BOTTLE MANUFACTURING PLANT
BOTTLEMANUFACTURINGPLANT
Location
Hlaing Thar Yar, My.
Duration
4 Days
Project value
25,000 USD
Equipment Used
5t Manitou forklift
3.7t Telehandler with boom
3t Forklift
12t Skates with steering bars  x6
30t Toe jacks  x4
35t Mobile crane
10t Mobile crane
48t Capacity prime mover x2
Lowbed trailer
Flatbed trailer
Mobile docking ramp
SCOPE
CEA Projects Myanmar recently completed the
delivery, positioning and installation of heavy
equipment for a new PET bottle manufacturing
plant in the Hlaing Thar Yar district of Yangon.
CEA provided customs clearance at port, inland transportation
and unloading at the installation site. CEA teams at the site
assembled a complete mezzanine floor and lifted it into position,
control panel, vacuum pump, chilling system and other auxiliary
equipment was also installed.
CASE STUDY		 CS018
Bottle Manufacturing Plant 1/2
40FT HEAT EXCHANGER AWAITING ASSEMBLY OF LEG SECTIONS
BOTTLEMANUFACTURINGPLANT
CEA PROJECT LOGISTICS
G-18 PEARL CONDO
KABAR AYE PAGODA ROAD
BAHAN TOWNSHIP
YANGON
MYANMAR
+959 421 031 286
www.ceaprojects.com
A 12 meter long heat exchanger unit was tandem lifted by
two mobile cranes from its 40ft container, the exchanger was
assembled and legs attached before being positioned in place for
commissioning outside of the facility.
After the auxiliary equipment was installed the heavy extrusion
and bottle blowing machinery was transported across the facility
and positioned, this was achieved through the use of 12 Tonne
capacity skates and 30 Tonne Toe Jacks supplied by CEA Projects
Myanmar. Each of the 10 Tonne pieces were jacked down and
levelled at their operational location. The whole project was
completed on time and within budget.
CASE STUDY		 CS018
Bottle Manufacturing Plant 2/2
MEZZANINE FLOOR ASSEMBLED
SUPPORT LEGS INSTALLED TO THE FLOOR
MEZZANINE FLOOR MOVED BY 12T SKATES
RAW MATERIAL HOPPER INSTALLED
HEAT EXCHANGER WITH LEGS ATTACHED LIFTED INTO POSITION WITH A 30 T MOBILE CRANE
BOTTLE BLOWER SKATED INTO POSITION 10 T EXTRUSION SCREW INSTALLED

More Related Content

Similar to Bottle Manufacturing Plant, Assembly & Installation

Bottle Blower Installation
Bottle Blower InstallationBottle Blower Installation
Bottle Blower Installation
CEA Project Logistics
 
CEA Myanmar - Bottle Washer Relocation
CEA Myanmar - Bottle Washer RelocationCEA Myanmar - Bottle Washer Relocation
CEA Myanmar - Bottle Washer Relocation
CEA Project Logistics
 
Power Plant Demobilisation
Power Plant DemobilisationPower Plant Demobilisation
Power Plant Demobilisation
CEA Project Logistics
 
Injection Mould Demob & Export
Injection Mould Demob & ExportInjection Mould Demob & Export
Injection Mould Demob & Export
CEA Project Logistics
 
Seahawk Helicopter Transportation
Seahawk Helicopter TransportationSeahawk Helicopter Transportation
Seahawk Helicopter Transportation
CEA Project Logistics
 
KONA Hub Master Planning Report.ppt
KONA Hub Master Planning Report.pptKONA Hub Master Planning Report.ppt
KONA Hub Master Planning Report.ppt
udayRavi10
 
Technical Lifting
Technical LiftingTechnical Lifting
Technical Lifting
CEA Project Logistics
 
The Asian Marshalling Yard
The Asian Marshalling YardThe Asian Marshalling Yard
The Asian Marshalling Yard
CEA Project Logistics
 
Future Shipbuilding & Offshore Opportunities in Myanmar Shipyards
Future Shipbuilding & Offshore Opportunities in Myanmar ShipyardsFuture Shipbuilding & Offshore Opportunities in Myanmar Shipyards
Future Shipbuilding & Offshore Opportunities in Myanmar Shipyards
Dr. Oliver Massmann
 
Muyang Feed Machinery & BIomass Machine
Muyang Feed Machinery & BIomass MachineMuyang Feed Machinery & BIomass Machine
Muyang Feed Machinery & BIomass Machine
Niki Lei
 
Updated Presentation star 05052016
Updated Presentation star 05052016Updated Presentation star 05052016
Updated Presentation star 05052016
Muhammad Kamran
 
Technical Installation
Technical InstallationTechnical Installation
Technical Installation
CEA Project Logistics
 
Rahul gajbhiye infra resubmission
Rahul gajbhiye infra resubmissionRahul gajbhiye infra resubmission
Rahul gajbhiye infra resubmission
Rahul Gajbhiye
 
Crane Demobilization
Crane DemobilizationCrane Demobilization
Crane Demobilization
CEA Project Logistics
 
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15Aaron Lian Kian Hoe
 
Mud Mixing plant installed onboard Trinity Supporter for NIKO
Mud Mixing plant installed onboard Trinity Supporter for NIKOMud Mixing plant installed onboard Trinity Supporter for NIKO
Mud Mixing plant installed onboard Trinity Supporter for NIKORoy Catto
 

Similar to Bottle Manufacturing Plant, Assembly & Installation (18)

Bottle Blower Installation
Bottle Blower InstallationBottle Blower Installation
Bottle Blower Installation
 
CEA Myanmar - Bottle Washer Relocation
CEA Myanmar - Bottle Washer RelocationCEA Myanmar - Bottle Washer Relocation
CEA Myanmar - Bottle Washer Relocation
 
Power Plant Demobilisation
Power Plant DemobilisationPower Plant Demobilisation
Power Plant Demobilisation
 
Injection Mould Demob & Export
Injection Mould Demob & ExportInjection Mould Demob & Export
Injection Mould Demob & Export
 
Seahawk Helicopter Transportation
Seahawk Helicopter TransportationSeahawk Helicopter Transportation
Seahawk Helicopter Transportation
 
Break Bulk Consolidation
Break Bulk ConsolidationBreak Bulk Consolidation
Break Bulk Consolidation
 
KONA Hub Master Planning Report.ppt
KONA Hub Master Planning Report.pptKONA Hub Master Planning Report.ppt
KONA Hub Master Planning Report.ppt
 
Technical Lifting
Technical LiftingTechnical Lifting
Technical Lifting
 
New PPT
New PPT New PPT
New PPT
 
The Asian Marshalling Yard
The Asian Marshalling YardThe Asian Marshalling Yard
The Asian Marshalling Yard
 
Future Shipbuilding & Offshore Opportunities in Myanmar Shipyards
Future Shipbuilding & Offshore Opportunities in Myanmar ShipyardsFuture Shipbuilding & Offshore Opportunities in Myanmar Shipyards
Future Shipbuilding & Offshore Opportunities in Myanmar Shipyards
 
Muyang Feed Machinery & BIomass Machine
Muyang Feed Machinery & BIomass MachineMuyang Feed Machinery & BIomass Machine
Muyang Feed Machinery & BIomass Machine
 
Updated Presentation star 05052016
Updated Presentation star 05052016Updated Presentation star 05052016
Updated Presentation star 05052016
 
Technical Installation
Technical InstallationTechnical Installation
Technical Installation
 
Rahul gajbhiye infra resubmission
Rahul gajbhiye infra resubmissionRahul gajbhiye infra resubmission
Rahul gajbhiye infra resubmission
 
Crane Demobilization
Crane DemobilizationCrane Demobilization
Crane Demobilization
 
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
 
Mud Mixing plant installed onboard Trinity Supporter for NIKO
Mud Mixing plant installed onboard Trinity Supporter for NIKOMud Mixing plant installed onboard Trinity Supporter for NIKO
Mud Mixing plant installed onboard Trinity Supporter for NIKO
 

More from CEA Project Logistics

Catamaran Transport & Export
Catamaran Transport & ExportCatamaran Transport & Export
Catamaran Transport & Export
CEA Project Logistics
 
CEA & Fagioli Italy
CEA & Fagioli ItalyCEA & Fagioli Italy
CEA & Fagioli Italy
CEA Project Logistics
 
Drill Rig Transportation
Drill Rig TransportationDrill Rig Transportation
Drill Rig Transportation
CEA Project Logistics
 
CEA Project Logistics Brochure 2016
CEA Project Logistics Brochure 2016CEA Project Logistics Brochure 2016
CEA Project Logistics Brochure 2016
CEA Project Logistics
 
Drill Pipe Storage & Transportation
Drill Pipe Storage & TransportationDrill Pipe Storage & Transportation
Drill Pipe Storage & Transportation
CEA Project Logistics
 
CEA Ao-Udom Facility
CEA Ao-Udom FacilityCEA Ao-Udom Facility
CEA Ao-Udom Facility
CEA Project Logistics
 
CEA SURELIFT Brochure 2015
CEA SURELIFT Brochure 2015CEA SURELIFT Brochure 2015
CEA SURELIFT Brochure 2015
CEA Project Logistics
 
CEA Project Logistics News Articles
CEA Project Logistics News ArticlesCEA Project Logistics News Articles
CEA Project Logistics News Articles
CEA Project Logistics
 
Warehousing & Storage
Warehousing & StorageWarehousing & Storage
Warehousing & Storage
CEA Project Logistics
 
Fleet & Equipment
Fleet & EquipmentFleet & Equipment
Fleet & Equipment
CEA Project Logistics
 
CEA Project Logistics Myanmar
CEA Project Logistics MyanmarCEA Project Logistics Myanmar
CEA Project Logistics Myanmar
CEA Project Logistics
 
VpCI Cortec Preservation
VpCI Cortec PreservationVpCI Cortec Preservation
VpCI Cortec Preservation
CEA Project Logistics
 
Heliotrope 65 Catamaran Launch
Heliotrope 65 Catamaran LaunchHeliotrope 65 Catamaran Launch
Heliotrope 65 Catamaran Launch
CEA Project Logistics
 
Dual Penetrator Catamaran Launch
Dual Penetrator Catamaran LaunchDual Penetrator Catamaran Launch
Dual Penetrator Catamaran Launch
CEA Project Logistics
 
Cleaning & Quarantine
Cleaning & QuarantineCleaning & Quarantine
Cleaning & Quarantine
CEA Project Logistics
 
CEA Quarantine Management
CEA Quarantine ManagementCEA Quarantine Management
CEA Quarantine Management
CEA Project Logistics
 

More from CEA Project Logistics (19)

Catamaran Transport & Export
Catamaran Transport & ExportCatamaran Transport & Export
Catamaran Transport & Export
 
CEA & Fagioli Italy
CEA & Fagioli ItalyCEA & Fagioli Italy
CEA & Fagioli Italy
 
Drill Rig Transportation
Drill Rig TransportationDrill Rig Transportation
Drill Rig Transportation
 
CEA Project Logistics Brochure 2016
CEA Project Logistics Brochure 2016CEA Project Logistics Brochure 2016
CEA Project Logistics Brochure 2016
 
Drill Pipe Storage & Transportation
Drill Pipe Storage & TransportationDrill Pipe Storage & Transportation
Drill Pipe Storage & Transportation
 
CEA Ao-Udom Facility
CEA Ao-Udom FacilityCEA Ao-Udom Facility
CEA Ao-Udom Facility
 
Steel Handling & Consolidation
Steel Handling & ConsolidationSteel Handling & Consolidation
Steel Handling & Consolidation
 
CEA SURELIFT Brochure 2015
CEA SURELIFT Brochure 2015CEA SURELIFT Brochure 2015
CEA SURELIFT Brochure 2015
 
CEA Project Logistics News Articles
CEA Project Logistics News ArticlesCEA Project Logistics News Articles
CEA Project Logistics News Articles
 
Warehousing & Storage
Warehousing & StorageWarehousing & Storage
Warehousing & Storage
 
Fleet & Equipment
Fleet & EquipmentFleet & Equipment
Fleet & Equipment
 
Specialized Lifting
Specialized LiftingSpecialized Lifting
Specialized Lifting
 
DAFF/AQIS Quarantine Project
DAFF/AQIS Quarantine ProjectDAFF/AQIS Quarantine Project
DAFF/AQIS Quarantine Project
 
CEA Project Logistics Myanmar
CEA Project Logistics MyanmarCEA Project Logistics Myanmar
CEA Project Logistics Myanmar
 
VpCI Cortec Preservation
VpCI Cortec PreservationVpCI Cortec Preservation
VpCI Cortec Preservation
 
Heliotrope 65 Catamaran Launch
Heliotrope 65 Catamaran LaunchHeliotrope 65 Catamaran Launch
Heliotrope 65 Catamaran Launch
 
Dual Penetrator Catamaran Launch
Dual Penetrator Catamaran LaunchDual Penetrator Catamaran Launch
Dual Penetrator Catamaran Launch
 
Cleaning & Quarantine
Cleaning & QuarantineCleaning & Quarantine
Cleaning & Quarantine
 
CEA Quarantine Management
CEA Quarantine ManagementCEA Quarantine Management
CEA Quarantine Management
 

Recently uploaded

Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
zechu97
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 

Recently uploaded (20)

Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 

Bottle Manufacturing Plant, Assembly & Installation

  • 1. BOTTLE MANUFACTURING PLANT BOTTLEMANUFACTURINGPLANT Location Hlaing Thar Yar, My. Duration 4 Days Project value 25,000 USD Equipment Used 5t Manitou forklift 3.7t Telehandler with boom 3t Forklift 12t Skates with steering bars x6 30t Toe jacks x4 35t Mobile crane 10t Mobile crane 48t Capacity prime mover x2 Lowbed trailer Flatbed trailer Mobile docking ramp SCOPE CEA Projects Myanmar recently completed the delivery, positioning and installation of heavy equipment for a new PET bottle manufacturing plant in the Hlaing Thar Yar district of Yangon. CEA provided customs clearance at port, inland transportation and unloading at the installation site. CEA teams at the site assembled a complete mezzanine floor and lifted it into position, control panel, vacuum pump, chilling system and other auxiliary equipment was also installed. CASE STUDY CS018 Bottle Manufacturing Plant 1/2 40FT HEAT EXCHANGER AWAITING ASSEMBLY OF LEG SECTIONS
  • 2. BOTTLEMANUFACTURINGPLANT CEA PROJECT LOGISTICS G-18 PEARL CONDO KABAR AYE PAGODA ROAD BAHAN TOWNSHIP YANGON MYANMAR +959 421 031 286 www.ceaprojects.com A 12 meter long heat exchanger unit was tandem lifted by two mobile cranes from its 40ft container, the exchanger was assembled and legs attached before being positioned in place for commissioning outside of the facility. After the auxiliary equipment was installed the heavy extrusion and bottle blowing machinery was transported across the facility and positioned, this was achieved through the use of 12 Tonne capacity skates and 30 Tonne Toe Jacks supplied by CEA Projects Myanmar. Each of the 10 Tonne pieces were jacked down and levelled at their operational location. The whole project was completed on time and within budget. CASE STUDY CS018 Bottle Manufacturing Plant 2/2 MEZZANINE FLOOR ASSEMBLED SUPPORT LEGS INSTALLED TO THE FLOOR MEZZANINE FLOOR MOVED BY 12T SKATES RAW MATERIAL HOPPER INSTALLED HEAT EXCHANGER WITH LEGS ATTACHED LIFTED INTO POSITION WITH A 30 T MOBILE CRANE BOTTLE BLOWER SKATED INTO POSITION 10 T EXTRUSION SCREW INSTALLED