1 of 26
Network Design and Implementation
          Presentation
               By
      CSD Networking LLC,
Dawonne D. Jackson – Project Manager

Cheyenna Carson – Team Leader

Susan Worcester – Client Engagement Manager
Services & Materials
Proposal
                      Internet Service
WAN/LAN Design        Providers
                      Hardware
Security & Disaster
Recovery              Software & Licensing
Work Break Down       Training & Service
Structure             Level Agreement (SLA)
Allow for all medical offices to send, receive, and share
data & resources throughout the network
Upgrade all hardware/software to ensure network
operability
Allow scalability for growth of and on the network
Merge all five medical offices without slowing down
current service at any location
Provide physical security in addition to complying
with the current HIPPA laws
Allow for a redundant connection
Implement a plan for disaster recovery, backups, and
how security will exist and be maintained
CSD's main goal is to have all five medical offices up and
  running in a timely and efficient fashion in the event of
  disaster that will introduce down time.
   All backup and recovery must adhere to the Disaster
   and Recovery Plan
   All data will be backed up on-site and off-site
   Incremental backups done daily
   Full backups will be performed on Saturdays 1 hour
   after closing
   Tapes will be stored in a secure container ready for
   pickup by Iron Mountain
Security
           Demilitarized Zone (DMZ)
           Hard Disk Encryption (HDE)
           Ensure HIPPA compliance
           Wireless WPA Encryption
           Symantec Backup Exec Recovery 2010
           Server Room with Swipe Card
           RSA Encrypted VPN
Microsoft Server 2008 R2
     Main network operating system

Microsoft Windows 7 Professional
     Workstation operating system
MediSoft
Medical billing, EMR, scheduling,
imaging software

Symantec Protection Suite Small
 Business Edition
 Antivirus protection and workstation
 backup software
All software training will be provided off-site
   by The Computer Workshop with the
   exception of MediSoft

MediSoft training will be provided on-site by
 Medical Business Billing Services
 (MBBS)
Training will be available during the final
  week of the conversion of each location.

Should any employee miss a training
  session or require more training they may
  do so during the training week of the next
  location at no additional cost.
Insight Technology Solutions has been
  contracted to provide service on all
  hardware devices as well as software to
  ensure that a SLA of 1-4 hours can be
  provided.

Insight will utilize Solar Winds Ip Monitor
  software to monitor equipment for
  outages or down time.
Training by The Computer Workshop
           and MBBS

VoIP Telephone provided by AT&T
          and Verizon for redundancy

Internet Services provided by Time Warner Cable
            and AT&T for redundancy

Hardware and Software service provided by
          Insight Technology Services
Servers: Dell Power Edge T310 – Customized
           Intel Xeon X3440, 2.53 GHz, 8M Cache,
   Turbo, HT

Workstations: Dell Precision T3500 – Customized
          Dual Core Intel® Xeon® W3503 2.40GHz,
 4M L3, 4.8GT/s

Mobile Workstations: Dell Precision Mobile M4500 –
  Customized
          Intel Core i5-520M Dual Core 2.40GHz
  3MB
System      Quantity   Total Cost

  Server       15qty       32,558

Workstation    50qty     98,199.50

 Mobile        12qty       19,584
Workstation
Equipment          Quantity   Total Cost

Uninterrupted Power     25qty       7,975
      Supply

 24 Port Patch Panel    10qty       1,500

       Switch           10qty       8,290

  Wireless Router       10qty       1,780

 Fiber Optic Router      5qty        790

   16 Port Router        5qty       1,650
Equipment       Quantity   Total Cost

Printer/Copier    11qty       1,650
/Scanner/Fax


 VoIP Phones      50qty       4,250
The total cost of this project estimated
            to be $531,884.50

The cost per location breaks down to
              $106,376.90
 A detailed cost analysis has been provided to 5
    Rivers Medical Center to review at their
                     leisure.
Capstone Presentation For Five Rivers Medical Centers

More Related Content

What's hot

APManagement_FeatureGuide
APManagement_FeatureGuideAPManagement_FeatureGuide
APManagement_FeatureGuideEugene Yu
 
LNL Company Profile-NEW
LNL Company Profile-NEWLNL Company Profile-NEW
LNL Company Profile-NEWJayesh Unadkat
 
Network Infrastructure Upgrade - Nextrio
Network Infrastructure Upgrade - NextrioNetwork Infrastructure Upgrade - Nextrio
Network Infrastructure Upgrade - NextrioAadil Hussaini
 
Projects controls on a 900 project substation network upgrade ppt
Projects controls on a 900 project substation network upgrade pptProjects controls on a 900 project substation network upgrade ppt
Projects controls on a 900 project substation network upgrade pptp6academy
 
WWTC_implementation_plan_Group5_FINAL
WWTC_implementation_plan_Group5_FINALWWTC_implementation_plan_Group5_FINAL
WWTC_implementation_plan_Group5_FINALJohn Bernal
 
IRJET- Implementation of Dynamic Internetworking in the Real World it Domain
IRJET-  	  Implementation of Dynamic Internetworking in the Real World it DomainIRJET-  	  Implementation of Dynamic Internetworking in the Real World it Domain
IRJET- Implementation of Dynamic Internetworking in the Real World it DomainIRJET Journal
 
White Paper Security and High Availability Concerns with Wide Area Networks
White Paper Security and High Availability Concerns with Wide Area NetworksWhite Paper Security and High Availability Concerns with Wide Area Networks
White Paper Security and High Availability Concerns with Wide Area NetworksChristopher Lietz
 
White Paper Security and High Availability Concerns with Wide Area Networks
White Paper Security and High Availability Concerns with Wide Area NetworksWhite Paper Security and High Availability Concerns with Wide Area Networks
White Paper Security and High Availability Concerns with Wide Area NetworksChristopher Lietz
 
Wp ipam infoblox
Wp ipam infobloxWp ipam infoblox
Wp ipam infobloxislamet
 
Syed Siraj - Telecom_Infrastructure Manager
Syed Siraj - Telecom_Infrastructure ManagerSyed Siraj - Telecom_Infrastructure Manager
Syed Siraj - Telecom_Infrastructure ManagerSiraj Syed
 
Aruba Rightsizing Your Network
Aruba Rightsizing Your NetworkAruba Rightsizing Your Network
Aruba Rightsizing Your Networkhypknight
 

What's hot (20)

Comprehensive AAP
Comprehensive AAPComprehensive AAP
Comprehensive AAP
 
APManagement_FeatureGuide
APManagement_FeatureGuideAPManagement_FeatureGuide
APManagement_FeatureGuide
 
Network upgrade
Network upgradeNetwork upgrade
Network upgrade
 
LNL Company Profile-NEW
LNL Company Profile-NEWLNL Company Profile-NEW
LNL Company Profile-NEW
 
Network Infrastructure Upgrade - Nextrio
Network Infrastructure Upgrade - NextrioNetwork Infrastructure Upgrade - Nextrio
Network Infrastructure Upgrade - Nextrio
 
Projects controls on a 900 project substation network upgrade ppt
Projects controls on a 900 project substation network upgrade pptProjects controls on a 900 project substation network upgrade ppt
Projects controls on a 900 project substation network upgrade ppt
 
WWTC_implementation_plan_Group5_FINAL
WWTC_implementation_plan_Group5_FINALWWTC_implementation_plan_Group5_FINAL
WWTC_implementation_plan_Group5_FINAL
 
Jvvnl 071108
Jvvnl 071108Jvvnl 071108
Jvvnl 071108
 
RFP-Final3
RFP-Final3RFP-Final3
RFP-Final3
 
IRJET- Implementation of Dynamic Internetworking in the Real World it Domain
IRJET-  	  Implementation of Dynamic Internetworking in the Real World it DomainIRJET-  	  Implementation of Dynamic Internetworking in the Real World it Domain
IRJET- Implementation of Dynamic Internetworking in the Real World it Domain
 
Murari kumar
Murari kumarMurari kumar
Murari kumar
 
White Paper Security and High Availability Concerns with Wide Area Networks
White Paper Security and High Availability Concerns with Wide Area NetworksWhite Paper Security and High Availability Concerns with Wide Area Networks
White Paper Security and High Availability Concerns with Wide Area Networks
 
White Paper Security and High Availability Concerns with Wide Area Networks
White Paper Security and High Availability Concerns with Wide Area NetworksWhite Paper Security and High Availability Concerns with Wide Area Networks
White Paper Security and High Availability Concerns with Wide Area Networks
 
Public Internet WAN
Public Internet WANPublic Internet WAN
Public Internet WAN
 
Wp ipam infoblox
Wp ipam infobloxWp ipam infoblox
Wp ipam infoblox
 
Document case study-Systweak - Go4Hosting
Document case study-Systweak - Go4HostingDocument case study-Systweak - Go4Hosting
Document case study-Systweak - Go4Hosting
 
SHRUTHI SHARMA MS
SHRUTHI SHARMA MSSHRUTHI SHARMA MS
SHRUTHI SHARMA MS
 
Syed Siraj - Telecom_Infrastructure Manager
Syed Siraj - Telecom_Infrastructure ManagerSyed Siraj - Telecom_Infrastructure Manager
Syed Siraj - Telecom_Infrastructure Manager
 
Resume
ResumeResume
Resume
 
Aruba Rightsizing Your Network
Aruba Rightsizing Your NetworkAruba Rightsizing Your Network
Aruba Rightsizing Your Network
 

Similar to Capstone Presentation For Five Rivers Medical Centers

Similar to Capstone Presentation For Five Rivers Medical Centers (20)

Cyberdyne systems (2)
Cyberdyne systems (2)Cyberdyne systems (2)
Cyberdyne systems (2)
 
Group presentation
Group presentationGroup presentation
Group presentation
 
sysadmin
sysadminsysadmin
sysadmin
 
JayWegner
JayWegnerJayWegner
JayWegner
 
Winnipeg Technology Innovation Day
Winnipeg Technology Innovation Day Winnipeg Technology Innovation Day
Winnipeg Technology Innovation Day
 
Gopu_CV_2016
Gopu_CV_2016Gopu_CV_2016
Gopu_CV_2016
 
Syed_Network_resume
Syed_Network_resumeSyed_Network_resume
Syed_Network_resume
 
Dale E Shell Jr Resume
Dale E Shell Jr ResumeDale E Shell Jr Resume
Dale E Shell Jr Resume
 
Resume
ResumeResume
Resume
 
resume 2015 update
resume 2015 updateresume 2015 update
resume 2015 update
 
Help Now Guardian Network
Help Now Guardian NetworkHelp Now Guardian Network
Help Now Guardian Network
 
HaroldTBurwell2015(2)
HaroldTBurwell2015(2)HaroldTBurwell2015(2)
HaroldTBurwell2015(2)
 
Resume l
Resume lResume l
Resume l
 
SDN Application Delivery
SDN Application DeliverySDN Application Delivery
SDN Application Delivery
 
Floyd R - Oak
Floyd R - OakFloyd R - Oak
Floyd R - Oak
 
Chanh Ackerman
Chanh AckermanChanh Ackerman
Chanh Ackerman
 
NetX
NetXNetX
NetX
 
Considerations for UC and cloud deployments
Considerations for UC and cloud deploymentsConsiderations for UC and cloud deployments
Considerations for UC and cloud deployments
 
Khalid suliman sideg hamdan original ts
Khalid suliman sideg hamdan original tsKhalid suliman sideg hamdan original ts
Khalid suliman sideg hamdan original ts
 
19370_Tara_Brooks_21729_Resume1
19370_Tara_Brooks_21729_Resume119370_Tara_Brooks_21729_Resume1
19370_Tara_Brooks_21729_Resume1
 

Capstone Presentation For Five Rivers Medical Centers

  • 1. Network Design and Implementation Presentation By CSD Networking LLC,
  • 2. Dawonne D. Jackson – Project Manager Cheyenna Carson – Team Leader Susan Worcester – Client Engagement Manager
  • 3. Services & Materials Proposal Internet Service WAN/LAN Design Providers Hardware Security & Disaster Recovery Software & Licensing Work Break Down Training & Service Structure Level Agreement (SLA)
  • 4. Allow for all medical offices to send, receive, and share data & resources throughout the network Upgrade all hardware/software to ensure network operability Allow scalability for growth of and on the network Merge all five medical offices without slowing down current service at any location Provide physical security in addition to complying with the current HIPPA laws Allow for a redundant connection Implement a plan for disaster recovery, backups, and how security will exist and be maintained
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12. CSD's main goal is to have all five medical offices up and running in a timely and efficient fashion in the event of disaster that will introduce down time. All backup and recovery must adhere to the Disaster and Recovery Plan All data will be backed up on-site and off-site Incremental backups done daily Full backups will be performed on Saturdays 1 hour after closing Tapes will be stored in a secure container ready for pickup by Iron Mountain
  • 13. Security Demilitarized Zone (DMZ) Hard Disk Encryption (HDE) Ensure HIPPA compliance Wireless WPA Encryption Symantec Backup Exec Recovery 2010 Server Room with Swipe Card RSA Encrypted VPN
  • 14.
  • 15. Microsoft Server 2008 R2 Main network operating system Microsoft Windows 7 Professional Workstation operating system
  • 16. MediSoft Medical billing, EMR, scheduling, imaging software Symantec Protection Suite Small Business Edition Antivirus protection and workstation backup software
  • 17. All software training will be provided off-site by The Computer Workshop with the exception of MediSoft MediSoft training will be provided on-site by Medical Business Billing Services (MBBS)
  • 18. Training will be available during the final week of the conversion of each location. Should any employee miss a training session or require more training they may do so during the training week of the next location at no additional cost.
  • 19. Insight Technology Solutions has been contracted to provide service on all hardware devices as well as software to ensure that a SLA of 1-4 hours can be provided. Insight will utilize Solar Winds Ip Monitor software to monitor equipment for outages or down time.
  • 20. Training by The Computer Workshop and MBBS VoIP Telephone provided by AT&T and Verizon for redundancy Internet Services provided by Time Warner Cable and AT&T for redundancy Hardware and Software service provided by Insight Technology Services
  • 21. Servers: Dell Power Edge T310 – Customized Intel Xeon X3440, 2.53 GHz, 8M Cache, Turbo, HT Workstations: Dell Precision T3500 – Customized Dual Core Intel® Xeon® W3503 2.40GHz, 4M L3, 4.8GT/s Mobile Workstations: Dell Precision Mobile M4500 – Customized Intel Core i5-520M Dual Core 2.40GHz 3MB
  • 22. System Quantity Total Cost Server 15qty 32,558 Workstation 50qty 98,199.50 Mobile 12qty 19,584 Workstation
  • 23. Equipment Quantity Total Cost Uninterrupted Power 25qty 7,975 Supply 24 Port Patch Panel 10qty 1,500 Switch 10qty 8,290 Wireless Router 10qty 1,780 Fiber Optic Router 5qty 790 16 Port Router 5qty 1,650
  • 24. Equipment Quantity Total Cost Printer/Copier 11qty 1,650 /Scanner/Fax VoIP Phones 50qty 4,250
  • 25. The total cost of this project estimated to be $531,884.50 The cost per location breaks down to $106,376.90 A detailed cost analysis has been provided to 5 Rivers Medical Center to review at their leisure.