Kidz Cater is a catering business run by Bright Future Youth and Family Services, a nonprofit organization. The business plan provides an executive summary, mission, management team, locations and facilities, products and services, market analysis, operations, and financial projections. Kidz Cater aims to provide job training and experience to at-risk youth while offering catering services. It will operate out of the commercial kitchen at the Chambers School and Career Center, serving internal and external nonprofit customers. The financial projections estimate revenues of $738,000 in year one and net income of $41,139, with revenues and profits growing each year.
The catering business is one of the most rewarding careers as it not only lets you pursue your passion, it has the potential to grow into a huge business by size and volume if planned properly.
A business plan is helpful for a catering business because along with great cooking skills, great management skills are an integral part of a successful catering business. A business plan can help you conduct your daily business activities without chaos, have good finances, help you in finding your desired customers, and in making your unique business idea a marketable one.
If the above benefits sound good, let’s discuss how to write a catering business plan.
A Business Plan On Catering Services (Wholesome Catering Services)Sneha J Chouhan
Viewers please note this presentaion is for educational purpose only. The figures and details mentioned in this presentiontation are purely hypothetical.
The catering business is one of the most rewarding careers as it not only lets you pursue your passion, it has the potential to grow into a huge business by size and volume if planned properly.
A business plan is helpful for a catering business because along with great cooking skills, great management skills are an integral part of a successful catering business. A business plan can help you conduct your daily business activities without chaos, have good finances, help you in finding your desired customers, and in making your unique business idea a marketable one.
If the above benefits sound good, let’s discuss how to write a catering business plan.
A Business Plan On Catering Services (Wholesome Catering Services)Sneha J Chouhan
Viewers please note this presentaion is for educational purpose only. The figures and details mentioned in this presentiontation are purely hypothetical.
Proposal For Catering Services PowerPoint Presentation SlidesSlideTeam
If your company needs to submit a Proposal For Catering Services PowerPoint Presentation Slides look no further. Our researchers have analyzed thousands of proposals on this topic for effectiveness and conversion. Just download our template, add your company data and submit to your client for a positive response. https://bit.ly/36N9czT
Before you start writing your business plan for your bar business, spend as much time as you can to reading through some samples of bar or food and restaurant business plan templates. Not only will that give you a good idea of what it is you’re aiming for, but it will also show you the different sections that different entrepreneurs include and the language they use to write about themselves and their future plans.
We have created a sample bar business plan example for you to get a good idea about how a perfect bar business plan should look like and what details you should include in your business plan.
Source: https://upmetrics.co/template/bar-business-plan-example
this ppt presentation is about the restaurant atmosphere that how should we enhance our restaurant beauty by following these simple steps..... things that affect our design, concept, theme and over all ambiance.....
What is bar? What are the different types of beverage service industry. Packed for you to read, study and learn about bar and bar and beverage industry.
The catering business plan focuses on opening a local catering service with a focus on providing a variety of menu selections that are customized to match the unique tastes and financial constraints of clients. The objective is to have a dependable, successful business with a well-run kitchen, knowledgeable employees, and efficient inventory management to reduce waste. The strategy strives to establish a reputation for quality, hygiene, and client happiness while retaining an emphasis on sustainability through responsible sourcing and reducing food waste. It targets a broad consumer base, including individuals, small companies, and corporate clients. The company wants to be profitable while minimizing risks like price changes and market rivalry. To that end, it works with neighborhood event planners and relies on word-of-mouth recommendations.
If you are planning to start a new food cafe business, the first thing you will need is a business plan. Use our Mexican Rodio - food cafe business plan created using upmetrics business plan software to start writing your business plan in no time.
Before you start writing your business plan for your new food cafe business, spend as much time as you can reading through some examples of free food and restaurant business plans. Reading some sample business plans will give you a good idea of what you’re aiming for and also it will show you the different sections that different entrepreneurs include and the language they use to write about themselves and their business plans.
We have created this sample food cafe business plan for you to get a good idea about how a perfect food cafe business plan should look like and what details you will need to include in your stunning business plan.
Proposal For Catering Services PowerPoint Presentation SlidesSlideTeam
If your company needs to submit a Proposal For Catering Services PowerPoint Presentation Slides look no further. Our researchers have analyzed thousands of proposals on this topic for effectiveness and conversion. Just download our template, add your company data and submit to your client for a positive response. https://bit.ly/36N9czT
Before you start writing your business plan for your bar business, spend as much time as you can to reading through some samples of bar or food and restaurant business plan templates. Not only will that give you a good idea of what it is you’re aiming for, but it will also show you the different sections that different entrepreneurs include and the language they use to write about themselves and their future plans.
We have created a sample bar business plan example for you to get a good idea about how a perfect bar business plan should look like and what details you should include in your business plan.
Source: https://upmetrics.co/template/bar-business-plan-example
this ppt presentation is about the restaurant atmosphere that how should we enhance our restaurant beauty by following these simple steps..... things that affect our design, concept, theme and over all ambiance.....
What is bar? What are the different types of beverage service industry. Packed for you to read, study and learn about bar and bar and beverage industry.
The catering business plan focuses on opening a local catering service with a focus on providing a variety of menu selections that are customized to match the unique tastes and financial constraints of clients. The objective is to have a dependable, successful business with a well-run kitchen, knowledgeable employees, and efficient inventory management to reduce waste. The strategy strives to establish a reputation for quality, hygiene, and client happiness while retaining an emphasis on sustainability through responsible sourcing and reducing food waste. It targets a broad consumer base, including individuals, small companies, and corporate clients. The company wants to be profitable while minimizing risks like price changes and market rivalry. To that end, it works with neighborhood event planners and relies on word-of-mouth recommendations.
If you are planning to start a new food cafe business, the first thing you will need is a business plan. Use our Mexican Rodio - food cafe business plan created using upmetrics business plan software to start writing your business plan in no time.
Before you start writing your business plan for your new food cafe business, spend as much time as you can reading through some examples of free food and restaurant business plans. Reading some sample business plans will give you a good idea of what you’re aiming for and also it will show you the different sections that different entrepreneurs include and the language they use to write about themselves and their business plans.
We have created this sample food cafe business plan for you to get a good idea about how a perfect food cafe business plan should look like and what details you will need to include in your stunning business plan.
Before you start writing your bakery business plan, spend as much time as you can to reading through some samples of food and restaurant business plans. Not only will that give you a good idea of what it is you’re aiming for, but it will also show you the different sections that different entrepreneurs include and the language they use to write about themselves and their future plans.
We have created a sample bakery business plan example for you to get a good idea about how a perfect bakery business plan should look like and what details you should include in your business plan.
Source: https://upmetrics.co/template/bakery-business-plan-example
Before you start writing your daycare business plan, spend as much time as you can to reading through some samples of a service related business plans. Not only will that give you a good idea of what it is you’re aiming for, but it will also show you the different sections that different entrepreneurs include and the language they use to write about themselves and their future plans.
We have created a sample daycare business plan example for you to get a good idea about how a perfect day care business plan should look like and what details you should include in your business plan.
Source: https://upmetrics.co/template/day-care-business-plan-example
Today marks our 20th year inception.
Unidine is proud to have served our residents, patients, guests, and clients with exceptional food and hospitality for the past 20 years. It has been an incredible journey to get where we are today, and we are honored to be the leading provider of food and dining services. In this brand e- book, you’ll be able to take a deeper look at Unidine’s story, those who helped us along the way, and what truly makes Unidine the Solution.
Residential Assisted Living Business Plan ExampleECorp
A residential assisted living business plan outlines strategies for operating a facility providing care services to elderly residents. It typically includes market analysis, financial projections, staffing plans, and details on amenities and services offered to residents.
This business plan assignment is completed done by my senior classmate, Akibul Islam Amit. I uploaded this in respect of him. I hope this presentation assignment will support the presenters during their business presentation.
This is a combination work of five authors, edited by myself. For further and full presentation use the references provided at the end of the presentment.
Thank you.
If you are planning to start a new wedding venue business, the first thing you will need is a business plan. Use our sample Moore Weddings - Wedding Venue Business Plan created using upmetrics business plan software to start writing your business plan in no time.
Before you start writing your business plan for your new wedding venue business, spend as much time as you can reading through some examples of services-related business plans. Reading sample business plans will give you a good idea of what you’re aiming for and also it will show you the different sections that different entrepreneurs include and the language they use to write about themselves and their business plans.
We have created this sample Moore Weddings - Wedding Venue Business Plan for you to get a good idea about how perfect a wedding venue business plan should look like and what details you will need to include in your stunning business plan.
If you are planning to start a new web design company, the first thing you will need is a business plan. Use our sample Robid - Web Design Business Plan created using upmetrics business plan software to start writing your business plan in no time.
Before you start writing your business plan for your new web design firm, spend as much time as you can reading through some examples of the software and mobile app-related business plans. Reading sample business plans will give you a good idea of what you’re aiming for and also it will show you the different sections that different entrepreneurs include and the language they use to write about themselves and their business plans.
We have created this sample Robid - Web Design Business Plan for you to get a good idea about how a perfect web design business plan should look like and what details you will need to include in your stunning business plan.
Vocational school business plan exampleupmetrics.co
If you are planning to start a new vocational school business, the first thing you will need is a business plan. Use our sample Radiant - Vocational School Business Plan created using upmetrics business plan software to start writing your business plan in no time.
Before you start writing your business plan for your new vocational school, spend as much time as you can reading through some examples of the education and training-related business plans. Reading sample business plans will give you a good idea of what you’re aiming for and also it will show you the different sections that different entrepreneurs include and the language they use to write about themselves and their business plans.
We have created this sample Radient - Vocational School Business Plan for you to get a good idea about how a perfect vocational school business plan should look like and what details you will need to include in your stunning business plan
Not just that vending machines are easy to use, they come with a variety of product niches and help you avoid the hassle of showing product after product to customers, who’ll have every option displayed right in front of them with a vending machine. And though refilling a vending machine and protecting it from theft and vandalism might seem like a boring job, a vending machine business is much more than that. From vending machines that offer products ranging from granola bars to office supplies to the ones that take orders from apps through artificial intelligence, the vending machine business has gone through a massive change over the decades. But, one more interesting fact is that there are over 5 million vending machines in the US alone, and if you want to last in such a competitive market you need a proper business plan. So, read on to find out how to write a vending machine business plan.
If you are planning to start a new vacation rental business, the first thing you will need is a business plan. Use our sample Maxwell - Vacation Rental Business Plan created using upmetrics business plan software to start writing your business plan in no time.
Before you start writing your business plan for your new vacation rental business, spend as much time as you can reading through some examples of services-related business plans. Reading sample business plans will give you a good idea of what you’re aiming for and also it will show you the different sections that different entrepreneurs include and the language they use to write about themselves and their business plans.
We have created this sample Maxwell - Vacation Rental Business Plan for you to get a good idea about how perfect a vacation rental business plan should look like and what details you will need to include in your stunning business plan.
Check out our sample t-shirt business plan to learn how you can write your business plan. This sample business plan includes all the required information for a perfect t-shirt business plan.
If you are planning to start a new tour and travel agency business, the first thing you will need is a business plan. Use our sample Sunlight - Travel Agency Business Plan created using upmetrics business plan software to start writing your business plan in no time.
Before you start writing your business plan for your new tours and travels business, spend as much time as you can reading through some examples of the service-related business plans. Reading sample business plans will give you a good idea of what you’re aiming for and also it will show you the different sections that different entrepreneurs include and the language they use to write about themselves and their business plans.
We have created this sample Sunlight - Travel Agency Business Plan for you to get a good idea about how a perfect travel agency's business plan should look like and what details you will need to include in your stunning business plan.
If you are planning to start a new tire shop, the first thing you will need is a business plan. Use our sample Maxwell - Tire Shop Business Plan created using upmetrics business plan software to start writing your business plan in no time.
Before you start writing your business plan for your new tire shop business, spend as much time as you can reading through some examples of transportation-related business plans. Reading sample business plans will give you a good idea of what you’re aiming for and also it will show you the different sections that different entrepreneurs include and the language they use to write about themselves and their business plans.
We have created this sample Maxwell - Tire Shop Business Plan for you to get a good idea about how a perfect tire shop business plan should look like and what details you will need to include in your stunning business plan.
If you are planning to start a new thrift store, the first thing you will need is a business plan. Use our sample Maxwell - Thrift Store Business Plan created using upmetrics business plan software to start writing your business plan in no time.
Before you start writing your business plan for your new thrift store business, spend as much time as you can reading through some examples of retail store-related business plans. Reading sample business plans will give you a good idea of what you’re aiming for and also it will show you the different sections that different entrepreneurs include and the language they use to write about themselves and their business plans.
We have created this sample Maxwell - Thrift Store Business Plan for you to get a good idea about how a perfect thrift store business plan should look like and what details you will need to include in your stunning business plan.
If you want to start a new taxi business, the first thing you will need is a business plan. Use our sample Metro Cabs - Taxi Business Plan created using upmetrics business plan software to start writing your business plan in no time.
Before you start writing your business plan for your new taxi business, spend as much time as you can reading through some examples of transportation-related business plans. Reading sample business plans will give you a good idea of what you’re aiming for and also it will show you the different sections that different entrepreneurs include and the language they use to write about themselves and their business plans.
We have created this sample Metro Cabs - Taxi Business Plan for you to get a good idea about how perfect a taxi business plan should look like and what details you will need to include in your stunning business plan.
Startup Business Plan Template for Entrepreneursupmetrics.co
If you are planning to launch a new startup, the first thing you will need is a business plan. Use our startup business plan template created using Upmetrics business plan software to start writing your business plan in no time.
Before you start writing your business plan for your startup, spend as much time as you can reading through some sample business plans created for startups. Reading sample business plans will give you a good idea of what you’re aiming for. It will also show you the different sections that different entrepreneurs include and the language they use to write about themselves and their business goals.
We have created this startup business plan template to get a good idea about what a perfect startup business plan should look like and what details you will need to include in your stunning business plan.
If you are planning to start a new solar farm or energy business, the first thing you will need is a business plan. Use our sample Maxwell Technologies - Solar Farm Business Plan created using upmetrics business plan software to start writing your business plan in no time.
Before you start writing your business plan for your new solar farm, spend as much time as you can reading through some examples of manufacturing-related business plans. Reading sample business plans will give you a good idea of what you’re aiming for and also it will show you the different sections that different entrepreneurs include and the language they use to write about themselves and their business plans.
We have created this sample Maxwell Technologies - Solar Farm Business Plan for you to get a good idea about how a perfect solar farm business plan should look like and what details you will need to include in your stunning business plan.
The simple business plan template is based on Ash Maurya's lean canvas. If you need to write a business plan quickly or if your business is fairly simple and straightforward to explain, use our simple business plan template to write your business plan easily. Each section of a simple business plan is a quick summary and should not be longer than one page.
This simple business plan is not the detailed business plan that is being used to secure funding or loan. This simple business plan avoids long-worded summaries and detailed information about the business. This simple business plan is not even a document. It’s a collection of lists, tables, and bullet points of important aspects of your business strategy and management.
However, whenever there is a need for a formal business plan, this simple business plan can be an excellent first draft. Add descriptions and fill in the required information, make sure you have all the key business plan components, and you have the formal business plan ready that you need.
The easiest way to simplify the work of writing a business plan is to start with a sample business plan template. Our sample business plan template includes step by step guide on how and what you need to include in your winning business plan. In this sample business plan template, we have included help and guidelines about the purpose of each section and how to complete that particular section. Our business plan software and this template will save entrepreneurs critical time and make their business plan writing experience a lot easier. A standard business plan consists of a single document consists of several segments including a description of the company, customer pain problem, your solution including product or services, market research, marketing strategy, competitor analysis, sales strategies, funding requirements, and financial data. If you are looking for a business plan template for a particular industry, you can browse our sample business plans and find a business plan example specific to your industry.
Regardless if you’ve been operating for a long time already, by writing up a business plan for your retail store, you can get an overview of what you want to achieve with your business, and guidelines for how you’ll achieve your goals. A retail business plan is a solid foundation for the success of your business, whether you seek funding or not. It helps you see clearly what your business looks like and how it’s positioned in your target market. If you need to get funding, your retail business plan will work as proof that you and your business are good for investment. Studies suggest you can double your chances of securing a loan with a business plan and grow your business.
If you are planning to start a new restaurant business, the first thing you will need is a restaurant business plan. Use our restaurant business plan template created using upmetrics business plan software to start writing your business plan in no time.
Before you start writing your business plan for your new restaurant, spend as much time as you can reading through some samples of restaurant and cafe business plan templates. Reading sample business plans will give you a good idea of what you’re aiming for and also it will show you the different sections that different entrepreneurs include and the language they use to write about themselves and their business plans.
We have created this restaurant business plan template for you to get a good idea about how a perfect restaurant business plan should look like and what details you will need to include in your stunning business plan.
A rental property business is a great way of earning a passive income. It can help you have great finances if you go about it in the right way. The rental property market stood at a size of 174.2 bn dollars in the US in 2021. And with the subsiding pandemic isn’t about to shrink any time soon. Now, if you are planning to become a landlord, you might need just one thing before you start your business. A business plan. A business plan would become a guide in your business journey. It would also make your journey a less difficult and successful one. So, if you are ready to start your business, read on to find out all about a rental property business plan.
Real estate investment business plan exampleupmetrics.co
The real estate sector is one of the most profitable sectors to invest in. Many investors swear by it as a bankable source of secondary income. Not just that, the real estate investment market increased from 9.6 trillion dollars in 2019 to 10.5 trillion dollars in 2020. Although it may take time, investment in the housing market can help your money grow. And though the above information invests in the real estate sector a rosy prospect, it can go horribly wrong without a proper business plan and investment strategy. Read on to find out what a business plan can do for your investment business.
Real estate agency business plan exampleupmetrics.co
A real estate agency is one of the best ways of getting paid for your expertise in the real estate business. If you have a thorough knowledge of the market, are a brilliant negotiator, and can think on your feet then being a real estate agent might be the right career for you. The property sales and brokerage market in the US stood at a sum of 156.2 billion dollars in 2021. It is a great market to be in, but you need a well-designed business plan to succeed as a real estate agent. A business plan can help you in having a clear strategy and also in keeping a track of your progress.
If you are planning to start a new Plant Nursery business, the first thing you will need is a business plan. Use our Nature Box - Plant Nursery business plan example created using upmetrics business plan software to start writing your business plan in no time. Before you start writing your business plan for your new Plant Nursery business, spend as much time as you can reading through some samples of Farm and Food Production Business Plans. Reading sample business plans will give you a good idea of what you’re aiming for and also it will show you the different sections that different entrepreneurs include and the language they use to write about themselves and their business plans. We have created this sample Plant Nursery business plan for you to get a good idea about how a perfect Plant Nursery business plan should look like and what details you will need to include in your stunning business plan.
What You're Going to Learn
- How These 4 Leaks Force You To Work Longer And Harder in order to grow your income… improve just one of these and the impact could be life changing.
- How to SHUT DOWN the revolving door of Income Stagnation… you know, where new sales come into your magazine while at the same time existing sponsors exit.
- How to transform your magazine business by fixing the 4 “DON’Ts”...
#1 LEADS Don’t Book
#2 PROSPECTS Don’t Show
#3 PROSPECTS Don’t Buy
#4 CLIENTS Don’t Stay
- How to identify which leak to fix first so you get the biggest bang for your income.
- Get actionable strategies you can use right away to improve your bookings, sales and retention.
Explore Sarasota Collection's exquisite and long-lasting dining table sets and chairs in Sarasota. Elevate your dining experience with our high-quality collection!
Best Crypto Marketing Ideas to Lead Your Project to SuccessIntelisync
In this comprehensive slideshow presentation, we delve into the intricacies of crypto marketing, offering invaluable insights and strategies to propel your project to success in the dynamic cryptocurrency landscape. From understanding market trends to building a robust brand identity, engaging with influencers, and analyzing performance metrics, we cover all aspects essential for effective marketing in the crypto space.
Also Intelisync, our cutting-edge service designed to streamline and optimize your marketing efforts, leveraging data-driven insights and innovative strategies to drive growth and visibility for your project.
With a data-driven approach, transparent communication, and a commitment to excellence, InteliSync is your trusted partner for driving meaningful impact in the fast-paced world of Web3. Contact us today to learn more and embark on a journey to crypto marketing mastery!
Ready to elevate your Web3 project to new heights? Contact InteliSync now and unleash the full potential of your crypto venture!
Office Furniture | Furniture Store in Sarasota, Florida | Sarasota Collection
Catering business plan example
1. Catering Business Plan
Business Plan
2019
John Doe
10200 Bolsa Ave, Westminster, CA, 92683
(650) 359-3153
text@example.com
http://www.example.com/
2. Table of Contents
Executive Summary 4
Mission 4
Keys to Success 4
Objectives 4
Management Team 5
JOHN DOE 5
Financial Summary 5
About Kidz Cater 6
Legal Entity 6
Management Team 6
JOHN DOE 6
Locations and Facilities 6
Milestones 7
Facility Design 7
Products & Services 8
Food Product Descriptions 8
Boxed lunches 8
Buffet style lunches: 8
Alternative Providers 8
Sourcing 9
Technology 9
Future Products 9
Market & Customer Analysis 10
Market Segmentation 10
Internal Bright Future Customers 10
Nonprofit External Customers 10
For-profit External Customers 11
Market Analysis 11
1 / 25
3. Target Market Segment Strategy 11
Market Trends 11
Market Growth 12
Value Proposition 12
Competitive Edge 12
Marketing Strategy 12
Distribution Strategy 13
Marketing Programs 13
Pricing Strategy 13
Promotion Strategy 13
Competitive Analysis 14
Competitors 14
Of Grape & Grain 14
Cravings Fine Foods 14
Ariana's Deli 15
Fetuccini and Co 15
Napoli Restaurant 15
Brindiamo Catering 15
Wild Duck Brewery 15
Oregon Electric Station 16
Local and national grocery stores chains 16
Local and national sandwich fast-food chains 16
Strategic Alliances 16
Operations 18
Organizational Structure 18
Management Team 18
JOHN DOE 18
JANE DOE 19
Management Team Gaps 19
Personnel Plan 19
2 / 25
4. Financial Plan 20
Important Assumptions 20
Other General Assumptions 20
Fundraising Strategy 20
Fundraising Programs 20
Funding Forecast 21
Start-up Summary 21
Income Statement (5 Year Projections) 22
Balance Sheet (5 Year Projections) 23
Cash Flow (5 Year Projections) 24
3 / 25
5. Executive Summary
Start Writing here...
Examples
Kidz Cater
Bright Future Youth and Family Services is a private nonprofit organization that
serves more than 7,000 children, youth and families each year in Lane County,
Oregon. We provide a continuum of services ranging from prevention to treatment
for clients ranging in age from two to 24. Our agency also works closely with and
helps shape, the major systems that impact the young people and families in our
community and state. You will find us involved in such diverse areas as mental
Mission
Start Writing here...
Examples
Kidz Cater
Kidz Cater is dedicated to providing at-risk youth with an opportunity to gain work
experience and transferable skills by providing our customers with healthy,
homemade foods and excellent service at reasonable prices. Employees of Kidz
Cater will be students who are enrolled in the culinary arts program at the
Chambers School and Career Center and are interested in gaining work
experience in the restaurant and food services industry. The experiences the
Keys to Success
Start Writing here...
Examples
Kidz Cater
Cultivate an identity (brand) for the Catering For Kids business in the
Eugene/Springfield community.
Expand our customer base into new areas within Eugene/Springfield.
Hire a year-round business manager for the catering business, thereby
providing student employment twelve months of the year.
Expand the donor/corporate partner base and corporate contributions that
Objectives
Examples
Kidz Cater
Enroll approximately 25 Chambers School students for stipend and school
credit based positions in the next school year.
Serve a sufficient number of clients to break even financially, covering pay
for student employees, staff and all inventory expenses.
Move from serving internal clients of Bright Future to external clients,
especially other nonprofit organizations.
upmetrics.co
Read More
Read More
Read More
Read More
2019 Business Plan | Catering Business Plan 4 / 25
6. Start Writing here...
Management Team
JOHN DOE
Owners - John.doe@example.com
Kidz Cater is led by John Doe who has been in the catering business for 20 years. While
Mr. Doe has never run a business himself, he has taught cooking classes at the local
culinary institute for 10 years and has worked as a head chef an upscale caterer in the
community over the past 10 years. As such Mr. Doe has an in-depth knowledge of the
catering business including the operations side (e.g., running day-to-day operations) and
the business management side (e.g., staffing, marketing, etc.).
Financial Summary
Kidz Cater is currently seeking $285,000 to launch. Specifically, these funds will be used as follows:
Facility design/build: $110,000
Working capital: $175,000 to pay for marketing, salaries, and land costs until Kidz Cater reaches break-
even.
Year1 Year2 Year3 Year4 Year5
Revenue $738,000 $1,716,272 $2,007,297 $2,331,125 $2,694,524
Total Expenses $639,595 $1,021,515 $1,110,127 $1,190,308 $1,273,715
EBITDA $98,405 $694,757 $897,169 $1,140,817 $1,420,809
Depreciation $16,560 $16,560 $16,560 $16,560 $16,560
EBIT $81,845 $678,197 $880,609 $1,124,257 $1,404,249
Interest $18,554 $16,235 $13,916 $11,596 $9,277
Pre Tax Income $63,291 $661,962 $866,694 $1,112,661 $1,394,972
Income Tax Expense $22,152 $231,687 $303,343 $389,431 $488,240
Net Income $41,139 $430,276 $563,351 $723,230 $906,732
Number of locations 1 1 1 1 1
Avg private customers/day 4 4 5 5 5
Number of orders/yr 720 1,555 1,680 1,814 1,959
Corporate kids/year 12 28 44 60 76
2019 Business Plan | Catering Business Plan 5 / 25
7. About Kidz Cater
Start Writing here...
Examples
Kidz Cater
The Chambers School and Career Center is an accredited alternative school,
offering education and vocational training for out-of-school youth, ages 14 to 21.
Our mission is to help prepare young adults to become productive citizens by
providing a work and learning environment where they feel challenged, respected,
and accountable as they strive to meet the demands of adulthood. The program is
funded by the Lane Workforce Partnership, Oregon Youth Conservation Corps,
Legal Entity
Start Writing here...
Examples
Kidz Cater
Bright Future Youth and Family Services is a 501(c)3 tax-exempt not-for-profit
organization that strives to uphold the following values:
Providing quality services to all of our clients, regardless of age, sex, race,
color, religion, national origin, sexual orientation, mental or physical
disabilities or ability to pay for services.
Management Team
JOHN DOE
Owner - john.doe@example.com
The program Kidz Cater is led by John Doe who has been in the catering business for 20
years. While Mr. Doe has never run a business himself, he has taught cooking classes at
the local culinary institute for 10 years and has worked as a head chef an upscale caterer
in the community over the past 10 years. As such Mr. Doe has an in-depth knowledge of
the catering business including the operations side (e.g., running day-to-day operations)
and the business management side (e.g., staffing, marketing, etc.).
Locations and Facilities
Examples
Kidz Cater
Kidz Cater will be located inside the Chambers School and Career Center at 1390
Keasey Boulevard in Eugene, Oregon. The school facility includes a commercial
kitchen that is licensed by the Oregon Department of Human Services to serve
the public. Currently, the kitchen is used by the culinary arts program to prepare
upmetrics.co
Read More
Read More
Read More
2019 Business Plan | Catering Business Plan 6 / 25
8. Start Writing here...
and serve breakfast and lunch for students during each school year.
Milestones
Start Writing here...
Examples
Kidz Cater
The accompanying table lists important program milestones, with dates and
managers in charge, and budgets for each. The milestone schedule indicates our
emphasis on planning for implementation.
What the table doesn't show is the commitment behind it. Our business plan
includes complete provisions for plan-vs.-actual analysis, and we will be holding
follow-up meetings every month to discuss the variance and course corrections.
Facility Design
Start Writing here...
Examples
Kidz Cater
Kidz Cater will develop a 4,000 square foot kitchen and office space whose key
elements will include the following:
Kitchen area
Storage Room
Sales and administrative office
Read More
Read More
Read More
2019 Business Plan | Catering Business Plan 7 / 25
9. Products & Services
Start Writing here...
Examples
Kidz Cater
Corporate customers demand that food and presentation quality be consistently
high, which is why Kidz Cater will strive to maintain the best quality possible. Our
ingredients include high-quality products and many goods are baked fresh daily.
Each boxed lunch is packed with the utmost care in environmentally responsible
packaging.
Food Product Descriptions
Boxed lunches
Examples
Kidz Cater
A sandwich or salad with dressing packet, deli salad (i.e. pasta salad or cottage
cheese, cinnamon, and fresh fruit), fresh seasonal fruit, chips, and a cookie.
Sandwich or salad options will include:
Roast beef and Havarti dill sandwich;
Avocado smoked turkey, lettuce and tomato sandwich;
Buffet style lunches:
Examples
Kidz Cater
It Includes:
Party platters of meats, cheeses, bread, fruit, condiments, chips, and
dessert;
Sandwich wrap platters with several deli salad options, fruit, chips, and
dessert;
Start Writing here...
Examples
Kidz Cater
Both styles of lunch catering will include vegetarian, low-fat, dairy-free and allergy-
free options and we plan to modify individual meals at our customer's request. Our
desserts include freshly baked cookies and dessert bars. Chips will be 1-1.5oz.
store-bought packages with a variety of popular flavors available. Each lunchbox
will include one package each of mayonnaise, dijonaise deli mustard, a plastic
fork, our trademark blue straw and thank you card, a napkin, and a Euphoria
Alternative Providers
Examples
upmetrics.co
Read More
Read More
Read More
Read More
2019 Business Plan | Catering Business Plan 8 / 25
10. Start Writing here...
Examples
Kidz Cater
A number of other caterers offer boxed lunches for business clients. However,
none of these businesses specialize in serving the nonprofit sector, nor are they
themselves a nonprofit that benefits the local community. Kidz Cater will
specialize in developing excellent relationships with its nonprofit clientele. We
believe that this unique position, combined with competitively priced, fresh, high-
quality meals will set Kidz Cater apart as the premier caterer for the Lane County
Sourcing
Start Writing here...
Examples
Kidz Cater
Food products for meal preparation will be purchased by the Kidz Cater marketing
manager at local grocery wholesalers, either Costco or United Grocers, using a
business account. Staff to prepare the food will be current students of the
Chambers School's Culinary Arts Program. These students will receive a stipend
for their work as well as school credit. Food preparation will be supervised by the
Chambers School's Culinary Arts instructor. Management of Kidz Cater itself,
Technology
Start Writing here...
Examples
Kidz Cater
So far, only three Eugene caterers offer online ordering, which means that the
primary methods of ordering catered lunches in Eugene/Springfield are still by
phone or fax. Kidz Cater will offer fax/phone ordering with either trained students
or staff taking orders with a minimum of two days in advance of delivery. During
this first year, Kidz Cater will primarily serve Bright Future internal customers only
and online ordering will be unnecessary. However, in the long term, as more
Future Products
Start Writing here...
Examples
Kidz Cater
As our business grows, we foresee the need to expand our current kitchen, which
may mean opening a second location in which students can work to prepare
meals and receive instruction. This additional kitchen must meet strict guidelines
set forth by the Department of Human Services and will require our students to be
transported to and from this location under adult supervision. However, this
second location will allow Kidz Cater to allow an even greater number of at-risk
Read More
Read More
Read More
Read More
2019 Business Plan | Catering Business Plan 9 / 25
11. Market & Customer Analysis
Start Writing here...
Examples
Kidz Cater
According to the Eugene Area Chamber of Commerce, "at the heart of the
Eugene economy are the homegrown small and medium-sized businesses. Most
of Eugene's businesses employ fewer than 20 workers. From specialty retail
shops to financial service firms, from management consultancies to ethnic
groceries, Eugene's small business community is diverse, active, thriving and
well-supported. Including sole proprietorships and limited partnerships, there are
Market Segmentation
Start Writing here...
Examples
Kidz Cater
Kidz Cater will serve three primary groups of customers. As our business grows,
we will begin serving these groups in the order listed below as each new
customer group represents a larger step into the community and therefore
requires Kidz Cater to differentiate itself further from local for-profit caterers. All
of our target customers may be defined as corporate clients who are continually
looking for new, refreshing meals to eat at recurring lunchtime meetings.
Internal Bright Future Customers
Examples
Kidz Cater
Board of Directors meetings, serving 35-45 meals per month in either a buffet
or lunch box format.
Board Sub-committee meetings, serving 40-50 meals per month in either a
buffet or lunch box format.
Bright Future Counseling Center meetings, serving approximately 25 meals
each week in either a buffet or lunch box format.
Nonprofit External Customers
Examples
Kidz Cater
Catered meetings held by other nonprofit clients.
Examples
Kidz Cater
Rolling cart boxed lunch and college City coffee service in local government
or private sector offices that are underserved by local restaurants and coffee
upmetrics.co
Read More
Read More
Read More
Read More
2019 Business Plan | Catering Business Plan 10 / 25
12. For-profit External Customers
shops.
Market Analysis
Potential
Customers
Growth Year1 Year2 Year3 Year4 Year5 CAGR
Internal
Customers
1% 1 1 1 1 1 0.00%
Nonprofit
External
Customers
13% 13 13 15 17 19 9.95%
For-profit
External
Customers
4% 4 4 4 4 4 0.00%
Total 7.46% 18 18 20 22 24 7.46%
Target Market Segment Strategy
Start Writing here...
Examples
Kidz Cater
Catering For Kids' target market segment is nonprofit customers (including internal
customers). We plan to target this group for several important reasons. First, we
are a nonprofit organization and believe that we are better positioned to serve the
needs of other nonprofits. Secondly, we believe that nonprofit organizations are
more likely to try and continue to use a fellow nonprofit for catering services.
Thirdly, we do not intend to jump into the commercial catering market in direct
Market Trends
Examples
Kidz Cater
Significant market trends for caterers are as follows:
Consumers are value-conscious, especially during the current economic
climate.
Consumers are health-conscious with an increasing number expecting
vegetarian, dairy-free, low-fat, sugar-free and organic options to be available.
Examples
Kidz Cater
According to the National Restaurant Association, the restaurant industry's share
of the food dollar is currently 46.1% and is expected to reach 53% in 2010. More
Read More
Read More
Read More
2019 Business Plan | Catering Business Plan 11 / 25
13. Market Growth
and more Americans are choosing to buy prepared food, rather than make it
themselves. As caterers area part of this industry, they are also likely to see an
increase in the number of traditional meal catering engagements as fewer
business people bring lunch to work each day. Nonprofit or tax-exempt
Value Proposition
Start Writing here...
Examples
Kidz Cater
Although Kidz Cater will offer high-quality food at competitive prices, the real
benefit of using our service is knowing that the money a nonprofit is spending is
being used not to improve our bottom line but to improve the lives of at-risk youth
in the Eugene/Springfield area. Youth from the Chambers School benefit each
time a customer books a catering event with Catering For Kids. Youth involved in
the program get valuable work experience and a chance to learn real-life skills
Competitive Edge
Start Writing here...
Examples
Kidz Cater
Kidz Cater has the ability to provide internal and external customers with high-
quality catered business lunches year round at competitive pricing while providing
a valuable service to the community. We are able to provide this value because
we have a pre-trained workforce - students of the Bright Future Chambers School
and Safe & Sound Youth Project. These students are enrolled in the culinary arts
program and have training in commercial food preparation and have food
Marketing Strategy
Start Writing here...
Examples
Kidz Cater
Our main strategy is the growth of catering customers. A large customer base
provides revenue and furthers both goals of operating a self-sustaining
business and providing even more part-time employment for at-risk youth. This
also positions Kidz Cater as the caterer of choice for every nonprofit in
Eugene/Springfield.
The tactics to grow the customer base are:
Examples
Kidz Cater
The distribution strategy for Kidz Cater is:
Timely delivery of catered lunches.
Read More
Read More
Read More
Read More
2019 Business Plan | Catering Business Plan 12 / 25
14. Distribution Strategy
Fresh meals whose quality has not been diminished by time in transit.
Prioritization of wholesale grocery suppliers, such as Costco Wholesale, who
offer free delivery in order to make the best use of labor hours.
Marketing Programs
Examples
Kidz Cater
Our most important marketing program is the preparation of the meals itself, along
with a thoughtful presentation that consistently exceeds our customers'
expectations. The business manager will be responsible for ensuring that these
objectives are met, with a milestone date of the 15th of October, 2003. This
program is intended to cultivate and grow our customer base as well as give
student workers an opportunity to see the inner workings of an entrepreneurial
Pricing Strategy
Examples
Kidz Cater
Because of the competitive local catering market, we walk a fine line in pricing our
meals. They cannot be so expensive that we are competing with high-end
caterers who have professional chefs planning their menus, but at the same time,
we must cover our operating expenses, overhead and pay for our small staff. Our
ready pool of trained student workers, who will be reimbursed primarily through
school district stipends, will help keep our prices lowerthan our competitors. Our
Promotion Strategy
Examples
Kidz Cater
Kidz Cater plans to utilize a low-cost, low-visibility promotion program because of
our limited ability to grow rapidly in the first year. We have already introduced our
service to a number of Lane County nonprofits via an email campaign. We plan to
continue this campaign as we move closer to launching the business, keeping
potential customers apprised of our development and eventually, of the menu and
services we offer. Then, once a service contract has been agreed upon with a
Read More
Read More
Read More
Read More
2019 Business Plan | Catering Business Plan 13 / 25
15. Competitive Analysis
Start Writing here...
Examples
Kidz Cater
The catering industry is highly competitive and is made up of large numbers of
independent participants. These participants serve the local corporate, social
and/or cultural clientele, though some find unique niches such as a local
university or school district. Food costs are generally quite low, with most of a
caterer's expenses attributed to labor and overhead. Demand for catering
services depends on local population size, number of businesses and cultural
Competitors
Start Writing here...
Examples
Kidz Cater
There are several caterers in town that will compete directly with Kidz Cater once
we grow beyond serving our internal organization customers only. The key
alternative caterers are:
Of Grape & Grain
Examples
Kidz Cater
Of Grape & Grain, which specializes in deli style boxed lunches and cafe-style
dining. This is the caterer currently used by Bright Future.
Cravings Fine Foods
Examples
Kidz Cater
There are which specializes in event planning and cafe-style dining but which
also offers deli style corporate boxed lunches.
Examples
Kidz Cater
Ariana's Deli (owned by Alpine Catering), which features online ordering of deli
style boxed lunches for delivery.
upmetrics.co
Read More
Read More
Read More
Read More
2019 Business Plan | Catering Business Plan 14 / 25
16. Ariana's Deli
Fetuccini and Co
Examples
Kidz Cater
Fetuccini and Co. which also features online ordering of deli style boxed lunches
for delivery.
Napoli Restaurant
Examples
Kidz Cater
Napoli Restaurant, which features Italian style boxed lunches with a limited menu
and no delivery.
Brindiamo Catering
Examples
Kidz Cater
Brindiamo Catering, which features high-end boxed lunches with delivery, table
decor and wait staff.
Wild Duck Brewery
Examples
Kidz Cater
Wild Duck Brewery, which features hot and cold boxed lunches as well as boxed
salads and offers delivery for a small fee.
Examples
Kidz Cater
Oregon Electric Station, which specializes in high-end events such as weddings
and corporate parties.
Read More
Read More
Read More
Read More
Read More
2019 Business Plan | Catering Business Plan 15 / 25
17. Oregon Electric Station
Start Writing here...
Examples
Kidz Cater
Several of the above caterers, such as Napoli Restaurant, has a primary focus of
operating their restaurant and may not put as much emphasis on catering details.
Others, like Wild Duck Brewery, are focused primarily on large events and require
a 15 person minimum for service. Still others, like Brindiamo Catering, are focused
on very high-end customers and are out of the price range of many nonprofit
organizations at over $12 per person. Therefore, Kidz Cater's primary competitors
Local and national grocery stores chains
Examples
Kidz Cater
Local and national grocery stores chains such as Albertson's that will make
made-to-order deli submarine sandwiches, chips and sides.
Local and national sandwich fast-food chains
Examples
Kidz Cater
Local and national sandwich fast-food chains such as Togo's and Quizno's. Like
grocery stores, these stores will also make made-to-order sandwich based meals
that include chips and a beverage.
Start Writing here...
Examples
Kidz Cater
Although these providers offer low-cost fare, they are unable to offer much in the
way of custom menu planning and do not differentiate between retail consumers
and business or nonprofit customers. Thus, their services are one size fits all -
they have a fixed and limited menu and their delivery hours are restricted to their
normal hours of operation. Patronizing this type of business also does not benefit
the community directly as does the Kidz Cater.
Strategic Alliances
Read More
Read More
Read More
Read More
Read More
2019 Business Plan | Catering Business Plan 16 / 25
18. Start Writing here...
Examples
Kidz Cater
We would not exist without the Safe & Sound Youth Project and other
organizations, which were instrumental in the planning of this endeavor. Kidz
Cater has alliances with thefollowing businesses and organizations that have
provided volunteer hours to assist in the launch of this project:
La Petite Croissant Bakery Read More
2019 Business Plan | Catering Business Plan 17 / 25
19. Operations
Start Writing here...
Examples
Kidz Cater
The initial management team consists of the director of the Chambers School and
the school's culinary arts instructor. A part-time business manager will also be
hired who is able to instruct an afternoon shift of students in culinary arts and who
will manage the Kidz Cater business. Additional staff will come from the culinary
arts programs itself, consisting of five to ten trained high school age students with
food handler's cards and a sincere interest in the food and hospitality services
Organizational Structure
Start Writing here...
Examples
Kidz Cater
Our organization is led by the director with the instructor(s) reporting directly to this
director. A volunteer advisory board offers a broad range of social services
expertise and years of business experience to the team.
Management Team
JOHN DOE
Director & Owner - john.doe@example.com
John Doe, the director of the Chambers School and Career Center, holds an MS in
counseling from the University of Ohio and has been employed with Bright Future for the
past 24 years. She has over 30 years of experience in working with at-risk youth and 16
years in program management including: personnel, grant writing, fiscal management,
contract compliance, public relations and daily operations.
upmetrics.co
Read More
Read More
2019 Business Plan | Catering Business Plan 18 / 25
20. JANE DOE
Head of Kidz Cater Program
Jane Doe, the head of the culinary arts program at the Chambers School
and Career Center has over 23 years of restaurant business experience. While she
currently owns La Pequena Taqueria, a successful food booth that has been serving the
Eugene Saturday Market for 23 years, she has also owned a catering business and cafe
and was a founding member of the Keystone Restaurant, a fixture in Eugene since 1981.
She received her teaching credentials at Kansas State University in 1977 and has been
teaching the curriculum she developed for the Chambers School since January 2002.
Start Writing here...
Examples
Kidz Cater
The volunteer steering Committee consists of seven talented members of the
Eugene/Springfield business and education communities. Combined, they bring
years over 55 years of business experience, including two MBAs, to the table.
These volunteers are dedicated to the success of the Kidz Cater and to ensuring
that our area youth get the opportunities they deserve.
Management Team Gaps
Start Writing here...
Examples
Kidz Cater
The remaining position is that of business manager/culinary arts instructor for the
Catering For Kids. This part-time position will be funded by a grant and has not yet
been filled. Beginning in August, we will begin accepting applications for this
position. Like other instructors in culinary arts at the Chambers School, the ideal
candidate will have experience teaching youth and successfully operating an
entrepreneurial venture from start-up to expansion, demonstrating an ability to
Personnel Plan
Start Writing here...
Examples
Kidz Cater
The director of the Kidz Cater is employed by the Chambers School and Career
Center and therefore, her salary is not included in our budget. Likewise, the head
of the culinary arts program is also employed under the auspices of Chambers
School and her salary is also omitted.
The student workers, on the other hand, are paid through the Kidz Cater and their
wages are included in this budget. However, as these workers are students who
Read More
Read More
Read More
2019 Business Plan | Catering Business Plan 19 / 25
21. Financial Plan
Important Assumptions
Start Writing here...
Examples
Kidz Cater
The financial plan depends on important assumptions, most of which are shown
in the following table. The key underlying assumptions are:
Direct food costs will be less than or equal to 30% of total direct costs.
A slow-growth economy without a major recession or food crisis.
No unforeseen changes in government grant funding availability.
Other General Assumptions
Year1 Year2 Year3
Plan Month [Amount] [Amount] [Amount]
Current Interest Rate [Percentage] [Percentage] [Percentage]
Long-term Interest
Rate
[Percentage] [Percentage] [Percentage]
Tax Rate [Percentage] [Percentage] [Percentage]
Other [Percentage] [Percentage] [Percentage]
Fundraising Strategy
Start Writing here...
Examples
Kidz Cater
Kidz Cater is committed to balancing its budget and operating on a solid financial
foundation. These efforts are based on a mixture of revenues from catering
events, fundraising, partnerships with local businesses and charitable gifting. Kidz
Cater is emphasizing the need to reduce reliance on donations and looks toward
revenues from catering customers to support the program. Our goal is to become
self-sustaining, involving our students in the process of maintaining a profitable
Fundraising Programs
Examples
Kidz Cater
First-year revenues assume that internal Bright Future customers will begin
using Kidz Cater in October for all catered board, committee and counseling
meetings. A sales increase is anticipated in December when Kidz Cater may
upmetrics.co
Read More
Read More
2019 Business Plan | Catering Business Plan 20 / 25
22. Start Writing here...
be used to cater to company Christmas parties.
Per person pricing of $6.50 is assumed and is an average number. This
Funding Forecast
Sales for year one are based on internal BrightFuture clients only. We plan to double this number in year two
as we expand our business to serving external customers, especially other nonprofits. Finally, in year three,
we plan to expand to serving the community at large, including retail customers.
Funding resources primarily come from school district revenues for teaching. A part-time instructor teaching
for three hours a day, four days a week in an afternoon class shift of five to eight students would provide
revenues of approximately $600/month. In January of 2003, we plan to receive funding from various grants
that we are in the process of applying for now. We have been successful in applying for grants in the past and
are very optimistic about receiving this type of funding in the future. Revenues brought in for our current
daytime culinary arts curriculum instruction are not included in this calculation as they will continue to be
taught with or without the launch of Kidz Cater.
Units Year1 Year2 Year3
Corporate boxed
lunches
[Amount] [Amount] [Amount]
Corporate buffet lunches [Amount] [Amount] [Amount]
Grant Funding [Amount] [Amount] [Amount]
School District
Reimbursement
[Amount] [Amount] [Amount]
Start-up Summary
Our start-up costs primarily cover inventory costs, marketing materials, and the services of a business
consultant from the University of Oregon. The assumptions are shown in the following tables and chart. We
will use existing assets in order to keep start-up expenses and need for capital assets down in the early
stages of operation.
Read More
2019 Business Plan | Catering Business Plan 21 / 25
23. Start-up Expenses Amount
Dept. of Health Fees [Amount]
Brochures
Consultants
Lease (Commercial kitchen)
Expensed Equipment
Software
Total Start-up Expenses
Start-up Assets
Cash Required
Start-up Inventory
Other Current Assets
Long-term Assets
Total Assets
Total Requirements
Start-up Funding
Start-up Expenses to Fund
Start-up Assets to Fund
Total Funding Required
Assets
Non-cash Assets from Start-up
Cash Requirements from Start-up
Additional Cash Raised
Cash Balance on Starting Date
Total Assets
Liabilities and Capital
Income Statement (5 Year Projections)
2019 Business Plan | Catering Business Plan 22 / 25