CURRICULUM VITAE
              INSTRUMENT SUPERVISOR




Personal Details
           Name: Bogdan
           Surname: Tudor
           Date / Place of Birth: 26.10.1967 / Ploiesti, Romania
           Nationality: Romanian
           Marital Status: married
           Address: bl.86,ap.32,no.1,LACUL BALEA street, PLOIESTI
                     city, PRAHOVA county, ROMANIA
           Phone: 0040723351434

Executive
Summary
            A highly skilled Instrument Technician with over 20+ years of
            International and Domestic Romania experience in performing
            pre-commissioning, commissioning, start up and maintenance .
Career
Objective
            To advance professional in instrumentation field, in a
            challenging position where my experience, communication
            skills and team player attributes can be used in obtaining
            personal career goals and those of my employer.
Expertise

             Technical: Loop check , Cold & Hot Functional Test , As
            Built Drawings                            up-dating,Start-
            up&EnduranceTest,MaintenanceProcedures
            according to the International Standards.

            Professional: Industrial Training, Fire Fighting Training.

Bio Data
Country worked in: Romania, United Arab Emirates

            Country lived in: Romania, United Arab Emirates
            Foreign language: English writing and speaking well.


Work Experience

  •   Period:               2010 apr. to oct.
                                  Position:               Commissioning
                           Instrument Supervisor
                                    Company & Location:         ALSTOM
                           SWITZERLAND,FUJAIRAH-UAE
                                   Client:                    FUJAIRAH
                           ASIA POWER COMPANY
                                  Project:                 FUJAIRAH F2
                           PROJECT (2000 MW + 1600 MIGD
                                                             COMBINED
                           CYCLE POWER AND DESALINATION
                                                             PLANT)
                                 Responsibilities:
                             o Reported to the Alstom Instrument Coor-
                                dinator
                             o Comparing the documentation and draw-
                                ings with field and make as built drawings
                                up-dating
                             o Checking the cable connection according
                                with wiring diagram(PRINCE),loop test,
                                cold function test, hot function test for
                                equipments and skids, start up and then
                                hot commissioning ,maintenance , calibra-
                                tion and troubleshooting
                             o Part of plant: ALSTOM ST : 3-CASING
                                CONDENSING TYPE             STF30C, DE-
                                SIGNED LOAD 350M
                             o Types of instruments which are used in
                                this        project:      ROSEMOUNT,
                                ENDRESS+HAUSER, AUMA, RO-
                                TORK, FISHER PNEUMATIC, VICK-
                                ERS HYDRAULIC VALVE, BENTLY-
NEVADA 3500.The process program
                                which manage this power plant is ALSPA
                                DCS

   •   Period:            2007 – 2009
       Position:          Maintenance-Technical Advisor
                             Instrumentation
      Company & Location: Mitsubishi/Toshiba, Dubai-U.A.E.
      Client:             Dubai Electricity and Water Authority
      Consultant:          Lachmayer International
      Project:             Jebel- Ali, Power and Desalination Plant, ”L”
Station,
                         Phase 1

       Responsibilities:
                            o Reported to the Toshiba Maintenance
                                Manager
                            o   Attend to daily morning maintenance
                                meetings internal and with the client
                            o   Make the program for maintenance activi-
                                ties: corrective, preventive, periodical in
                                coordination with mechanical and electri-
                                cal teams
                            o   On job training with client maintenance
                                team
                            o   Parts of power plant:
                                Gas system – ROTRING ENGINEERING,
                                gas and air compressors – ATLAS
                                COPCO, GENERAL ELECTRIC gas
                                turbine(MS 9001FA) Speedtronic MK6
                                with back HRSG(F9A-220MW,750t/h),
                                Auxiliary Boilers IHI, Sampling system –
                                EUROSISTEMI-ITALY,                Chemical
                                Dosing system - JHONSON MARCH,
                                Steam Turbine TOSHIBA(160MW), By-
                                pass steam system CCI-SWEDEN,
                                Cooling Water System, Fuel Oil System
                            o   Types of instrument which are used in this
                                project :
Pressure, differential pressure, flow, level,
                              proximitter transmitters and switches :
                              ROSEMOUNTH, DRUCK, KROHNE,
                              ENDRESS+HAUSER,                      WIKA,
                              PHEONIX-CONTACT,                 FLOTECT,
                              MAGNETROL, BENTLEY NEVADA,
                              SHINKAWA, control valves AUMA,
                              FISHER ROSEMOUNTH and PLC
                              ALLEN BRADLEY, GE . The proces
                              program which managed the power plant is
                              TOSMAP from TOSHIBA


•   Period:              2005 – 2007
    Position:            I&C Pre-commissioning & Commissioning
                           Supervisor
    Company & Location:    Mitsubishi/Toshiba, Dubai-U.A.E
    Client:              Dubai Electricity and Water Authority
    Project:             Jebel- Ali, Power and Desalination Plant,
                        ”L” Station, Phase 1


    Responsibilities:
                          o Pre-Commissioning & commissioning
                               checks of Mark VI
                          o    Installation & replacement of System
                               cards in Mark VI Panel
                          o    Installation, checking & commissioning
                               of all field devices on a GE Gas Turbines
                          o    On base wiring of Turbine
                          o    Support to Mechanical for Hot Gas path
                               inspection
                          o    I worked with GE – team consisting of
                               Controls, Electrical and Mechanical Engi-
                               neers for installation & commissioning of
                               Gas Turbines.
                          o    Provided technical Assistance to the
                               Start-Up Contractors Field Instrumenta-
                               tion Team during installation phase. GE
instrumentation & controls team during
                              installation & commissioning of MS
                              9001FA gas turbines.
                            o Provision of Assistance to the Vendor
                              Specialist for energisation or start-up of
                              their equipment, Trouble Shooting, Re-
                              calibration of Various Instruments, Fire &
                              Gas System for Gas Turbine.


•   Period:              2002-2005
    Position:            I&C Pre-commissioning & Commissioning
                            Supervisor
    Company & Location: Asea Brown Boveri Romania, Ploiesti
                       Romania
    Client:             Conpet
    Project:          Romanian National Crude Oil Transport
                      System Rehabilitation (implementation of
                      SCADA Automation System in pumping
                      stations network)
    Responsibilities:
                          o site inspections: punch lists, non confor-
                             mance reports
                          o loop tests, instrumentation testing (leak-
                             age detection, checking of electrical con-
                             nections, instrument cable testing), cabi-
                             nets checking, final approvals
                          o cabinets checking and troubleshooting
                          o troubleshooting for RTU and ACS,
                             wiring modifications
                          o calibration for smart field instruments as
                             PT, TT, LT(VEGA)
                          o programming of actuators: Rotork as re-
                             quested by client
                          o function tests to screw and centrifuge
                             pumps running serial or parallel
                          o station startup
•   Period:              1998-2002
      Position:            Senior Instrument Technician
      Company &Location:     Lukoil/Ploiesti, Romania

      Responsibilities         cracking plant
                           o    mounting, configuration, testing, and
                                metrological calibration of smart con-
                                trollers, recorders, transmitters: Yoko-
                                gawa, Foxboro, Chessel, Masoneilan,
                                Rosemount, Asco and other apparatus
                           o    pre-comissioning/ commissioning and
                                start up for gas treatment plant with for-
                                eign equipment
                           o    testing interlocking systems
                           o    maintaining for the “Bently Nevada -
                                monitoring system 3003” for dynamic
                                equipment ( axial and transversal move)
                                start up after periodical shutdown

  • Period:                1992-1998
   Position:               Instrument Technician
   Company &Location:           PETROTEL REFINERY/PLOIESTI
ROMANIA


      Responsibilities         workshop intervention team
                           o I have installed interlocking box
                           o Verified and started up interlocking sys-
                             tems
                           o Monitored maintenance and trou-
                             bleshooting
                             Activity

  •   Period:              1990-1992
      Position:            Senior Instrument Technician
      Company &Location:       Petrochemical works Teleajen


      Responsibilities
cracking plant
                   o Studied the technical documentation
                   o Mounting, installation, checking and
                      maintained
                      automation and control loop
                  o Testing, calibration, configuration,
                     maintenance,
                 troubleshooting indigene and foreign
                 equipments: Foxboro, Masoneilan,
              Eckardt.
                 Recorders: Barber-Colman, Chessell and
                 indigene controllers: Foxboro and indi-
              gene and
                another apparatus
                  o Start up after periodical shutdown
                  o Maintenance and troubleshooting in
                     the plant


Education              1983-1987 INDUSTRIAL HIGH
SCHOOL NO.5
                            PLOIESTI

                      1987-1988 ECONOMICAL POST
HIGH SCHOOL

  Trainings
                   o Basic presentation of SCADA sys-
                     tem(ACS 410,
                   o RTU 211, Marshaling Cabinet

                -ABB transmitter ASD 800,
                -ABB communicator STT 04,
                -Smart Vision basic programming,
                -VEGA pulse radar,
                -SAAB TankRadar REX,
                -Liebherr WIOM
Bogdan tudor cv

Bogdan tudor cv

  • 1.
    CURRICULUM VITAE INSTRUMENT SUPERVISOR Personal Details Name: Bogdan Surname: Tudor Date / Place of Birth: 26.10.1967 / Ploiesti, Romania Nationality: Romanian Marital Status: married Address: bl.86,ap.32,no.1,LACUL BALEA street, PLOIESTI city, PRAHOVA county, ROMANIA Phone: 0040723351434 Executive Summary A highly skilled Instrument Technician with over 20+ years of International and Domestic Romania experience in performing pre-commissioning, commissioning, start up and maintenance . Career Objective To advance professional in instrumentation field, in a challenging position where my experience, communication skills and team player attributes can be used in obtaining personal career goals and those of my employer. Expertise Technical: Loop check , Cold & Hot Functional Test , As Built Drawings up-dating,Start- up&EnduranceTest,MaintenanceProcedures according to the International Standards. Professional: Industrial Training, Fire Fighting Training. Bio Data
  • 2.
    Country worked in:Romania, United Arab Emirates Country lived in: Romania, United Arab Emirates Foreign language: English writing and speaking well. Work Experience • Period: 2010 apr. to oct. Position: Commissioning Instrument Supervisor Company & Location: ALSTOM SWITZERLAND,FUJAIRAH-UAE Client: FUJAIRAH ASIA POWER COMPANY Project: FUJAIRAH F2 PROJECT (2000 MW + 1600 MIGD COMBINED CYCLE POWER AND DESALINATION PLANT) Responsibilities: o Reported to the Alstom Instrument Coor- dinator o Comparing the documentation and draw- ings with field and make as built drawings up-dating o Checking the cable connection according with wiring diagram(PRINCE),loop test, cold function test, hot function test for equipments and skids, start up and then hot commissioning ,maintenance , calibra- tion and troubleshooting o Part of plant: ALSTOM ST : 3-CASING CONDENSING TYPE STF30C, DE- SIGNED LOAD 350M o Types of instruments which are used in this project: ROSEMOUNT, ENDRESS+HAUSER, AUMA, RO- TORK, FISHER PNEUMATIC, VICK- ERS HYDRAULIC VALVE, BENTLY-
  • 3.
    NEVADA 3500.The processprogram which manage this power plant is ALSPA DCS • Period: 2007 – 2009 Position: Maintenance-Technical Advisor Instrumentation Company & Location: Mitsubishi/Toshiba, Dubai-U.A.E. Client: Dubai Electricity and Water Authority Consultant: Lachmayer International Project: Jebel- Ali, Power and Desalination Plant, ”L” Station, Phase 1 Responsibilities: o Reported to the Toshiba Maintenance Manager o Attend to daily morning maintenance meetings internal and with the client o Make the program for maintenance activi- ties: corrective, preventive, periodical in coordination with mechanical and electri- cal teams o On job training with client maintenance team o Parts of power plant: Gas system – ROTRING ENGINEERING, gas and air compressors – ATLAS COPCO, GENERAL ELECTRIC gas turbine(MS 9001FA) Speedtronic MK6 with back HRSG(F9A-220MW,750t/h), Auxiliary Boilers IHI, Sampling system – EUROSISTEMI-ITALY, Chemical Dosing system - JHONSON MARCH, Steam Turbine TOSHIBA(160MW), By- pass steam system CCI-SWEDEN, Cooling Water System, Fuel Oil System o Types of instrument which are used in this project :
  • 4.
    Pressure, differential pressure,flow, level, proximitter transmitters and switches : ROSEMOUNTH, DRUCK, KROHNE, ENDRESS+HAUSER, WIKA, PHEONIX-CONTACT, FLOTECT, MAGNETROL, BENTLEY NEVADA, SHINKAWA, control valves AUMA, FISHER ROSEMOUNTH and PLC ALLEN BRADLEY, GE . The proces program which managed the power plant is TOSMAP from TOSHIBA • Period: 2005 – 2007 Position: I&C Pre-commissioning & Commissioning Supervisor Company & Location: Mitsubishi/Toshiba, Dubai-U.A.E Client: Dubai Electricity and Water Authority Project: Jebel- Ali, Power and Desalination Plant, ”L” Station, Phase 1 Responsibilities: o Pre-Commissioning & commissioning checks of Mark VI o Installation & replacement of System cards in Mark VI Panel o Installation, checking & commissioning of all field devices on a GE Gas Turbines o On base wiring of Turbine o Support to Mechanical for Hot Gas path inspection o I worked with GE – team consisting of Controls, Electrical and Mechanical Engi- neers for installation & commissioning of Gas Turbines. o Provided technical Assistance to the Start-Up Contractors Field Instrumenta- tion Team during installation phase. GE
  • 5.
    instrumentation & controlsteam during installation & commissioning of MS 9001FA gas turbines. o Provision of Assistance to the Vendor Specialist for energisation or start-up of their equipment, Trouble Shooting, Re- calibration of Various Instruments, Fire & Gas System for Gas Turbine. • Period: 2002-2005 Position: I&C Pre-commissioning & Commissioning Supervisor Company & Location: Asea Brown Boveri Romania, Ploiesti Romania Client: Conpet Project: Romanian National Crude Oil Transport System Rehabilitation (implementation of SCADA Automation System in pumping stations network) Responsibilities: o site inspections: punch lists, non confor- mance reports o loop tests, instrumentation testing (leak- age detection, checking of electrical con- nections, instrument cable testing), cabi- nets checking, final approvals o cabinets checking and troubleshooting o troubleshooting for RTU and ACS, wiring modifications o calibration for smart field instruments as PT, TT, LT(VEGA) o programming of actuators: Rotork as re- quested by client o function tests to screw and centrifuge pumps running serial or parallel o station startup
  • 6.
    Period: 1998-2002 Position: Senior Instrument Technician Company &Location: Lukoil/Ploiesti, Romania Responsibilities cracking plant o mounting, configuration, testing, and metrological calibration of smart con- trollers, recorders, transmitters: Yoko- gawa, Foxboro, Chessel, Masoneilan, Rosemount, Asco and other apparatus o pre-comissioning/ commissioning and start up for gas treatment plant with for- eign equipment o testing interlocking systems o maintaining for the “Bently Nevada - monitoring system 3003” for dynamic equipment ( axial and transversal move) start up after periodical shutdown • Period: 1992-1998 Position: Instrument Technician Company &Location: PETROTEL REFINERY/PLOIESTI ROMANIA Responsibilities workshop intervention team o I have installed interlocking box o Verified and started up interlocking sys- tems o Monitored maintenance and trou- bleshooting Activity • Period: 1990-1992 Position: Senior Instrument Technician Company &Location: Petrochemical works Teleajen Responsibilities
  • 7.
    cracking plant o Studied the technical documentation o Mounting, installation, checking and maintained automation and control loop o Testing, calibration, configuration, maintenance, troubleshooting indigene and foreign equipments: Foxboro, Masoneilan, Eckardt. Recorders: Barber-Colman, Chessell and indigene controllers: Foxboro and indi- gene and another apparatus o Start up after periodical shutdown o Maintenance and troubleshooting in the plant Education 1983-1987 INDUSTRIAL HIGH SCHOOL NO.5 PLOIESTI 1987-1988 ECONOMICAL POST HIGH SCHOOL Trainings o Basic presentation of SCADA sys- tem(ACS 410, o RTU 211, Marshaling Cabinet -ABB transmitter ASD 800, -ABB communicator STT 04, -Smart Vision basic programming, -VEGA pulse radar, -SAAB TankRadar REX, -Liebherr WIOM