CEA Project Logistics Thailand was contracted to transport a 17-meter catamaran ferry weighing 17 tonnes from Chonburi, Thailand to Freetown, Sierra Leone in West Africa. The ferry was lifted from the water by a marine straddle carrier and loaded onto a custom frame attached to a lowbed trailer. Due to height restrictions, the top section was removed and transported separately. After a 7 day storage period, the ferry was transported to port and loaded onto a shipping vessel. CEA provided transportation, storage, export documentation, and supervision of the entire process over 7 days to deliver the ferry overseas.
5. PORT AMENITIES & OPERATIONS (PHE) GTU 3170623VATSAL PATEL
Ferry, Transfer bridges, floating landing stages, transit sheds, warehouses, cold storage, aprons, cargo handling equipment, purpose and general description: stack area, single point mooring, IS provisions
5. PORT AMENITIES & OPERATIONS (PHE) GTU 3170623VATSAL PATEL
Ferry, Transfer bridges, floating landing stages, transit sheds, warehouses, cold storage, aprons, cargo handling equipment, purpose and general description: stack area, single point mooring, IS provisions
Assembly of World's Largest Pipe Lay VesselNiels Haakman
20,000 ton crane TAISUN, the largest and strongest crane in the world, lifts the heaviest accommodation block ever handled by a crane in a single lift at 3300 metric tons.
CEA Project Logistics Myanmar recently carried out the demobilisation of 14 Gas Powered Generator Sets and accompanying parts and accessories from a Power Plant project in Kyaukpyu, Rakhine State to Yangon and then onwards to Singapore.
PowerLogistics Asia 2014 - Combining Experience, Know - How & Equipment - Jon...PowerLift Events
www.powerlogisticsasia.com is an annual project logistics event which is taking place in Singapore. The event brings together the heavy transport and lifting industry that is catering to the oil, gas, heavy engineering, power, mining and other related industries. It offers a great opportunity for participants to hold up the flag in the South East Asian project cargo market. It comprises of educational workshops, conferences, seminars and an exhibition.
www.powerlogisticsasia.com
CEA Project Logistics in Thailand recently carried out the demobilisation and export of a 150 Tonne High-Pressure Plastic Injection Moulding Machine, the unit, after demobilisation was exported to Malaysia. The original factory installation of the machine was undertaken by Mitsubishi technicians who were also on hand for this demobilisation.
CEA Project Logistics and Fagioli Italy are aligning focus, resources and efforts to expand our combined market presence and reach in South East Asia.
A consortium agreement has been agreed by our two companies that will see CEA Project Logistics & Fagioli provide a multitude of services throughout Thailand, Myanmar, Laos, Vietnam and Cambodia. These services will include Heavy Haulage for Module Transportation, Load-Out of Modules and other offshore structures, Lifting & Skidding of heavy items by use of Strand Jacks, Barge Transportation and projects pertaining to civil structures.
Well beyond a typical representative or distribution relationship, we are creating and developing a very deep and strongly bounded partnership wherein both companies will cross train service personnel, share facilities and infrastructures, and align sales and marketing efforts throughout the region. By collaborating in such a manner, CEA and Fagioli are producing an increase in value to all our clients in the form of reduced costs, expanded footprint and improved services. By creating this new business model we can provide the optimum equation whereby 1+1 = 3 for all our clients. We are very excited about this new synergy and the new opportunities it will bring and genuinely look forward to passing these benefits on to our clients.
CEA Project Logistics Myanmar completed the transportation and mobilisation of three 9 tonne drill rigs and four 20 ft. containers to Kawlin in the Sagaing region 850km from the capital Yangon. Due to the poor condition of the roads and bridges, this transportation project was completed in two separate trips over 16 days. Each of the bridges that were crossed had a maximum capacity of just 15 tonne, this meant that on several occasions the trucks would be unloaded and then reloaded to adhere to the safe working limit.
CEA Project Logistics Myanmar recently completed the final part of a three-part project in Yangon.
The whole project consisted of the moving of an entire soft drinks factory from its old location to the new site some 20kms away. The final part of the project involved the transportation and installation of a new Bottle Blower Machine and other auxiliary parts, the total value of the cargo was in excess of 500,000 USD. CEA Myanmar was responsible for the unloading at the port, customs process, transportation and eventual installation. Due to the complex layout of the factory several modifications were made to the walls to facilitate the installation process. The project was completed in under five days ahead of schedule and within operational budget.
A technically challenging project involving a 25-year-old bottle washer that was moved to a new factory in Yangon, Myanmar.
For this project CEA Project Logistics Thailand and CEA Projects Myanmar worked together.
CEA Projects Myanmar recently completed the delivery, positioning, and installation of heavy equipment for a new PET bottle manufacturing plant in the Hlaing Thar Yar district of Yangon.
This case study features a very technical and potentially difficult installation at drinks factory in Thailand. Two cranes working in tandem were needed to complete the project. Several parts of the installation were of considerable weight and length.
Feature about the CEA Logistics Base in Laem Chabang Thailand. The facility can provide 80,000m2 of open gravel hard stand and 2,800m2 of covered warehousing.
CEA Engineering Consult Co. Ltd. have officially launched their range of modular spreader beams called CEA Surelift™. As the logistics sector continues to demand safety with high quality and flexibility, CEA Engineering now produce DNV (Type) approved modular spreader beams with nominal lifting capacities from 50 Tonne to 400 Tonne. CEA Engineering will initially be focused on the SEA and Australasia regions with planned expansion worldwide through a network of country agents.
A selection of news articles written and post by one of our affiliate networks 'Project Cargo Network'. The articles contain all the happenings within CEA
Case study from our recent project involving the Technical Lifting of BTS Train Carriages in Laem Chabang Port, Thailand. The carriages were then transported to BTS headquarters in Bangkok.
Top Best Astrologer +91-9463629203 LoVe Problem SolUtion specialist In InDia ...gitapress3
Top Best Astrologer +91-9463629203 LoVe Problem SolUtion specialist In InDia Love ProBlem asTroloGer +91-9463629203 love problem solution astrologer
best love problem solution astrologer
online love problem solution astrologer
love problem solution astrologer in india
love problem solution astrologer in kolkata
love problem solution astrologer near me
love problem solution astrologer in ludhiana
love problem solution astrologer acharya ji
love problem solution astrologer in delhi
love problem solution astrologer amritsar
astrologer love problem solution
astrologer for love problem
astrology love problem solution
love solution astrologer
love problem solution specialist astrologer
love problem solution by astrologer
astrology love problem solution baba ji
love problem solve astrologer
love problem solution usa
love problem solution expert astrologer
astrologer for love marriage problem solution
love problem solution astrologer in mumbai
love problem solution muslim astrologer
love marriage specialist astrologer problem solution
famous love astrologer
love problem solution astrologer specialist
love problem solution astrologer baba ji
SECUREX UK FOR SECURITY SERVICES AND MOBILE PATROLsecurexukweb
At Securex UK Ltd we are dedicated to providing top-rated security solutions tailored to your specific needs. With a team of highly trained professionals and cutting-edge technology, we prioritize your safety and peace of mind.
Our commitment to excellence extends beyond traditional security measures. We understand the dynamic nature of security challenges, and our personalized approach ensures that every client receives a bespoke protection plan.
Islamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxamilabibi1
Islamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docx
Maximizing Efficiency with Integrated Water Management SystemsIrri Design Studio
Integrated water management systems are essential for improving irrigation design sustainability and efficiency. Irri Design Studio helps customers maximize water consumption, reduce waste, and encourage responsible stewardship of water resources by utilizing cutting-edge technology like drone-based construction updates and BIM modeling. The increasing issues of water shortage and environmental protection require an all-encompassing strategy to water management. Irrigation systems may be planned to optimize water consumption efficiency while guaranteeing the safety of people and the environment by putting new ideas and concepts into practice. Visit our website https://www.irridesignstudio.com/ for more information.
SMS2ORBIT | launched in 2022 in Mumbai's Andheri area, aims to be the most reliable Bulk SMS Service Provider in Mumbai.
If More Information About The SMS Service Provided By SMS2ORBIT Is Desired, Please Don’t Hesitate To Contact The Business Team. They Can Be Reached At
business@sms2orbit.com Or By Calling 97248 55877.
Blessed Marine Automation offers cutting-edge marine automation solutions tailored to enhance vessel efficiency and safety. From advanced control systems to remote monitoring, our services empower maritime operations worldwide. Explore our comprehensive range of products and services to optimize your vessel's performance. https://www.blessedmarineautomation.com/
Delightful Finds: Unveiling the Power of Gifts Under 100JoyTree Global
Stretch your budget and spread joy! This guide explores the world of gifts under 100, proving thoughtful gestures don't require a hefty price tag. Discover unique and practical options for birthdays, holidays, or simply showing someone you care. Find inspiration for every occasion within your budget!
Looking for the Reliable Logistics Solutions in India? Discover unparalleled efficiency and reliability with our top-rated logistics services. We specialize in streamlining supply chains, ensuring timely deliveries, and providing cutting-edge tracking solutions. Our platform caters to businesses of all sizes, offering customizable logistics solutions to meet your unique needs. With a focus on innovation and customer satisfaction, we are your trusted partner in navigating the complexities of logistics in India. Choose us for seamless, cost-effective, and scalable logistics solutions. Experience the best in Indian logistics with our expert team by your side.
Colors of Wall Paint and Their Mentally Properties.pptxBrendon Jonathan
Discover how different wall paint colors can influence your mood and mental well-being. Learn the psychological effects of colors and find the perfect hue for every room in your home.
BesT panDit Ji LoVe problem solution 9463629203 UK uSA California New Zealand...gitapress3
love problem solution astrologer
best love problem solution astrologer
online love problem solution astrologer
love problem solution astrologer in india
love problem solution astrologer in kolkata
love problem solution astrologer near me
love problem solution astrologer in ludhiana
love problem solution astrologer acharya ji
love problem solution astrologer in delhi
love problem solution astrologer amritsar
astrologer love problem solution
astrologer for love problem
astrology love problem solution
love solution astrologer
love problem solution specialist astrologer
love problem solution by astrologer
astrology love problem solution baba ji
love problem solve astrologer
love problem solution usa
love problem solution expert astrologer
astrologer for love marriage problem solution
love problem solution astrologer in mumbai
love problem solution muslim astrologer
love marriage specialist astrologer problem solution
famous love astrologer
love problem solution astrologer specialist
love problem solution astrologer tantrikBesT panDit Ji LoVe problem solution 9463629203 UK uSA California New Zealand baba ji LoVe marriage specialist Uk USA LonDOn panDit ji
The Jamstack Revolution: Building Dynamic Websites with Static Site Generator...Softradix Technologies
In this infographic, the Jamstack architecture emphasizes pre-rendered content and decoupling the frontend from the backend. It leverages static site generators (SSGs) to create fast-loading HTML files and APIs for dynamic functionality. Benefits include improved performance, enhanced security, scalability, and ease of deployment. Real-world examples include Netlify, Gatsby, and Contentful. https://softradix.com/web-development/
Solar power panels, also known as photovoltaic (PV) panels, convert sunlight into electricity, offering a renewable and sustainable energy solution. Composed of semiconductor materials, typically silicon, these panels absorb photons from sunlight, generating an electric current through the photovoltaic effect. This clean energy source reduces dependence on fossil fuels, mitigates greenhouse gas emissions, and contributes to environmental sustainability.
Learn about Inspect Edge, the leading platform for efficient inspections, featuring the advanced NSPIRE Inspection Application for seamless property assessments. Discover how the NSPIRE Inspection Application by Inspect Edge revolutionizes property inspections with advanced features and seamless integration.
Elevate Your Brand with Digital Marketing for Fashion IndustryMatebiz Pvt. Ltd
Matebiz Pvt. Ltd. specializes in providing cutting-edge digital marketing for Fashion Industry. Our comprehensive strategies ensure that your brand stands out in the competitive fashion landscape. From targeted social media campaigns to search engine optimization tailored for fashion keywords, we cover it all. With a deep understanding of industry trends and consumer behavior, we craft compelling content and engaging visuals to enhance your online presence. Trust Matebiz Pvt. Ltd. to elevate your fashion brand through strategic digital marketing initiatives.
All Trophies at Trophy-World Malaysia | Custom Trophies & Plaques Supplier. Come to our Trophy Shop today and check out all our variety of Trophies available. We have the widest range of Trophies in Malaysia. Our team is always ready to greet your needs and discuss with you on your custom Trophy for your event. Rest assured, you will be with the best Trophy Supplier in Malaysia. The official Trophy Malaysia. Thank you for your support.
Unlocking Insights: AI-powered Enhanced Due Diligence Strategies for Increase...RNayak3
Explore how a risk-based approach to Enhanced Due Diligence can deliver effective Anti-Money Laundering (AML) compliance and monitoring in banking and financial services.
How Does Littering Affect the Environment.ClenliDirect
Read this PPT now to gain in-depth insights into how to fight litter and safeguard our landscapes from its negative impacts.
Visit-https://clenlidirect.com/cleaning-equipment/litter-picker-grabber-equipment.html
1. SCOPE
CEA Project Logistics Thailand was contracted
for the transportation, storage and export of
a Catamaran Ferry from Chonburi, Thailand to
Freetown, Sierra Leone in West Africa.
The ferry was moored at Ocean Marina Yacht Club and was lifted
from the water by the on-site Marine Straddle Carrier. CEA Teams
were on hand to supervise the lift and to execute the lowering and
loading onto a specially fabricated frame that was attached to a
standard Lowbed trailer.
CATAMARANTRANSPORT&EXPORT
Locations
Chonburi, Thailand.
Sierra Leone, West Africa.
Duration
7 Days
Boat Specifications
ModelCatamaran
Weight 17 Tonne
Length 17 Meters
Beam 5.5 Meters
Capacity 80 Passengers
Class ISO Cat. B (Off Shore)
Engines 4x Yamaha GETU 250 HP
Equipment Used
Marine straddle carrier
Prime mover
Bespoke boat frame
Lowbed trailer
Hiab crane truck
Services Used
Rigging teams
Customs team
Shipping Export teams
CASE STUDY CS026
Catamaran Transport Export 1/2
CATAMARAN TRANSPORT EXPORT
THE MARINE STRADDLE CARRIER LOWERS THE FERRY ONTO THE FRAME AND LOWBED TRAILER
2. CEA PROJECT LOGISTICS
4/222 HARBOR OFFICE BUILDING
12TH FLOOR SUKHUMVIT ROAD
SRI RACHA
CHONBURI 20230
THAILAND
+66 38 354 019
www.ceaprojects.com
CATAMARANTRANSPORTEXPORT
Due to the height restrictions on the roads the top section of the
ferry was removed and loaded onto a separate trailer. After the
CEA rigging teams had secured the ferry to the trailer, the prime
mover and its cargo began the 33km journey to Laem Chabang.
The ferry, upon arrival, was stored at the CEA Free Trade Zone until
the shipping vessel Atlantic Dawn arrived.
After seven days in storage, the ferry was transported to Laem
Chabang Port under CEA escort and readied for loadout which
included the top section being reattached. Port and vessel
stevedores executed the loading and stowage aboard the Atlantic
Dawn. CEA provided all the necessary shipping and customs
documentation in preparation of export.
CASE STUDY CS026
Catamaran Transport Export 2/2
IN STORAGE AT THE CEA FACILITY
NIGHT TRANSPORT TO THE CEA FACILITY
LEAVING THE CEA FACILITY
BRIDGE SECTION SECURED ON TRAILER
VESSEL STEVEDORES OVERSEE THE LOADINGLIFTING ONTO THE ATLANTA DAWN
CONVOY ENTERS PORTCEA ESCORT VEHICLE LEADS THE CONVOY
THE CATAMARAN FERRY UNLOADED AND ON THE WATER IN SIERRA LEONE