The document provides instructions for disassembling a track roller frame on a D11T track-type tractor. It describes using straps and a hydraulic cylinder with a puller stud to remove the recoil spring and pilot assembly from the front of the track roller frame. It then explains removing bolts and plates to disassemble additional components like the trunnion, pivot shaft, and retainer assembly from the track roller frame. Precautions are mentioned regarding supporting the heavy weight of components and using properly rated lifting tools.
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...Autohaus Service and Sales
Learn what "PARKTRONIC Inoperative, See Owner's Manual" means for your Mercedes-Benz. This message indicates a malfunction in the parking assistance system, potentially due to sensor issues or electrical faults. Prompt attention is crucial to ensure safety and functionality. Follow steps outlined for diagnosis and repair in the owner's manual.
In this presentation, we have discussed a very important feature of BMW X5 cars… the Comfort Access. Things that can significantly limit its functionality. And things that you can try to restore the functionality of such a convenient feature of your vehicle.
Symptoms like intermittent starting and key recognition errors signal potential problems with your Mercedes’ EIS. Use diagnostic steps like error code checks and spare key tests. Professional diagnosis and solutions like EIS replacement ensure safe driving. Consult a qualified technician for accurate diagnosis and repair.
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Hyundai Motor Group
What’s the force behind Hyundai Motor Group's EV performance and quality?
Maximized driving performance and quick charging time through high-density battery pack and fast charging technology and applicable to various vehicle types!
Discover more about Hyundai Motor Group’s EV platform ‘E-GMP’!
"Trans Failsafe Prog" on your BMW X5 indicates potential transmission issues requiring immediate action. This safety feature activates in response to abnormalities like low fluid levels, leaks, faulty sensors, electrical or mechanical failures, and overheating.
What Does the Active Steering Malfunction Warning Mean for Your BMWTanner Motors
Discover the reasons why your BMW’s Active Steering malfunction warning might come on. From electrical glitches to mechanical failures and software anomalies, addressing these promptly with professional inspection and maintenance ensures continued safety and performance on the road, maintaining the integrity of your driving experience.
Things to remember while upgrading the brakes of your carjennifermiller8137
Upgrading the brakes of your car? Keep these things in mind before doing so. Additionally, start using an OBD 2 GPS tracker so that you never miss a vehicle maintenance appointment. On top of this, a car GPS tracker will also let you master good driving habits that will let you increase the operational life of your car’s brakes.
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs AttentionBertini's German Motors
IBS monitors and manages your BMW’s battery performance. If it malfunctions, you will have to deal with an array of electrical issues in your vehicle. Recognize warning signs like dimming headlights, frequent battery replacements, and electrical malfunctions to address potential IBS issues promptly.
Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
What Exactly Is The Common Rail Direct Injection System & How Does It WorkMotor Cars International
Learn about Common Rail Direct Injection (CRDi) - the revolutionary technology that has made diesel engines more efficient. Explore its workings, advantages like enhanced fuel efficiency and increased power output, along with drawbacks such as complexity and higher initial cost. Compare CRDi with traditional diesel engines and discover why it's the preferred choice for modern engines.
𝘼𝙣𝙩𝙞𝙦𝙪𝙚 𝙋𝙡𝙖𝙨𝙩𝙞𝙘 𝙏𝙧𝙖𝙙𝙚𝙧𝙨 𝙞𝙨 𝙫𝙚𝙧𝙮 𝙛𝙖𝙢𝙤𝙪𝙨 𝙛𝙤𝙧 𝙢𝙖𝙣𝙪𝙛𝙖𝙘𝙩𝙪𝙧𝙞𝙣𝙜 𝙩𝙝𝙚𝙞𝙧 𝙥𝙧𝙤𝙙𝙪𝙘𝙩𝙨. 𝙒𝙚 𝙝𝙖𝙫𝙚 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙥𝙡𝙖𝙨𝙩𝙞𝙘 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙪𝙨𝙚𝙙 𝙞𝙣 𝙖𝙪𝙩𝙤𝙢𝙤𝙩𝙞𝙫𝙚 𝙖𝙣𝙙 𝙖𝙪𝙩𝙤 𝙥𝙖𝙧𝙩𝙨 𝙖𝙣𝙙 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙛𝙖𝙢𝙤𝙪𝙨 𝙘𝙤𝙢𝙥𝙖𝙣𝙞𝙚𝙨 𝙗𝙪𝙮 𝙩𝙝𝙚 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙛𝙧𝙤𝙢 𝙪𝙨.
Over the 10 years, we have gained a strong foothold in the market due to our range's high quality, competitive prices, and time-lined delivery schedules.
Why Is Your BMW X3 Hood Not Responding To Release CommandsDart Auto
Experiencing difficulty opening your BMW X3's hood? This guide explores potential issues like mechanical obstruction, hood release mechanism failure, electrical problems, and emergency release malfunctions. Troubleshooting tips include basic checks, clearing obstructions, applying pressure, and using the emergency release.
2. Shutdown SIS
Previous Screen
Product: TRACK-TYPE TRACTOR
Model: D11T TRACK-TYPE TRACTOR JNS
Configuration: D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POWERED BY C32 Engine
Disassembly and Assembly
D11T Track-Type Tractor Power Train
Media Number -KENR5620-00 Publication Date -01/08/2011 Date Updated -26/08/2011
i04407756
Recoil Spring - Install
SMCS - 4158-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
8S-7640 Stand 1
8S-7611 Tube 1
8S-7615 Pin 1
8S-8048 Saddle 1
B 3S-6224 Electric Hydraulic Pump Gp 1
1S-8937 Needle Valve 1
8S-7172 Double Acting Cylinder 1
5P-7269 Plate 1
1J-2921 Bolt 2
5F-9888 Coupling 1
5P-8713 Plate 1
163-9151 Pilot 1
5P-2678 Stud 5
FT-2631 Spacers 10
5P-8249 Hard Washer 5
1/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
3. 2J-3505 Full Nut 5
C 1P-0520 Driver Gp 1
D -
Bar Stock
12.7 mm (0.50 inch) by
54.00 mm (2.125 inch) by
609.6 mm (24.00 inch) long
1
Illustration 1 g00553596
Typical example
NOTICE
Install stop assembly (13) with the large inside diameter toward the
front of the track roller frame.
2/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
4. Illustration 2 g00553595
Typical example
NOTICE
Do not damage the threads on the inside of the front track roller frame
when the recoil spring is installed.
1. Attach a suitable lifting device to recoil spring (12) and stop assembly (13). The weight of
recoil spring (12) and stop assembly (13) is approximately 522 kg (1150 lb). Install recoil
spring (12) and stop assembly (13) in the front track roller frame.
2. Use a suitable lift truck and install the recoil spring (12) and stop assembly (13) into the
front track roller frame.
Illustration 3 g00553594
Typical example
3. Use Tooling (C) to install bearing (11) in pilot assembly (10) if the bearing was removed.
The inside diameter of the bearing must be 101.100 ± 0.116 mm (3.9803 ± .0045 inch) after
installation.
Note: The recoil spring and the stop assembly must be against the end of the front track
roller frame before pilot assembly (10) is installed.
4. Install pilot assembly (10) in the front track roller frame.
3/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
5. Illustration 4 g00553003
Typical example
5. Attach a suitable lifting device to recoil spring retainer (9). The weight of recoil spring
retainer (9) is approximately 55 kg (120 lb). Install recoil spring retainer (9) in the front
track roller frame.
6. Tighten recoil spring retainer (9). Use Tooling (D) to tighten the recoil spring retainer (9)
enough to contact the pilot assembly. Recoil spring retainer (9) must be installed
approximately 89.0 mm ( 3.50 inch).
Illustration 5 g00553481
Typical example
Use only the tooling and cylinder listed in this procedure. Do not use
other cylinders because they can cause enough force to break the
tension rods. This can result in personal injury or death.
4/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
6. 7. Install Tooling (B). Measure the distance between Surface (C) and 5P-7269 Plate (5) at four
locations next to 5P-2678 Studs. Use 2J-3505 Nuts (7) in order to adjust the plate. Adjust
the distance to 550.0 mm (21.65 inch). Install stops (2) on 5P-2678 Studs (6) to aid in
proper alignment for installation.
Illustration 6 g00553482
Typical example
Illustration 7 g00553483
Typical example
The recoil spring must never have more than 12.7 mm (.50 inch)
distance between the recoil spring retainer during installation of the
recoil spring.
5/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
7. 8. Slowly extend the cylinder rod in order to compress the recoil spring while recoil spring
retainer (9) is installed. Continue this procedure until the outside of the recoil spring retainer
is 3.0 mm (0.12 inch) inside the front track roller frame.
9. Turn recoil spring retainer (9) until the slots are in alignment. Install stops (2) in the front
track roller frame.
10. Remove Tooling (B) from the front track roller frame.
Illustration 8 g00558740
Typical example
11. Put stops (2) in position, and install four bolts (1) .
12. Fasten a suitable lifting device to track adjuster (4). Install track adjuster (4) in the front
track roller frame. The weight of track adjuster (4) is approximately 177 Kg (390 lb).
13. Put cable (3) in position on track adjuster (4). Install the spacer, the washer, and the bolt that
keeps the cable in place.
End By: Install the front track roller frame.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Feb 7 22:38:27 UTC+0800 2020
6/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
8. Shutdown SIS
Previous Screen
Product: TRACK-TYPE TRACTOR
Model: D11T TRACK-TYPE TRACTOR JNS
Configuration: D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POWERED BY C32 Engine
Disassembly and Assembly
D11T Track-Type Tractor Power Train
Media Number -KENR5620-00 Publication Date -01/08/2011 Date Updated -26/08/2011
i04369271
Track Roller Frame - Remove
SMCS - 4151-011
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
105-3351 Strap 2
105-3349 Strap 2
B 8S-6470 Forcing Bolt 1
C
8S-7620 Base As 1
8S-7650 Cylinder As 1
8S-7615 Pin 1
3S-6224 Electric Hydraulic Pump Gp 1
D
6V-3160 Double Acting Cylinder 1
9S-5564 Pin Puller Sleeve As 1
4C-9633 Puller Stud 1
1P-0543 Nut 1
3S-6224 Electric Hydraulic Pump Gp 1
E
142-8548 Bracket 1
189-0411 Shackle As 2
193-5474 Shackle As 1
1/8
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
9. 9U-7536 Lift Stand 2
277-7200 Electric Hydraulic Pump Gp 2
Start By:
a. Remove the bulldozer.
b. Separate the track.
When you are using hydraulic cylinders and puller studs, always ensure
that the rated capacity of the puller stud meets or exceeds the rated
capacity of the hydraulic cylinder. If the puller stud does not meet or
exceed the rated capacity of the hydraulic cylinder, a sudden failure of
the puller stud could occur. The sudden failure of the puller stud could
result in personal injury or death.
Illustration 1 g01425311
1. Install Tooling (A) to hold the bogies in place when the machine is raised.
2/8
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
10. Illustration 2 g01414487
Note: Install Tooling (F) near the outer edge of the case, forward of the ripper pin bore to
support the weight of the machine. Improper placement of Tooling (F) could result in
damage to the underside of the case.
2. Lift the rear of the machine with Tooling (F) until the track guides are above the track links.
3. Lift the front of the machine with Tooling (F) until the track guides are above the track
links.
Illustration 3 g01414894
4. Remove plug (3) and drain the oil from the pivot shaft compartment into a suitable
container for storage or disposal.
5. Fasten a suitable lifting device to trunnion (1). The weight of trunnion (1) is approximately
147 kg (325 lb). Remove bolts (2) and trunnion (1) from the track roller frame.
3/8
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
11. Illustration 4 g01414954
6. Remove plug (6) from plate (5).
7. Remove spiral lock ring (4).
Illustration 5 g01414955
8. Install Tooling (B) in plate (5). Tighten Tooling (B) to remove plate (5) from the track roller
frame.
Illustration 6 g00525912
4/8
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
12. 9. Position Tooling (C) under the front track roller frame, as shown. Support the weight of the
roller frame with Tooling (C).
Illustration 7 g01414960
10. Remove bolts (8) that hold retainer assembly (7) to the main frame case.
NOTICE
To prevent damage to the pivot shaft seal, make sure the bolts that
hold the pivot shaft seal retainer to the main frame case has been
removed before the equalizer bar is disconnected.
Illustration 8 g01414529
11. Remove bolts (9) and the nuts that clamp pin (10) in place in the track roller frame.
12. Remove the retaining ring and the spacer from the end of pin (10).
5/8
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
13. Illustration 9 g00525919
13. Attach Tooling (D), as shown. Fasten a suitable lifting device to Tooling (D).
14. Use Tooling (D) to remove pin (10) from the track roller frame.
Illustration 10 g00525920
Personal injury or death can result from lifting a heavy assembly.
The heavy assembly can fall if using an incorrect hoist to lift the load.
Be sure the hoist has the correct capacity to lift a heavy assembly.
Approximate weight of the assembly is given below.
Pinch Point
Stay clear of this area!
6/8
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
14. Serious personal injury may occur.
15. Fasten a suitable lifting device and Tooling (E) to the track roller frame. Support the weight
of the track roller frame with the suitable lifting device. The weight of the roller frame is
approximately 9979 kg (22000 lb).
16. Remove Tooling (C) from the front frame.
Illustration 11 g01414538
17. Remove bolts (11) and plate (12) that holds the track roller frame to the pivot shaft.
Remove the thrust ring.
18. Use a suitable lifting device and Tooling (E) to remove the track roller frame.
Illustration 12 g01414549
(13) Thrust plate
19. Remove O-ring seal (15).
20. Fasten a suitable lifting device to retainer assembly (7). The weight of retainer assembly (7)
is approximately 34 kg (75 lb). -Remove bolts (14) that hold retainer assembly (7) to the
track roller frame and remove retainer assembly (7).
7/8
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
15. Illustration 13 g01414735
21. Remove O-ring seal (17) from retainer (16).
22. Use a hammer and a chisel to remove seal assembly (18) from retainers (16) and (19).
23. Remove plate (13) from retainer (7). Refer to Illustration 12 for the location of plate (13).
Illustration 14 g01414747
24. If necessary, remove bearings (20) from the track roller frame.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Feb 7 22:39:26 UTC+0800 2020
8/8
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
16. Shutdown SIS
Previous Screen
Product: TRACK-TYPE TRACTOR
Model: D11T TRACK-TYPE TRACTOR JNS
Configuration: D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POWERED BY C32 Engine
Disassembly and Assembly
D11T Track-Type Tractor Power Train
Media Number -KENR5620-00 Publication Date -01/08/2011 Date Updated -26/08/2011
i06671320
Track Roller Frame - Disassemble
SMCS - 4151-015
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 105-3349 Strap 1
B
3S-6224 Electric Hydraulic Pump Gp 1
6V-3175 Hydraulic Cylinder Gp 1
4C-9634 Puller Stud 1
5P-7270 Sleeve 1
1P-1840 Bearing Puller Adapter 1
9U-6832 Nut 1
3H-0467 Puller Washer 1
C FT-1713 Wedge 1
D 2D-1201 Eyebolt 1
Start By:
a. Remove the track roller frame or the front track roller frame. Refer to Disassembly and
Assembly, "Track Roller Frame - Remove".
b. Remove the idlers. Refer to Disassembly and Assembly, "Idlers - Remove".
1/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
17. NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat®
products.
Dispose of all fluids according to local regulations and mandates.
Note: The disassembly procedure for the track roller frame and the front track roller frame is the
same procedure. Only the front track roller frame is shown.
Illustration 1 g01425527
1. Fasten a suitable lifting device to track roller (1).
2. Remove bolts (3) and caps (2) and remove the track roller. The weight of track roller is
approximately 179 kg (394 lb).
Note: Special Spiralock threads are used on the minor bogies with caps with 2 bolts.
Spiralock threads provide improved bolt retention. Use special Spiralock taps to chase the
threads in these holes. The use of standard taps in these holes will eliminate the Spiralock
feature. This will cause the bolts to loosen.
3. Remove Tooling (A) from the track roller frame.
2/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
18. Illustration 2 g01425931
4. Remove guides (4) and covers (5) from both sides of the track roller frame.
Illustration 3 g01425933
Note: There will be a loss of oil when the stoppers and plug (7) are removed from pin
assembly (6).
5. Use a drill and remove the stoppers and plugs (7) from both ends of pin assembly (6).
3/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
19. Illustration 4 g01425935
6. Put Tooling (B) in position. Fasten a suitable lifting device to Tooling (B). The combined
weight of the pin assembly and Tooling (B) is approximately 45 kg (100 lb).
7. Use Tooling (B) to remove the pin assembly that holds minor bogie (8) to the major bogie.
Illustration 5 g00526056
8. Fasten a suitable lifting device to minor bogie (8). Remove minor bogie (8). The weight of
minor bogie (8) is approximately 39 kg (86 lb).
4/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
20. Illustration 6 g01425936
9. Remove retaining ring (10).
10. Install Tooling (D) in plate (9). Remove the plate (9) from the track roller frame.
Illustration 7 g01425937
Note: There will be a loss of oil when the stoppers and plugs (11) are removed.
11. Use a suitable drill, and remove the stoppers and plugs (11) from pin assembly (12).
5/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
21. Illustration 8 g00526071
12. Install Tooling (C) between the inside of the track roller frame and the major bogie.
13. Install Tooling (B). Fasten a suitable lifting device to Tooling (B).
14. Use Tooling (B) and remove the pin assemblies that hold the major bogie to the track roller
frame.
Illustration 9 g00526078
15. Fasten a suitable lifting device to major bogie (13). Remove major bogie (13) from the track
roller frame. The weight of major bogie (13) is approximately 435 kg (960 lb).
16. Remove pad assemblies (14) from the major bogie and the track roller frame.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Feb 7 22:40:26 UTC+0800 2020
6/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
22. Shutdown SIS
Previous Screen
Product: TRACK-TYPE TRACTOR
Model: D11T TRACK-TYPE TRACTOR JNS
Configuration: D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POWERED BY C32 Engine
Disassembly and Assembly
D11T Track-Type Tractor Power Train
Media Number -KENR5620-00 Publication Date -01/08/2011 Date Updated -26/08/2011
i07041863
Track Roller Frame - Assemble
SMCS - 4151-016
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 105-3349 Strap 1
D
3S-6224 Electric Hydraulic Pump Gp 1
5P-7399 Adapter (Bearing Puller) 1
6V-3175 Cylinder Gp 1
5P-9695 Pressure Plate 1
5P-4776 Tool Stud 3
1A-1935 Nut 3
3K-5234 Hard Washer 3
E 5P-3931 Anti-Seize Compound -
F 1P-7409 Eyebolt 1
When you are using hydraulic cylinders and puller studs, always ensure
that the rated capacity of the puller stud meets or exceeds the rated
capacity of the hydraulic cylinder. If the puller stud does not meet or
1/7
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
23. exceed the rated capacity of the hydraulic cylinder, a sudden failure of
the puller stud could occur. The sudden failure of the puller stud could
result in personal injury or death.
NOTICE
Do not use threaded rods that have not been hardened as tooling with
hydraulic cylinders. The maximum rated tonnage should be stamped
on one end of the puller studs. Do not use threaded rods that have not
been stamped with the rated tonnage.
Illustration 1 g00526078
1. Put pad assemblies (14) in position on the major bogie (13) and the track roller frame.
Install the bolts that hold the pad assemblies in place.
2. Fasten a suitable lifting device to major bogie (13). Put the major bogie (13) in position in
the track roller frame. The weight of major bogie (13) is approximately 435 kg (960 lb).
2/7
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
24. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
25. Illustration 2 g01427639
Note: to reuse original pin assemblies (12), the pad assemblies must be filled with
120 ± 3 mL (4.08 ± 0.10 oz) of SAE 90W oil. The rubber stoppers must be installed
3.00 ± 1.00 mm (0.118 ± 0.039 inch) below the surface of the end of the pin assemblies.
NOTICE
The end of the pin with the Mark X or a hole must be toward the
outside of the roller frame. The Mark X or hole must be on the top or
bottom on the vertical center line of the bore.
3. Put Tooling (E) on the bores of the major bogie and the track roller frame.
4. Lower temp of pin assembly (12) and position in the bore.
5. Install Tooling (D). Use Tooling (D) and install pin assembly (12) in the major bogie.
3/7
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
26. Illustration 3 g01425936
6. Install Tooling (F) into plate (9). Install plate (9). Install retaining ring (10) to hold the plate
in position.
Illustration 4 g00526056
Note: The minor bogie (8) must be installed with the part number or the words THIS SIDE
OUT toward the outside of the major bogie.
7. Put minor bogie (8) in position in the major bogie.
8. Put Tooling (E) on the bores of the minor bogie and the major bogie.
4/7
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
27. Illustration 5 g01427640
Note: to reuse original pin assemblies (12), the pin assemblies must be filled with
120 ± 3 mL (4.08 ± 0.10 oz) of SAE 90W oil. The rubber stoppers must be installed
3.00 ± 1.00 mm (0.118 ± 0.039 inch) below the surface of the end of the pin assemblies.
NOTICE
The end of the pin with the Mark X must be toward the outside of the
roller frame. The Mark X must be on the top or bottom on the vertical
centerline of the bore.
9. Lower temp of pin assembly (6), and position in the bore.
10. Install Tooling (D), as shown. Use Tooling (D) to install pin assembly (6). Install the pin
assembly to a depth of 5.0 ± 0.50 mm (0.20 ± 0.02 inch) above the surface of the major
bogie.
5/7
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...