The

BUSINESS MODEL & CONTENT
HENRY JOHN N. NUEVA,
Management Engineering
•        A tool that helps engineers develop an understanding of the effectiveness
            of the design and management of the enterprise business as well as
            the critical performance related issues.




                                It identifies the inter-linking activities carried out within a bu
                                Describes the external forces that bear upon the entity.
                                Describes the business relationship with persons and othe
e entity.
1. Strategic Analysis
2. Business Process Analysis
3. Business Measurement
4. Risk Management
5. Continuous Improvement
Fig. 1 Business Improvement Principles ( from Bell et al.1997 )
I. EXTERNAL FORCES & AGENTS
II. MARKETS
III. BUSINESS PROCESS
IV. ALLIANCES AND RELATIONSHIPS
V. CORE PRODUCTS AND SERVICES
VI. CUSTOMERS
1. EXTERNAL FORCES AND AGENTS



  These are factors that shape the enterprise’s competitive marketplace and
  Provide new opportunities as well as areas of risk to be managed.


  This element is often called “Environment”



  Analysis of external forces and agents includes an assessment of both the
  General environment and the Competitive Environment.
GENERAL ENVIRONMENT:

      consists of factors external to the industry that may have a significant
      impact on the enterprise’s strategies

      factors often overlap and developments in one area may influence
      those in another.

      usually holds both opportunities & threats to expansion.


COMPETITIVE ENVIRONMENT:

      commonly referred to as “ Industry Environment”

      these are combination of forces that are particularly relevant to an
      enterprise’s strategy including competitors, customers & suppliers.
Important !



          BASIC THEORY OF STRATEGIC MANAGEMENT PRIOR TO
                         EXTERNAL FORCES:

A)Managers or top management adjust their strategies to reflect the environment
   in which their business operate.

B) For a successful business , one must first consider the environment in which the
enterprise operates and the alignment of its strategy with that environment.
Fig. 2 Dimensions in General Environment Assessment ( from Risk Mgmt., Inc.)
Fig. 3 The Five (5) Forces Model of Competition (Adapted from Michael Porter 1985)
2. MARKETS

                                      Generally, Markets are not Static
       MARKET
                                      since they:

       It is generally where
       enterprise’s competes.                1. EMERGE
       FOCUS
                                             2. GROW
                                             3. MATURE
       It is the extent to which an          4. DECLINE
       enterprise concentrates on
       a narrowly define niche or
       segment of the market.
Important !



Market life cycle provides useful framework for studying markets and their
Impact on the enterprise’s value prospective.
Market segmentation allows an organization to pursue the acquisition
of those customers that are most attractive to its value proposition.
Segmenting markets also provides the basis for tailoring products more
specifically to the customers’ needs.


                             The engineer should understand the
                             relevant advantages and disadvantages of
         CHALLENGE
                             a particular levels of focus in terms of their
                             impact on competitive advantage.
3. BUSINESS PROCESSES



     A Process is a set of activities designed to produce a specified output
     for a particular customer or market.

     It entails a strong emphasis on HOW work is done rather
     than WHAT is done.

     In general term, a Process is a structured set of work activities which
     clearly defines inputs and outputs.
Useful terms:
Business Process
        a logical, related, sequential-connected-set of activities that takes an input
        from a supplier, adds value to it, and produces an output to a customer.

Key Business Process
        a process that usually involves more than one function within the
        organizational structure, and its operation has a significant impact on the
        way the organization functions.

Subprocess
        a portion of a major process that accomplishes a specific objective in
        support of that major process.

Activities
             work elements that go on within process or subprocess performed by a person or team

Tasks
             these are individual elements and/or subsets of an activity. Task relate to how an
             individual performs a specific assignment.
Categories of Business Process
A)STRATEGIC MANAGEMENT PROCESS
             these are processes that develop the value proposition of the
enterprise
             and define the business objectives.

B)CORE BUSINESS PROCESS
             processes that develop, produce, sell and distribute products and
services
             (i.e. Value Chain)

C)RESOURCE MANAGEMENT PROCESS
            processes that support and provide appropriate resources to the
value
            creating processes of the enterprise.
Fig. 4 Process Definitions (Adapted from Risk Management Partners Inc.)
Fig. 5 Illustrative Strategic Management Process
      (From Risk Management Partners Inc.)
STRATEGIC MANAGEMENT PROCESS

Change is the central concern and focus of strategic management:

1.Change in the environment,
2.Change inside the enterprise, and
3.Change in how the enterprise links strategy and structure.

Strategic management

         the process of identifying opportunities to achieve tangible and
sustainable success in the marketplace and understanding the risks that
threaten achievement of that success.
CORE BUSINESS PROCESS

         The management of core business processes is about execution of
the enterprise’s value proposition. Significant changes are taking place in
the New Economy that will have profound impacts on core business processes
and the way they are managed in the future.

         Information Technology is driving the transformation of core business
processes by creating a new competitive dynamic that rewards institutional
agility.

CHALLENGE

          The evolution of extranets and content standards alters the bases of
competitive advantage by increasing the quality of information and its access.
RESOURCE MANAGEMENT PROCESS
         Resource management processes are the processes by which
organizations allocate resources and monitor their use.

         They provide appropriate resources to support the other business
processes. Resource management processes can be placed into three basic
categories:

                              1.Information
                                2.People
                                3.Capital


Without appropriate resources—information, people, and capital—the core
processes cannot offer the value customers need and will cease to provide an
effective source of competitive advantage.
PROCESS ANALYSIS AND OBJECTIVES


Processes are established to serve specific customer needs. The customers
may be internal, such as another process, or external to the enterprise.

The process objectives define what value will be supplied to the customer.


                        Process objectives need to be
                                  S.M.A.R.T.
  specific, measurable, attainable, and realistic and to have a sense of time.
Fig. 6 Process Analysis Framework (Adapted from Bell et al.1997)
Important !




Understanding the structural elements of the process is key to understanding
  workflow, measuring process performance and recommending process
                               improvements.
. ALLIANCES AND BUSINESS RELATIONSHIPS




      Due to business financial pressure and time constraints, acquisitions were
      introduce. However, it was proven so much to cause high expenditure and
      brought not only the capabilities needed but also many were not satisfied.

      As a result, numbers of global enterprises recognized Alliances.
BENEFITS OF ALLIANCES AND BUSINESS RELATIONSHIPS

       A)It provides a way for organizations to leverage resources.

           B) Provides growth at a fraction of any other cost.

C) Can support other goals such as quality and productivity improvement.
Top three (3) Common Types of Alliances

A)Transactional Alliances

B) Strategic Sourcing

C) Strategic Alliances
Transactional Alliances



           These are alliances established for a specific purpose, typically
   to improve each participant’s ability to conduct its business.


           EXAMPLE

           1. Cross-licensing in the pharmaceutical industry
           2. Open-ended purchase orders for specific
              products would be another.
Strategic Sourcing



           It involves a longer-term commitment. It is a partnership between
   buyer and seller that can reduce the cost and friction between supplier
   and buyer by

           A.        Sharing products
           B.        Allocating Development plans
           C.        Jointly programming production
           D.        Sharing confidential information


   Wal-Mart and Home Depot are examples of companies with substantial
   capabilities in strategic sourcing.
Strategic Alliances


             It involve two enterprises pulling together to

             1. Share resources
             2. Funding
             3. Even equity in a new enterprise on a long-term basis

             EXAMPLE


     Motorola, Apple, and IBM pooled research programs and made financial
     commitments to develop a new-generation engine for
     personal computers—the Power PC.
5. CORE PRODUCTS AND SERVICES



                          BUSINESS
                            CORE



 PRODUCTS                       SERVICES
Important !




       Superior and differentiated products are those that deliver
           Unique benefits and superior value to customer
THE BENEFITS & IMPORTANCE OF MEASURING NEW
            PRODUCTS SUCCESS & FAILURES

   A)Facilitates organizational learning and process improvements.

   B)Fulfills the need for consensus on new product outcomes and
                              determinants.

    C)Leads to observable benefits such as improved cycle times,
improved new product success rates and an enhanced ability to assess
         changes to the new product development process.
Measurements of Product Performance should
          exist along 4 Diemension

       DIMENSION                  GUIDE
Market Performance      How does the marketplace
                        view the companys
                        prodcuts?
Process Performance     How well does the product
                        development process work?
Resource Performance    How well do cross+functional
                        teams perform?

Financial Performance   How profitable are the
                        products and service?
Fig. 7 Core Products / Services Measurement Framework
         (from Risk Management Partners, Inc.)
6. CUSTOMERS (an intangible asset)




        Three (3) Factors to consider in understanding the power of
 Enterprise’s customers in developing a knowledge-based business model

                             1.Customer Needs
                          2.Customers Satisfaction
                  3.Customers Manner towards the Business
Important !




         In a knowledge economy, information is more valuable
          than ever. Generally speaking, customers have more
                     knowledge than the enterprise.
An Enterprise Business Model (EBM) as a complex system should be planned
    And managed like any complex business project.




       The following are the steps in a model-building
                        project plan:

1.Obtain a committed sponsor at the appropriate level of enterprise.
2.Set out the purpose and scope of the model.
3.Gather and Orient the Model-Building Team.
4.Determine requirements for each element of the model.
5.Construct the Business Model.
6.Build consensus for the Model.
Ways on how an Engineer apply an
          Enterprise Business Model

1.Communication of the nature of the business.
2.Strategic Analysis
3.Business Process Analysis
4.Business Performance Management
5.Risk Assessment
1. Communication of the nature of the business.




                 Accuracy                  Used as a basis for
                                        communicating the nature
            Completeness               And structure of the business


           Potential and
         New Perspective

                                      To Employees     To other interested
                                                          Stakeholders
2

       Industry Information                                          Industry structure
                                                                                                                I
    Significant Industry Risks

                                                                                                                N
                                                                                                                T




                                                                                        Industry Segmentation
                                                     Update On:                                                 E
                                               •Organization’s History                                          R




                                                                          SUB PROCESS
                                                                          SUPPORTING
                                 STRATEGIES

                                              •Management’s Business                                            N
                                  BUSINESS



E
X                                               Strategy & Objectives                                           A
T                                                  •Business Risks                                              L
E                                              •Management Planned
R                                                    Responses
N                                                •Business Process
A
L     Critical Business                                                  Dynamics among
            Issues                                                        Organizations
At the Conclusion of strategic analysis, the engineer will have
            Learned DIRECTIONAL COURSE as follows:

1.The relationship between the broad economic environment and the industry segment(s)
in which the enterprise competes.
2.The enterprise’s position and role within its perspective industry segment(s).
3.Threats to maintaining or improving the current position.
4.The needs and wants of the enterprise’s chosen market segment(s).
5.The total productive capacity of the enterprise and its competitors for each niche.
6.Management’s vision of how to satisfy the market needs better than its rivals.
7.Management’s specific strategies and plans for achieving that vision.



    The strategic analysis will provide the engineer with in-depth
    knowledge of the enterprise’s value proposition and insight into
    opportunities to improve business performance and mitigate the risks
    that threaten achievement of the established objectives.
3. Business Process Analysis

    Business process analysis is designed to provide the engineer with an in-
    depth understanding of the key business processes during strategic
    analysis.

    Through this analysis, the engineer learns how the organization
    creates value.

    Specifically, each core business process is studied in depth to distinguish:

    1.Significant process objectives
    2.The business risks related to these objectives
    3.The controls established to mitigate the risks
    4.The financial implications of the risks and controls
Business process analysis adopts a ‘‘Value Chain’’
Important !   approach to analyzing the interconnected activities in the
              business, both domestically and globally.

              During business process analysis, the engineer recognizes
              the cross-functional nature of activities in the enterprise’s
              business, that not all activities within and across
              processes are sequential, and that important linkages
              exist between processes.
              Business process analysis depicts the (4) four core business
              processes of a hypothetical retail company such as :
              1.Brand and image delivery
              2.Product / service delivery
              3.Customer service delivery
              4.Customer sales
Seven (7) Components that guides an Engineer in the
            Collection and Integration of Information
                   about Business Processes

1.Process Objectives
2.Inputs
3.Activities
4.Outputs
5.Systems
6.Risks that threaten objectives
7.Management controls linked to risks
In a retail company, the engineer would
address each of the following objectives,
which are typical in business process
analysis:
4. Business Performance Management



      Information-age enterprises succeed by investing in and managing their
      intellectual assets as well as integrating functional specialization into
      customer-based business processes.



      Measurement and Management in the information age requires
      enterprises to become much more competent at identifying and
      monitoring measures that drive their business performance.
To develop a credible business model, the engineer
                   must gain an understanding of how the enterprise
  Important !
                   measures and monitors business performance.
                   Performance drivers are key indicators of an enterprise’s
                   future financial performance. Understanding the cause-
                   and-effect relationships between resource, process,
                   market, and financial performances is essential to
                   understanding      the   enterprise’s   strengths    and
                   weaknesses.

Key Performance Indicators (KPIs)

These are quantitative measurements, both financial and nonfinancial,
collected by an entity or by the engineer, either continuously or periodically,
and used by management and the engineer to evaluate performance in
terms of the entity’s defined business objectives.
Fig. 8 Financial and Nonfinancial Performance Relationships
           (from Risk Management Partners, Inc.)
Fig. 9 Sample Financial and Nonfinancial Measures – Consulting Firm
              (from Risk Management Partners, Inc.)
Engineer and the Management might Monitor and
      Control process performance using one or more of the
                     following type of KPIs:

1.Waste, rework, and other indicators of process inefficiency
2.Backlog of work in process
3.Customer response time
4.Number of times work is recycled between subprocess & departments
5.Number of document errors
6.Customer Satisfaction Ratings
7.Number of routing errors
8.Value-adding processing time
9.Information processing errors
5. Risk Assessment

      At this point, the engineer will have developed a business risk
      profile of the organization.

      In the business risk profile, residual business risks are classified
      as:

      1.Strategic Risks
      2.Process Risks.

      Interactions among risks are identified, and the risk classifications
      and identified interactions are cross matched with related business
      performance attributes
A risk event is a discrete random occurrence that (if occurring)
affects the project. Risk events are identified based on the difficulty to
achieve the required project outcome (the characteristics of the
product or service), constraints on schedules and budgets, and the
availability of resources.



   Risk Assessment and Management
           Four (4) processes
                   1.Risk Identification
                  2.Risk Quantification
             3.Risk Response Development
                4.Risk Response Control
Top Four (4) Risk Response commonly used in a
                   Project / Product Management

1. Risk Elimination

        In some projects it is possible to eliminate some risks altogether
by using a different technology, a different supplier, etc.

2.Risk Reduction

         Risk reduction may be used by reducing the probability of a risk
event or its impact or both. A typical example is redundancy in R&D
projects when two mutually exclusive technologies are developed in
parallel to reduce the risk that a failure in development will harm the
project. Although only one of the alternative technologies will be used,
the redundancy reduces the probability of a failure.
Top Four (4) Risk Response commonly used in a
                   Project / Product Management

3.       Risk Sharing

          It is possible in some projects to share risks (and benefits) with
some stakeholders such as suppliers, subcontractors, partners, or even
the client. Another form of risk sharing is with an insurance company.

4.      Risk Absorption

          If a decision is made to absorb the risk, buffers in the form of
management reserve or extra time in the schedule can be used. In
addition, contingency plans may be appropriate tools to help in coping
with the consequences of risk events.
At the conclusion of the business model design and development effort, the
engineer will have constructed a fully integrated business model containing all
of the information he or she has collected and integrated through the
application of the five business principles : strategic analysis, business
process analysis, risk assessment, business measurement, and
continuous improvement. The engineer will use the completed model as the
basis for final review of the recommendations for improving business
performance. But it must be remembered that the business model is a living
document that must be updated and maintained on a continuous basis to
reflect changing market conditions, new or improved value propositions,
changes in organization structures, and the like. Continuous improvement
applies just as much to the business model as it does to the business itself.
END

Business Model and Content

  • 1.
    The BUSINESS MODEL &CONTENT HENRY JOHN N. NUEVA, Management Engineering
  • 2.
    A tool that helps engineers develop an understanding of the effectiveness of the design and management of the enterprise business as well as the critical performance related issues. It identifies the inter-linking activities carried out within a bu Describes the external forces that bear upon the entity. Describes the business relationship with persons and othe e entity.
  • 3.
    1. Strategic Analysis 2.Business Process Analysis 3. Business Measurement 4. Risk Management 5. Continuous Improvement
  • 4.
    Fig. 1 BusinessImprovement Principles ( from Bell et al.1997 )
  • 5.
    I. EXTERNAL FORCES& AGENTS II. MARKETS III. BUSINESS PROCESS IV. ALLIANCES AND RELATIONSHIPS V. CORE PRODUCTS AND SERVICES VI. CUSTOMERS
  • 6.
    1. EXTERNAL FORCESAND AGENTS These are factors that shape the enterprise’s competitive marketplace and Provide new opportunities as well as areas of risk to be managed. This element is often called “Environment” Analysis of external forces and agents includes an assessment of both the General environment and the Competitive Environment.
  • 7.
    GENERAL ENVIRONMENT: consists of factors external to the industry that may have a significant impact on the enterprise’s strategies factors often overlap and developments in one area may influence those in another. usually holds both opportunities & threats to expansion. COMPETITIVE ENVIRONMENT: commonly referred to as “ Industry Environment” these are combination of forces that are particularly relevant to an enterprise’s strategy including competitors, customers & suppliers.
  • 8.
    Important ! BASIC THEORY OF STRATEGIC MANAGEMENT PRIOR TO EXTERNAL FORCES: A)Managers or top management adjust their strategies to reflect the environment in which their business operate. B) For a successful business , one must first consider the environment in which the enterprise operates and the alignment of its strategy with that environment.
  • 9.
    Fig. 2 Dimensionsin General Environment Assessment ( from Risk Mgmt., Inc.)
  • 10.
    Fig. 3 TheFive (5) Forces Model of Competition (Adapted from Michael Porter 1985)
  • 11.
    2. MARKETS Generally, Markets are not Static MARKET since they: It is generally where enterprise’s competes. 1. EMERGE FOCUS 2. GROW 3. MATURE It is the extent to which an 4. DECLINE enterprise concentrates on a narrowly define niche or segment of the market.
  • 12.
    Important ! Market lifecycle provides useful framework for studying markets and their Impact on the enterprise’s value prospective. Market segmentation allows an organization to pursue the acquisition of those customers that are most attractive to its value proposition. Segmenting markets also provides the basis for tailoring products more specifically to the customers’ needs. The engineer should understand the relevant advantages and disadvantages of CHALLENGE a particular levels of focus in terms of their impact on competitive advantage.
  • 13.
    3. BUSINESS PROCESSES A Process is a set of activities designed to produce a specified output for a particular customer or market. It entails a strong emphasis on HOW work is done rather than WHAT is done. In general term, a Process is a structured set of work activities which clearly defines inputs and outputs.
  • 14.
    Useful terms: Business Process a logical, related, sequential-connected-set of activities that takes an input from a supplier, adds value to it, and produces an output to a customer. Key Business Process a process that usually involves more than one function within the organizational structure, and its operation has a significant impact on the way the organization functions. Subprocess a portion of a major process that accomplishes a specific objective in support of that major process. Activities work elements that go on within process or subprocess performed by a person or team Tasks these are individual elements and/or subsets of an activity. Task relate to how an individual performs a specific assignment.
  • 15.
    Categories of BusinessProcess A)STRATEGIC MANAGEMENT PROCESS these are processes that develop the value proposition of the enterprise and define the business objectives. B)CORE BUSINESS PROCESS processes that develop, produce, sell and distribute products and services (i.e. Value Chain) C)RESOURCE MANAGEMENT PROCESS processes that support and provide appropriate resources to the value creating processes of the enterprise.
  • 16.
    Fig. 4 ProcessDefinitions (Adapted from Risk Management Partners Inc.)
  • 17.
    Fig. 5 IllustrativeStrategic Management Process (From Risk Management Partners Inc.)
  • 18.
    STRATEGIC MANAGEMENT PROCESS Changeis the central concern and focus of strategic management: 1.Change in the environment, 2.Change inside the enterprise, and 3.Change in how the enterprise links strategy and structure. Strategic management the process of identifying opportunities to achieve tangible and sustainable success in the marketplace and understanding the risks that threaten achievement of that success.
  • 19.
    CORE BUSINESS PROCESS The management of core business processes is about execution of the enterprise’s value proposition. Significant changes are taking place in the New Economy that will have profound impacts on core business processes and the way they are managed in the future. Information Technology is driving the transformation of core business processes by creating a new competitive dynamic that rewards institutional agility. CHALLENGE The evolution of extranets and content standards alters the bases of competitive advantage by increasing the quality of information and its access.
  • 20.
    RESOURCE MANAGEMENT PROCESS Resource management processes are the processes by which organizations allocate resources and monitor their use. They provide appropriate resources to support the other business processes. Resource management processes can be placed into three basic categories: 1.Information 2.People 3.Capital Without appropriate resources—information, people, and capital—the core processes cannot offer the value customers need and will cease to provide an effective source of competitive advantage.
  • 21.
    PROCESS ANALYSIS ANDOBJECTIVES Processes are established to serve specific customer needs. The customers may be internal, such as another process, or external to the enterprise. The process objectives define what value will be supplied to the customer. Process objectives need to be S.M.A.R.T. specific, measurable, attainable, and realistic and to have a sense of time.
  • 22.
    Fig. 6 ProcessAnalysis Framework (Adapted from Bell et al.1997)
  • 23.
    Important ! Understanding thestructural elements of the process is key to understanding workflow, measuring process performance and recommending process improvements.
  • 24.
    . ALLIANCES ANDBUSINESS RELATIONSHIPS Due to business financial pressure and time constraints, acquisitions were introduce. However, it was proven so much to cause high expenditure and brought not only the capabilities needed but also many were not satisfied. As a result, numbers of global enterprises recognized Alliances.
  • 25.
    BENEFITS OF ALLIANCESAND BUSINESS RELATIONSHIPS A)It provides a way for organizations to leverage resources. B) Provides growth at a fraction of any other cost. C) Can support other goals such as quality and productivity improvement.
  • 26.
    Top three (3)Common Types of Alliances A)Transactional Alliances B) Strategic Sourcing C) Strategic Alliances
  • 27.
    Transactional Alliances These are alliances established for a specific purpose, typically to improve each participant’s ability to conduct its business. EXAMPLE 1. Cross-licensing in the pharmaceutical industry 2. Open-ended purchase orders for specific products would be another.
  • 28.
    Strategic Sourcing It involves a longer-term commitment. It is a partnership between buyer and seller that can reduce the cost and friction between supplier and buyer by A. Sharing products B. Allocating Development plans C. Jointly programming production D. Sharing confidential information Wal-Mart and Home Depot are examples of companies with substantial capabilities in strategic sourcing.
  • 29.
    Strategic Alliances It involve two enterprises pulling together to 1. Share resources 2. Funding 3. Even equity in a new enterprise on a long-term basis EXAMPLE Motorola, Apple, and IBM pooled research programs and made financial commitments to develop a new-generation engine for personal computers—the Power PC.
  • 30.
    5. CORE PRODUCTSAND SERVICES BUSINESS CORE PRODUCTS SERVICES
  • 31.
    Important ! Superior and differentiated products are those that deliver Unique benefits and superior value to customer
  • 32.
    THE BENEFITS &IMPORTANCE OF MEASURING NEW PRODUCTS SUCCESS & FAILURES A)Facilitates organizational learning and process improvements. B)Fulfills the need for consensus on new product outcomes and determinants. C)Leads to observable benefits such as improved cycle times, improved new product success rates and an enhanced ability to assess changes to the new product development process.
  • 33.
    Measurements of ProductPerformance should exist along 4 Diemension DIMENSION GUIDE Market Performance How does the marketplace view the companys prodcuts? Process Performance How well does the product development process work? Resource Performance How well do cross+functional teams perform? Financial Performance How profitable are the products and service?
  • 34.
    Fig. 7 CoreProducts / Services Measurement Framework (from Risk Management Partners, Inc.)
  • 35.
    6. CUSTOMERS (anintangible asset) Three (3) Factors to consider in understanding the power of Enterprise’s customers in developing a knowledge-based business model 1.Customer Needs 2.Customers Satisfaction 3.Customers Manner towards the Business
  • 36.
    Important ! In a knowledge economy, information is more valuable than ever. Generally speaking, customers have more knowledge than the enterprise.
  • 38.
    An Enterprise BusinessModel (EBM) as a complex system should be planned And managed like any complex business project. The following are the steps in a model-building project plan: 1.Obtain a committed sponsor at the appropriate level of enterprise. 2.Set out the purpose and scope of the model. 3.Gather and Orient the Model-Building Team. 4.Determine requirements for each element of the model. 5.Construct the Business Model. 6.Build consensus for the Model.
  • 39.
    Ways on howan Engineer apply an Enterprise Business Model 1.Communication of the nature of the business. 2.Strategic Analysis 3.Business Process Analysis 4.Business Performance Management 5.Risk Assessment
  • 40.
    1. Communication ofthe nature of the business. Accuracy Used as a basis for communicating the nature Completeness And structure of the business Potential and New Perspective To Employees To other interested Stakeholders
  • 41.
    2 Industry Information Industry structure I Significant Industry Risks N T Industry Segmentation Update On: E •Organization’s History R SUB PROCESS SUPPORTING STRATEGIES •Management’s Business N BUSINESS E X Strategy & Objectives A T •Business Risks L E •Management Planned R Responses N •Business Process A L Critical Business Dynamics among Issues Organizations
  • 42.
    At the Conclusionof strategic analysis, the engineer will have Learned DIRECTIONAL COURSE as follows: 1.The relationship between the broad economic environment and the industry segment(s) in which the enterprise competes. 2.The enterprise’s position and role within its perspective industry segment(s). 3.Threats to maintaining or improving the current position. 4.The needs and wants of the enterprise’s chosen market segment(s). 5.The total productive capacity of the enterprise and its competitors for each niche. 6.Management’s vision of how to satisfy the market needs better than its rivals. 7.Management’s specific strategies and plans for achieving that vision. The strategic analysis will provide the engineer with in-depth knowledge of the enterprise’s value proposition and insight into opportunities to improve business performance and mitigate the risks that threaten achievement of the established objectives.
  • 43.
    3. Business ProcessAnalysis Business process analysis is designed to provide the engineer with an in- depth understanding of the key business processes during strategic analysis. Through this analysis, the engineer learns how the organization creates value. Specifically, each core business process is studied in depth to distinguish: 1.Significant process objectives 2.The business risks related to these objectives 3.The controls established to mitigate the risks 4.The financial implications of the risks and controls
  • 44.
    Business process analysisadopts a ‘‘Value Chain’’ Important ! approach to analyzing the interconnected activities in the business, both domestically and globally. During business process analysis, the engineer recognizes the cross-functional nature of activities in the enterprise’s business, that not all activities within and across processes are sequential, and that important linkages exist between processes. Business process analysis depicts the (4) four core business processes of a hypothetical retail company such as : 1.Brand and image delivery 2.Product / service delivery 3.Customer service delivery 4.Customer sales
  • 45.
    Seven (7) Componentsthat guides an Engineer in the Collection and Integration of Information about Business Processes 1.Process Objectives 2.Inputs 3.Activities 4.Outputs 5.Systems 6.Risks that threaten objectives 7.Management controls linked to risks
  • 46.
    In a retailcompany, the engineer would address each of the following objectives, which are typical in business process analysis:
  • 47.
    4. Business PerformanceManagement Information-age enterprises succeed by investing in and managing their intellectual assets as well as integrating functional specialization into customer-based business processes. Measurement and Management in the information age requires enterprises to become much more competent at identifying and monitoring measures that drive their business performance.
  • 48.
    To develop acredible business model, the engineer must gain an understanding of how the enterprise Important ! measures and monitors business performance. Performance drivers are key indicators of an enterprise’s future financial performance. Understanding the cause- and-effect relationships between resource, process, market, and financial performances is essential to understanding the enterprise’s strengths and weaknesses. Key Performance Indicators (KPIs) These are quantitative measurements, both financial and nonfinancial, collected by an entity or by the engineer, either continuously or periodically, and used by management and the engineer to evaluate performance in terms of the entity’s defined business objectives.
  • 49.
    Fig. 8 Financialand Nonfinancial Performance Relationships (from Risk Management Partners, Inc.)
  • 50.
    Fig. 9 SampleFinancial and Nonfinancial Measures – Consulting Firm (from Risk Management Partners, Inc.)
  • 51.
    Engineer and theManagement might Monitor and Control process performance using one or more of the following type of KPIs: 1.Waste, rework, and other indicators of process inefficiency 2.Backlog of work in process 3.Customer response time 4.Number of times work is recycled between subprocess & departments 5.Number of document errors 6.Customer Satisfaction Ratings 7.Number of routing errors 8.Value-adding processing time 9.Information processing errors
  • 52.
    5. Risk Assessment At this point, the engineer will have developed a business risk profile of the organization. In the business risk profile, residual business risks are classified as: 1.Strategic Risks 2.Process Risks. Interactions among risks are identified, and the risk classifications and identified interactions are cross matched with related business performance attributes
  • 53.
    A risk eventis a discrete random occurrence that (if occurring) affects the project. Risk events are identified based on the difficulty to achieve the required project outcome (the characteristics of the product or service), constraints on schedules and budgets, and the availability of resources. Risk Assessment and Management Four (4) processes 1.Risk Identification 2.Risk Quantification 3.Risk Response Development 4.Risk Response Control
  • 54.
    Top Four (4)Risk Response commonly used in a Project / Product Management 1. Risk Elimination In some projects it is possible to eliminate some risks altogether by using a different technology, a different supplier, etc. 2.Risk Reduction Risk reduction may be used by reducing the probability of a risk event or its impact or both. A typical example is redundancy in R&D projects when two mutually exclusive technologies are developed in parallel to reduce the risk that a failure in development will harm the project. Although only one of the alternative technologies will be used, the redundancy reduces the probability of a failure.
  • 55.
    Top Four (4)Risk Response commonly used in a Project / Product Management 3. Risk Sharing It is possible in some projects to share risks (and benefits) with some stakeholders such as suppliers, subcontractors, partners, or even the client. Another form of risk sharing is with an insurance company. 4. Risk Absorption If a decision is made to absorb the risk, buffers in the form of management reserve or extra time in the schedule can be used. In addition, contingency plans may be appropriate tools to help in coping with the consequences of risk events.
  • 56.
    At the conclusionof the business model design and development effort, the engineer will have constructed a fully integrated business model containing all of the information he or she has collected and integrated through the application of the five business principles : strategic analysis, business process analysis, risk assessment, business measurement, and continuous improvement. The engineer will use the completed model as the basis for final review of the recommendations for improving business performance. But it must be remembered that the business model is a living document that must be updated and maintained on a continuous basis to reflect changing market conditions, new or improved value propositions, changes in organization structures, and the like. Continuous improvement applies just as much to the business model as it does to the business itself.
  • 57.