The Ranch at Arrington
Proposed Multi Family Development
Site Location
Arrington Update
County/City/Developer Meeting - 2/16/17
-Condition vs. Capacity
-No regulatory requirement for improvements
-Upgrading condition of Arrington benefits The Ranch
-Developer participation
Timing
-Mesa Verde Extension projected completion date 12/31/17
-Arrington can start construction after Mesa Verde complete
Tracking Roads Advisory Committee Update
TRAC Members/Developer Meeting – 2/16/17
-Arrington Road Update
-80’ Right-of-Way
-Dedications on west side of Arrington
-Relocate BTU and Wellborn SUD facilities
-Access
-Fire, required
-Secondary, not required, must maintain connection to
Arrington
-Buffer
Site Plan
Development Buffer
The Ranch
Demographics
Young Professionals
ViaSat – 300 jobs, $64,000 average salary
Fujifilm – 250 jobs, $60,000 average salary
Academic Advisors - $30,000 - $33,000 salary
Young Families
New Graduates
Leased by the unit, not per bedroom
Traffic Impact Analysis
Existing Traffic Patterns of future development ‘generated’
Human Nature factor
10% Annual Growth 2016-2024
TEC Experience – 1,500+ TIAs, 8 states, highest growth rate
seen is 5%
TIA completed in May 2016 on Wellborn Road, 2% growth
Urban Land Uses
All studied intersections operate at acceptable Levels of Service
Summary
-No adverse impact to utility or roadway infrastructure
-Consistent with the City of College Station Comprehensive Plan
-Willing participant in Arrington Road remediation though not
required
-Exceeded requirements and expectations with regard to working
with neighbors, public entities, and development community

The Ranch at Arrington Proposed Development

  • 1.
    The Ranch atArrington Proposed Multi Family Development
  • 2.
  • 3.
    Arrington Update County/City/Developer Meeting- 2/16/17 -Condition vs. Capacity -No regulatory requirement for improvements -Upgrading condition of Arrington benefits The Ranch -Developer participation Timing -Mesa Verde Extension projected completion date 12/31/17 -Arrington can start construction after Mesa Verde complete
  • 4.
    Tracking Roads AdvisoryCommittee Update TRAC Members/Developer Meeting – 2/16/17 -Arrington Road Update -80’ Right-of-Way -Dedications on west side of Arrington -Relocate BTU and Wellborn SUD facilities -Access -Fire, required -Secondary, not required, must maintain connection to Arrington -Buffer
  • 5.
  • 6.
  • 7.
  • 8.
    Demographics Young Professionals ViaSat –300 jobs, $64,000 average salary Fujifilm – 250 jobs, $60,000 average salary Academic Advisors - $30,000 - $33,000 salary Young Families New Graduates Leased by the unit, not per bedroom
  • 9.
    Traffic Impact Analysis ExistingTraffic Patterns of future development ‘generated’ Human Nature factor 10% Annual Growth 2016-2024 TEC Experience – 1,500+ TIAs, 8 states, highest growth rate seen is 5% TIA completed in May 2016 on Wellborn Road, 2% growth Urban Land Uses All studied intersections operate at acceptable Levels of Service
  • 10.
    Summary -No adverse impactto utility or roadway infrastructure -Consistent with the City of College Station Comprehensive Plan -Willing participant in Arrington Road remediation though not required -Exceeded requirements and expectations with regard to working with neighbors, public entities, and development community