This document outlines the scope of work for a biometric authentication hardware design consultation project. It describes the challenges faced by the original project team including chaos, bugs, delays, and lack of coordination. It then details how the new consulting firm improved the project by bringing it under control, accelerating the schedule, improving quality, and reducing resources and costs. The scope of work includes hardware design verification, testing, validation, certification support, and mentoring the customer engineering team. Required tools include design software, testing equipment, and 3D modeling software. The benefits to the customer include improved quality, accelerated project, reduced costs, and better cross-functional team coordination.