Chaos engineering involves experimenting with failures and turbulent conditions in a production system to build resilience. As systems become more distributed and complex, failures have become harder to predict. Chaos engineering embraces failure to discover weaknesses and prevent outages. It involves conducting controlled experiments to explore a system's behavior under different conditions. The goal is to validate system reliability and identify areas for improvement before real failures occur.