SlideShare a Scribd company logo
1 of 29
Orange Creek Inc.
Network Build Out
By DataScoptic
Introduction
John Stickney
Project Manager
Patrice Harper
Supply & Marketing
Wanda Morgan
MaterialsTechnician
Kelly Schurr
Budget Analyst
Carla Speranza
Business Analyst
MinhVu
Technical Manager
2ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16
“Coming together is a beginning; keeping together is progress; working together is success.”
-Henry Ford
Agenda
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 3
 Project Overview
 Description
 Scope
 Objectives & Dependencies
 Schedule & Milestones
 Solution
 Back End
 Backbone
 Client-side & Security
 Implementation
 Logical Layout
 Active Directory
 Physical Layout
 Risk Management
 Cost Analysis
 Summary
“The secret of your success is determined by your daily agenda.”
-John C. Maxwell
Project Overview
“For me, every day is a new thing. I approach each project
with a new insecurity, almost like the first project I ever did.
And I get the sweats. I go in and start working, I'm not sure
where I'm going. If I knew where I was going I wouldn't do it.”
-Frank Gehry
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 4
Orange Creek Inc. is requesting bids to
implement network infrastructure for their
new location in Lexington, Kentucky.
 New office space for software development
and testing of their banking software.
 The new facility will be dedicated to:
 Development
 Testing
 On-site IT staff
 Management
 Administration
Project Description
5ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16
Project Scope
In Scope:
Network Infrastructure Installation
 Storage Area Network (SAN)
 Active Directory, Email &Test servers
 DesktopWorkstations
 Wireless Access Points
Installation of aVoice Over IP (VoIP)
telephony system
 Data Center Design & Installation
 Dedicated HVAC and Fire Suppression
 Security & Access
Internal Security
 Internet Protocol (IP) Cameras
 Physical access to network infrastructure
Out of Scope:
× External building security
× Software Licensing
 Microsoft Software Assurance
× Wireless support external to the
facility
× Handling and/or recycling of legacy
hardware
 Re-purposing to back-up site
6ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16
Project Objectives & Dependencies
Objectives:
Timely Project Completion
Meet OccupancyTimetable for
Orange Creek Inc.
Cost-Effectiveness
“Best bang for the buck”
SmoothTransition
Documentation
Training
Meet Infrastructure Requirements
Current Needs
Future Growth
7ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16
Dependencies:
Facility Construction
Commence Network Build-out
Material Delivery
System Installation &Testing
Network Build-out &Turnover
Orange Creek Inc. Occupancy
Project Schedule & Milestones
Milestone 1:
Core Infrastructure Installed
 Cable Drops
 HVAC & Fire Suppression
 Trunk Hardware
Milestone 2:
Server Delivery & Installation
 Operating Systems
 Basic Configuration
Milestone 3:
VoIP System Installed
Workstations Installed
 Operating Systems
 Configuration
Milestone 4:
Full Network Integration &
Testing
 Functionality
 Performance
 Final Configurations
Project Conclusion:
Documentation
Training
Turnover
8ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16
“Planning is bringing the future into the present
so that you can do something about it now. “
-Alan Lakein
Solution
“The solution often turns out more beautiful than the puzzle.”
-Richard Dawkins
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 9
Solution: Back End
Five Core (Physical) Servers
 2x Domain Controllers (DC)
 Active Directory (AD)
 Domain Name Service (DNS)
 2x Microsoft Exchange 2013
(Email & Collaboration)
 1x Linux Server (Code box)
2xVirtual Machine (VM) Servers
 Versatility & Flexibility
 Redundancy
Server OS:Windows 2012 R2
Uninterruptible Power Supply
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 10
Blade System
 High Integration & Consolidation
 Density
 Expansion & Growth
 Built-in Network Fabric Support
 Gigabit Ethernet
 Fibre Channel
Storage Area Network
 42.6TBTotal Capacity
 Hybrid/Tiered Storage
 Solid-State Drives (SSDs) for
speed
 Traditional Hard-Disk Drives
(HDDs) for space“One of the most feared expressions in
modern times is 'The computer is down.‘”
-Norman Ralph Augustine
Solution: Server Configurations
Server Domain, Exchange, Linux Virtualization
Processor 2x Intel Xeon E5-4607
• 2.20GHz Clock-speed
• 12MB Cache
• 6 (C)ores / 6 (T)hreads
• 95 Watt Thermal Design Power (TDP)
• 6.4 Giga-Transfers/sec (GT/s) Intel
QuickPath Interconnect (QPI)
4x Intel Xeon E5-4655v3
• 2.9GHz
• 30MB Cache
• 6C / 12T
• 135 Watt TDP
• 9.60GT/s QPI
Memory 128GB (16GB x8)
• 1600 Mega-Transfers/sec (MT/s)
• Low Voltage
• Advanced Error Correcting Code (AECC)
• Registered Dual-Inline Memory Modules
(RDIMM)
512GB (32GB x16)
• 2133 MT/s
• Low Voltage
• AECC
• RDIMM
Storage** 3x 300GB SAS 6Gbps 15K RPM HDD 3x 800GB SAS 12Gbps MLC SSD
RAID* RAID 5** RAID 5**
Network  Broadcom 57810-k Dual port 10Gb
Ethernet
 Emulex LPE1205-M 8Gbps Dual Port
Fibre Channel
 Broadcom 5720 1Gb Quad Port
Ethernet
 Emulex LPE1205-M 8Gbps Dual Port
Fibre Channel
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 11
*RAID – Redundant Array of Independent/Inexpensive Disks. Used for fault tolerance/redundancy.
** RAID 5 requires a minimum of 3 drives to provide fault tolerance.
Solution: Back Bone
4-Port Router
 Failover Support
 Virtual Private Network (VPN)-
capable
 500Megabit/sec throughput
 Upgradeable toGigabit
15x 52-port Layer 2-3 Managed
Switches (Gigabit)
 Virtual Local Area Network
(VLAN)-capable
 Power-over-Ethernet (PoE)
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 12
Wireless Access Points
 Full-range support of wireless
standards (802.11a/b/g/n/ac)
 PoE-capable
Dual Physical Firewalls
 Dedicated firewall protection
 First line of defense
 SegregateWireless Network
Category 6 (Cat6) Cabling
 SupportsGigabit Ethernet
(1000Base-T)
“You can't trust the internet.”
-Nicollette Sheridan
Solution: Client-side & Security
SingleWorkstation
Configuration
 Uniformity
 Ease of management
Laptop Systems
 Executives
 On-siteTechnicians
Multifunction Printers
 Copy, Print, Scan, Fax
 Versatility
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 13
Internet Protocol (IP) Security
Cameras
 Common Infrastructure
 PoE – Placement not dependent
on power outlet availability
 High Resolution (1280x960)
 Supports most networking
protocols and features
 Monitor access to facility entries
and network infrastructure
Biometrics
 Fingerprint reader in addition to
keypad
 Control and secure access to
network infrastructure
Solution: Client System Configurations
System Workstation Laptop
Processor Intel Core i3 Dual Core @ 3.6GHz Intel Core i3 Dual Core @ 2.0GHz
Memory 4GB 8GB
Storage 500GB HDD 128GB Solid State Drive
Video Integrated Intel Graphic
Network Integrated Ethernet
• Wireless A/G/N
• Bluetooth 4.0
OS Windows 7
Other
• Fingerprint Reader
• 65W AC Adapter
• 40 Watt-hour Li-Ion Battery
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 14
Implementation
“Success is simple. Do what's right, the right way, at the right time.”
-Arnold H. Glasow
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 15
Implementation: Logical Network Structure
16ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16
VM Server (x2)Gateway
Router
Internet
Firewall
Wireless
Access
Points
Wireless
Firewall
Trunk &
Switches
Rack Switch
AD Servers (x2) Exchange
Servers (x2)
Wireless
Network
Phone
Trunk
IP Phones Peripherals
Production &
Development
Administration
QA Lab 1
QA Lab 2
Prior Site
(via VPN)
Switch IP CamerasSecurity
Linux
Codebox
WAN/Internet
Demark
SAN
Implementation: Active Directory Scheme
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 17
IT SystemsUsers Infrastructure
Workstations
Peripherals Laptops
Administration Servers
Domain
Quality
Assurance
Executive
Production
Human
Resources
Reception
SysAdmin Support
15' 0" x 12' 2.032"
Data Center
6' 0.141" x 6' 7.101"
Dedicated HVAC
for Data Center
Fire Suppression System
Up
s
Up
Up
250'
HR
Director s
Office
QA Lab 2
E2 E4E3
Executive s Office
Wiring
Closet
IT Director s
Office
QA Lab 1
C
C
F
C
C
F
C
C
Quiet Room
Break Room
Conference
Room
Wiring
Closet
C
F
C
C
C
C
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 18
First Floor
Implementation: Physical Layout
C
C
F
C
KeypadCamera Biometric WAP Cable Drop Cubicles Wiring Closet
Implementation: Physical Layout
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 19
Second Floor
Up
Z
Up
Wiring
Closet
Up
250'
250'
Up
72.0 in. x 36.0 in.
2nd
Floor Cafe
Wiring
Closet
.
.
.
.
.
.
Conference
Room
Lounge
C
C
C
C
F
C
C
F
C
C
C
F
C
KeypadCamera Biometric WAP Cable Drop Cubicles Wiring Closet
Risk Management
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 20
“Carelessness and overconfidence are usually more
dangerous than deliberately accepted risks.”
-Orville Wright
Risk Management Plan
21ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16
Risk Area Probability Impact Risk Plan
1. Flooding due
to facility
location
Low High Elevated the servers to 4 feet from the
floor; seal the server room; equip room
with flood-proofing safeguards
2. Hardware
delay
Medium Medium Investigate cause of delay and formulate
appropriate plan of action, such as:
• Contact vendor for expedited delivery
of new hardware (lost/damage
delivery)
• Find new vendor (vendor-induced
delay)
Cost Analysis
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 22
Cost Analysis*
23ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16
Category Costs
Back End $162,805.30
Back Bone $123,796.68
Client-side & Security $262,138.21
Utility $56,568.00
Contracting $101,550.00
Fees $82,160.00
Services $1,800.00
Total $790,818.19
*Detailed cost breakdown in proposal package
Summary
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 24
Summary
Cost-Efficiency
Framework Solution
Timeliness
Customization
SmoothTransition via:
Training
Ongoing Support
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 25
Questions
“The price of success is hard work, dedication to the job at
hand, and the determination that whether we win or lose,
we have applied the best of ourselves to the task at hand.”
-Vince Lombardi
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 26
Appendix
27ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16
“Coming together is a beginning; keeping together is
progress; working together is success.”
-Henry Ford
“The price of success is hard work, dedication to the
job at hand, and the determination that whether we
win or lose, we have applied the best of ourselves to
the task at hand.”
-Vince Lombardi
“The secret of your success is determined by your
daily agenda.”
-John C. Maxwell
“Carelessness and overconfidence are usually more
dangerous than deliberately accepted risks.”
-Orville Wright
“You can't trust the internet.”
-Nicollette Sheridan
“Planning is bringing the future into the present so that
you can do something about it now. “
-Alan Lakein
“For me, every day is a new thing. I approach each
project with a new insecurity, almost like the first
project I ever did. And I get the sweats. I go in and
start working, I'm not sure where I'm going. If I knew
where I was going I wouldn't do it.”
-Frank Gehry
“The solution often turns out more beautiful than the
puzzle.”
-Richard Dawkins
“One of the most feared expressions in modern times
is 'The computer is down.‘”
-Norman Ralph Augustine
“Success is simple. Do what's right, the right way, at
the right time.”
-Arnold H. Glasow
Quotes from:
 http://www.brainyquote.com
Implementation: Network Activity Diagram
VM Server (x2)
Wireless
Access
Points
Rack Switch
Peripheals
Production &
Development
Administration
QA Lab 1
QA Lab 2Switch IP CamerasSecurity
Demark
SAN
Gateway
Router
Internet
Firewall
Wireless
Firewall
Trunk &
Switches
AD Servers (x2) Exchange
Servers (x2)
Wireless
Network
Phone
Trunk
IP Phones
Prior Site
(via VPN)
Linux
Codebox
WAN/Internet
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 28
Workstation Naming Convention
ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 29
Workstation naming scheme will follow a basic standardize convention:
 OCL[DEPT]Wks[ID#]
• OCL: Orange Creek Lexington – Organization & facility location
• [DEPT]: Shorthand identifier of Department
• Wks: Initialism for “Workstation”
• [ID#]: Numeric identifier for the workstation
 Examples:
• OCLQAL1Wks01: Quality Assurance Lab 1
• OCLProdWks99: Production
• OCLExecWks13: Executive Offices

More Related Content

What's hot

Resume Of Ifthekharul Islam_2016_V1.5
Resume Of Ifthekharul Islam_2016_V1.5Resume Of Ifthekharul Islam_2016_V1.5
Resume Of Ifthekharul Islam_2016_V1.5
Ifthekharul Islam
 
Carlos Morales 2016v3_sinRef
Carlos Morales  2016v3_sinRefCarlos Morales  2016v3_sinRef
Carlos Morales 2016v3_sinRef
carlos morales
 
Network Infrastructure Upgrade - Nextrio
Network Infrastructure Upgrade - NextrioNetwork Infrastructure Upgrade - Nextrio
Network Infrastructure Upgrade - Nextrio
Aadil Hussaini
 
Haseeb Resume LATEST
Haseeb Resume LATESTHaseeb Resume LATEST
Haseeb Resume LATEST
Abdul Haseeb
 
Projects controls on a 900 project substation network upgrade ppt
Projects controls on a 900 project substation network upgrade pptProjects controls on a 900 project substation network upgrade ppt
Projects controls on a 900 project substation network upgrade ppt
p6academy
 
TuanVu_CiscoNetworkEngineer
TuanVu_CiscoNetworkEngineerTuanVu_CiscoNetworkEngineer
TuanVu_CiscoNetworkEngineer
Tuan Vu
 

What's hot (20)

CV-ROB
CV-ROBCV-ROB
CV-ROB
 
Cisco DNA
Cisco DNACisco DNA
Cisco DNA
 
Murari kumar
Murari kumarMurari kumar
Murari kumar
 
Public Internet WAN
Public Internet WANPublic Internet WAN
Public Internet WAN
 
Mudher alattar resume
Mudher alattar resumeMudher alattar resume
Mudher alattar resume
 
Resume Of Ifthekharul Islam_2016_V1.5
Resume Of Ifthekharul Islam_2016_V1.5Resume Of Ifthekharul Islam_2016_V1.5
Resume Of Ifthekharul Islam_2016_V1.5
 
OCS LIA
OCS LIAOCS LIA
OCS LIA
 
Carlos Morales 2016v3_sinRef
Carlos Morales  2016v3_sinRefCarlos Morales  2016v3_sinRef
Carlos Morales 2016v3_sinRef
 
Usage Based Metering in the Cloud (Subscribed13)
Usage Based Metering in the Cloud (Subscribed13)Usage Based Metering in the Cloud (Subscribed13)
Usage Based Metering in the Cloud (Subscribed13)
 
Resume mohammed ahmed awad (1)
Resume mohammed ahmed awad (1)Resume mohammed ahmed awad (1)
Resume mohammed ahmed awad (1)
 
Network Infrastructure Upgrade - Nextrio
Network Infrastructure Upgrade - NextrioNetwork Infrastructure Upgrade - Nextrio
Network Infrastructure Upgrade - Nextrio
 
Network upgrade
Network upgradeNetwork upgrade
Network upgrade
 
UCS Update: Efficiently Managing your server environment for traditional ente...
UCS Update: Efficiently Managing your server environment for traditional ente...UCS Update: Efficiently Managing your server environment for traditional ente...
UCS Update: Efficiently Managing your server environment for traditional ente...
 
Haseeb Resume LATEST
Haseeb Resume LATESTHaseeb Resume LATEST
Haseeb Resume LATEST
 
Arturo Lugo
Arturo LugoArturo Lugo
Arturo Lugo
 
Resume
ResumeResume
Resume
 
Projects controls on a 900 project substation network upgrade ppt
Projects controls on a 900 project substation network upgrade pptProjects controls on a 900 project substation network upgrade ppt
Projects controls on a 900 project substation network upgrade ppt
 
TuanVu_CiscoNetworkEngineer
TuanVu_CiscoNetworkEngineerTuanVu_CiscoNetworkEngineer
TuanVu_CiscoNetworkEngineer
 
Document case study-Systweak - Go4Hosting
Document case study-Systweak - Go4HostingDocument case study-Systweak - Go4Hosting
Document case study-Systweak - Go4Hosting
 
White Paper on SNMPv3
White Paper on SNMPv3White Paper on SNMPv3
White Paper on SNMPv3
 

Viewers also liked (9)

ET2799 Capstone presentation
ET2799 Capstone presentationET2799 Capstone presentation
ET2799 Capstone presentation
 
Cross platform mobile apps
Cross platform mobile appsCross platform mobile apps
Cross platform mobile apps
 
ITT-Tech Capstone Final for CNS
ITT-Tech Capstone Final for CNSITT-Tech Capstone Final for CNS
ITT-Tech Capstone Final for CNS
 
Capstone Final Part
Capstone Final PartCapstone Final Part
Capstone Final Part
 
Capstone Project Pt 11
Capstone Project Pt 11Capstone Project Pt 11
Capstone Project Pt 11
 
IT 415 - Capstone Project Orientation
IT 415 - Capstone Project OrientationIT 415 - Capstone Project Orientation
IT 415 - Capstone Project Orientation
 
Capstone Powerpoint Presentation
Capstone Powerpoint PresentationCapstone Powerpoint Presentation
Capstone Powerpoint Presentation
 
Network Design on cisco packet tracer 6.0
Network Design on cisco packet tracer 6.0Network Design on cisco packet tracer 6.0
Network Design on cisco packet tracer 6.0
 
Writing Chapters 1, 2, 3 of the Capstone Project Proposal Manuscript
Writing Chapters 1, 2, 3 of the Capstone Project Proposal ManuscriptWriting Chapters 1, 2, 3 of the Capstone Project Proposal Manuscript
Writing Chapters 1, 2, 3 of the Capstone Project Proposal Manuscript
 

Similar to NSA Capstone Presentation

Lon cv network_10072013
Lon cv network_10072013Lon cv network_10072013
Lon cv network_10072013
nmeadows
 
Md Sohrab Khan(Resume)
Md Sohrab Khan(Resume)Md Sohrab Khan(Resume)
Md Sohrab Khan(Resume)
Md Sohrab khan
 

Similar to NSA Capstone Presentation (20)

Building the SD-Branch using uCPE
Building the SD-Branch using uCPEBuilding the SD-Branch using uCPE
Building the SD-Branch using uCPE
 
Build the network of the future on your terms today
Build the network of the future on your terms todayBuild the network of the future on your terms today
Build the network of the future on your terms today
 
Resume_SyedAtifShamim
Resume_SyedAtifShamimResume_SyedAtifShamim
Resume_SyedAtifShamim
 
Lon cv network_10072013
Lon cv network_10072013Lon cv network_10072013
Lon cv network_10072013
 
JAL Resume
JAL ResumeJAL Resume
JAL Resume
 
Connectivity for the data centric era
Connectivity for the data centric eraConnectivity for the data centric era
Connectivity for the data centric era
 
updated cvmn
updated cvmnupdated cvmn
updated cvmn
 
Building converged plantwide ethernet architectures
Building converged plantwide ethernet architecturesBuilding converged plantwide ethernet architectures
Building converged plantwide ethernet architectures
 
Md Sohrab Khan(Resume)
Md Sohrab Khan(Resume)Md Sohrab Khan(Resume)
Md Sohrab Khan(Resume)
 
Ahmed mostafa ahmed v1.3
Ahmed mostafa ahmed v1.3Ahmed mostafa ahmed v1.3
Ahmed mostafa ahmed v1.3
 
MOSTAFA AHMED KHATTAB-
MOSTAFA AHMED KHATTAB-MOSTAFA AHMED KHATTAB-
MOSTAFA AHMED KHATTAB-
 
Resume for Network Engineer, Network Security, IT Management L2 / L3
Resume for Network Engineer, Network Security,  IT Management L2 / L3 Resume for Network Engineer, Network Security,  IT Management L2 / L3
Resume for Network Engineer, Network Security, IT Management L2 / L3
 
Cisco connect winnipeg 2018 a look at network assurance in dna center
Cisco connect winnipeg 2018   a look at network assurance in dna centerCisco connect winnipeg 2018   a look at network assurance in dna center
Cisco connect winnipeg 2018 a look at network assurance in dna center
 
Finto InfoSec ExIBM- CISSP ITIL CCSP CCIE JNCIS MCP 8.5 Yrs
Finto InfoSec ExIBM- CISSP ITIL CCSP CCIE  JNCIS MCP 8.5  YrsFinto InfoSec ExIBM- CISSP ITIL CCSP CCIE  JNCIS MCP 8.5  Yrs
Finto InfoSec ExIBM- CISSP ITIL CCSP CCIE JNCIS MCP 8.5 Yrs
 
Wojciechowski paul
Wojciechowski  paul Wojciechowski  paul
Wojciechowski paul
 
White Box Hardware Challenges in the 5G & IoT Hyperconnected Era
White Box Hardware Challenges in the 5G & IoT Hyperconnected EraWhite Box Hardware Challenges in the 5G & IoT Hyperconnected Era
White Box Hardware Challenges in the 5G & IoT Hyperconnected Era
 
Netsft2017 day in_life_of_nfv
Netsft2017 day in_life_of_nfvNetsft2017 day in_life_of_nfv
Netsft2017 day in_life_of_nfv
 
BRKIOT-2108.pdf
BRKIOT-2108.pdfBRKIOT-2108.pdf
BRKIOT-2108.pdf
 
Discrete MFG IoT Factory of the Future
Discrete MFG IoT Factory of the FutureDiscrete MFG IoT Factory of the Future
Discrete MFG IoT Factory of the Future
 
Weaving the Future - Enable Networks to Be More Agile for Services
Weaving the Future - Enable Networks to Be More Agile for ServicesWeaving the Future - Enable Networks to Be More Agile for Services
Weaving the Future - Enable Networks to Be More Agile for Services
 

NSA Capstone Presentation

  • 1. Orange Creek Inc. Network Build Out By DataScoptic
  • 2. Introduction John Stickney Project Manager Patrice Harper Supply & Marketing Wanda Morgan MaterialsTechnician Kelly Schurr Budget Analyst Carla Speranza Business Analyst MinhVu Technical Manager 2ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 “Coming together is a beginning; keeping together is progress; working together is success.” -Henry Ford
  • 3. Agenda ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 3  Project Overview  Description  Scope  Objectives & Dependencies  Schedule & Milestones  Solution  Back End  Backbone  Client-side & Security  Implementation  Logical Layout  Active Directory  Physical Layout  Risk Management  Cost Analysis  Summary “The secret of your success is determined by your daily agenda.” -John C. Maxwell
  • 4. Project Overview “For me, every day is a new thing. I approach each project with a new insecurity, almost like the first project I ever did. And I get the sweats. I go in and start working, I'm not sure where I'm going. If I knew where I was going I wouldn't do it.” -Frank Gehry ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 4
  • 5. Orange Creek Inc. is requesting bids to implement network infrastructure for their new location in Lexington, Kentucky.  New office space for software development and testing of their banking software.  The new facility will be dedicated to:  Development  Testing  On-site IT staff  Management  Administration Project Description 5ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16
  • 6. Project Scope In Scope: Network Infrastructure Installation  Storage Area Network (SAN)  Active Directory, Email &Test servers  DesktopWorkstations  Wireless Access Points Installation of aVoice Over IP (VoIP) telephony system  Data Center Design & Installation  Dedicated HVAC and Fire Suppression  Security & Access Internal Security  Internet Protocol (IP) Cameras  Physical access to network infrastructure Out of Scope: × External building security × Software Licensing  Microsoft Software Assurance × Wireless support external to the facility × Handling and/or recycling of legacy hardware  Re-purposing to back-up site 6ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16
  • 7. Project Objectives & Dependencies Objectives: Timely Project Completion Meet OccupancyTimetable for Orange Creek Inc. Cost-Effectiveness “Best bang for the buck” SmoothTransition Documentation Training Meet Infrastructure Requirements Current Needs Future Growth 7ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 Dependencies: Facility Construction Commence Network Build-out Material Delivery System Installation &Testing Network Build-out &Turnover Orange Creek Inc. Occupancy
  • 8. Project Schedule & Milestones Milestone 1: Core Infrastructure Installed  Cable Drops  HVAC & Fire Suppression  Trunk Hardware Milestone 2: Server Delivery & Installation  Operating Systems  Basic Configuration Milestone 3: VoIP System Installed Workstations Installed  Operating Systems  Configuration Milestone 4: Full Network Integration & Testing  Functionality  Performance  Final Configurations Project Conclusion: Documentation Training Turnover 8ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 “Planning is bringing the future into the present so that you can do something about it now. “ -Alan Lakein
  • 9. Solution “The solution often turns out more beautiful than the puzzle.” -Richard Dawkins ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 9
  • 10. Solution: Back End Five Core (Physical) Servers  2x Domain Controllers (DC)  Active Directory (AD)  Domain Name Service (DNS)  2x Microsoft Exchange 2013 (Email & Collaboration)  1x Linux Server (Code box) 2xVirtual Machine (VM) Servers  Versatility & Flexibility  Redundancy Server OS:Windows 2012 R2 Uninterruptible Power Supply ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 10 Blade System  High Integration & Consolidation  Density  Expansion & Growth  Built-in Network Fabric Support  Gigabit Ethernet  Fibre Channel Storage Area Network  42.6TBTotal Capacity  Hybrid/Tiered Storage  Solid-State Drives (SSDs) for speed  Traditional Hard-Disk Drives (HDDs) for space“One of the most feared expressions in modern times is 'The computer is down.‘” -Norman Ralph Augustine
  • 11. Solution: Server Configurations Server Domain, Exchange, Linux Virtualization Processor 2x Intel Xeon E5-4607 • 2.20GHz Clock-speed • 12MB Cache • 6 (C)ores / 6 (T)hreads • 95 Watt Thermal Design Power (TDP) • 6.4 Giga-Transfers/sec (GT/s) Intel QuickPath Interconnect (QPI) 4x Intel Xeon E5-4655v3 • 2.9GHz • 30MB Cache • 6C / 12T • 135 Watt TDP • 9.60GT/s QPI Memory 128GB (16GB x8) • 1600 Mega-Transfers/sec (MT/s) • Low Voltage • Advanced Error Correcting Code (AECC) • Registered Dual-Inline Memory Modules (RDIMM) 512GB (32GB x16) • 2133 MT/s • Low Voltage • AECC • RDIMM Storage** 3x 300GB SAS 6Gbps 15K RPM HDD 3x 800GB SAS 12Gbps MLC SSD RAID* RAID 5** RAID 5** Network  Broadcom 57810-k Dual port 10Gb Ethernet  Emulex LPE1205-M 8Gbps Dual Port Fibre Channel  Broadcom 5720 1Gb Quad Port Ethernet  Emulex LPE1205-M 8Gbps Dual Port Fibre Channel ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 11 *RAID – Redundant Array of Independent/Inexpensive Disks. Used for fault tolerance/redundancy. ** RAID 5 requires a minimum of 3 drives to provide fault tolerance.
  • 12. Solution: Back Bone 4-Port Router  Failover Support  Virtual Private Network (VPN)- capable  500Megabit/sec throughput  Upgradeable toGigabit 15x 52-port Layer 2-3 Managed Switches (Gigabit)  Virtual Local Area Network (VLAN)-capable  Power-over-Ethernet (PoE) ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 12 Wireless Access Points  Full-range support of wireless standards (802.11a/b/g/n/ac)  PoE-capable Dual Physical Firewalls  Dedicated firewall protection  First line of defense  SegregateWireless Network Category 6 (Cat6) Cabling  SupportsGigabit Ethernet (1000Base-T) “You can't trust the internet.” -Nicollette Sheridan
  • 13. Solution: Client-side & Security SingleWorkstation Configuration  Uniformity  Ease of management Laptop Systems  Executives  On-siteTechnicians Multifunction Printers  Copy, Print, Scan, Fax  Versatility ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 13 Internet Protocol (IP) Security Cameras  Common Infrastructure  PoE – Placement not dependent on power outlet availability  High Resolution (1280x960)  Supports most networking protocols and features  Monitor access to facility entries and network infrastructure Biometrics  Fingerprint reader in addition to keypad  Control and secure access to network infrastructure
  • 14. Solution: Client System Configurations System Workstation Laptop Processor Intel Core i3 Dual Core @ 3.6GHz Intel Core i3 Dual Core @ 2.0GHz Memory 4GB 8GB Storage 500GB HDD 128GB Solid State Drive Video Integrated Intel Graphic Network Integrated Ethernet • Wireless A/G/N • Bluetooth 4.0 OS Windows 7 Other • Fingerprint Reader • 65W AC Adapter • 40 Watt-hour Li-Ion Battery ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 14
  • 15. Implementation “Success is simple. Do what's right, the right way, at the right time.” -Arnold H. Glasow ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 15
  • 16. Implementation: Logical Network Structure 16ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 VM Server (x2)Gateway Router Internet Firewall Wireless Access Points Wireless Firewall Trunk & Switches Rack Switch AD Servers (x2) Exchange Servers (x2) Wireless Network Phone Trunk IP Phones Peripherals Production & Development Administration QA Lab 1 QA Lab 2 Prior Site (via VPN) Switch IP CamerasSecurity Linux Codebox WAN/Internet Demark SAN
  • 17. Implementation: Active Directory Scheme ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 17 IT SystemsUsers Infrastructure Workstations Peripherals Laptops Administration Servers Domain Quality Assurance Executive Production Human Resources Reception SysAdmin Support
  • 18. 15' 0" x 12' 2.032" Data Center 6' 0.141" x 6' 7.101" Dedicated HVAC for Data Center Fire Suppression System Up s Up Up 250' HR Director s Office QA Lab 2 E2 E4E3 Executive s Office Wiring Closet IT Director s Office QA Lab 1 C C F C C F C C Quiet Room Break Room Conference Room Wiring Closet C F C C C C ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 18 First Floor Implementation: Physical Layout C C F C KeypadCamera Biometric WAP Cable Drop Cubicles Wiring Closet
  • 19. Implementation: Physical Layout ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 19 Second Floor Up Z Up Wiring Closet Up 250' 250' Up 72.0 in. x 36.0 in. 2nd Floor Cafe Wiring Closet . . . . . . Conference Room Lounge C C C C F C C F C C C F C KeypadCamera Biometric WAP Cable Drop Cubicles Wiring Closet
  • 20. Risk Management ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 20 “Carelessness and overconfidence are usually more dangerous than deliberately accepted risks.” -Orville Wright
  • 21. Risk Management Plan 21ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 Risk Area Probability Impact Risk Plan 1. Flooding due to facility location Low High Elevated the servers to 4 feet from the floor; seal the server room; equip room with flood-proofing safeguards 2. Hardware delay Medium Medium Investigate cause of delay and formulate appropriate plan of action, such as: • Contact vendor for expedited delivery of new hardware (lost/damage delivery) • Find new vendor (vendor-induced delay)
  • 22. Cost Analysis ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 22
  • 23. Cost Analysis* 23ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 Category Costs Back End $162,805.30 Back Bone $123,796.68 Client-side & Security $262,138.21 Utility $56,568.00 Contracting $101,550.00 Fees $82,160.00 Services $1,800.00 Total $790,818.19 *Detailed cost breakdown in proposal package
  • 24. Summary ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 24
  • 25. Summary Cost-Efficiency Framework Solution Timeliness Customization SmoothTransition via: Training Ongoing Support ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 25
  • 26. Questions “The price of success is hard work, dedication to the job at hand, and the determination that whether we win or lose, we have applied the best of ourselves to the task at hand.” -Vince Lombardi ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 26
  • 27. Appendix 27ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 “Coming together is a beginning; keeping together is progress; working together is success.” -Henry Ford “The price of success is hard work, dedication to the job at hand, and the determination that whether we win or lose, we have applied the best of ourselves to the task at hand.” -Vince Lombardi “The secret of your success is determined by your daily agenda.” -John C. Maxwell “Carelessness and overconfidence are usually more dangerous than deliberately accepted risks.” -Orville Wright “You can't trust the internet.” -Nicollette Sheridan “Planning is bringing the future into the present so that you can do something about it now. “ -Alan Lakein “For me, every day is a new thing. I approach each project with a new insecurity, almost like the first project I ever did. And I get the sweats. I go in and start working, I'm not sure where I'm going. If I knew where I was going I wouldn't do it.” -Frank Gehry “The solution often turns out more beautiful than the puzzle.” -Richard Dawkins “One of the most feared expressions in modern times is 'The computer is down.‘” -Norman Ralph Augustine “Success is simple. Do what's right, the right way, at the right time.” -Arnold H. Glasow Quotes from:  http://www.brainyquote.com
  • 28. Implementation: Network Activity Diagram VM Server (x2) Wireless Access Points Rack Switch Peripheals Production & Development Administration QA Lab 1 QA Lab 2Switch IP CamerasSecurity Demark SAN Gateway Router Internet Firewall Wireless Firewall Trunk & Switches AD Servers (x2) Exchange Servers (x2) Wireless Network Phone Trunk IP Phones Prior Site (via VPN) Linux Codebox WAN/Internet ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 28
  • 29. Workstation Naming Convention ITT TECHNICAL INSTITUTE - 086 GETZVILLE - NSA CAPSTONE - WINTER 2015/16 29 Workstation naming scheme will follow a basic standardize convention:  OCL[DEPT]Wks[ID#] • OCL: Orange Creek Lexington – Organization & facility location • [DEPT]: Shorthand identifier of Department • Wks: Initialism for “Workstation” • [ID#]: Numeric identifier for the workstation  Examples: • OCLQAL1Wks01: Quality Assurance Lab 1 • OCLProdWks99: Production • OCLExecWks13: Executive Offices

Editor's Notes

  1. Conducted by PROJMGR: Introduction of Team and members.
  2. Progress of the Presentation- Overview: What the project is asking for. Solution: Hardware solution to the project Implement.: Configuration and layout Management: Scheduling, Risks Cost Analysis: Basic costs breakdown (by category) Summary: Review the presentation (final sales pitch push)
  3. Section Title page: Good place for presenter switch over (if needed) before continuing. Again, the following section details the essential requirements of the project.
  4. This is a rewording of the original assignment/project description handed out AKA Request For Proposal (RFP) Fairly self-explanatory.
  5. This is a breakdown of what will/can do versus what we can’t/won’t according to the requirements given (Remember the client interviews). This is mainly a checklist, so should be self explanatory.
  6. Mostly a checklist, but there are some details to be aware of: Occupancy Timetable: Target is within 140 days of contract commencement Documentation & Training: New software infrastructure (Windows Server 2012 R2 + Exchange 2013) Current Needs: 150 to 200 employees Future Growth: 20%-40% projection over next 5 years Dependencies are in the “This project completion (main bullet) allows this next project (sub-bullet)” format. The reasoning/relationships are hopefully obvious.
  7. Title page: Presenter turnover (?)
  8. Breakdown of the main server room build. Physical servers are for essential services that should always be available in some fashion. DHCP is not mentioned, but may be added to the AD servers of implemented as a service via a VM server instance. VM provide the client a means of quickly expanding the backend service temporarily (say while waiting for more dedicated servers) as well as providing the main QA testing servers.
  9. Xeon CPU: Enterprise-grade processors (reliability) Cores/Thread: Processing capacity (NOTE: Total count is #CPU * Core/Thread) TDP: Heat dissipation (Blade enclosure should handle this) QPI is the connection speed between CPUs in a server. Allows data sharing among CPUs. ECC helps eliminate errors Registered RAM is buffered RAM: design for providing reliable signaling. The above should be noted relative to client’s involvement in banking SW Dev: errors are BAD. Storage: Phys. Server are basic config. VMs have SSDs for speed (potentially lots of disk access). Sizes assume main data storage on SAN. RAID 5 for balance of speed and redundancy. Phys. Server network cards mainly for failover and throughput. VM Ethernet NIC is for VMs.
  10. Common workstation/platform eases maintenance and management: Everything is the same on the user side. Laptops points indicate intended usage/issuance. Note that it is a another common platform: Only 2 unique client systems in the company to deal with. -IP Cameras use Ethernet as well, so the installation can be done at the same time as the main network cable drops. -PoE – Power over Ethernet: The cameras can be powered over the network cable as well. Eliminates need for a separate power connection. High resolution provides details in video.
  11. Client system specs were pretty barebones, so not much to cover offhand. Maybe mention that the laptop has more RAM and an SSD to help offset it’s slower CPU. (Extra RAM and an SSD make a computer >FEEL< faster/snappier.) If asked, SSD size is enough to handle OS installation (WINDOWS 7!) and essential software; small size would also help prevent users from cramming junk onto them. OS is Win7. Most businesses stick with proven OSes, especially ones with custom software development like Orange Creek does. If asked, Win10 is optional and perhaps either be substituted IF REQUESTED or let client handle that in the future.
  12. Diagram is roughly set into 4 areas: Upper Left – ISP/WAN/Demark Upper Right – Server Room/Back End Lower Left – Isolated Networks Lower Right – User-facing
  13. -Framework Solution: This is a rewording of “Solid foundation”. Same idea: the framework can be built upon and expanded. -Everything else is basically as originally intended.
  14. Ancillary Slide: Use if asked
  15. Ancillary Slide: Use if asked