Caprock 10
Proposed Multi Family Development
Site Location
Site Plan
Building Elevations
Traffic Impact Analysis
Existing Traffic Patterns of future development ‘generated’
10% Annual Growth 2016-2024
Trips: General Commercial - 524.50 Trips (50 Trips/AC)
Multi-Family - 195.11 Trips (18.6 Trips/AC)
Caprock 10 – 150.04 Trips (242 Units, 0.62 Trips / unit)
Project opens Summer 2019 – Two future egress points, Greens
Prairie / Arrington Intersection Signal
Future Egress

Caprock 10 Multi-Family Development