This document provides an installation/operation qualification protocol for the Building Management System (BMS) controlling the sterile air handling unit and covered area at Hikma Pharmaceuticals-APIs. The protocol includes documentation checks, visual inspections of BMS panels and layouts, verification of DDC panels, communication cables, and point checks. It also covers an operation qualification including challenge testing and acceptance criteria. The overall goal is to validate that the BMS system meets Hikma Pharmaceuticals' requirements and codes.