Burgasnefteproject OOD is an engineering company based in Burgas, Bulgaria that has completed several oil and gas projects for Lukoil and its subsidiaries. Some of its key projects include developing designs for a heavy residue processing complex in Burgas, Bulgaria from 2011-2015; a C4 purification unit in Burgas from 2010-2011; and revamping a desulfurization plant in Perm, Russia from 2012-2015 to increase treatment capacity and reduce emissions. Burgasnefteproject has extensive experience developing designs and providing supervision for projects involving isomerization, desulfurization, storage, pipelines and other oil and gas infrastructure.
3. Name Heavy Residue Processing Complex
Main Client “LUKOIL Neftochim Burgas” JSC , Burgas, Bulgaria
Client Technip S.A., Italy
Activity Development of basic and detailed design documentation for interconnecting pipelines and
off-site facilities; authorization
Aim Increasing the efficiency of oil refining through increasing the production of light fuels of high
added value up to 90% of crude oil
Duration 2011 – 2015
Cooling Water System Fire fighting System
Storage Tanks Nitrogen Spheres
Flare System
Interconnecting pipelines
4. Name C4 Purification Unit
Main Client “LUKOIL Neftochim Burgas” JSC , Bulgaria
Activity Development of detailed design documentation; supervision
Aim Bringing of N-Butane Isomerisation Unit to design parameters
Duration 2010-2011
3D Model Isomerisation Unit
5. Desulfurization Plant
Interconnecting of new air cooler
Heat Exchange Unit
Claus Unit – 3D model
Claus Unit – under
construction
Name Revamping of the unit for desulphurization of petroleum gas
with increase of capacity for treatment of natural gas from
"Kokuy" gas field
Main
Client
LUKOIL-Permnefteorgsintez, Perm, Russia
Activity Development of basic and detailed design documentation; supervision
Aim 1) Increasing the capacity of the unit for treatment of oil, fat and natural
gas mixture to 2 billion normal cubic meters per year;
2) Hydrogen sulfide content of treated oil, fat and natural gas mixture
shall be in accordance with the requirements of GOST - degree of
purification of petroleum gas from hydrogen sulfide ≤ 5 ppm;
3) Utilization of hydrogen sulfide released from petroleum gas and the
liquid sulfur produced under Claus process, leading to a reduction in air
pollution by products of hydrogen sulfide burning at flares;
4) Improving safety and environmental parameters of production
Duration 2012-2015
6. Name Reconstruction of “Kogalymneftegaz”
Refinery
Main Client OOO “LUKOIL West Siberia”, Kogalym, Russia
Client OOO “LUKOIL Nizhegorodniinefteproyect”, Nizhny
Novgorod, Russia
Activity Development of detailed design documentation
for:
1) construction of new isomerisation unit;
2) Reconstruction of VGO hydrodesulphurization
section of Hydrocracking unit
3) Installation of new reactor
Aim Production of 5th Diesel fuel class 5 (Euro-5)
Duration 2013-2014
Isomerisation Unit
Construction Works
7. Name Loading Storage for Liquefied Hydrocarbon Gases
Main Client OOO “Stavrolen”, Budennovsk, Russia
Client OOO “LUKOIL Nizhegorodniinefteproyect”, Nizhny Novgorod, Russia
Activity Development of basic and detailed design documentation
Aim Storage capacity increase for additional volumes of Wide Light Hydrocarbon Fractions
Duration 2013-2015
Loading and storage facilities Storage Park
Pumps Pipe Rack