SlideShare a Scribd company logo
Page 1
HOW DO ARCHITECTS GET PAID?
CASE STUDIES
THE ARCHITECTURAL PRACTICE
Page 2
THIS IS TO GIVE YOU A SAMPLE
COMPUTATION ON THE BREAKDOWN
OF FEES FOR THE METHOD OF
COMPENSATION UNDER
PERCENTAGE OF
CONSTRUCTION COST
THE ARCHITECTURAL PRACTICE
CASE STUDY 1
FOR PROJECT COST
AMOUNTING TO
$4,500,000 ($4.5M)
CASE STUDY
Page 3
CASE STUDY
PROFESSIONAL FEE
RANGING FROM 5% TO 15 %
Page 4
PROFESSIONAL FEE
5% OF CONSTRUCTION COST
= $ 225,000
CASE STUDY
Page 5
BREAKDOWN OF FEES
20% PROFESSIONAL FEE – PRELIMINARY DESIGN STAGE
CASE STUDY
40% PROFESSIONAL FEE – DESIGN DEVELOPMENT STAGE
25% PROFESSIONAL FEE – CONTRACT-DOCUMENT STAGE
15% PROFESSIONAL FEE – CONSTRUCTION STAGE
Page 6
UPON COMPLETION OF PRELIMINARY DESIGN STAGE
20% OF PROFESSIONAL FEE IS PAID
CASE STUDY
= $ 45,000
Page 7
CASE STUDY
= $ 90,000
UPON COMPLETION OF DESIGN DEVELOPMENT STAGE
40% OF PROFESSIONAL FEE IS PAID
Page 8
CASE STUDY
= $ 56,750
UPON COMPLETION OF CONTRACT DOCUMENT STAGE
25% OF PROFESSIONAL FEE IS PAID
Page 9
CASE STUDY
= $ 33,750
UPON COMPLETION OF CONSTRUCTION STAGE
15% OF PROFESSIONAL FEE IS PAID
Page 10
CASE STUDY
* THE FINAL PAYMENT IS ADJUSTED
BASED ON THE
•ACTUAL COST OF THE PROJECT
Page 11
$5,000,000 ($5M)
INSTEAD OF
$4,500,000 ($4.5M)
CASE STUDY
IF THE ACTUAL CONSTRUCTION COST IS
Page 12
$58,750
INSTEAD OF
$33,750
CASE STUDY
THE FINAL AMOUNT COLLECTIBLE UPON COMPLETION OF
THE PROJECT (CONSTRUCTION STAGE) SHOULD BE
ADJUSTED TO
Page 13
SUMMARY - CASE STUDY 1
5% OF CONSTRUCTION COST WITH ASSUMED
$4.5 M
CONTRACT AMOUNT
AND ACTUAL CONSTRUCTION TO
$5.0M
Page 14
20% PROFESSIONAL FEE – $45,000
40% PROFESSIONAL FEE – $90,000
25% PROFESSIONAL FEE – $56,250
15% PROFESSIONAL FEE – $37,750 ADJUSTED TO $58,750
ACTUAL PROFESSIONAL FEE – $250,000
BREAKDOWN OF FEES
Page 15
SUMMARY - CASE STUDY 1
5% OF CONSTRUCTION COST WITH ASSUMED
$4.5 M CONTRACT AMOUNT
= PROFESSIONAL FEE = $ 225,000
AND
$5.0M ACTUAL CONSTRUCTION TO
= PROFESSIONAL FEE = $ 250,000
Page 16
CASE STUDY 2
FOR PROJECT COST
AMOUNTING TO
$4,500,000 ($4.5M)
CASE STUDY
Page 17
CASE STUDY
PROFESSIONAL FEE
RANGING FROM 5% TO 15 %
Page 18
PROFESSIONAL FEE
15% OF CONSTRUCTION COST
= $ 675,000
CASE STUDY
Page 19
BREAKDOWN OF FEES
20% PROFESSIONAL FEE – PRELIMINARY DESIGN STAGE
CASE STUDY
40% PROFESSIONAL FEE – DESIGN DEVELOPMENT STAGE
25% PROFESSIONAL FEE – CONTRACT-DOCUMENT STAGE
15% PROFESSIONAL FEE – CONSTRUCTION STAGE
Page 20
UPON COMPLETION OF PRELIMINARY DESIGN STAGE
20% OF PROFESSIONAL FEE IS PAID
CASE STUDY
= $ 135,000
Page 21
CASE STUDY
= $ 270,000
UPON COMPLETION OF DESIGN DEVELOPMENT STAGE
40% OF PROFESSIONAL FEE IS PAID
Page 22
CASE STUDY
= $ 168,750
UPON COMPLETION OF CONTRACT DOCUMENT STAGE
25% OF PROFESSIONAL FEE IS PAID
Page 23
CASE STUDY
= $ 675,000
UPON COMPLETION OF CONSTRUCTION STAGE
15% OF PROFESSIONAL FEE IS PAID
Page 24
CASE STUDY
* THE FINAL PAYMENT IS ADJUSTED
BASED ON THE
•ACTUAL COST OF THE PROJECT
Page 25
$5,000,000 ($5M)
INSTEAD OF
$4,500,000 ($4.5M)
CASE STUDY
IF THE ACTUAL CONSTRUCTION COST IS
Page 26
$176,250
INSTEAD OF
$101,250
CASE STUDY
THE FINAL AMOUNT COLLECTIBLE UPON COMPLETION OF
THE PROJECT (CONSTRUCTION STAGE) SHOULD BE
ADJUSTED TO
Page 27
SUMMARY - CASE STUDY 2
15% OF CONSTRUCTION COST WITH ASSUMED
$4.5 M
CONTRACT AMOUNT
AND ACTUAL CONSTRUCTION TO
$5.0M
Page 28
20% PROFESSIONAL FEE – $135,000
40% PROFESSIONAL FEE – $270,000
25% PROFESSIONAL FEE – $168,750
15% PROFESSIONAL FEE – $101,250 ADJUSTED TO
$176,250
ACTUAL PROFESSIONAL FEE – $750,000
BREAKDOWN OF FEES
Page 29
SUMMARY - CASE STUDY 2
15% OF CONSTRUCTION COST WITH ASSUMED
$4.5 M CONTRACT AMOUNT
= PROFESSIONAL FEE = $ 675,000
AND
$5.0M ACTUAL CONSTRUCTION TO
= PROFESSIONAL FEE = $ 750,000
Page 30
THANK YOU VERY MUCH

More Related Content

Viewers also liked

Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice Ar. Mukunda K.S
 
How do architects design a house
How do architects design a houseHow do architects design a house
How do architects design a house3dartrender
 
Architectural Styles and Case Studies, Software architecture ,unit–2
Architectural Styles and Case Studies, Software architecture ,unit–2Architectural Styles and Case Studies, Software architecture ,unit–2
Architectural Styles and Case Studies, Software architecture ,unit–2Sudarshan Dhondaley
 
ARCHITECTURAL CASE STUDY RENZO PIANO
ARCHITECTURAL CASE STUDY RENZO PIANOARCHITECTURAL CASE STUDY RENZO PIANO
ARCHITECTURAL CASE STUDY RENZO PIANOStudent
 
Architectural case study of Apartments
Architectural case study of ApartmentsArchitectural case study of Apartments
Architectural case study of ApartmentsTanzil Faraz
 
Neural network & its applications
Neural network & its applications Neural network & its applications
Neural network & its applications Ahmed_hashmi
 
LinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-PresentedLinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-PresentedSlideShare
 

Viewers also liked (7)

Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice
 
How do architects design a house
How do architects design a houseHow do architects design a house
How do architects design a house
 
Architectural Styles and Case Studies, Software architecture ,unit–2
Architectural Styles and Case Studies, Software architecture ,unit–2Architectural Styles and Case Studies, Software architecture ,unit–2
Architectural Styles and Case Studies, Software architecture ,unit–2
 
ARCHITECTURAL CASE STUDY RENZO PIANO
ARCHITECTURAL CASE STUDY RENZO PIANOARCHITECTURAL CASE STUDY RENZO PIANO
ARCHITECTURAL CASE STUDY RENZO PIANO
 
Architectural case study of Apartments
Architectural case study of ApartmentsArchitectural case study of Apartments
Architectural case study of Apartments
 
Neural network & its applications
Neural network & its applications Neural network & its applications
Neural network & its applications
 
LinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-PresentedLinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-Presented
 

Similar to Case studies How Do Architects Get Paid

IP on top of Microsoft Dynamics CRM
IP on top of Microsoft Dynamics CRMIP on top of Microsoft Dynamics CRM
IP on top of Microsoft Dynamics CRMWim Geukens
 
Why the Roof Hasn't Caved In [Sightlines_CAUBO Webinar]
Why the Roof Hasn't Caved In [Sightlines_CAUBO Webinar]Why the Roof Hasn't Caved In [Sightlines_CAUBO Webinar]
Why the Roof Hasn't Caved In [Sightlines_CAUBO Webinar]Eric Nolan
 
Why the Roof Hasn't Caved In [Sightlines_CAUBO Webinar]
Why the Roof Hasn't Caved In [Sightlines_CAUBO Webinar]Why the Roof Hasn't Caved In [Sightlines_CAUBO Webinar]
Why the Roof Hasn't Caved In [Sightlines_CAUBO Webinar]Sightlines
 
Gulf Coast Green 09 0416 Final
Gulf Coast Green 09 0416   FinalGulf Coast Green 09 0416   Final
Gulf Coast Green 09 0416 FinalHayley Pallister
 
University of Phoenix MaterialVenture Budgeting and Forecasting .docx
University of Phoenix MaterialVenture Budgeting and Forecasting .docxUniversity of Phoenix MaterialVenture Budgeting and Forecasting .docx
University of Phoenix MaterialVenture Budgeting and Forecasting .docxgidmanmary
 
How to Build a Great Cloud/SaaS Business Case Analysis for Technology Investment
How to Build a Great Cloud/SaaS Business Case Analysis for Technology InvestmentHow to Build a Great Cloud/SaaS Business Case Analysis for Technology Investment
How to Build a Great Cloud/SaaS Business Case Analysis for Technology InvestmentGotransverse
 

Similar to Case studies How Do Architects Get Paid (7)

IP on top of Microsoft Dynamics CRM
IP on top of Microsoft Dynamics CRMIP on top of Microsoft Dynamics CRM
IP on top of Microsoft Dynamics CRM
 
Why the Roof Hasn't Caved In [Sightlines_CAUBO Webinar]
Why the Roof Hasn't Caved In [Sightlines_CAUBO Webinar]Why the Roof Hasn't Caved In [Sightlines_CAUBO Webinar]
Why the Roof Hasn't Caved In [Sightlines_CAUBO Webinar]
 
Why the Roof Hasn't Caved In [Sightlines_CAUBO Webinar]
Why the Roof Hasn't Caved In [Sightlines_CAUBO Webinar]Why the Roof Hasn't Caved In [Sightlines_CAUBO Webinar]
Why the Roof Hasn't Caved In [Sightlines_CAUBO Webinar]
 
Gulf Coast Green 09 0416 Final
Gulf Coast Green 09 0416   FinalGulf Coast Green 09 0416   Final
Gulf Coast Green 09 0416 Final
 
University of Phoenix MaterialVenture Budgeting and Forecasting .docx
University of Phoenix MaterialVenture Budgeting and Forecasting .docxUniversity of Phoenix MaterialVenture Budgeting and Forecasting .docx
University of Phoenix MaterialVenture Budgeting and Forecasting .docx
 
How to Build a Great Cloud/SaaS Business Case Analysis for Technology Investment
How to Build a Great Cloud/SaaS Business Case Analysis for Technology InvestmentHow to Build a Great Cloud/SaaS Business Case Analysis for Technology Investment
How to Build a Great Cloud/SaaS Business Case Analysis for Technology Investment
 
08.pdf
08.pdf08.pdf
08.pdf
 

Recently uploaded

Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdfKamal Acharya
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf884710SadaqatAli
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfPipe Restoration Solutions
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectRased Khan
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisDr. Radhey Shyam
 
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxThe Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxCenterEnamel
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Krakówbim.edu.pl
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdfKamal Acharya
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwoodseandesed
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industriesMuhammadTufail242431
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsAtif Razi
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxwendy cai
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfKamal Acharya
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGKOUSTAV SARKAR
 

Recently uploaded (20)

Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
 
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxThe Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 

Case studies How Do Architects Get Paid

  • 1. Page 1 HOW DO ARCHITECTS GET PAID? CASE STUDIES THE ARCHITECTURAL PRACTICE
  • 2. Page 2 THIS IS TO GIVE YOU A SAMPLE COMPUTATION ON THE BREAKDOWN OF FEES FOR THE METHOD OF COMPENSATION UNDER PERCENTAGE OF CONSTRUCTION COST THE ARCHITECTURAL PRACTICE
  • 3. CASE STUDY 1 FOR PROJECT COST AMOUNTING TO $4,500,000 ($4.5M) CASE STUDY Page 3
  • 4. CASE STUDY PROFESSIONAL FEE RANGING FROM 5% TO 15 % Page 4
  • 5. PROFESSIONAL FEE 5% OF CONSTRUCTION COST = $ 225,000 CASE STUDY Page 5
  • 6. BREAKDOWN OF FEES 20% PROFESSIONAL FEE – PRELIMINARY DESIGN STAGE CASE STUDY 40% PROFESSIONAL FEE – DESIGN DEVELOPMENT STAGE 25% PROFESSIONAL FEE – CONTRACT-DOCUMENT STAGE 15% PROFESSIONAL FEE – CONSTRUCTION STAGE Page 6
  • 7. UPON COMPLETION OF PRELIMINARY DESIGN STAGE 20% OF PROFESSIONAL FEE IS PAID CASE STUDY = $ 45,000 Page 7
  • 8. CASE STUDY = $ 90,000 UPON COMPLETION OF DESIGN DEVELOPMENT STAGE 40% OF PROFESSIONAL FEE IS PAID Page 8
  • 9. CASE STUDY = $ 56,750 UPON COMPLETION OF CONTRACT DOCUMENT STAGE 25% OF PROFESSIONAL FEE IS PAID Page 9
  • 10. CASE STUDY = $ 33,750 UPON COMPLETION OF CONSTRUCTION STAGE 15% OF PROFESSIONAL FEE IS PAID Page 10
  • 11. CASE STUDY * THE FINAL PAYMENT IS ADJUSTED BASED ON THE •ACTUAL COST OF THE PROJECT Page 11
  • 12. $5,000,000 ($5M) INSTEAD OF $4,500,000 ($4.5M) CASE STUDY IF THE ACTUAL CONSTRUCTION COST IS Page 12
  • 13. $58,750 INSTEAD OF $33,750 CASE STUDY THE FINAL AMOUNT COLLECTIBLE UPON COMPLETION OF THE PROJECT (CONSTRUCTION STAGE) SHOULD BE ADJUSTED TO Page 13
  • 14. SUMMARY - CASE STUDY 1 5% OF CONSTRUCTION COST WITH ASSUMED $4.5 M CONTRACT AMOUNT AND ACTUAL CONSTRUCTION TO $5.0M Page 14
  • 15. 20% PROFESSIONAL FEE – $45,000 40% PROFESSIONAL FEE – $90,000 25% PROFESSIONAL FEE – $56,250 15% PROFESSIONAL FEE – $37,750 ADJUSTED TO $58,750 ACTUAL PROFESSIONAL FEE – $250,000 BREAKDOWN OF FEES Page 15
  • 16. SUMMARY - CASE STUDY 1 5% OF CONSTRUCTION COST WITH ASSUMED $4.5 M CONTRACT AMOUNT = PROFESSIONAL FEE = $ 225,000 AND $5.0M ACTUAL CONSTRUCTION TO = PROFESSIONAL FEE = $ 250,000 Page 16
  • 17. CASE STUDY 2 FOR PROJECT COST AMOUNTING TO $4,500,000 ($4.5M) CASE STUDY Page 17
  • 18. CASE STUDY PROFESSIONAL FEE RANGING FROM 5% TO 15 % Page 18
  • 19. PROFESSIONAL FEE 15% OF CONSTRUCTION COST = $ 675,000 CASE STUDY Page 19
  • 20. BREAKDOWN OF FEES 20% PROFESSIONAL FEE – PRELIMINARY DESIGN STAGE CASE STUDY 40% PROFESSIONAL FEE – DESIGN DEVELOPMENT STAGE 25% PROFESSIONAL FEE – CONTRACT-DOCUMENT STAGE 15% PROFESSIONAL FEE – CONSTRUCTION STAGE Page 20
  • 21. UPON COMPLETION OF PRELIMINARY DESIGN STAGE 20% OF PROFESSIONAL FEE IS PAID CASE STUDY = $ 135,000 Page 21
  • 22. CASE STUDY = $ 270,000 UPON COMPLETION OF DESIGN DEVELOPMENT STAGE 40% OF PROFESSIONAL FEE IS PAID Page 22
  • 23. CASE STUDY = $ 168,750 UPON COMPLETION OF CONTRACT DOCUMENT STAGE 25% OF PROFESSIONAL FEE IS PAID Page 23
  • 24. CASE STUDY = $ 675,000 UPON COMPLETION OF CONSTRUCTION STAGE 15% OF PROFESSIONAL FEE IS PAID Page 24
  • 25. CASE STUDY * THE FINAL PAYMENT IS ADJUSTED BASED ON THE •ACTUAL COST OF THE PROJECT Page 25
  • 26. $5,000,000 ($5M) INSTEAD OF $4,500,000 ($4.5M) CASE STUDY IF THE ACTUAL CONSTRUCTION COST IS Page 26
  • 27. $176,250 INSTEAD OF $101,250 CASE STUDY THE FINAL AMOUNT COLLECTIBLE UPON COMPLETION OF THE PROJECT (CONSTRUCTION STAGE) SHOULD BE ADJUSTED TO Page 27
  • 28. SUMMARY - CASE STUDY 2 15% OF CONSTRUCTION COST WITH ASSUMED $4.5 M CONTRACT AMOUNT AND ACTUAL CONSTRUCTION TO $5.0M Page 28
  • 29. 20% PROFESSIONAL FEE – $135,000 40% PROFESSIONAL FEE – $270,000 25% PROFESSIONAL FEE – $168,750 15% PROFESSIONAL FEE – $101,250 ADJUSTED TO $176,250 ACTUAL PROFESSIONAL FEE – $750,000 BREAKDOWN OF FEES Page 29
  • 30. SUMMARY - CASE STUDY 2 15% OF CONSTRUCTION COST WITH ASSUMED $4.5 M CONTRACT AMOUNT = PROFESSIONAL FEE = $ 675,000 AND $5.0M ACTUAL CONSTRUCTION TO = PROFESSIONAL FEE = $ 750,000 Page 30