Capacity Planning
Department of Mechanical Engineering
ME 6703 - Computer Integrated Manufacturing Systems
1CIM / CAPACITY PLANNING / R PRADEEP KUMAR AP/MECH
Capacity Planning
Master Schedule must be consistent:
• Production capabilities.
• Limitations of the plant.
• labor and equipment resources.
• long-term future production.
Master Schedule must be consistent:
• Production capabilities.
• Limitations of the plant.
• labor and equipment resources.
• long-term future production.
2CIM / CAPACITY PLANNING / R PRADEEP KUMAR AP/MECH
Capacity planning accomplished in two stages,
•MPS
•MRP
rough-cut capacity planning
MPS
MRP
Capacity
planning
rough-cut capacity planning
capacity requirements planning
3CIM / CAPACITY PLANNING / R PRADEEP KUMAR AP/MECH
Capacity Planning - Short Term
• Employment levels.
• Temporary workers.
• Number of work shifts.
• Labor hours.
• Inventory stockpiling.
• Order backlog.
• Subcontracting.
• Employment levels.
• Temporary workers.
• Number of work shifts.
• Labor hours.
• Inventory stockpiling.
• Order backlog.
• Subcontracting.
4CIM / CAPACITY PLANNING / R PRADEEP KUMAR AP/MECH
Capacity Planning - Long Term
• New equipment Investments.
• New plant construction.
• Purchase of existing plants.
• Acquisition of existing companies.
• Plant closings.
• New equipment Investments.
• New plant construction.
• Purchase of existing plants.
• Acquisition of existing companies.
• Plant closings.
5CIM / CAPACITY PLANNING / R PRADEEP KUMAR AP/MECH

More Related Content

Similar to Capacity planning

Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019
Akash Maurya
 
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011naveenupmanyu01
 
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011naveenupmanyu01
 
Module 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxModule 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptx
Shivakumar Malagihal
 
OPERATIONS SCHEDULING.pptx
OPERATIONS SCHEDULING.pptxOPERATIONS SCHEDULING.pptx
OPERATIONS SCHEDULING.pptx
RajviParmar5
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2samjune
 
Manufacturing plng and control
Manufacturing plng and controlManufacturing plng and control
Manufacturing plng and controlKarthik Yadav
 
SCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docxSCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docx
bagotjesusa
 
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)
Snehav Sharma
 
MRP CASE STUDY
MRP CASE STUDYMRP CASE STUDY
MRP CASE STUDY
Sachin Khandagale
 
Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019samjune
 
Ravi manufacturing
Ravi manufacturingRavi manufacturing
Ravi manufacturing
jabi khan
 
Production management
Production managementProduction management
Production management
Purnesh Aloni
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and controlLaxmikant Deshmukh
 
production scheduling
production schedulingproduction scheduling
production scheduling
PraveenManickam2
 
Erp chapter 3
Erp chapter 3Erp chapter 3
Erp chapter 3
PoonamPangarkar1
 
Close Loop MRP
Close Loop MRPClose Loop MRP
Close Loop MRP
guest865c0e0c
 
Close Loop Mrp
Close Loop MrpClose Loop Mrp
Close Loop Mrp
Anand Subramaniam
 
Capacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity PlanningCapacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity Planning
Raju Pegada
 

Similar to Capacity planning (20)

Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019
 
Rccp report
Rccp reportRccp report
Rccp report
 
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
 
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
 
Module 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxModule 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptx
 
OPERATIONS SCHEDULING.pptx
OPERATIONS SCHEDULING.pptxOPERATIONS SCHEDULING.pptx
OPERATIONS SCHEDULING.pptx
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2
 
Manufacturing plng and control
Manufacturing plng and controlManufacturing plng and control
Manufacturing plng and control
 
SCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docxSCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docx
 
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)
 
MRP CASE STUDY
MRP CASE STUDYMRP CASE STUDY
MRP CASE STUDY
 
Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019
 
Ravi manufacturing
Ravi manufacturingRavi manufacturing
Ravi manufacturing
 
Production management
Production managementProduction management
Production management
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
production scheduling
production schedulingproduction scheduling
production scheduling
 
Erp chapter 3
Erp chapter 3Erp chapter 3
Erp chapter 3
 
Close Loop MRP
Close Loop MRPClose Loop MRP
Close Loop MRP
 
Close Loop Mrp
Close Loop MrpClose Loop Mrp
Close Loop Mrp
 
Capacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity PlanningCapacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity Planning
 

Recently uploaded

HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 

Recently uploaded (20)

HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 

Capacity planning

  • 1. Capacity Planning Department of Mechanical Engineering ME 6703 - Computer Integrated Manufacturing Systems 1CIM / CAPACITY PLANNING / R PRADEEP KUMAR AP/MECH
  • 2. Capacity Planning Master Schedule must be consistent: • Production capabilities. • Limitations of the plant. • labor and equipment resources. • long-term future production. Master Schedule must be consistent: • Production capabilities. • Limitations of the plant. • labor and equipment resources. • long-term future production. 2CIM / CAPACITY PLANNING / R PRADEEP KUMAR AP/MECH
  • 3. Capacity planning accomplished in two stages, •MPS •MRP rough-cut capacity planning MPS MRP Capacity planning rough-cut capacity planning capacity requirements planning 3CIM / CAPACITY PLANNING / R PRADEEP KUMAR AP/MECH
  • 4. Capacity Planning - Short Term • Employment levels. • Temporary workers. • Number of work shifts. • Labor hours. • Inventory stockpiling. • Order backlog. • Subcontracting. • Employment levels. • Temporary workers. • Number of work shifts. • Labor hours. • Inventory stockpiling. • Order backlog. • Subcontracting. 4CIM / CAPACITY PLANNING / R PRADEEP KUMAR AP/MECH
  • 5. Capacity Planning - Long Term • New equipment Investments. • New plant construction. • Purchase of existing plants. • Acquisition of existing companies. • Plant closings. • New equipment Investments. • New plant construction. • Purchase of existing plants. • Acquisition of existing companies. • Plant closings. 5CIM / CAPACITY PLANNING / R PRADEEP KUMAR AP/MECH