience, other requirements and terms &
conditions for these positions, please visit the Institute website http://www.svnit.ac.in. The
number of Posts may vary at the time of final selection / recruitment.
The recruitment notice for the post advertised vide advertisement no. Estt./2021/Gr_A/3051
dated 02.03.2021 & Estt./2021/2021/EE/678 dated 07.06.2021 for which the recruitment process
has not been completed is cancelled vide Notice No.E/Rect.(2021)/1165 dated 14.10.2022. The
interested applicant who has applied earlier may apply afresh.
The interested candidates may apply online through the Institute website http://www.svnit.ac.in
and send the filled in downloaded online application form duly singed alongwith self-attested
documents viz. relevant testimonials, certificates, payment receipts etc. by speed/ registered
posts to the Deputy Registrar (Establishment), Sardar Vallabhbhi National Institute of
Technology, Ichchhanath, Dumas Road, Surat – 395 007, Gujarat, The applications received
through any other mode shall not be accepted and summarily rejected. The last date for
submission of online application is December 02, 2022 till 5.00 p.m. and receipt of
downloaded signed completed application at SVNIT Surat is December 12, 2022.
-sd/-
REGISTRAR
1
(Established by the Government of India under NITSER Act,)
P.O. ICHCHHANATH, SURAT-395 007, GUJARAT, INDIA
Website: http://www.svnit.ac.in
Advt No. Estt. /2022/Gr_A1/2002 Date: October 17, 2022
RECRUITMENT FOR NON-TEACHING P
Highway planning and alignment: Different modes of transportation – historical Development of road construction- Highway Development in India –Classification of roads- Road pattern
– Highway planning in India- Highway alignment - Engineering Surveys for alignment – Highway Project- Important Transport/Highway related agencies in India. PMGSY project.
Introduction about IRC, NRRDA
Transportation engineering, primarily involves planning, design, construction, maintenance, and operation of transportation facilities. The facilities support air, highway, railroad, pipeline, water, and even space transportation.
Highway planning and alignment: Different modes of transportation – historical Development of road construction- Highway Development in India –Classification of roads- Road pattern
– Highway planning in India- Highway alignment - Engineering Surveys for alignment – Highway Project- Important Transport/Highway related agencies in India. PMGSY project.
Introduction about IRC, NRRDA
Transportation engineering, primarily involves planning, design, construction, maintenance, and operation of transportation facilities. The facilities support air, highway, railroad, pipeline, water, and even space transportation.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
1. • Introduction to transportation engg
• Classification of modes of transport
• History of ancient roads
• Necessity and objectives of highway planing
• Recommendations of jayakar committee
• Classifications of roads
• Different road development plans-sailent features
• Master plan
• Planning surveys
• Road patterns
2. Transportation engineering
• Transportation engineering is the
application of technology and scientific
principles to the planning, functional design,
operation and management of facilities for
any mode of transportation in order to
provide for the safe, efficient, rapid,
comfortable, convenient, economical, and
environmentally compatible movement of
people and goods from one place to other.
3. Scope of highway engineering
• Development, planning and location
• Highway design, geometric and structure
• Traffic performance and its control
• Materials, construction and maintenance
• Economic, finance and administration
4. Roman roads
Some of roads exists still 2000 years
The main features of the roman roads :
They were built straight regardless of gradients.
They were built after the soft soil was removed and a hard stratum was
reached
The total thickness of the construction was as high 0.75 m to 1.2m at some
places, even though magnitude of wheel loads is low.
was dug along straight path by
A trench width equal to that carriageway
removing the loose from the top.
A trench was cut until hard stratum reached
One or two layers of large foundation stones are laid in lime motor at the
bottom.
The thickness of bottom layer ranges from 10 to 20 cm.
Vertical kerbs are placed along the edges of pvt for lateral stability
A second layer of lime concrete with larger broken stones were laid in lime
mortar was laid over the bottom course up to thickness 25 to 40cm
A another layer of lime concrete was laid with smaller broken stones mixed
in lime mortar to a thickness 25 to 40cm if necessary.
A wearing course is provided in lime motor upto 10 to 20cm.
7. Tresaguet construction:
The thickness of construction is in the order of 30 cm
Tresaguet was the inspector of general of roads in france from 1775 to
1785.
The subgrade is prepared
The corners of these heavy foundation stones were hammered and then
interistics filled with the smaller stones .
Broken stones were packed to a thickness of about 8cm and compacted
.
The top wearing course was made of smaller stones and compacted to
thickness of 5cm at the edges and gradually increased towards the centre
giving the cross slope of 1 in 45 to the surface
The shoulders were also provided cross slope to drain the surface water
to the
side drain
8.
9. Telford construction
A level of subgrade was prepared to designed width of about
9m.
A large foundation stones of thickness 17 to 22 cm were laid
with their large face down so as to be laid in stable position .
The stones of lesser thickness (17cm) were placed towards the
edges and stones of increasing thickness (22cm) were laid
towards the centre .( for camber)
The interstics between foundation stones were filled with
smaller stone
The centre portion of about 5.5m width was covered with two
layers of angular broken stones to a compacted thickness of 10
and 5cm
A binding layer of wearing course 4cm thickness was
constructed on the top using gravel
The finished surface had a cross slope of 1 in 45.
10.
11. Macadam construction
Macadam was the first person to suggest the heavy foundation
stones are not necessary to place at the bottom layer of
construction
He realised that the subgrade being the lowest portion should be
prepared properly and kept drained so as to carry the load
transmitted through the pavement .
Compacted layers of smaller size broken stones placed at the
bottom.
Though the thickness of pavement is very less when compared
to previous methods the technique serve in a better way due to
better load dispersion of smaller size of aggregate.
The size of broken stones were placed at the top for stability.
The pavement surface was provided with a cross slope of 1 in
36.
12.
13. Indian Roads
• India has a large road network of over 3.314
million kilometers of roadways (2.1 million
miles), making it 3rd largest road network in the
world.
• At 0.66 km of highway per square kilometer of
land the density of India’s highway network is
higher than that of the United States (0.65) and
far higher than that of China's (0.16) or Brazil's
(0.20).
14. Highway Development in India
• Jayakar Committee (1927)
• Central Road Fund (1929)
• Indian Roads Congress (IRC), 1934
• Central Road Research Institute (CRRI), 1950
• Motor vehicle act (1936)
• National Highway Authority of India (NHAI),1995
• First twenty year road plan ( 1943-61 )
• Second twenty year road plan ( 1961-81 )
• Highway Research board ( 1973 )
• National Transport Policy committee ( 1978 )
• Third twenty year road plan ( 1981-2001 )
15. Jayakar Committee,1927
• After the first World War, motor vehicle using the roads
increases, this demanded a better road network.
• In 1927,Indian road development committee was appointed
by the government with M.R. Jaykar as chairman.
• Road development in the country should be made as a
national interest since local govt. do not have financial and
technical capacity for road development.
• An extra tax should be levied on petrol from road users to
create the road development fund.
• To establish a semi-official ,technical institution to pool
technical knowledge, sharing of ideas and to act as an
advisory body.
• To create a national level institution to carry research ,
development works and consultation.
16. Central road fund
• It was formed on 1st march 1929
• The consumers of petrol were charged an extra
leavy of 2.64 paisa per litre of petrol to built up
this road development fund.
• From this 20% of annual reveneu is to be retain
as a central reveneu for research and
experimental work expenses..etc
• Balance 80% is allowed by central govt. to
various states based on actual petrol
consumption or revenue collected.
17. Central Road Fund , 1929
CRF Act , 2000
Distribution of 100% cess on petrol as follows:
57.5% for NH
30% for SH
12.5% for safety works on rail-Road crossing.
50% cess on diesel for Rural Road development
MORTH
18. Indian Roads Congress, 1934
• Central semi official body known as IRC was formed in
1934.
• To provide national forum for regular pooling of
experience and ideas on matters related to construction
and maintenance of highways.
• It is a active body controlling the specification,
standardization and recommendations on materials,
design of roads and bridges.
• It publishes journals, research publications and standard
specifications guide lines.
• To provide a platform for expression of professional
opinion on matters relating to roads and road transport.
19. Motor vehicle act
• It was formed in 1939
• To regulate the road traffic in the form of
traffic laws, ordinances and regulations.
• Three phases primarily covered are
control of driver, vehicle ownership and
vehicle operation
• It was revised on 1988
20. Central road research institute(1950)
engaged in carrying out research and development
projects.
design, construction and maintenance of roads and
runways, traffic and transportation planning of mega
and medium cities, management of roads in different
terrains,
Improvement of marginal materials.
Utilization of industrial waste in road construction.
Landslide control.
Ground improvements, environmental pollution.
Road traffic safety.
21. Ministry of Road Transport & Highways
• Planning, development and maintenance of
National Highways in the country.
• Extends technical and financial support to State
Governments for the development of state roads
and the roads of inter-state connectivity and
economic importance.
• Evolves standard specifications for roads and
bridges in the country.
• It stores the data related to technical knowledge
on roads and bridges.
22. Highway Research Board
• To ascertain the nature and extent of
research required
• To correlate research information from
various organisation in India and abroad.
• To collect and correlation services.
• To collect result on research
• To channelise consultative services
23. Classification of Highways
Depending on weather
All weather roads
Fair weather roads
Depending the type of Carriage way
Paved roads(WBM)
Unpaved roads(earth road or gravel road)
Depending upon the pavement surface
Surfaced roads(bituminous or cement concrete
road)
Un surfaced roads
24. Based on the Traffic Volume
Heavy
Medium
Light
Based on Load or Tonnage
Class 1 or Class 2 etc or Class A , B etc Tonnes per
day
Based on location and function ( Nagpur road plan )
National highway (NH)
State highway (SH)
Major district road (MDR)
Other district road (ODR)
Village road (VR)
Classification of Highways
25. Based on modified system of
Highways classification
• Primary
Expressways
National Highways
• Secondary
SH
MDR
• Tertiary
ODR
VR
26. Expressways
• Heavy traffic at high speed (120km/hr)
• Land Width (90m)
• Full access control
• Connects major points of traffic generation
• No slow moving traffic allowed
•No loading, unloading,
parking.
The Mumbai-Pune Expressway as seen
from Khandala
27. National Highways
• NH are the main highways running through the length and
breadth of India, connecting major parts,foreign
highways,capital of large states and large industrial and
tourist centres including roads required for strategic
movements for the defence of India.
• The national highways have a total length of 70,548 kms.
Indian highways cover 2% of the total road network of India
and carry 40% of the total traffic.
• The highway connecting Delhi-Ambala-Amritsar is denoted
as NH-1, whereas a bifurcation of this highway beyond
Jalandar to Srinagar and Uri is denoted NH-1-A
• The longest highway in India is NH7 which stretches from
Varansi in Uttar Pradesh to Kanyakumari in the southern
most point of Indian mainland.
28. National Highways cont…
• The shortest highway is NH47A which stretches
from Ernakulam to Kochi and covers total length of
4 Kms.
• Golden Quadrilateral – (5,846 Kms) connecting Delhi-
Kolkata-Chennai-Mumbai
NH-2 Delhi- Kol (1453 km)
NH 4,7&46 Che-Mum (1290km )
NH5&6 Kol- Che (1684 m)
NH 8 Del- Mum (1419 km)
29. State Highways
• They are the arterial roads of a state,
connecting up with the national highways of
adjacent states, district head quarters and
important cities within the state.
• Total length of all SH in the country is
1,37,119 Kms.
• Speed 80 kmph
30. Major District Roads
• Important roads with in a district serving
areas of production and markets ,
connecting those with each other or with
the major highways.
• India has a total of 4,70,000 kms of MDR.
• Speed 60-80kmph
31. Other district roads
serving rural areas of production and providing
them with outlet to market centers or other
important roads like MDR or SH.
Speed 50-60kmph
Village roads
• They are roads connecting villages or group of
villages with each other or to the nearest road of a
higher category like ODR or MDR.
• India has 26,50,000 kms of ODR+VR out of the
total 33,15,231 kms of all type of roads.
• Speed-40-50kmph
32. Urban Road Classification
• Arterial Roads
• Sub Arterial
• Collector
• Local Street
• Cul-de-sac
• Pathway
• Driveway
33. ARTERIAL
• No frontage access, no standing vehicle,
very little cross traffic.
• Design Speed : 80km/hr
• Land width : 50 – 60m
• Divided roads with full or partial parking
• Pedestrian allowed to walk only at
intersection
34. SUB ARTERIAL ROAD
• Bus stops but no standing vehicle.
• Less mobility than arterial.
• Spacing for CBD
• Design speed
• Land width
: 0.5km
: 60 km/hr
: 30 – 40 m
35. Collector Street
• Collects and distributes traffic from local
streets
• Provides access to arterial roads
• Located in residential, business and
industrial areas.
• Full access allowed.
• Parking permitted.
• Design speed : 50km/hr
• Land Width : 20-30m
36. Local Street
• Design Speed : 30km/hr.
• Land Width : 10 – 20m.
• Primary access to residence, business or
other abutting property
• Less volume of traffic at slow speed
• Unrestricted parking, pedestrian
movements. (with frontage access, parked
vehicle, bus stops and no waiting
restrictions)
37. CUL–DE- SAC
• Dead End Street with only one entry
access for entry and exit.
• Recommended in Residential areas
38. Driveway
• A driveway is a type of private road for local
access to one or a small group of structures, and
is owned and maintained by an individual or
group.
• Driveways are commonly used as paths to
private garages, fuel stations, or houses
39. First 20-years road plan(1943-63)
• The conference of chief engineer held at Nagpur in
1943 finalized the first 20-years road development
plan for India called Nagpur road plan
• Road network was classified into five categories.
• The responsibility of construction maintenance of NH
was assign to central govt.
• The target road length was 5,32,700 km at the end of
1961.
• Density of about 16km of road length per 100 sq. km
area would be available in the country by the year
1963.
40. First 20-years road plan cont…
• The formulae were based on star and grid
pattern of road network.
• An allowance of 15% is provided for
agricultural industrial development during the
next 20-years
• The length of railway track in the area was
also consider in deciding the length of first
category road. The length or railway track is
directly subtracted from the estimated road
length of metalled roads.
41. Second 20-years road plan(1961-81)
• It was initiated by the IRC and was finalised in
1959 at the meeting of chief engineers.
• It is known as the Bombay road plan.
• The target road length was almost double that
of Nagpur road plan i.e. 10,57,330 km.
• Density about 32 km per 100 sq. km. and an
outlay of 5200 crores
• Every town with population above 2000 in
plans and above 1000 in semi hill area and
above 500 in hilly area should be connected
by metalled road
42. Second 20-years road plan cont…
• the maximum distance from any place in a
semi develop area would be 12.8 km from
metalled road and 4.8 from any road
• Expressways have also been considered in
this plan and 1600km of length has been
included in the proposed target NH
• Length of railway track is considered
independent of road system
• 5% are to be provided for future development
and unforeseen factor
43. Third twenty years road plan (1981-2001)
• The future road development should be based on
the revised classification of roads system i.e.
primary, secondary and tertiary
• Develop the rural economy and small towns with all
essential features.
• Population over 500 should be connected by all
weather roads.
• Density increases to 82 km per 100 sq. km
• The NH network should be expanded to form a
square grids of 100 km sides so that no part of the
country is more than 50 km away from the NH
44. Third twenty years road plan cont…
• Expressway should be constructed along major
traffic corridors
• All towns and villages with population over 1500
should be connected by MDR and villages with
population 1000-1500 by ODR.
• Road should be built in less industrialized areas to
attract the growth of industries
• The existing roads should be improved by rectifying
the defects in the road geometry, widening, riding
quality and strengthening the existing pavement to
save vehicle operation cost and thus to conserve
energy
45. Planning surveys
It includes:
Calculation of road length required for an area i)may be district or state or country
Preparation of master plan showing the phases of plan in annual or five years plans
The field surveys are conducted for collecting data called as planning surveys
Planning surveys consists of following studies
• a)Economic studies b)financial studies c)traffic studies
d) engineering studies
• a)Economic studies:
i) Population and its distribution in each village ,town
or locality
ii) Trends of population growth
iii) Agricultural & industrial development & future trends
iv) Existing facilities with regard to communication
,education
v) Percepita income
46. C)Traffic studies:
i)Traffic volume in vehicles per day ,annual avg daily traffic ,hourly volume traffic
ii) Origin & destination studies
iii)Traffic flow patterns
iv)Accidents ,their cost analysis and causes
v)Future trends and growth in volume
vi)Growth of passengers trip
D) Engineering studies:
i)Topographic surveys
ii)Soil surveys
iii)Location and classification of existing roads
iv)Special problems in drainage
b)Financial studies:
i) Sources of income & estimated revenue from taxation
ii) Living standards
iii) Resources at local level ,toll taxes ,vehicles registration & fines
iv) Future trends in financial aspects
47. Preparation of master plan:
Master plan is the final road development plan for an area under study which may
be taluk, district or state or whole country
Different possible network of new roads & improvement of some of existing
roads are proposed
In each proposal the population and productivity ( industrial & agricultural) of
each locality ,other details ,& possible changes in future are kept in view
Saturation system:
In this system the best road length is calculated for area, based on the concept of
obtaining utility per unit length of road
Hence this system is called saturation system (or) maximum utility system
The factors which are taken for obtaining utility per unit length of road are
a) Population serve by road network
b)Productivity served by network
i)Agriculture products
ii)Industrial products
a) Population serve by road network
Since the area under consideration may consists of villages & towns with different
populations,it is required to group those into some convienent ranges & to
assign some reasonable values of utility units to each range of population serves
48. For example ,villages having population ranges between 1001 to 2000 may together
& be
assigned as one utlity unit per village
Similarly the various villages & town may be grouped in different population ranges
can be assigned suitability utility units given below
Population less than 500, utility units
=0.25 Population 501 to 1000, utility
units =0.50
Population 1001 to 2000, utility units =1.0
Population 2001 to 5000, utility units =2.0 e.t.c
b) Productivity served by network
Total agricultural & industrial products served by each road system should be worked
out
Productivity served by may be assigned appropriate values of utility units per unit weight
For example one thousand tonnes agricultural products may be considered equivalent to
one unit
Similarly one thousand tonnes industrial products may be considered equivalent to one
unit
Utility:
The total utility units of each road system is found by adding population &
productivity units
The total units is divided by total length of road system to obtain utility rate per
unit length.
49. Road
Patterns
The various road patterns may be classified as:
•Rectangular or Block pattern
•Radial or star and block pattern
•Radial or star and circular pattern
•Radial or star and grid pattern
•Hexagonal pattern
•Minimum travel pattern
51. I n this pattern, the whole area is divided into rectangular blocks of plots, w
i
t
h
streets intersecting at right angles.
T h e main road which passes through thecenter of the
area should be sufficiently wide and other branch roads may be
comparatively narrow.
T h e main road is provided a direct approach to outside the
c
i
t
yAdvantages:
1.The rectangular plots may be further divided into small rectangular blocks for
construction of buildings placed blocks to blocks having roads on their front.The
construction and maintenance of roads of this pattern is comparatively easier.
Limitations:
1.This pattern is not very much convenient from traffic point of view, because at
the intersections, the vehicles face each other.
Example:
City roads of Chandigarh has rectangular pattern
52. Radial or star & blockpattern
Central
Business Area
Radial roads
Built-up area
Rectangular
pattern
53. -n this pattern, the entire area is divided into a networ! of roads radiating from
the business outwardly. In between radiating main roads, the built up area
may be planned with rectangular bloc!.
Advantages:
1.Reduces level of congestion at the primary bottlenec! location.".Prevents
traffic from accessing local flow routes in the direction of the eventvenue that
operate in favor of egress traffic flow.$.-f one road is bloc!ed, traffic can move
on other.&./ehicles face each other less than bloc! pattern.
Limitations:
54. 1.Proves particularly effective if two lane ramp traffic does not have to
merge atdownstream end of ramp.".#afety appurtenances such as guide rail
transitions, crash attenuators, and postsupport bases have not been
designed to provide ade0uate protection atha ardous locations from the
opposite direction of travel.
E ample:
%handigarh has rectangular pattern
55. Radial or star & Circularpattern
Radial road
Ring road
Central
Business Area
59. The choice of the pattern very much depends on the
locality, the layout of different towns, villages, industrial
and production centres and on the choice of the planning
engineer. The rectangular or the block pattern has been
adopted in the city roads of Chandigarh. But from traffic
operation point this is not considered convenient. An
example of radial and circular pattern is the road network
of Connaught Place in New Delhi. The Nagpur road plan
formulae were prepared assuming Star and Grid Pattern.