HOSPITALITYMandarin Oriental HotelWashington, DCAt an estimated cost of $144 million, the Mandarin Oriental Hotel, Washington, become the first 5-Star facility in the Portals district.  Catering to the elite business traveler, this Beaux Arts style, 400-room hotel offers impressive views of the Potomac tidal basin, the Jefferson Memorial and the Washington Monument.  Steeped in luxury, it includes a highly acclaimed 14,000 square-foot spa along with a 24,000 square-foot conference facility and two award-winning restaurants.  In concert with the hotel group’s tradition, the building incorporates distinctively oriental architecture and design elements.  The Mandarin Oriental Washington also focuses on a theme of the elements: Earth is represented by the terraced garden, Air by the kite installation above the swimming pool, Water by the marina itself and Fire is a feature incorporated in the CityZen restaurant’s open exhibition kitchen. Architect:		Brennan Beer GormanInterior Design: Hirsch Bedner AtlantaLighting Design: Hilary Wainer (PHA)
HOSPITALITYMandarin Oriental HotelNew York, NYThe Mandarin Oriental Hotel New York is an exclusive development on the 35th to 54th floors of the Time Warner Center in Columbus Circle. Regarded among the best in Manhattan, the 250-room luxury hotel provides stunning views of Central Park, the Hudson River and the city skyline. The $85 million facility includes several chic, innovative restaurants, as well as a 14,000 square-foot luxury spa and a 7,000 square-foot conference center.Hilary Wainer participated in the design of this project under the direction of Paul Helms Associates.Building Architect: SOM ArchitectsInterior Architect: Brennan Beer GormanInterior Design: Hirsch Bedner AtlantaLighting Design: Hilary Wainer (PHA)
HOSPITALITYMandarin Oriental HotelMiami, flLocated on the quiet beach at Brickell Key, the Mandarin Oriental Miami has been awarded the prestigious AAA Five Diamond Award for four consecutive years. Inspired by the diverse cultures of this sophisticated, cosmopolitan city, the interiors of the Mandarin Oriental Hotel Miami incorporate tall ceilings and a variety of textures- dark woods, marble, bamboo, rice paper and glass. The hotel’s 15,000 square-foot spa features 17 private treatment rooms and was voted “Best Spa in the USA” by readers of Travel + Leisure magazine.Hilary Wainer participated in the design of this project under the direction of Paul Helms Associates.Architect: 	RTKLInterior Design: Hirsch Bedner AtlantaLighting Design: Hilary Wainer (PHA)
HOSPITALITYTHEhotel at Mandalay bay  Las Vegas, NVTHEhotel is a 43-story tower complementing Mandalay Bay’s 60 acre, tropically themed casino and resort property on the Las Vegas Strip.Appointed with polished stone, elegant furnishings and understated luxury, THEhotel encompasses 1,117 one and two-bedroom suites, as well as meeting facilities and upscale restaurants and lounges. Every room in the hotel is a true suite, with separate sleeping and sitting rooms.THEhotelalso features business suites located directly adjacent to the 5,000 square foot conference center.In 2006, THEhotel was featured on the front cover of Luxury Hotels America, by publisher teNeues press.Architect: 	Klai + JubaInterior Design: Dougall DesignLighting Design: Marc Rosenberg (MarCAD)
CORPORATESovereign Tower  Atlanta, gaAn architectural marvel that soars 635 feet into the skyline, Sovereign is a 50-story high-rise tower on Peachtree Road in the Buckhead district of Atlanta. With 600,000 square feet of retail, restaurant and office space, this mixed-use urban designed project was designed by Atlanta-based Smallwood, Reynolds, Stewart and Stewart and has won numerous accolades including a 2009 ULI Development Excellence Project of the Year award.CD+M provided architectural lighting design of the site, residential and office lobbies, 28th floor residential club and pool deck and façade. Custom poles located at the street level feature twin 4,000 watt spotlights which prominently light the south façade of the building which can be seen from more than 10 miles distance.Architect:	Smallwood, Reynolds, Stewart, StewartLighting Design: Ted Ferreira
CORPORATEVolkswagen Glaserne Manufactur  dresden, GermanyThe $190 million Glaserne Manufactur, or ‘Glass Factory,’ in Dresden, Germany, is a visual celebration of modern manufacturing. In the words of the architect, Gunter Henn, this is a “master craftsman’s atelier” with parquet floors, transparent glass walls, water features and an 80-foot wide sphere featuring a multimedia show by BRC Imagination Arts. In the atrium, City Design Group designed a system of theatrical trusses and lighting to support a variety of uses. CDG provided exhibit and specialty lighting, facility lighting consulting provided by Kardoff Ingenieure.The venue aims to give its visitors a hands-on and highly entertaining look at the craftsmanship of the  Volkswagen brand through six attractions, including a “virtual test drive” motion simulator, a real-time “earth observatory,” and a touch screen exhibit that enables visitors to design a dream car then print its brochure, including the user’s own photo likeness next tothe car.Architect: 	Gunter HennExhibit Design: BRC Imagination ArtsLighting Design: Ted Ferreira
EDUCATIONUNIVERSITY OF GEORGIA – EAST VILLAGE DINING FACILITY  ATHENS, GAA new concept in dining at the University of Georgia in Athens, the East Village Dining Facility features casual seating areas, a retail store, café and a modern servery in a variety of warm and comfortable finishes. The barrel vault ceiling is prominently featured at the center of The building and provides a gathering place for both the common areas below and the dining areas above. The dining area is part of UGA’s new East Village community, which also includes a student center and 1200- bed housing complex. The project was awarded a 2005 IIDA Award of Merit in Lighting Design.Architect: 	Collins Cooper CarusiLighting Design: Ted Ferreira
HOSPITALITYThe Queen Victoria The second largest ship built by the prestigious Cunard line features seven restaurants, 13 bars and three swimming pools, in addition to an ornately decorated, three-story Grand Lobby, highlighted with mahogany and marble.Most lighting throughout the ship is warm white to accentuate the rich finishes, especially the sumptuous stone and wood flooring.Architect: 	GEM, Giacomo MortolaLighting Design: Marc Rosenberg, Shawn Whitaker
ENTERTAINMENT & LEISURESTAR CITY CASINO  SYDNEY, AUSTRALIAEnjoying sweeping views of Sydney Harbor and the city skyline, the $750 million Star City Casino comprises four separate themed gaming areas, a variety of restaurants and bars, two performing arts facilities, a residential condominium complex and a towering rockwork feature complete with a 40 meter waterfall and flame effects. This Las Vegas-style resort casino is the sole licensee in the city of Sydney and draws visitors from throughout the Pacific Rim and beyond. Theming and interior design was completed by Landmark Entertainmentof Los Angeles with specialty lighting design consultation by City Design Group and facility lighting design by Vision Design Studio.Architect: 	Cox/HillierInteriors:		Landmark EntertainmentConceptual Lighting Design: Ted FerreiraArchitectural Lighting Design: Vision Design Studio
RESTAURANT & BARGinkgo Restaurant  Chengdu, PRCThe owners of Gingko Restaurant in Chengdu, one of China’s fastest growing cities, retained CD+M to support in intricate, technical designs of Beijing-based design architect GRAFT. A surrealistic blend of traditional still life paintings and contemporary western textures and textiles, Gingko’s ingenious design plays on space and depth, heightening the senses.Plush seating, exceptional food and intimate lighting combine at Gingko to create an ultimate Chinese dining atmosphere. The project was awarded a 2008 IIDA Award of Merit in Lighting Design.Mall Architect: GRAFT BeijingConceptual Lighting Design: Ted Ferreira, Patrick Yu
MASTERPLANJUMEIRAH GOLF ESTATES  DUBAI, UAEMaster planned golf and residential community consisting of 13 planned residential communities offering residential living to more than 1,000 families. First two golf course designs will be completed by Greg Norman, Sergio Garcia, Pete Dye and Vijay Singh. CD+M scope consists of site lighting master planning including roadways, walkways, landscaping, iconic architecture, fountains and main entry areas.Project Manager: Mott McDonaldLandscape Architect: EDSALighting Design: Ted Ferreira, Hilary Wainer
ENTERTAINMENT & LEISUREFerrari World Theme Park  DUBAI, UAEMaster planned golf and residential community consisting of 13 planned residential communities offering residential living to more than 1,000 families. First two golf course designs will be completed by Greg Norman, Sergio Garcia, Pete Dye and Vijay Singh. CD+M scope consists of site lighting master planning including roadways, walkways, landscaping, iconic architecture, fountains and main entry areas.Architect:	BenoyShow Producer: Jack Rouse AssociatesLighting Design [Site, Façade, Selected Attractions]:	Ted Ferreira, Anjan Sarkar, Teresa Enroth
MASTERPLANTaiyuan cbd master plan  taiyuan, prcA strong theme of ancient Chinese architecture, the “dougong”, has been incorporated into the custom design of the light poles used on Changfeng Street. Eight 150 watt metal halide lights have been integrated into the structure, enclosed in a highly efficient prefabricated housing that will direct the light to where it is needed without much light pollution or waste. Calculations were performed to ensure the number of light fixtures used on the poll would create an illumination level that would meet the national standard of 20 – 30 lux on the road surface (we have achieved an average of 25 lux). Landscape Architect: AECOMLighting Design: Ted Ferreira, Patrick Yu
ENTERTAINMENT & LEISUREHappy Magic WatercubeBeijing, prcThe iconic facility Beijing’s famous ‘Water Cube’ for the 2008 Beijing Olympic Games was recently retrofitted to hold a massive indoor water park known as the “Happy Magic Watercube”Once inside the amazing structure, guests are be immersed in the world's largest indoor water park, with giant funnels, interactive jelly fish and China’s first ever AquaLoop.  All the details have been designed to match each other; theatrical lighting, the iconic architecture and glass mosaics which work together to transport guests to a new world.Architect:		ForrecLighting Design: Ted Ferreira, Shawn Whitaker
ENTERTAINMENT & LEISUREWannado City  Ft. Lauderdale, flWannado City, the first role-playing theme park for children in the United States, empowers kids by letting them take on realistic, grown-up roles in acity just for them.The project features kid-sized police and fire stations, a theater, recording studio, beauty salon and many other activities all designed to ignite the imagination.Located in Ft. Lauderdale, Florida, the spectacular indoor arena has been featured in USA Today, INC. and Funworld magazines. The project was awarded a 2006 IIDA Award of Merit in Lighting Design. Landscape Architect:	 Morris ArchitectsLighting Design: Ted Ferreira
EDUCATIONKing Abdullah University of science & Technology  Thuwal, KSAA new university, commercial and residential complex on the Red Sea Coast consisting of academic buildings, research facilities with laboratories, innovation and technology centers, convention facilities, mosques, recreational and residential facilities covering nearly 36,000,000 sq m.CD+M provided site lighting master planning including roads, parking, landscaping, iconic architecture and public art. The site will eventually accommodate 20,000 people. Architect:		HOKLighting Design: Ted Ferreira
RETAILThe EThel M Chocolate Superstore, m&m Academy Las vegas, nvA mixture of film, retail, live action and whimsy, the M&M’s Academy at the Showcase Mall in Las Vegas offers guests an opportunity to experience the creation of the world-famous M&M’s candies.This branded attraction features a 3D film by Will Vinton Studios, creator of the popular M&M’s candy television commercials, and a walk-through experience which delights kids young and old.City Design Group provided lighting design and controls specifications for the Academy and the fourth-floor retail and café area under contract to Cunningham Group Architects and attraction designer Landmark Entertainment.The project was awarded a 1999 Award for Excellence from the Themed Entertainment Association (TEA) and was featured in the pages of Lighting Dimensions International.Architect:		Cunningham GroupAttraction Design: Landmark EntertainmentLighting Design: Ted Ferreira
HOSPITALITYGrand Hyatt resort and ResidencesShenzhou Peninsula, PRCThe Grand Hyatt Shenzhou Resort on the Hainan Peninsula of China is a new 358 room luxury hotel is scheduled to open in 2012. The Grand Hyatt provides two essential components to the guest experience: a holistic environment that blends architecture and interiors with the surrounding landscape, and a relaxing sanctuary from everyday life. It meets both challenges by using water to unify the experience and to create a relaxing, reflective and invigorating environment. Architect:		RTKLInterior Design: WilsonLighting Design: Hilary Wainer
ENTERTAINMENT & LEISUREStar Trek: The Experience  Las Vegas, NVStar Trek: The Experience was a $US 70 million permanent Star Trek-themed attraction at the Las Vegas Hilton Hotel, containing Star Trek: The Experience was a US$70 million permanent Star Trek-themed attraction at the Las Vegas Hilton Hotel, containing shops, restaurants and a museum styled after the popular film and television and several 4D simulator rides.CD+M provided lighting design for this multiple award-winning project which hosted millions of guests in more than a decade of operation.Owner: Las Vegas Hilton/Paramount PicturesArchitect:		Cunningham GroupAttraction Design: Landmark EntertainmentLighting Design: Ted Ferreira, Teresa Enroth
PUBLICBeijing Olympic Green  beijing, PRCIn 2007, CD+M participated in an invited, international competition to develop a complete architectural and lighting design solution for these iconic media towers, placed on the Beijing Olympic Green between the National Stadium and the Aquatics Center.  Standing 30 meters above the 2008 Beijing Olympic Green, our media tower concept fused glass, metal and lighting around the symbology of Taijitu, more commonly known as Yin-Yang - the cornerstone for Taoism and traditional Chinese medicine.Concept Architect: SWA GroupExecutive Architect: BAID BeijingLighting Design (waterfront): Ted Ferreira
ENTERTAINMENT & LEISURESeaworld Orlando  Orlando, FLMistify is a fantasy experience of film, water and special effects that unfold in the lake just offshore from the Waterfront expansion area at Seaworld Orlando.  Guests watch along the shore as hundred-foot-tall walls of water serve as screens on which the film is projected, surrounded by dancing arrays of fountain jets, flames and fireworks shooting skyward. CD+M provided underwater and above-water lighting design and programming for this popular summer show, now in it's fifth season.Concept Design: 5 Star EntertainmentShow Producer: OnTrack ThemesLighting Design: Ted Ferreira
HOSPITALITYThe Meydan Jumeirah  Dubai, UAELocated at the Nad Al Sheba Racing Club in Dubai, The Meydan is the world’s first five star trackside hotel. The Meydan provides a prime location to catch the exhilarating action of the racing season, and creates a coveted travel destination all-year round.The Meydan offers 285 rooms and suites with balconies directly overlooking the racetrack, including one Royal Suite, and two Presidential Suites. It also has 5 luxury restaurants and bars, served in elegant settings with views of the racecourse.Architect:		Teo A. Khing AssociatesLighting Design: Ted Ferreira, Hilary Wainer, 		         Bill Johnson
MASTERPLANCity of Lights Master Plan  abu dhabi, UAEThe City of Lights on Al Reem Island is a breathtaking community set amidst a verdant, waterfront oasis. Draped across 101 acres of land, the area will include commercial and residential properties, including hotels, offices, retail space and residential accommodation.  Towers will be built along a waterfront promenade and be interlinked by lush, landscaped plazas with signature clusters of date palms. World-class shopping and dining establishments will line the waterfront, which will offer an array of water-based activities and sports. CD+M provided a concept lighting master plan for the site and framework guidelines for the developers of the towers along the site.Landscape Architect:	 Hyder ConsultingLighting Design: Ted Ferreira, Bill Johnson
ENTERTAINMENT & LEISUREUniversal Studios Island of adventure  ORLANDO, FLUniversal Studios Islands of Adventure Theme Park opened in Orlando in 1999 and comprises six themed areas, each containing shops, restaurants and attractions. Inviting its guests to “Live the Adventure,” the park begins with the dramatic Port of Entry, followed by Seuss Landing, the Lost Continent, Jurassic Park, Toon Lagoon and Marvel Superhero Island.Ted Ferreira was among a team of lighting designers on the project and contributed to the design of site lighting, pre-construction negotiation and specifications for the parkwide lighting control system, among the most technologically advanced in the world.Owner: Universal Studios CreativeArchitect:		Morris ArchitectsLighting Design: Ted Ferreira
ENTERTAINMENT & LEISUREGeorgia Aquarium  Atlanta, GACD+M consulted with program manager Heery International and concept designer Gary Goddard Enterprises to design and program specialty lighting for the 4-D theatre show, lantern wall, plaza and ballroom ceiling. Architectural lighting design was provided by Quentin Thomas and Exhibit Lighting was provided by Fisher Marantz Stone & Associates. The project was awarded a 2007 Lumen East award for the Exhibit lighting and a 2007 IIDA Award of Merit in Lighting Design.CD+M collaborated with lead A/V contractor, Electrosonic, to develop a sophisticated controls system which integrates lighting, audio and video throughout the areas in our scope.Program Manager: Heery InternationalArchitect: Thompson, Ventulett, Stainback & AssociatesConcept Design: Gary Goddard EnterprisesExhibit Design: Peckham, Guyton, Albert & Viers, Inc.Lighting Design: Ted Ferreira
RETAILEric Paris Salon  Beijing, PRCCD+M recently collaborated with GRAFT to expand the Eric Paris Salon in Beijing. The Eric Paris line was founded by world-renowned stylist Eric, who rose to fame as the owner of Studio 54, the largest chain of salons in the South of France. As the premier stylist for China’s high fashion industry, Eric Paris Salon is recognized for innovative styles and a luxurious environment.  Located in the Kerry Center in Beijing, the expanded salon spans more than 3,200 square feet over three stories and boasts a color palette ranging from clean, chic whites to sensuous, fingernail reds.Architect:		GRAFT BeijingLighting Design: Ted Ferreira, 	         Burke Greenwod/GRAFT
PUBLICDagu Bridge  Tianjin, PRCCompleted in the spring of 2004, the Dagu Bridge is a new six-lane auto and pedestrian thoroughfare crossing the Haihe River in Tianjin, China. Conceptualized by Man-Chung Tang of T.Y. Lin International, the Dagu Bridge reflects a concept of the sun, moon and stars. Located in the center of Tianjin’s redevelopment area, the bridge is one of the first projects to emerge as part of the city’s major redevelopment plan.Bridge Architect: T.Y. Lin InternationalLighting Design: Ted Ferreira
RETAILForum Shops at Caesar’s Palace  Las Vegas, NVThe Forum Shops at Caesar’s Palace is Las Vegas’ premier retail, dining and entertainment destination, featuring more than 160 boutiques and shops as well as 13 restaurants and specialty food shops. Through continual progress, The Forum Shops have maintained a position as the most successful shopping venue in the nation.Completed in 2004, the most recent expansion to The Forum Shops added 175,000 square feet of luxury shopping and extended the property out to Las Vegas Boulevard, where a new grand pedestrian plaza creates a remarkable entrance. The three-level addition includes an array of upscale shops and several new restaurants, as well as a spiral escalator -- one of only two in the United States.Architect: Kittrell Gorlock & AssociatesInterior Design: Dougall DesignLighting Design: Shawn Whitaker
PERFORMING ARTS VENUECobb Performing Arts Center  Atlanta, GAOn September 15, 2007, the Cobb Energy Performing Arts Centre became the first major arts facility to open in the Atlanta area in more than 40 years and serves as the new home of The Atlanta Opera.As the architectural lighting consultant for this $145 million project, CD+M developed a custom lighting concept that enhanced the dramatic and opulent design envisioned by Atlanta architects Smallwood, Reynolds, Stewart, Stewart & Associates, Inc. The state-of-the-art facility includes a 2,750-seat theatre, a special event space, 1,000 parking spaces, full-service food and beverage capabilities and rehearsal facilities.  With the facility’s ground-breaking in January 2005 and a grand opening only two and a half years later, the design and construction teams completed this impressive project on time and under budget, a rare accomplishment for a major performing arts center. Architect: 	Smallwood, Reynolds, Stewart, StewartTheater Consultant: Theater Projects ConsultantsLighting Design: Ted Ferreira
EDUCATIONCWRU Weatherhead Graduate School of Management  Cleveland, ohThe building’s façade follows Frank Gehry’s distinctive sculptural approach to building design, which utilizes curvaceous structures, intersecting forms and reflective metal. Equally unconventional, the school’s interior features intimate spaces within a soaring interior and circulation paths designed to encourage interaction between students and faculty.In addition to its coverage in numerous magazine, newspaper and academic articles, the facility has been featured on the covers of Architecture, Global Architecture and Inc.Architect: 	Gehry Partners, LLPElectrical Engineering: Lucci & Associates, Inc.Lighting Design: Ted Ferreira
MUSEUMS & VISITOR’S CENTERSFord Rouge Visitor Center  Dearborn, MIThe Ford Rouge Factory Tour is a multimedia museum which introduces guests to the history of the Ford Motor Company using state-of-the-art projection systems, theatrical effects and a vintage collection of classic Ford cars.The facility received the 2004 Themed Entertainment Association award for Best Visitors Center and was certified LEED Gold by the USGBC, one of only 20 such projects in the U.S. in 2004.As an integral part of the overall Ford Rouge reconstruction project, the venue was featured in an issue of Architecture magazine.Architect: 	Harley Ellis Devereaux, Co.Exhibit Design: BRC Imagination ArtsLighting Design: Ted Ferreira
PUBLICGeorgia State Capitol  Atlanta, GAIn renovating the Georgia State Capital, the project leaders wanted to achieve color consistency and to make the variety of architectural details visible at night. Overcoming the challenges of close neighboring buildings, enormous trees and even a helicopter flight path, we realized a design that enhances the architectural detail, highlights the shining gold domes and illuminates the once-lost statue at the monument’s crown. The project was awarded a 2006 IIDA Award of Merit in Lighting Design and a 2006 GE Edison Award of Merit.Architect: 	Lord Aeck & SargentLighting Design: Ted Ferreira
RETAILH Stockton Retail Store  Atlanta, GAH Stockton, the venerable Atlanta retailer known for its exceptional tailored suits, wanted to update its established, well-respected look with a fresh design for its midtown flagship store at 1180 Peachtree Street, among Atlanta’s newest high-rise buildings.  CD+M worked with architect Duane Stone to develop a sophisticated, new approach to the presentation of their merchandise.Architect: 	Duane Stone & AssociatesLighting Design: Hilary Wainer
PERFORMING ARTS VENUEHouse of BluesDallas, txAn anchor in the 75-acre, $3 billion+ Victory Park urban development area, the club includes a 1,625 seat music hall, a 400 person capacity restaurant which features distinctive Southern-inspired cuisine, unique décor built upon one of the largest collections of world-culture inspired folk art in the US, and the Foundation Room, House of Blues’ exclusive membership lounge, entertainment and fine-dining space.Dallas marks CD+M’s eighth House of Blues design, with completed venues in Atlantic City, Cleveland and San Diego, and several others currently in design.Architect [Music Hall]: GenslerArchitect [Foundation Room]: BDRALighting Design: Ted Ferreira, Amanda Bennett
HOSPITALITYHyatt Regency O’Hare  Chicago, ILCD+M collaborated with leading design firm The Johnson Studio to create two exciting new dining facilities in the $60 million renovation of the Hyatt O’Hare in Chicago.  The elegant O’H Restaurant features graceful tree sculptures of metal, light and glass and   Red, the new premium sports bar and lounge, features an elegantly curved bar, plush leather seats, plasma television screens and video projectors.Architect:		The Johnson StudioLighting Design: Hilary Wainer
HOSPITALITYInn of the Mountain Gods  MESCALERO, NMMarc Rosenberg, with architect and interior designer Worth Group, designed the Inn of the Mountain Gods resort and casino, which opened in March 2005. Situated high in the picturesque mountains of Mescalero, New Mexico, just outside of Ruidoso, the upscale property features 250 guest rooms, 26 suites, 38,000 square-feet of gaming space, 40,000 square feet of convention space and several restaurants. The resort’s dazzling lobby features a two- story panoramic window, as well as natural materials and warm tones that bring the understated luxury of the resort into harmony with its breathtaking surroundings.Owned and operated by the Mescalero Apache Tribe, the resort is the second largest employer in Otero County and has made great contributions to the economy of the reservation and neighboring communities.Architect:		Worth GroupInteriors:		Worth GroupLighting Design: Marc Rosenberg, Shawn Whitaker
HOSPITALITYM resort  Las Vegas, NvEncompassing more than 90 acres of prime real estate, M Resort is the latest addition to the glittering Las Vegas skyline. CD+M developed a lighting plan for the resort’s interior and exterior spaces - including a full-service spa, casino, nine restaurants and five bars - using a wide variety of modern technology to create color- changing coves and glowing, rear-illuminated panels.This blend of unique amenities and pop ambience ensures M Resort will provide guests with an unforgettable experience, both at present and in the future. The project was awarded a 2010 IIDA Award of Merit in Lighting Design.Architect:		Marnekk Corrao AssociatesLighting Design: Marc Rosenberg, Shawn Whitaker
HOSPITALITYPlanet Hollywood Resort & Casino  Las Vegas, NvBuilt upon the former Aladdin Casino on the heart of the Las Vegas Strip, the new Planet Hollywood Resort and Casino offers guests an opportunity to immerse themselves in a retro- chic world of Hollywood and celebrity culture.The elegant and visually sumptuous new property features floor-to-ceiling Swarovski crystal chandeliers at the casino entry lobby, 2,600 movie-themed rooms and suites, high definition plasma screens in each room and on the casino floor, award winning restaurants, a 7,000 seat theatre and a 1,500 seat showroom for high-end Las Vegas entertainment.Architect: Klai + JubaInteriors: Dougall DesignLighting Design: Marc Rosenberg
HOSPITALITYMcAllen Convention Center  Mcallen, TXThe new 175,000 square-foot McAllen Convention Center is the centerpiece of a large mixed-use retail, exhibition and arts master plan, designed by Atlanta-based Thompson, Ventulett, Stainback and Associates (tvsdesign), in partnership with Corpus Christi-based Gignac & Associates. CD+M Lighting Design Group designed lighting for all of the interior public spaces and exterior site, including the exhibition hall, main and prefunction lobbies, ballroom, meeting rooms and boardrooms. Located in the Rio Grande valley near the border to Mexico, the center serves as an important commercial keystone in this fast-growing city.Architect:		tvsdesignInteriors:		Gignac & AssociatesLighting Design: Ted Ferreira
HOSPITALITYHUDSONALPHA INSTITUTE FOR BIOTECHNOLOGY (HAIB)  Huntsville, alUnder the leadership of Atlanta-based Cooper Carry Architects, CD+M assisted in the design of a new quarters for the HudsonAlpha Institute for Biotechnology (HAIB) in Huntsville, Alabama. Warm wood finishes throughout the stunning five-story atrium are enhanced with ambient light in the evening, transforming this public space into an inviting common area for the staff to discuss ideas, collaborate and think creatively. The project was awarded a 2006 IIDA Award of Merit in Lighting Design.Architect: Cooper Carry ArchitectsMEP Engineer: NBP EngineersLighting Design: HIlaryWainer
CD+M Projects

CD+M Projects

  • 2.
    HOSPITALITYMandarin Oriental HotelWashington,DCAt an estimated cost of $144 million, the Mandarin Oriental Hotel, Washington, become the first 5-Star facility in the Portals district. Catering to the elite business traveler, this Beaux Arts style, 400-room hotel offers impressive views of the Potomac tidal basin, the Jefferson Memorial and the Washington Monument. Steeped in luxury, it includes a highly acclaimed 14,000 square-foot spa along with a 24,000 square-foot conference facility and two award-winning restaurants. In concert with the hotel group’s tradition, the building incorporates distinctively oriental architecture and design elements. The Mandarin Oriental Washington also focuses on a theme of the elements: Earth is represented by the terraced garden, Air by the kite installation above the swimming pool, Water by the marina itself and Fire is a feature incorporated in the CityZen restaurant’s open exhibition kitchen. Architect: Brennan Beer GormanInterior Design: Hirsch Bedner AtlantaLighting Design: Hilary Wainer (PHA)
  • 3.
    HOSPITALITYMandarin Oriental HotelNewYork, NYThe Mandarin Oriental Hotel New York is an exclusive development on the 35th to 54th floors of the Time Warner Center in Columbus Circle. Regarded among the best in Manhattan, the 250-room luxury hotel provides stunning views of Central Park, the Hudson River and the city skyline. The $85 million facility includes several chic, innovative restaurants, as well as a 14,000 square-foot luxury spa and a 7,000 square-foot conference center.Hilary Wainer participated in the design of this project under the direction of Paul Helms Associates.Building Architect: SOM ArchitectsInterior Architect: Brennan Beer GormanInterior Design: Hirsch Bedner AtlantaLighting Design: Hilary Wainer (PHA)
  • 4.
    HOSPITALITYMandarin Oriental HotelMiami,flLocated on the quiet beach at Brickell Key, the Mandarin Oriental Miami has been awarded the prestigious AAA Five Diamond Award for four consecutive years. Inspired by the diverse cultures of this sophisticated, cosmopolitan city, the interiors of the Mandarin Oriental Hotel Miami incorporate tall ceilings and a variety of textures- dark woods, marble, bamboo, rice paper and glass. The hotel’s 15,000 square-foot spa features 17 private treatment rooms and was voted “Best Spa in the USA” by readers of Travel + Leisure magazine.Hilary Wainer participated in the design of this project under the direction of Paul Helms Associates.Architect: RTKLInterior Design: Hirsch Bedner AtlantaLighting Design: Hilary Wainer (PHA)
  • 5.
    HOSPITALITYTHEhotel at Mandalaybay Las Vegas, NVTHEhotel is a 43-story tower complementing Mandalay Bay’s 60 acre, tropically themed casino and resort property on the Las Vegas Strip.Appointed with polished stone, elegant furnishings and understated luxury, THEhotel encompasses 1,117 one and two-bedroom suites, as well as meeting facilities and upscale restaurants and lounges. Every room in the hotel is a true suite, with separate sleeping and sitting rooms.THEhotelalso features business suites located directly adjacent to the 5,000 square foot conference center.In 2006, THEhotel was featured on the front cover of Luxury Hotels America, by publisher teNeues press.Architect: Klai + JubaInterior Design: Dougall DesignLighting Design: Marc Rosenberg (MarCAD)
  • 6.
    CORPORATESovereign Tower Atlanta, gaAn architectural marvel that soars 635 feet into the skyline, Sovereign is a 50-story high-rise tower on Peachtree Road in the Buckhead district of Atlanta. With 600,000 square feet of retail, restaurant and office space, this mixed-use urban designed project was designed by Atlanta-based Smallwood, Reynolds, Stewart and Stewart and has won numerous accolades including a 2009 ULI Development Excellence Project of the Year award.CD+M provided architectural lighting design of the site, residential and office lobbies, 28th floor residential club and pool deck and façade. Custom poles located at the street level feature twin 4,000 watt spotlights which prominently light the south façade of the building which can be seen from more than 10 miles distance.Architect: Smallwood, Reynolds, Stewart, StewartLighting Design: Ted Ferreira
  • 7.
    CORPORATEVolkswagen Glaserne Manufactur dresden, GermanyThe $190 million Glaserne Manufactur, or ‘Glass Factory,’ in Dresden, Germany, is a visual celebration of modern manufacturing. In the words of the architect, Gunter Henn, this is a “master craftsman’s atelier” with parquet floors, transparent glass walls, water features and an 80-foot wide sphere featuring a multimedia show by BRC Imagination Arts. In the atrium, City Design Group designed a system of theatrical trusses and lighting to support a variety of uses. CDG provided exhibit and specialty lighting, facility lighting consulting provided by Kardoff Ingenieure.The venue aims to give its visitors a hands-on and highly entertaining look at the craftsmanship of the Volkswagen brand through six attractions, including a “virtual test drive” motion simulator, a real-time “earth observatory,” and a touch screen exhibit that enables visitors to design a dream car then print its brochure, including the user’s own photo likeness next tothe car.Architect: Gunter HennExhibit Design: BRC Imagination ArtsLighting Design: Ted Ferreira
  • 8.
    EDUCATIONUNIVERSITY OF GEORGIA– EAST VILLAGE DINING FACILITY ATHENS, GAA new concept in dining at the University of Georgia in Athens, the East Village Dining Facility features casual seating areas, a retail store, café and a modern servery in a variety of warm and comfortable finishes. The barrel vault ceiling is prominently featured at the center of The building and provides a gathering place for both the common areas below and the dining areas above. The dining area is part of UGA’s new East Village community, which also includes a student center and 1200- bed housing complex. The project was awarded a 2005 IIDA Award of Merit in Lighting Design.Architect: Collins Cooper CarusiLighting Design: Ted Ferreira
  • 9.
    HOSPITALITYThe Queen VictoriaThe second largest ship built by the prestigious Cunard line features seven restaurants, 13 bars and three swimming pools, in addition to an ornately decorated, three-story Grand Lobby, highlighted with mahogany and marble.Most lighting throughout the ship is warm white to accentuate the rich finishes, especially the sumptuous stone and wood flooring.Architect: GEM, Giacomo MortolaLighting Design: Marc Rosenberg, Shawn Whitaker
  • 10.
    ENTERTAINMENT & LEISURESTARCITY CASINO SYDNEY, AUSTRALIAEnjoying sweeping views of Sydney Harbor and the city skyline, the $750 million Star City Casino comprises four separate themed gaming areas, a variety of restaurants and bars, two performing arts facilities, a residential condominium complex and a towering rockwork feature complete with a 40 meter waterfall and flame effects. This Las Vegas-style resort casino is the sole licensee in the city of Sydney and draws visitors from throughout the Pacific Rim and beyond. Theming and interior design was completed by Landmark Entertainmentof Los Angeles with specialty lighting design consultation by City Design Group and facility lighting design by Vision Design Studio.Architect: Cox/HillierInteriors: Landmark EntertainmentConceptual Lighting Design: Ted FerreiraArchitectural Lighting Design: Vision Design Studio
  • 11.
    RESTAURANT & BARGinkgoRestaurant Chengdu, PRCThe owners of Gingko Restaurant in Chengdu, one of China’s fastest growing cities, retained CD+M to support in intricate, technical designs of Beijing-based design architect GRAFT. A surrealistic blend of traditional still life paintings and contemporary western textures and textiles, Gingko’s ingenious design plays on space and depth, heightening the senses.Plush seating, exceptional food and intimate lighting combine at Gingko to create an ultimate Chinese dining atmosphere. The project was awarded a 2008 IIDA Award of Merit in Lighting Design.Mall Architect: GRAFT BeijingConceptual Lighting Design: Ted Ferreira, Patrick Yu
  • 12.
    MASTERPLANJUMEIRAH GOLF ESTATES DUBAI, UAEMaster planned golf and residential community consisting of 13 planned residential communities offering residential living to more than 1,000 families. First two golf course designs will be completed by Greg Norman, Sergio Garcia, Pete Dye and Vijay Singh. CD+M scope consists of site lighting master planning including roadways, walkways, landscaping, iconic architecture, fountains and main entry areas.Project Manager: Mott McDonaldLandscape Architect: EDSALighting Design: Ted Ferreira, Hilary Wainer
  • 13.
    ENTERTAINMENT & LEISUREFerrariWorld Theme Park DUBAI, UAEMaster planned golf and residential community consisting of 13 planned residential communities offering residential living to more than 1,000 families. First two golf course designs will be completed by Greg Norman, Sergio Garcia, Pete Dye and Vijay Singh. CD+M scope consists of site lighting master planning including roadways, walkways, landscaping, iconic architecture, fountains and main entry areas.Architect: BenoyShow Producer: Jack Rouse AssociatesLighting Design [Site, Façade, Selected Attractions]: Ted Ferreira, Anjan Sarkar, Teresa Enroth
  • 14.
    MASTERPLANTaiyuan cbd masterplan taiyuan, prcA strong theme of ancient Chinese architecture, the “dougong”, has been incorporated into the custom design of the light poles used on Changfeng Street. Eight 150 watt metal halide lights have been integrated into the structure, enclosed in a highly efficient prefabricated housing that will direct the light to where it is needed without much light pollution or waste. Calculations were performed to ensure the number of light fixtures used on the poll would create an illumination level that would meet the national standard of 20 – 30 lux on the road surface (we have achieved an average of 25 lux). Landscape Architect: AECOMLighting Design: Ted Ferreira, Patrick Yu
  • 15.
    ENTERTAINMENT & LEISUREHappyMagic WatercubeBeijing, prcThe iconic facility Beijing’s famous ‘Water Cube’ for the 2008 Beijing Olympic Games was recently retrofitted to hold a massive indoor water park known as the “Happy Magic Watercube”Once inside the amazing structure, guests are be immersed in the world's largest indoor water park, with giant funnels, interactive jelly fish and China’s first ever AquaLoop. All the details have been designed to match each other; theatrical lighting, the iconic architecture and glass mosaics which work together to transport guests to a new world.Architect: ForrecLighting Design: Ted Ferreira, Shawn Whitaker
  • 16.
    ENTERTAINMENT & LEISUREWannadoCity Ft. Lauderdale, flWannado City, the first role-playing theme park for children in the United States, empowers kids by letting them take on realistic, grown-up roles in acity just for them.The project features kid-sized police and fire stations, a theater, recording studio, beauty salon and many other activities all designed to ignite the imagination.Located in Ft. Lauderdale, Florida, the spectacular indoor arena has been featured in USA Today, INC. and Funworld magazines. The project was awarded a 2006 IIDA Award of Merit in Lighting Design. Landscape Architect: Morris ArchitectsLighting Design: Ted Ferreira
  • 17.
    EDUCATIONKing Abdullah Universityof science & Technology Thuwal, KSAA new university, commercial and residential complex on the Red Sea Coast consisting of academic buildings, research facilities with laboratories, innovation and technology centers, convention facilities, mosques, recreational and residential facilities covering nearly 36,000,000 sq m.CD+M provided site lighting master planning including roads, parking, landscaping, iconic architecture and public art. The site will eventually accommodate 20,000 people. Architect: HOKLighting Design: Ted Ferreira
  • 18.
    RETAILThe EThel MChocolate Superstore, m&m Academy Las vegas, nvA mixture of film, retail, live action and whimsy, the M&M’s Academy at the Showcase Mall in Las Vegas offers guests an opportunity to experience the creation of the world-famous M&M’s candies.This branded attraction features a 3D film by Will Vinton Studios, creator of the popular M&M’s candy television commercials, and a walk-through experience which delights kids young and old.City Design Group provided lighting design and controls specifications for the Academy and the fourth-floor retail and café area under contract to Cunningham Group Architects and attraction designer Landmark Entertainment.The project was awarded a 1999 Award for Excellence from the Themed Entertainment Association (TEA) and was featured in the pages of Lighting Dimensions International.Architect: Cunningham GroupAttraction Design: Landmark EntertainmentLighting Design: Ted Ferreira
  • 19.
    HOSPITALITYGrand Hyatt resortand ResidencesShenzhou Peninsula, PRCThe Grand Hyatt Shenzhou Resort on the Hainan Peninsula of China is a new 358 room luxury hotel is scheduled to open in 2012. The Grand Hyatt provides two essential components to the guest experience: a holistic environment that blends architecture and interiors with the surrounding landscape, and a relaxing sanctuary from everyday life. It meets both challenges by using water to unify the experience and to create a relaxing, reflective and invigorating environment. Architect: RTKLInterior Design: WilsonLighting Design: Hilary Wainer
  • 20.
    ENTERTAINMENT & LEISUREStarTrek: The Experience Las Vegas, NVStar Trek: The Experience was a $US 70 million permanent Star Trek-themed attraction at the Las Vegas Hilton Hotel, containing Star Trek: The Experience was a US$70 million permanent Star Trek-themed attraction at the Las Vegas Hilton Hotel, containing shops, restaurants and a museum styled after the popular film and television and several 4D simulator rides.CD+M provided lighting design for this multiple award-winning project which hosted millions of guests in more than a decade of operation.Owner: Las Vegas Hilton/Paramount PicturesArchitect: Cunningham GroupAttraction Design: Landmark EntertainmentLighting Design: Ted Ferreira, Teresa Enroth
  • 21.
    PUBLICBeijing Olympic Green beijing, PRCIn 2007, CD+M participated in an invited, international competition to develop a complete architectural and lighting design solution for these iconic media towers, placed on the Beijing Olympic Green between the National Stadium and the Aquatics Center. Standing 30 meters above the 2008 Beijing Olympic Green, our media tower concept fused glass, metal and lighting around the symbology of Taijitu, more commonly known as Yin-Yang - the cornerstone for Taoism and traditional Chinese medicine.Concept Architect: SWA GroupExecutive Architect: BAID BeijingLighting Design (waterfront): Ted Ferreira
  • 22.
    ENTERTAINMENT & LEISURESeaworldOrlando Orlando, FLMistify is a fantasy experience of film, water and special effects that unfold in the lake just offshore from the Waterfront expansion area at Seaworld Orlando. Guests watch along the shore as hundred-foot-tall walls of water serve as screens on which the film is projected, surrounded by dancing arrays of fountain jets, flames and fireworks shooting skyward. CD+M provided underwater and above-water lighting design and programming for this popular summer show, now in it's fifth season.Concept Design: 5 Star EntertainmentShow Producer: OnTrack ThemesLighting Design: Ted Ferreira
  • 23.
    HOSPITALITYThe Meydan Jumeirah Dubai, UAELocated at the Nad Al Sheba Racing Club in Dubai, The Meydan is the world’s first five star trackside hotel. The Meydan provides a prime location to catch the exhilarating action of the racing season, and creates a coveted travel destination all-year round.The Meydan offers 285 rooms and suites with balconies directly overlooking the racetrack, including one Royal Suite, and two Presidential Suites. It also has 5 luxury restaurants and bars, served in elegant settings with views of the racecourse.Architect: Teo A. Khing AssociatesLighting Design: Ted Ferreira, Hilary Wainer, Bill Johnson
  • 24.
    MASTERPLANCity of LightsMaster Plan abu dhabi, UAEThe City of Lights on Al Reem Island is a breathtaking community set amidst a verdant, waterfront oasis. Draped across 101 acres of land, the area will include commercial and residential properties, including hotels, offices, retail space and residential accommodation. Towers will be built along a waterfront promenade and be interlinked by lush, landscaped plazas with signature clusters of date palms. World-class shopping and dining establishments will line the waterfront, which will offer an array of water-based activities and sports. CD+M provided a concept lighting master plan for the site and framework guidelines for the developers of the towers along the site.Landscape Architect: Hyder ConsultingLighting Design: Ted Ferreira, Bill Johnson
  • 25.
    ENTERTAINMENT & LEISUREUniversalStudios Island of adventure ORLANDO, FLUniversal Studios Islands of Adventure Theme Park opened in Orlando in 1999 and comprises six themed areas, each containing shops, restaurants and attractions. Inviting its guests to “Live the Adventure,” the park begins with the dramatic Port of Entry, followed by Seuss Landing, the Lost Continent, Jurassic Park, Toon Lagoon and Marvel Superhero Island.Ted Ferreira was among a team of lighting designers on the project and contributed to the design of site lighting, pre-construction negotiation and specifications for the parkwide lighting control system, among the most technologically advanced in the world.Owner: Universal Studios CreativeArchitect: Morris ArchitectsLighting Design: Ted Ferreira
  • 26.
    ENTERTAINMENT & LEISUREGeorgiaAquarium Atlanta, GACD+M consulted with program manager Heery International and concept designer Gary Goddard Enterprises to design and program specialty lighting for the 4-D theatre show, lantern wall, plaza and ballroom ceiling. Architectural lighting design was provided by Quentin Thomas and Exhibit Lighting was provided by Fisher Marantz Stone & Associates. The project was awarded a 2007 Lumen East award for the Exhibit lighting and a 2007 IIDA Award of Merit in Lighting Design.CD+M collaborated with lead A/V contractor, Electrosonic, to develop a sophisticated controls system which integrates lighting, audio and video throughout the areas in our scope.Program Manager: Heery InternationalArchitect: Thompson, Ventulett, Stainback & AssociatesConcept Design: Gary Goddard EnterprisesExhibit Design: Peckham, Guyton, Albert & Viers, Inc.Lighting Design: Ted Ferreira
  • 27.
    RETAILEric Paris Salon Beijing, PRCCD+M recently collaborated with GRAFT to expand the Eric Paris Salon in Beijing. The Eric Paris line was founded by world-renowned stylist Eric, who rose to fame as the owner of Studio 54, the largest chain of salons in the South of France. As the premier stylist for China’s high fashion industry, Eric Paris Salon is recognized for innovative styles and a luxurious environment. Located in the Kerry Center in Beijing, the expanded salon spans more than 3,200 square feet over three stories and boasts a color palette ranging from clean, chic whites to sensuous, fingernail reds.Architect: GRAFT BeijingLighting Design: Ted Ferreira, Burke Greenwod/GRAFT
  • 28.
    PUBLICDagu Bridge Tianjin, PRCCompleted in the spring of 2004, the Dagu Bridge is a new six-lane auto and pedestrian thoroughfare crossing the Haihe River in Tianjin, China. Conceptualized by Man-Chung Tang of T.Y. Lin International, the Dagu Bridge reflects a concept of the sun, moon and stars. Located in the center of Tianjin’s redevelopment area, the bridge is one of the first projects to emerge as part of the city’s major redevelopment plan.Bridge Architect: T.Y. Lin InternationalLighting Design: Ted Ferreira
  • 29.
    RETAILForum Shops atCaesar’s Palace Las Vegas, NVThe Forum Shops at Caesar’s Palace is Las Vegas’ premier retail, dining and entertainment destination, featuring more than 160 boutiques and shops as well as 13 restaurants and specialty food shops. Through continual progress, The Forum Shops have maintained a position as the most successful shopping venue in the nation.Completed in 2004, the most recent expansion to The Forum Shops added 175,000 square feet of luxury shopping and extended the property out to Las Vegas Boulevard, where a new grand pedestrian plaza creates a remarkable entrance. The three-level addition includes an array of upscale shops and several new restaurants, as well as a spiral escalator -- one of only two in the United States.Architect: Kittrell Gorlock & AssociatesInterior Design: Dougall DesignLighting Design: Shawn Whitaker
  • 30.
    PERFORMING ARTS VENUECobbPerforming Arts Center Atlanta, GAOn September 15, 2007, the Cobb Energy Performing Arts Centre became the first major arts facility to open in the Atlanta area in more than 40 years and serves as the new home of The Atlanta Opera.As the architectural lighting consultant for this $145 million project, CD+M developed a custom lighting concept that enhanced the dramatic and opulent design envisioned by Atlanta architects Smallwood, Reynolds, Stewart, Stewart & Associates, Inc. The state-of-the-art facility includes a 2,750-seat theatre, a special event space, 1,000 parking spaces, full-service food and beverage capabilities and rehearsal facilities. With the facility’s ground-breaking in January 2005 and a grand opening only two and a half years later, the design and construction teams completed this impressive project on time and under budget, a rare accomplishment for a major performing arts center. Architect: Smallwood, Reynolds, Stewart, StewartTheater Consultant: Theater Projects ConsultantsLighting Design: Ted Ferreira
  • 31.
    EDUCATIONCWRU Weatherhead GraduateSchool of Management Cleveland, ohThe building’s façade follows Frank Gehry’s distinctive sculptural approach to building design, which utilizes curvaceous structures, intersecting forms and reflective metal. Equally unconventional, the school’s interior features intimate spaces within a soaring interior and circulation paths designed to encourage interaction between students and faculty.In addition to its coverage in numerous magazine, newspaper and academic articles, the facility has been featured on the covers of Architecture, Global Architecture and Inc.Architect: Gehry Partners, LLPElectrical Engineering: Lucci & Associates, Inc.Lighting Design: Ted Ferreira
  • 32.
    MUSEUMS & VISITOR’SCENTERSFord Rouge Visitor Center Dearborn, MIThe Ford Rouge Factory Tour is a multimedia museum which introduces guests to the history of the Ford Motor Company using state-of-the-art projection systems, theatrical effects and a vintage collection of classic Ford cars.The facility received the 2004 Themed Entertainment Association award for Best Visitors Center and was certified LEED Gold by the USGBC, one of only 20 such projects in the U.S. in 2004.As an integral part of the overall Ford Rouge reconstruction project, the venue was featured in an issue of Architecture magazine.Architect: Harley Ellis Devereaux, Co.Exhibit Design: BRC Imagination ArtsLighting Design: Ted Ferreira
  • 33.
    PUBLICGeorgia State Capitol Atlanta, GAIn renovating the Georgia State Capital, the project leaders wanted to achieve color consistency and to make the variety of architectural details visible at night. Overcoming the challenges of close neighboring buildings, enormous trees and even a helicopter flight path, we realized a design that enhances the architectural detail, highlights the shining gold domes and illuminates the once-lost statue at the monument’s crown. The project was awarded a 2006 IIDA Award of Merit in Lighting Design and a 2006 GE Edison Award of Merit.Architect: Lord Aeck & SargentLighting Design: Ted Ferreira
  • 34.
    RETAILH Stockton RetailStore Atlanta, GAH Stockton, the venerable Atlanta retailer known for its exceptional tailored suits, wanted to update its established, well-respected look with a fresh design for its midtown flagship store at 1180 Peachtree Street, among Atlanta’s newest high-rise buildings. CD+M worked with architect Duane Stone to develop a sophisticated, new approach to the presentation of their merchandise.Architect: Duane Stone & AssociatesLighting Design: Hilary Wainer
  • 35.
    PERFORMING ARTS VENUEHouseof BluesDallas, txAn anchor in the 75-acre, $3 billion+ Victory Park urban development area, the club includes a 1,625 seat music hall, a 400 person capacity restaurant which features distinctive Southern-inspired cuisine, unique décor built upon one of the largest collections of world-culture inspired folk art in the US, and the Foundation Room, House of Blues’ exclusive membership lounge, entertainment and fine-dining space.Dallas marks CD+M’s eighth House of Blues design, with completed venues in Atlantic City, Cleveland and San Diego, and several others currently in design.Architect [Music Hall]: GenslerArchitect [Foundation Room]: BDRALighting Design: Ted Ferreira, Amanda Bennett
  • 36.
    HOSPITALITYHyatt Regency O’Hare Chicago, ILCD+M collaborated with leading design firm The Johnson Studio to create two exciting new dining facilities in the $60 million renovation of the Hyatt O’Hare in Chicago. The elegant O’H Restaurant features graceful tree sculptures of metal, light and glass and Red, the new premium sports bar and lounge, features an elegantly curved bar, plush leather seats, plasma television screens and video projectors.Architect: The Johnson StudioLighting Design: Hilary Wainer
  • 37.
    HOSPITALITYInn of theMountain Gods MESCALERO, NMMarc Rosenberg, with architect and interior designer Worth Group, designed the Inn of the Mountain Gods resort and casino, which opened in March 2005. Situated high in the picturesque mountains of Mescalero, New Mexico, just outside of Ruidoso, the upscale property features 250 guest rooms, 26 suites, 38,000 square-feet of gaming space, 40,000 square feet of convention space and several restaurants. The resort’s dazzling lobby features a two- story panoramic window, as well as natural materials and warm tones that bring the understated luxury of the resort into harmony with its breathtaking surroundings.Owned and operated by the Mescalero Apache Tribe, the resort is the second largest employer in Otero County and has made great contributions to the economy of the reservation and neighboring communities.Architect: Worth GroupInteriors: Worth GroupLighting Design: Marc Rosenberg, Shawn Whitaker
  • 38.
    HOSPITALITYM resort Las Vegas, NvEncompassing more than 90 acres of prime real estate, M Resort is the latest addition to the glittering Las Vegas skyline. CD+M developed a lighting plan for the resort’s interior and exterior spaces - including a full-service spa, casino, nine restaurants and five bars - using a wide variety of modern technology to create color- changing coves and glowing, rear-illuminated panels.This blend of unique amenities and pop ambience ensures M Resort will provide guests with an unforgettable experience, both at present and in the future. The project was awarded a 2010 IIDA Award of Merit in Lighting Design.Architect: Marnekk Corrao AssociatesLighting Design: Marc Rosenberg, Shawn Whitaker
  • 39.
    HOSPITALITYPlanet Hollywood Resort& Casino Las Vegas, NvBuilt upon the former Aladdin Casino on the heart of the Las Vegas Strip, the new Planet Hollywood Resort and Casino offers guests an opportunity to immerse themselves in a retro- chic world of Hollywood and celebrity culture.The elegant and visually sumptuous new property features floor-to-ceiling Swarovski crystal chandeliers at the casino entry lobby, 2,600 movie-themed rooms and suites, high definition plasma screens in each room and on the casino floor, award winning restaurants, a 7,000 seat theatre and a 1,500 seat showroom for high-end Las Vegas entertainment.Architect: Klai + JubaInteriors: Dougall DesignLighting Design: Marc Rosenberg
  • 40.
    HOSPITALITYMcAllen Convention Center Mcallen, TXThe new 175,000 square-foot McAllen Convention Center is the centerpiece of a large mixed-use retail, exhibition and arts master plan, designed by Atlanta-based Thompson, Ventulett, Stainback and Associates (tvsdesign), in partnership with Corpus Christi-based Gignac & Associates. CD+M Lighting Design Group designed lighting for all of the interior public spaces and exterior site, including the exhibition hall, main and prefunction lobbies, ballroom, meeting rooms and boardrooms. Located in the Rio Grande valley near the border to Mexico, the center serves as an important commercial keystone in this fast-growing city.Architect: tvsdesignInteriors: Gignac & AssociatesLighting Design: Ted Ferreira
  • 41.
    HOSPITALITYHUDSONALPHA INSTITUTE FORBIOTECHNOLOGY (HAIB) Huntsville, alUnder the leadership of Atlanta-based Cooper Carry Architects, CD+M assisted in the design of a new quarters for the HudsonAlpha Institute for Biotechnology (HAIB) in Huntsville, Alabama. Warm wood finishes throughout the stunning five-story atrium are enhanced with ambient light in the evening, transforming this public space into an inviting common area for the staff to discuss ideas, collaborate and think creatively. The project was awarded a 2006 IIDA Award of Merit in Lighting Design.Architect: Cooper Carry ArchitectsMEP Engineer: NBP EngineersLighting Design: HIlaryWainer