Energy audit
What is energy audit?
Economic feasibility of the audit.
5
Thermodynamic solar panels
Old
Situation
Solution New
Situation
Consumed hot water, l/d 8 000 heated by GTC
016
heat pump with
23 kWth nominal
energy
output, 16
panels
8 000
Electricity consumption,
MW*h/year
118 29,5
Cost of the electricity
consumption, EUR/year
5 070 2 358
Investment - total price, EUR 11 520
Saving of money, EUR/year 2 712
Payback period, year 4,2
* Gas price – 0,4 EUR/m3
* Electricity price - 0,08 EUR/KW*h
6
Cardboard factory.
Replacement gas for heating of water for sanitary purposes
7
Photovoltaic
Using solar panels for electricity production
8
 
LOGISTIC CENTRE. Replacement electricity for illumination of storage halls
Old
Situation
Solution New
situation
Electricity consumption,
kW*h/year
17 351 PV system – 64 μc-Si
NT-150 AF PV panels,
150 W, DC each;
total installed power
– 10,2 kWp
17 351
Produced electricity,
kW*h/year
15 300
Electricity purchased for
illumination, kWh/year
2 051
Cost of electricity, EUR/year 1 735 205
Investment, total price, EUR 8 160
Saving of money, EUR/year 1 530
Pay back period, year 5,3
* Electricity price - 0,10 EUR/kW*h/year
9
 
Cogeneration installation
10
1. Piston gas engine
1 2
2. Power generator
3
3. Plate heat exchanger
6
6. Water cooled exhaust collector
5
5. Pipe-in-pipe heat exchanger
74
8
7. NOx catalyzer
4. Shell-pipes heat exchanger
8. Silencer
600 O
C
450 O
C
100 O
C
86°C
80°C
70°C
80°C
90°C
Inlet
Outlet
Cogeneration installation
11
Spa Club and Hotel. Replacement of heating oil and electricity with LPG
Old Situation Solution New
Situation
Consumed oil 153 Cogeneration
system CHP EM
140/207 – 140
kW nominal
electric
output, 207
nominal
thermal
output. LPG
fuel.
237
Electricity to substitute
MW*h/year
1 176
Cost of oil, EUR/year 179 443 220 574
Cost of electricity,
EUR/year
117 600
Cost for maintenance,
EUR/year
25 200
Investment, total price,
EUR
170 000
Saving of money, EUR/year 51 269
Pay back period, year 3,3
• Heating oil price –
• Electricity price –
• LPG price -
1,18 EUR/kg
0,10 EUR/kW*h
0,93 EUR/kg
12
   Minimal power consumption.
Electricity is used for the pumps
and the automation.
 Minimum noise level.
Environmentally friendly. The
coolant is regular water.
 Uses waste heat from hot water,
flue gas or manufacturing
processes.
 Long service life (at least 20
years).
 Full automation.
 Fire and explosion safe
Absorption chillers
13
 
Agrifood Market
CASE – max. efficient heating , cooling and hot water producing
SOLUTION – 5xROBUR GAHP/AR absorption heat pump + 3xROBUR ACF60
absorption chiller – 136 kW cooling output, 160 kW heating output.
SITUATION – 800 m2 roofed agrifood market.
1. 40% less gas consumption for heating and hot water production.
2. 10% less costs for cooling
3. No need from boiler room – no lost of commercial area – no lost of income from rent.
4. No need from trained operators – savings from salaries .
5. Very low maintenance costs – one system , practically no moving parts.
SAVING OF MONEY = around 23 000 EUR/year, compere with standard installation.
RESULTS:
INVESTMENT COST= 110 000 EUR
Investment cost are equal to standard
installation with gas boiler and electric
chiller.
•Electricity cons. = max. 12 kW/h
•Gas cons. = max. 21,6 Nm3/h summer
•Gas cons. = max. 13,5 Nm3/h winter
14
Energy from biogas
15
SLAUGHTERHOUSE. Biogas installation
•CASE – economically efficient treatment of organic waste
•SOLUTION – EUCOlino 100 biogas system – 100 kW electricity output,
120 kW heating output.
•SITUATION – 5 000 t/h slaughterhouse organic waste.
1. Saved investments in waste water treatment and
boiler installations = 50 000 EUR
2. Saved money from transport and taxes of 5 000 t/y
organic waste for incineration = 50 000 EUR/y
3. Saved money for heating and hot water with boiler on
LPG = 54 706 EUR/y
4. Income from sells of green electricity = 185 292 EUR/y.
5. Income from sells of organic fertilizer = 50 000 EUR/y.
6. O&M costs = 95 000 EUR/y
•POSSITIVE RESULT = around 284 998 EUR/year, compere
with standard installations for heating, waste water and
organic waste treatment.
•PAYBACK PERIOD = less than 3 years
Results:
•INVESTMENT COST = 750 000 EUR
CONDITIONS: -Transport and treatment cost = 10 EUR/t
- FIT green electricity price = 0,23 EUR/kWh
- LPG price = 0,93 EUR/kg
- Price for sells of organic bio fertilizer = 10 EUR/t
16
Geothermal pumps
• EconomicalEconomical
Annual heating cost 4-6 times lower
as compared to conventional
boilers.
• Without gasWithout gas
Geothermal pumps do not use gas for
heating and DHW.
• SafeSafe
The system is not connected to liquid
fuel, explosive material and no
high temperature processes.
• EnvironmentalEnvironmental
Heat pumps do not emit harmful
substances.
With this installation, 75% of the energy for heating and DHW provision is a gift from nature. During
the summer the installation can be used for cooling.
17
Replacement of natural gas and electricity for heating and cooling of 1 000 m2 supermarket
with geothermal energy
OLD
SITUATION
SOLUTION NEW
SITUATION
Consumed natural gas,
Nm3
/y
16 516 Geothermal pump
4 x VITOCAL 300 G –
164 kW nominal
thermal output, 27 kW
nominal electricity
Input
1 000 m2
ceiling pipes
heating and cooling, 1
000 m2
earth connected
coil pipes collector.
Consumed electricity,
MWh/ year
128 6,5
Cost of gas , EUR/year 8 258
Cost of electricity ,
EUR/year
12 800 650
High comfort with “natural cooling” – no air flows
Investment, total price, EUR 70 000
Saving of money, EUR/year 20 408
Pay back period, year 3,4
• Natural gas price –
• Electricity price -
0,5 EUR/Nm3
0,10 EUR/kWh
18
Steam Generator
19
Plant for the production of beverages. Replacing the steam boiler with a
new steam generator.
Old
Situation
Solution New
Situation
Steam production, t/h 4 CLAYTON SEG 254
– 4 t/h nominal
steam output, 2
452 kW nominal
thermal output,
complete new
boiler room,
equipped for 72
hours unattended
operation
4
Natural gas consumption
Nm³/year
857 364 689 355
Cost of natural gas
consumption, EUR/year
342 946 275 742
Operation cost (Before - 4
trained operators, After -
2), EUR/year
28 800 9 600
Investment, total price, EUR 150 000
Saving of money, EUR/year 86 404
Pay back period, year 1,7
• Natural gas price 0,4 EUR/Nm³
20
Thank you for the attention!

More Related Content

What's hot

125
125125
Renewable Heat/PassivHaus - Gary Wilburn, HPW
Renewable Heat/PassivHaus - Gary Wilburn, HPWRenewable Heat/PassivHaus - Gary Wilburn, HPW
Renewable Heat/PassivHaus - Gary Wilburn, HPW
the Environment Centre (tEC)
 
Energyes division ener termopac line 2015 ev v02
Energyes division ener termopac line 2015 ev v02Energyes division ener termopac line 2015 ev v02
Energyes division ener termopac line 2015 ev v02
Christian Moreau
 
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyAuxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Manohar Tatwawadi
 
电站锅炉专页翻译
电站锅炉专页翻译电站锅炉专页翻译
电站锅炉专页翻译
kathy xing
 
Thermal Efficiency of Buildings - Stefan Huber - Paul Heat Recovery Scotland
Thermal Efficiency of Buildings - Stefan Huber - Paul Heat Recovery ScotlandThermal Efficiency of Buildings - Stefan Huber - Paul Heat Recovery Scotland
Thermal Efficiency of Buildings - Stefan Huber - Paul Heat Recovery Scotland
Euro Energy Services
 
Air Source Heat Pumps - Thomas Dickson - Glow Worm
Air Source Heat Pumps - Thomas Dickson - Glow WormAir Source Heat Pumps - Thomas Dickson - Glow Worm
Air Source Heat Pumps - Thomas Dickson - Glow Worm
Euro Energy Services
 
VET4SBO Level 2 module 3 - unit 1 - v1.0 en
VET4SBO Level 2   module 3 - unit 1 - v1.0 enVET4SBO Level 2   module 3 - unit 1 - v1.0 en
VET4SBO Level 2 module 3 - unit 1 - v1.0 en
Karel Van Isacker
 
Biomass heat and power eco village-en
Biomass heat and power eco village-enBiomass heat and power eco village-en
Biomass heat and power eco village-en
Rado Irgl
 
Kingspan Range - Trinity 3c
Kingspan Range - Trinity 3cKingspan Range - Trinity 3c
Kingspan Range - Trinity 3c
Matt Lee
 
Congres F-gassen 2015. Workshop 6: Praktijkcase: Koelen zonder koudemiddel
Congres F-gassen 2015. Workshop 6: Praktijkcase: Koelen zonder koudemiddelCongres F-gassen 2015. Workshop 6: Praktijkcase: Koelen zonder koudemiddel
Congres F-gassen 2015. Workshop 6: Praktijkcase: Koelen zonder koudemiddel
RCCKL
 
Bioten
BiotenBioten
District Cooling And Desalination
District Cooling And DesalinationDistrict Cooling And Desalination
District Cooling And Desalination
Star Renewable Energy
 
Biomass Power Plants
Biomass Power PlantsBiomass Power Plants
Biomass Power Plants
Manohar Tatwawadi
 
Presentation1
Presentation1Presentation1
Presentation1
pratikguptateddy
 
Cogeneration
CogenerationCogeneration
Cogeneration
skdass23
 
Specs hybrid and thermal installation Poland - rodziszow
Specs hybrid and thermal installation Poland -  rodziszowSpecs hybrid and thermal installation Poland -  rodziszow
Specs hybrid and thermal installation Poland - rodziszow
Wikus Terblanche
 
The building conditioning by solar cooling, Roberto Jodice, CORTEA
The building conditioning by solar cooling, Roberto Jodice, CORTEAThe building conditioning by solar cooling, Roberto Jodice, CORTEA
The building conditioning by solar cooling, Roberto Jodice, CORTEA
AREA Science Park
 
Solar Process Heat - Markus Gründler
Solar Process Heat - Markus GründlerSolar Process Heat - Markus Gründler
Solar Process Heat - Markus Gründler
Sardegna Ricerche
 
Arup green expo
Arup green expoArup green expo
Arup green expo
Damian Connon
 

What's hot (20)

125
125125
125
 
Renewable Heat/PassivHaus - Gary Wilburn, HPW
Renewable Heat/PassivHaus - Gary Wilburn, HPWRenewable Heat/PassivHaus - Gary Wilburn, HPW
Renewable Heat/PassivHaus - Gary Wilburn, HPW
 
Energyes division ener termopac line 2015 ev v02
Energyes division ener termopac line 2015 ev v02Energyes division ener termopac line 2015 ev v02
Energyes division ener termopac line 2015 ev v02
 
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyAuxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
 
电站锅炉专页翻译
电站锅炉专页翻译电站锅炉专页翻译
电站锅炉专页翻译
 
Thermal Efficiency of Buildings - Stefan Huber - Paul Heat Recovery Scotland
Thermal Efficiency of Buildings - Stefan Huber - Paul Heat Recovery ScotlandThermal Efficiency of Buildings - Stefan Huber - Paul Heat Recovery Scotland
Thermal Efficiency of Buildings - Stefan Huber - Paul Heat Recovery Scotland
 
Air Source Heat Pumps - Thomas Dickson - Glow Worm
Air Source Heat Pumps - Thomas Dickson - Glow WormAir Source Heat Pumps - Thomas Dickson - Glow Worm
Air Source Heat Pumps - Thomas Dickson - Glow Worm
 
VET4SBO Level 2 module 3 - unit 1 - v1.0 en
VET4SBO Level 2   module 3 - unit 1 - v1.0 enVET4SBO Level 2   module 3 - unit 1 - v1.0 en
VET4SBO Level 2 module 3 - unit 1 - v1.0 en
 
Biomass heat and power eco village-en
Biomass heat and power eco village-enBiomass heat and power eco village-en
Biomass heat and power eco village-en
 
Kingspan Range - Trinity 3c
Kingspan Range - Trinity 3cKingspan Range - Trinity 3c
Kingspan Range - Trinity 3c
 
Congres F-gassen 2015. Workshop 6: Praktijkcase: Koelen zonder koudemiddel
Congres F-gassen 2015. Workshop 6: Praktijkcase: Koelen zonder koudemiddelCongres F-gassen 2015. Workshop 6: Praktijkcase: Koelen zonder koudemiddel
Congres F-gassen 2015. Workshop 6: Praktijkcase: Koelen zonder koudemiddel
 
Bioten
BiotenBioten
Bioten
 
District Cooling And Desalination
District Cooling And DesalinationDistrict Cooling And Desalination
District Cooling And Desalination
 
Biomass Power Plants
Biomass Power PlantsBiomass Power Plants
Biomass Power Plants
 
Presentation1
Presentation1Presentation1
Presentation1
 
Cogeneration
CogenerationCogeneration
Cogeneration
 
Specs hybrid and thermal installation Poland - rodziszow
Specs hybrid and thermal installation Poland -  rodziszowSpecs hybrid and thermal installation Poland -  rodziszow
Specs hybrid and thermal installation Poland - rodziszow
 
The building conditioning by solar cooling, Roberto Jodice, CORTEA
The building conditioning by solar cooling, Roberto Jodice, CORTEAThe building conditioning by solar cooling, Roberto Jodice, CORTEA
The building conditioning by solar cooling, Roberto Jodice, CORTEA
 
Solar Process Heat - Markus Gründler
Solar Process Heat - Markus GründlerSolar Process Heat - Markus Gründler
Solar Process Heat - Markus Gründler
 
Arup green expo
Arup green expoArup green expo
Arup green expo
 

Similar to Business Forum Energy Efficiency in Moldova

Water/ammonia absorption chillers NETWORKING B
Water/ammonia absorption chillers NETWORKING BWater/ammonia absorption chillers NETWORKING B
Water/ammonia absorption chillers NETWORKING B
ATMOsphere Conferences & Events
 
Biomass heat and power - gasification CHP with universal biomass gasifier
Biomass heat and power - gasification CHP with universal biomass gasifierBiomass heat and power - gasification CHP with universal biomass gasifier
Biomass heat and power - gasification CHP with universal biomass gasifier
Rado Irgl
 
"Emprendimiento del futuro ligados con la eficiencia energética y accesibilid...
"Emprendimiento del futuro ligados con la eficiencia energética y accesibilid..."Emprendimiento del futuro ligados con la eficiencia energética y accesibilid...
"Emprendimiento del futuro ligados con la eficiencia energética y accesibilid...
Cluster Construction Eraikune
 
Daniel Alonso - Integrated approach to energy optimization in the paint shop...
Daniel Alonso  - Integrated approach to energy optimization in the paint shop...Daniel Alonso  - Integrated approach to energy optimization in the paint shop...
Daniel Alonso - Integrated approach to energy optimization in the paint shop...
ponencias.eurosurfas2011
 
heat pump presentation 25-8-15
heat pump presentation  25-8-15heat pump presentation  25-8-15
heat pump presentation 25-8-15
Satish Joshi
 
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
Farming Futures
 
Ect
EctEct
Ect
14894
 
The Role of Low Carbon Technologies
The Role of Low Carbon TechnologiesThe Role of Low Carbon Technologies
The Role of Low Carbon Technologies
Sustainable Business Partnership
 
Marcel Borkent, Triogen
Marcel Borkent, TriogenMarcel Borkent, Triogen
R82 Energy Refurbishment
R82 Energy RefurbishmentR82 Energy Refurbishment
R82 Energy Refurbishment
Miguel Salgado Pérez
 
SETH electricity storage
SETH electricity storageSETH electricity storage
SETH electricity storage
Luc Traonvouez
 
Innovations @Waternet 2017
Innovations @Waternet 2017Innovations @Waternet 2017
Innovations @Waternet 2017
Alice Fermont
 
005 energy saving tips
005 energy saving tips005 energy saving tips
005 energy saving tips
Anil Palamwar
 
Energy refurbishment of the R82 factory
Energy refurbishment of the R82 factoryEnergy refurbishment of the R82 factory
Energy refurbishment of the R82 factory
David Canosa
 
Make power out of your waste heat - Organic Rankine Cycle
Make power out of your waste heat - Organic Rankine Cycle Make power out of your waste heat - Organic Rankine Cycle
Make power out of your waste heat - Organic Rankine Cycle
Sindhu Maiyya
 
Energy system needs to change
Energy system needs to changeEnergy system needs to change
Energy system needs to change
Karoliina Auvinen
 
Ethp Explaination Summary
Ethp Explaination SummaryEthp Explaination Summary
Ethp Explaination Summary
Ecotec Heat Pumps Ltd
 
One-day workshop on Industrial Heating
One-day workshop on Industrial HeatingOne-day workshop on Industrial Heating
One-day workshop on Industrial Heating
Aspiration Energy Pvt Ltd
 
Biomass heating and CHP on farms - Richard Harvey (Rural Energy)
Biomass heating and CHP on farms - Richard Harvey (Rural Energy)Biomass heating and CHP on farms - Richard Harvey (Rural Energy)
Biomass heating and CHP on farms - Richard Harvey (Rural Energy)
Farming Futures
 
Group 1 TenCate Presentation FINAL
Group 1 TenCate Presentation FINALGroup 1 TenCate Presentation FINAL
Group 1 TenCate Presentation FINAL
Ahmed Abunada BCE, MSc, USGBC FACULTY, LEED AP
 

Similar to Business Forum Energy Efficiency in Moldova (20)

Water/ammonia absorption chillers NETWORKING B
Water/ammonia absorption chillers NETWORKING BWater/ammonia absorption chillers NETWORKING B
Water/ammonia absorption chillers NETWORKING B
 
Biomass heat and power - gasification CHP with universal biomass gasifier
Biomass heat and power - gasification CHP with universal biomass gasifierBiomass heat and power - gasification CHP with universal biomass gasifier
Biomass heat and power - gasification CHP with universal biomass gasifier
 
"Emprendimiento del futuro ligados con la eficiencia energética y accesibilid...
"Emprendimiento del futuro ligados con la eficiencia energética y accesibilid..."Emprendimiento del futuro ligados con la eficiencia energética y accesibilid...
"Emprendimiento del futuro ligados con la eficiencia energética y accesibilid...
 
Daniel Alonso - Integrated approach to energy optimization in the paint shop...
Daniel Alonso  - Integrated approach to energy optimization in the paint shop...Daniel Alonso  - Integrated approach to energy optimization in the paint shop...
Daniel Alonso - Integrated approach to energy optimization in the paint shop...
 
heat pump presentation 25-8-15
heat pump presentation  25-8-15heat pump presentation  25-8-15
heat pump presentation 25-8-15
 
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
 
Ect
EctEct
Ect
 
The Role of Low Carbon Technologies
The Role of Low Carbon TechnologiesThe Role of Low Carbon Technologies
The Role of Low Carbon Technologies
 
Marcel Borkent, Triogen
Marcel Borkent, TriogenMarcel Borkent, Triogen
Marcel Borkent, Triogen
 
R82 Energy Refurbishment
R82 Energy RefurbishmentR82 Energy Refurbishment
R82 Energy Refurbishment
 
SETH electricity storage
SETH electricity storageSETH electricity storage
SETH electricity storage
 
Innovations @Waternet 2017
Innovations @Waternet 2017Innovations @Waternet 2017
Innovations @Waternet 2017
 
005 energy saving tips
005 energy saving tips005 energy saving tips
005 energy saving tips
 
Energy refurbishment of the R82 factory
Energy refurbishment of the R82 factoryEnergy refurbishment of the R82 factory
Energy refurbishment of the R82 factory
 
Make power out of your waste heat - Organic Rankine Cycle
Make power out of your waste heat - Organic Rankine Cycle Make power out of your waste heat - Organic Rankine Cycle
Make power out of your waste heat - Organic Rankine Cycle
 
Energy system needs to change
Energy system needs to changeEnergy system needs to change
Energy system needs to change
 
Ethp Explaination Summary
Ethp Explaination SummaryEthp Explaination Summary
Ethp Explaination Summary
 
One-day workshop on Industrial Heating
One-day workshop on Industrial HeatingOne-day workshop on Industrial Heating
One-day workshop on Industrial Heating
 
Biomass heating and CHP on farms - Richard Harvey (Rural Energy)
Biomass heating and CHP on farms - Richard Harvey (Rural Energy)Biomass heating and CHP on farms - Richard Harvey (Rural Energy)
Biomass heating and CHP on farms - Richard Harvey (Rural Energy)
 
Group 1 TenCate Presentation FINAL
Group 1 TenCate Presentation FINALGroup 1 TenCate Presentation FINAL
Group 1 TenCate Presentation FINAL
 

More from abozhkovbalkanikaenergy

Clayton i Balkanika Energy Prezentacija
Clayton i Balkanika Energy PrezentacijaClayton i Balkanika Energy Prezentacija
Clayton i Balkanika Energy Prezentacija
abozhkovbalkanikaenergy
 
Clayton and Balkanika Energy Presentation
Clayton and Balkanika Energy PresentationClayton and Balkanika Energy Presentation
Clayton and Balkanika Energy Presentation
abozhkovbalkanikaenergy
 
Balkanika Energy Prezentacija
Balkanika Energy PrezentacijaBalkanika Energy Prezentacija
Balkanika Energy Prezentacija
abozhkovbalkanikaenergy
 
Biogeen General Presentation
Biogeen General PresentationBiogeen General Presentation
Biogeen General Presentation
abozhkovbalkanikaenergy
 
Biogeen General Presentation
Biogeen General Presentation Biogeen General Presentation
Biogeen General Presentation
abozhkovbalkanikaenergy
 
Бизнес форум за Енергийна Ефективност в Молдова
Бизнес форум за Енергийна Ефективност в МолдоваБизнес форум за Енергийна Ефективност в Молдова
Бизнес форум за Енергийна Ефективност в Молдоваabozhkovbalkanikaenergy
 
Balkanika Energy PLC - Innovative Technologies LTD
Balkanika Energy PLC - Innovative Technologies LTDBalkanika Energy PLC - Innovative Technologies LTD
Balkanika Energy PLC - Innovative Technologies LTD
abozhkovbalkanikaenergy
 
Balkanika Energy Presentation
Balkanika Energy PresentationBalkanika Energy Presentation
Balkanika Energy Presentation
abozhkovbalkanikaenergy
 
Балканика Енерджи презентация
Балканика Енерджи презентацияБалканика Енерджи презентация
Балканика Енерджи презентацияabozhkovbalkanikaenergy
 
Capstone Turbine Corporation Product Catalog - English
Capstone Turbine Corporation Product Catalog - EnglishCapstone Turbine Corporation Product Catalog - English
Capstone Turbine Corporation Product Catalog - English
abozhkovbalkanikaenergy
 
Biogas in the Viessmann Group - Bulgarian
Biogas in the Viessmann Group - BulgarianBiogas in the Viessmann Group - Bulgarian
Biogas in the Viessmann Group - Bulgarianabozhkovbalkanikaenergy
 
Clayton Company Presentation in Bulgarian
Clayton Company Presentation in BulgarianClayton Company Presentation in Bulgarian
Clayton Company Presentation in Bulgarianabozhkovbalkanikaenergy
 
Viessmann Group Company Information
Viessmann Group Company InformationViessmann Group Company Information
Viessmann Group Company Information
abozhkovbalkanikaenergy
 
Eisenmann presentation for Balkanika Energy
Eisenmann presentation for Balkanika EnergyEisenmann presentation for Balkanika Energy
Eisenmann presentation for Balkanika Energyabozhkovbalkanikaenergy
 
Biogreen Energy presentation for Balkanika Energy
Biogreen Energy presentation for Balkanika EnergyBiogreen Energy presentation for Balkanika Energy
Biogreen Energy presentation for Balkanika Energy
abozhkovbalkanikaenergy
 
Sokra Therm presentation for Balkanika Energy
Sokra Therm presentation for Balkanika EnergySokra Therm presentation for Balkanika Energy
Sokra Therm presentation for Balkanika Energyabozhkovbalkanikaenergy
 

More from abozhkovbalkanikaenergy (16)

Clayton i Balkanika Energy Prezentacija
Clayton i Balkanika Energy PrezentacijaClayton i Balkanika Energy Prezentacija
Clayton i Balkanika Energy Prezentacija
 
Clayton and Balkanika Energy Presentation
Clayton and Balkanika Energy PresentationClayton and Balkanika Energy Presentation
Clayton and Balkanika Energy Presentation
 
Balkanika Energy Prezentacija
Balkanika Energy PrezentacijaBalkanika Energy Prezentacija
Balkanika Energy Prezentacija
 
Biogeen General Presentation
Biogeen General PresentationBiogeen General Presentation
Biogeen General Presentation
 
Biogeen General Presentation
Biogeen General Presentation Biogeen General Presentation
Biogeen General Presentation
 
Бизнес форум за Енергийна Ефективност в Молдова
Бизнес форум за Енергийна Ефективност в МолдоваБизнес форум за Енергийна Ефективност в Молдова
Бизнес форум за Енергийна Ефективност в Молдова
 
Balkanika Energy PLC - Innovative Technologies LTD
Balkanika Energy PLC - Innovative Technologies LTDBalkanika Energy PLC - Innovative Technologies LTD
Balkanika Energy PLC - Innovative Technologies LTD
 
Balkanika Energy Presentation
Balkanika Energy PresentationBalkanika Energy Presentation
Balkanika Energy Presentation
 
Балканика Енерджи презентация
Балканика Енерджи презентацияБалканика Енерджи презентация
Балканика Енерджи презентация
 
Capstone Turbine Corporation Product Catalog - English
Capstone Turbine Corporation Product Catalog - EnglishCapstone Turbine Corporation Product Catalog - English
Capstone Turbine Corporation Product Catalog - English
 
Biogas in the Viessmann Group - Bulgarian
Biogas in the Viessmann Group - BulgarianBiogas in the Viessmann Group - Bulgarian
Biogas in the Viessmann Group - Bulgarian
 
Clayton Company Presentation in Bulgarian
Clayton Company Presentation in BulgarianClayton Company Presentation in Bulgarian
Clayton Company Presentation in Bulgarian
 
Viessmann Group Company Information
Viessmann Group Company InformationViessmann Group Company Information
Viessmann Group Company Information
 
Eisenmann presentation for Balkanika Energy
Eisenmann presentation for Balkanika EnergyEisenmann presentation for Balkanika Energy
Eisenmann presentation for Balkanika Energy
 
Biogreen Energy presentation for Balkanika Energy
Biogreen Energy presentation for Balkanika EnergyBiogreen Energy presentation for Balkanika Energy
Biogreen Energy presentation for Balkanika Energy
 
Sokra Therm presentation for Balkanika Energy
Sokra Therm presentation for Balkanika EnergySokra Therm presentation for Balkanika Energy
Sokra Therm presentation for Balkanika Energy
 

Recently uploaded

Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Malak Abu Hammad
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
名前 です男
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
ControlCase
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
Matthew Sinclair
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
DianaGray10
 
Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...
Zilliz
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
Kari Kakkonen
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
sonjaschweigert1
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Aggregage
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
Neo4j
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
danishmna97
 
Full-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalizationFull-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalization
Zilliz
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Paige Cruz
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
Adtran
 
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Zilliz
 
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
Neo4j
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
Neo4j
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
DianaGray10
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Albert Hoitingh
 

Recently uploaded (20)

Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
 
Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
 
Full-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalizationFull-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalization
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
 
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
 
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
 

Business Forum Energy Efficiency in Moldova

  • 1.
  • 2. ENERGY EFFICIENCY – TREND OR NECESSITY 2  
  • 3. ALEXANDER VODENICHAROV ALLIANCE FOR SUSTAINABLE DEVELOPMENT 3  
  • 4. 4   Energy audit What is energy audit? Economic feasibility of the audit.
  • 6. Old Situation Solution New Situation Consumed hot water, l/d 8 000 heated by GTC 016 heat pump with 23 kWth nominal energy output, 16 panels 8 000 Electricity consumption, MW*h/year 118 29,5 Cost of the electricity consumption, EUR/year 5 070 2 358 Investment - total price, EUR 11 520 Saving of money, EUR/year 2 712 Payback period, year 4,2 * Gas price – 0,4 EUR/m3 * Electricity price - 0,08 EUR/KW*h 6 Cardboard factory. Replacement gas for heating of water for sanitary purposes
  • 7. 7 Photovoltaic Using solar panels for electricity production
  • 8. 8   LOGISTIC CENTRE. Replacement electricity for illumination of storage halls Old Situation Solution New situation Electricity consumption, kW*h/year 17 351 PV system – 64 μc-Si NT-150 AF PV panels, 150 W, DC each; total installed power – 10,2 kWp 17 351 Produced electricity, kW*h/year 15 300 Electricity purchased for illumination, kWh/year 2 051 Cost of electricity, EUR/year 1 735 205 Investment, total price, EUR 8 160 Saving of money, EUR/year 1 530 Pay back period, year 5,3 * Electricity price - 0,10 EUR/kW*h/year
  • 10. 10 1. Piston gas engine 1 2 2. Power generator 3 3. Plate heat exchanger 6 6. Water cooled exhaust collector 5 5. Pipe-in-pipe heat exchanger 74 8 7. NOx catalyzer 4. Shell-pipes heat exchanger 8. Silencer 600 O C 450 O C 100 O C 86°C 80°C 70°C 80°C 90°C Inlet Outlet Cogeneration installation
  • 11. 11 Spa Club and Hotel. Replacement of heating oil and electricity with LPG Old Situation Solution New Situation Consumed oil 153 Cogeneration system CHP EM 140/207 – 140 kW nominal electric output, 207 nominal thermal output. LPG fuel. 237 Electricity to substitute MW*h/year 1 176 Cost of oil, EUR/year 179 443 220 574 Cost of electricity, EUR/year 117 600 Cost for maintenance, EUR/year 25 200 Investment, total price, EUR 170 000 Saving of money, EUR/year 51 269 Pay back period, year 3,3 • Heating oil price – • Electricity price – • LPG price - 1,18 EUR/kg 0,10 EUR/kW*h 0,93 EUR/kg
  • 12. 12    Minimal power consumption. Electricity is used for the pumps and the automation.  Minimum noise level. Environmentally friendly. The coolant is regular water.  Uses waste heat from hot water, flue gas or manufacturing processes.  Long service life (at least 20 years).  Full automation.  Fire and explosion safe Absorption chillers
  • 13. 13   Agrifood Market CASE – max. efficient heating , cooling and hot water producing SOLUTION – 5xROBUR GAHP/AR absorption heat pump + 3xROBUR ACF60 absorption chiller – 136 kW cooling output, 160 kW heating output. SITUATION – 800 m2 roofed agrifood market. 1. 40% less gas consumption for heating and hot water production. 2. 10% less costs for cooling 3. No need from boiler room – no lost of commercial area – no lost of income from rent. 4. No need from trained operators – savings from salaries . 5. Very low maintenance costs – one system , practically no moving parts. SAVING OF MONEY = around 23 000 EUR/year, compere with standard installation. RESULTS: INVESTMENT COST= 110 000 EUR Investment cost are equal to standard installation with gas boiler and electric chiller. •Electricity cons. = max. 12 kW/h •Gas cons. = max. 21,6 Nm3/h summer •Gas cons. = max. 13,5 Nm3/h winter
  • 15. 15 SLAUGHTERHOUSE. Biogas installation •CASE – economically efficient treatment of organic waste •SOLUTION – EUCOlino 100 biogas system – 100 kW electricity output, 120 kW heating output. •SITUATION – 5 000 t/h slaughterhouse organic waste. 1. Saved investments in waste water treatment and boiler installations = 50 000 EUR 2. Saved money from transport and taxes of 5 000 t/y organic waste for incineration = 50 000 EUR/y 3. Saved money for heating and hot water with boiler on LPG = 54 706 EUR/y 4. Income from sells of green electricity = 185 292 EUR/y. 5. Income from sells of organic fertilizer = 50 000 EUR/y. 6. O&M costs = 95 000 EUR/y •POSSITIVE RESULT = around 284 998 EUR/year, compere with standard installations for heating, waste water and organic waste treatment. •PAYBACK PERIOD = less than 3 years Results: •INVESTMENT COST = 750 000 EUR CONDITIONS: -Transport and treatment cost = 10 EUR/t - FIT green electricity price = 0,23 EUR/kWh - LPG price = 0,93 EUR/kg - Price for sells of organic bio fertilizer = 10 EUR/t
  • 16. 16 Geothermal pumps • EconomicalEconomical Annual heating cost 4-6 times lower as compared to conventional boilers. • Without gasWithout gas Geothermal pumps do not use gas for heating and DHW. • SafeSafe The system is not connected to liquid fuel, explosive material and no high temperature processes. • EnvironmentalEnvironmental Heat pumps do not emit harmful substances. With this installation, 75% of the energy for heating and DHW provision is a gift from nature. During the summer the installation can be used for cooling.
  • 17. 17 Replacement of natural gas and electricity for heating and cooling of 1 000 m2 supermarket with geothermal energy OLD SITUATION SOLUTION NEW SITUATION Consumed natural gas, Nm3 /y 16 516 Geothermal pump 4 x VITOCAL 300 G – 164 kW nominal thermal output, 27 kW nominal electricity Input 1 000 m2 ceiling pipes heating and cooling, 1 000 m2 earth connected coil pipes collector. Consumed electricity, MWh/ year 128 6,5 Cost of gas , EUR/year 8 258 Cost of electricity , EUR/year 12 800 650 High comfort with “natural cooling” – no air flows Investment, total price, EUR 70 000 Saving of money, EUR/year 20 408 Pay back period, year 3,4 • Natural gas price – • Electricity price - 0,5 EUR/Nm3 0,10 EUR/kWh
  • 19. 19 Plant for the production of beverages. Replacing the steam boiler with a new steam generator. Old Situation Solution New Situation Steam production, t/h 4 CLAYTON SEG 254 – 4 t/h nominal steam output, 2 452 kW nominal thermal output, complete new boiler room, equipped for 72 hours unattended operation 4 Natural gas consumption Nm³/year 857 364 689 355 Cost of natural gas consumption, EUR/year 342 946 275 742 Operation cost (Before - 4 trained operators, After - 2), EUR/year 28 800 9 600 Investment, total price, EUR 150 000 Saving of money, EUR/year 86 404 Pay back period, year 1,7 • Natural gas price 0,4 EUR/Nm³
  • 20. 20 Thank you for the attention!