MESSAGE FROM THE PRESIDENT


                lliance Construction & Design’s rapid growth is a result of the dedication, experience and hard
                work of our employees. As a team, we continually challenge ouselves to deliver the most efficient,
                effective and high quality design build projects.

Our core values are based on ethic, dedication and professionalism. Combined with continuous education, training
and innovation, we believe our principles will continue expanding our business through repeat clientele.

Alliance designs and builds small and large projects, new structures, remodels and renovations. There is no project
that is too small or too big for our team. We take every construction job seriously and with the following goals in
mind:

- Quality services
- On time and within budget delivery
- 100% client satisfaction

Alliance Construction & Design’s ultimate goal is to become an industry leader and a role model for improving the
way the construction business is performed.

We are looking forward to working with You!
Todd Parczick
President
SERVICES
Pre-Construction Services

•	   Conceptual Estimating
•	   Construction Timelines & Processes
•	   Preliminary Budgeting
•	   Value Engineering & Analysis

Design Build | Construction Management Services

With our Design-Build Services, the design and construction are
both contracted and managed by us.

The Design-Build method is one of the most significant trends in
design and construction today. This one point of contact approach to
producing your project will allow the project to be more streamlined
and efficient. Design and construction professionals work hand-in-
hand developing the design while projecting costs through the
conceptual, design development and construction phases.
It provides a single source of responsibility.

Design-build streamlines project delivery through a single contract
between the owner and the design-build team. This simple
difference saves both time and money by transforming the
relationship between designers and builders into a closely-knit
alliance which promotes collaboration and teamwork.

General Contractor Services

•	 Steel Fabrication Services:
   Custom Design
   Steel erection services (pre-engineered & structural)

•	 Complete Construction Experts:
   Wood or Steel framing
   Finish carpentry
   Concrete or masonry
   Perform 100% of “Turn Key” projects utilizing alliances with
   qualified local sub contractors

•	 Custom Industrial Guarding:
   Stand of guarding
   Industrial design for years of heavy use
   Sound attenuation
   Dust control
   Environmentl control
   Economic design
WHY WORKING WITH ALLIANCE?

Alliance Construction & Design is a dedicated and results
oriented construction company with strong leadership
and innovative problem solving skills. We work closely
with owners and subcontractors to produce a high quality
project that is both cost effective and delivery oriented.

Our design / build capabilities and experience provide
considerable benefits to Alliance clientele. The clear
chain of command and responsibility established in a
design / build project; merged with practices of flexibility,
accountability, and single source cost control, contribute
explicitly to the ultimate outcome of each projects
success.

Alliance design / build projects offer single source
responsibility, shorter delivery times, and higher levels of
financial predictability early in the design process. When
the general contractor and designer are rooted in a single
organization, it consolidates accountability, thus
optimizing value and expedience, and effectively spawns
innovative solutions.

Construction costs are established much earlier in the
process. Shorter overall design / construction times result
in rapid project completion. There is no project delay
for bidding time, and, if needed to meet client deadlines
design / build lends itself readily to fast tracking, where
selected construction activities can begin before final
design is complete.




In a recent study conducted by our marketing team, 100%
of Alliance’s clients indicated that they would
recommend Alliance Construction & Design to their
colleagues, family and friends and that they will work
with us in the future. Over 90% of our business is
generated through repeat clientele.
MARKETS SERVED

COMMERCIAL:
Commercial construction is fast-paced and always changing. That’s why
quality, safety, speed and cost play a significant role in the successful
execution of every commercial project.

Alliance Construction & Design utilizes years of experience along with
knowledge of the latest technology to effectively deliver impressive
design, on time and within budget long lasting commercial structures.

As a leading commercial construction company, Alliance has developed
an extensive and diversified portfolio of commercial buildings.

Some of our valuable clients include:
Verizon Wireless
Festival Foods
Wisconsin Department of Natural Resources
B&B Metals
Bayside Machine
The MarQ
Seaquist Orchards
Hometown Pharmacy
Tailwaggers Doggy Daycare
Angels Touch Assisted Living
McCormick Memorial Home
Ryan Funeral Home

RESIDENTIAL:
New Construction:
Alliance Construction & Design is eager to design the unique home You
have always dreamed of and construct You a building of an exceptional
quality and timeless value.

Renovation Services:
When it comes to construction, there is no project that is too small or too
large for for Alliance’s team.

•	   Remodeling and historical renovations
•	   Whole-home makeovers
•	   Room additions
•	   Basement finishing

AGRICULTURAL:
Alliance Construction & Design offers full design/build, renovation and
construction services of Agricultural buildings to farmers throughout
Wisconsin.
Our experienced team specializes in freestall barns, steel and wood
structures, tools and equipment storage buildings, horse barns, stables
and equestrian arenas.
Mission...

 “To provide superior design/build services to
our clients by pursuing continuous innovation,
training and education in the construction and
            engineering industries.”
TESTIMONIALS




                     What our valuable clients said when we asked them:
                        “What did you like most about working with
                            Alliance Construction & Design?”

“They delivered what they promised on time, below budget. Very flexible to our unpredictable schedule.”
                                (Joe Schinkton, Ryan Funeral Home)

            “Professional, friendly, prompt, clean. Great work, done on time within budget.”
                               (Jim & Juli Constine, The Vault in De Pere)

            “Quality of work, professional crew, easy to get a hold of the person I needed.”
                                      (Joe Terrein, MJ Collision)

            “Friendly & knowledgeable people- Can take a project from concept to build.”
                                      (Ken Rogers, PCMC)

                           “Always available, anytime call or text. Working
                                      relationship and trust.”
                              (Fred Bauchert, Williams Development)

                            “Their creative ideas & suggestions matched the
                                      excellent customer service.”
                                     (Diane Omdahl, Home Owner)

         “When Alliance got on site, I was surprised on how fast the building got put together.”
                               (Brian Liebers, Hurckman Mechanical)

                           “Very Professional! Quality Work! Great People!”
                                  (Jim Seaquist, Seaquist Orchards)
Contact
          P: (920) 336-3400
          F: (920) 336-3401
     E: info@alliancebuilds.com
     W: www.alliancebuilds.com
1030 Orlando Drive, De Pere WI 54115

Alliance Construction & Design

  • 1.
  • 2.
    MESSAGE FROM THEPRESIDENT lliance Construction & Design’s rapid growth is a result of the dedication, experience and hard work of our employees. As a team, we continually challenge ouselves to deliver the most efficient, effective and high quality design build projects. Our core values are based on ethic, dedication and professionalism. Combined with continuous education, training and innovation, we believe our principles will continue expanding our business through repeat clientele. Alliance designs and builds small and large projects, new structures, remodels and renovations. There is no project that is too small or too big for our team. We take every construction job seriously and with the following goals in mind: - Quality services - On time and within budget delivery - 100% client satisfaction Alliance Construction & Design’s ultimate goal is to become an industry leader and a role model for improving the way the construction business is performed. We are looking forward to working with You! Todd Parczick President
  • 3.
    SERVICES Pre-Construction Services • Conceptual Estimating • Construction Timelines & Processes • Preliminary Budgeting • Value Engineering & Analysis Design Build | Construction Management Services With our Design-Build Services, the design and construction are both contracted and managed by us. The Design-Build method is one of the most significant trends in design and construction today. This one point of contact approach to producing your project will allow the project to be more streamlined and efficient. Design and construction professionals work hand-in- hand developing the design while projecting costs through the conceptual, design development and construction phases. It provides a single source of responsibility. Design-build streamlines project delivery through a single contract between the owner and the design-build team. This simple difference saves both time and money by transforming the relationship between designers and builders into a closely-knit alliance which promotes collaboration and teamwork. General Contractor Services • Steel Fabrication Services: Custom Design Steel erection services (pre-engineered & structural) • Complete Construction Experts: Wood or Steel framing Finish carpentry Concrete or masonry Perform 100% of “Turn Key” projects utilizing alliances with qualified local sub contractors • Custom Industrial Guarding: Stand of guarding Industrial design for years of heavy use Sound attenuation Dust control Environmentl control Economic design
  • 4.
    WHY WORKING WITHALLIANCE? Alliance Construction & Design is a dedicated and results oriented construction company with strong leadership and innovative problem solving skills. We work closely with owners and subcontractors to produce a high quality project that is both cost effective and delivery oriented. Our design / build capabilities and experience provide considerable benefits to Alliance clientele. The clear chain of command and responsibility established in a design / build project; merged with practices of flexibility, accountability, and single source cost control, contribute explicitly to the ultimate outcome of each projects success. Alliance design / build projects offer single source responsibility, shorter delivery times, and higher levels of financial predictability early in the design process. When the general contractor and designer are rooted in a single organization, it consolidates accountability, thus optimizing value and expedience, and effectively spawns innovative solutions. Construction costs are established much earlier in the process. Shorter overall design / construction times result in rapid project completion. There is no project delay for bidding time, and, if needed to meet client deadlines design / build lends itself readily to fast tracking, where selected construction activities can begin before final design is complete. In a recent study conducted by our marketing team, 100% of Alliance’s clients indicated that they would recommend Alliance Construction & Design to their colleagues, family and friends and that they will work with us in the future. Over 90% of our business is generated through repeat clientele.
  • 5.
    MARKETS SERVED COMMERCIAL: Commercial constructionis fast-paced and always changing. That’s why quality, safety, speed and cost play a significant role in the successful execution of every commercial project. Alliance Construction & Design utilizes years of experience along with knowledge of the latest technology to effectively deliver impressive design, on time and within budget long lasting commercial structures. As a leading commercial construction company, Alliance has developed an extensive and diversified portfolio of commercial buildings. Some of our valuable clients include: Verizon Wireless Festival Foods Wisconsin Department of Natural Resources B&B Metals Bayside Machine The MarQ Seaquist Orchards Hometown Pharmacy Tailwaggers Doggy Daycare Angels Touch Assisted Living McCormick Memorial Home Ryan Funeral Home RESIDENTIAL: New Construction: Alliance Construction & Design is eager to design the unique home You have always dreamed of and construct You a building of an exceptional quality and timeless value. Renovation Services: When it comes to construction, there is no project that is too small or too large for for Alliance’s team. • Remodeling and historical renovations • Whole-home makeovers • Room additions • Basement finishing AGRICULTURAL: Alliance Construction & Design offers full design/build, renovation and construction services of Agricultural buildings to farmers throughout Wisconsin. Our experienced team specializes in freestall barns, steel and wood structures, tools and equipment storage buildings, horse barns, stables and equestrian arenas.
  • 6.
    Mission... “To providesuperior design/build services to our clients by pursuing continuous innovation, training and education in the construction and engineering industries.”
  • 7.
    TESTIMONIALS What our valuable clients said when we asked them: “What did you like most about working with Alliance Construction & Design?” “They delivered what they promised on time, below budget. Very flexible to our unpredictable schedule.” (Joe Schinkton, Ryan Funeral Home) “Professional, friendly, prompt, clean. Great work, done on time within budget.” (Jim & Juli Constine, The Vault in De Pere) “Quality of work, professional crew, easy to get a hold of the person I needed.” (Joe Terrein, MJ Collision) “Friendly & knowledgeable people- Can take a project from concept to build.” (Ken Rogers, PCMC) “Always available, anytime call or text. Working relationship and trust.” (Fred Bauchert, Williams Development) “Their creative ideas & suggestions matched the excellent customer service.” (Diane Omdahl, Home Owner) “When Alliance got on site, I was surprised on how fast the building got put together.” (Brian Liebers, Hurckman Mechanical) “Very Professional! Quality Work! Great People!” (Jim Seaquist, Seaquist Orchards)
  • 8.
    Contact P: (920) 336-3400 F: (920) 336-3401 E: info@alliancebuilds.com W: www.alliancebuilds.com 1030 Orlando Drive, De Pere WI 54115