CSC succeeded in winning the contract to screed the luxury VIP terraces at Wimbledon Centre Court. This required an accelerated drying additive to ensure the screed was completely dry within 7 days.
This screed application for Addington School Reading required 5,500 square meters of accelerated drying screed laid onto underfloor heating with a demanding installation schedule.
CSC was contracted for the Albion Riverside project in Battersea to deploy operatives day and night to install 10,000 square meters of traditional fiber screed and bring the programme back on track after being contracted at a late stage.