SlideShare a Scribd company logo
1 of 4
VIKAS G
Email: gupta_vikas101@yahoo.com, Cell Phone: +91-9066509770, +91-8792739070
Work Experience:
 4+ Years of experience in Embedded Board Design and currently working as a Senior Hardware Design Engineer at
UTC Aerospace Systems and prior to that worked in L&T Technology Services.
 Responsible for Porting Project from requirement to production phase, Platform architecture, Engineering
Specification, Schematic design, Layout design co-ordination and review, Bring up and debugging of board,
Hardware Testing, Power management, Environmental testing and Production support.
 Experience in High speed Board design in Consumer and Automotive electronics domain & expertise in developing
Analog, Digital and Mixed Signals High Speed and Multilayer board design.
Profile Summary:
Platform: TI, Intel, NXP based Processors and Micro-controllers.
Interfaces: I2C, SPI, USB3.0, UART, 10/100 BaseT Ethernet, Memory Interfacing (DDR3,SDRAM,NAND,NOR).
Testing Equipments: Digital Oscilloscope, DPO, DMM, Power Supplies, Ni-DAQ, Current Probe, Soldering Equipments,
RF Shield box, Logic Analyzer, Thermal Chamber and Function Generator.
Software tools: ORCAD 16.6, Allegro PCB Editor, Flash tool, Mathcad, LT Powerplay, PSpice, Sigrity SI etc.
Software Exposure: Basic Embedded C, KEIL Compiler
Component Engineering: Selection of Active and Passive components (like Op-Amps ,MOSFETs, Transistors, Regulators,
Buffers, Switches, Connectors etc.) based on their electrical, mechanical, availability and cost parameters.
Technical Exposure:
 To prepare Engineering Specification document, Test plan, Test setup presentations for the project.
 Good hands on simulation tools like PSpice, LTspice and exposure to SI and PI tool Cadence Sigrity.
 Create designs for IP & systems validation boards, determine component placement, review layout and hand-off
for manufacturing.
 Good experience in designing Power supplies, LDO’s, SMPS, AC-DC, DC-DC converters.
 Exposure to Aeronautics Electronics Domain.
 To perform worst case analysis, simulations and design verification.
 Manage & Optimize Bill of Material (BOM).
 Provide hardware support to Software team in testing and debugging.
 Hands on experience in Soldering and handling the Lab equipments.
 Experience in AC –DC Analysis, Timing Analysis & EMI/EMC aspects of Hardware Product Design.
 Good documentation, communication & interpersonal skills.
 Signal Integrity Analysis: Experience in Signal Integrity Analysis i.e. ringing, crosstalk, signal loss, and power supply noise
within a Board design.
Project Details:
1. 2.5 inch and M.2 SSD SI and PI Validation :
Solid State Drive Design Validation has to be done which includes Signal Integrity Validation, Power Integrity
Validation and Simulation .
Duration: 6 Months Team Size: 8
o Responsibilities:
• Respin of the design for the two Form factor of the SSD i.e. 2.5 inch and M.2 .
• Gather requirements for the added circuitary, Documentation, Schematics, Layout Coordination, Test
Plan, Board Testing and Bring up .
• Coordination with the Onsite Team in their testing requirements.
• Entire power validation has performed individually.
• Coordination with the SI and PCB Engineer during the simulation and Layout.
• Exposure to Pre Layout and Post Layout SI and PI Analysis.
• Completely involved in documentation like Test Plan and Test Report.
• Involved in NAND , DDR3 , SATA validation for electrical and timing parameters.
• Involved in EMI/EMC Testing for Noise Immunity and Noise Coupling parameters.
• Gather requirements for the NGFF SSD for PCIe based solution.
2. Digital Multimedia Infotainment Receiver:
A Digital Multimedia System has been developed for Marine application which having three Modules to make a
complete system i.e. BlackBox, MW4 & Display Controller to display and control the multimedia information.
Duration: 10 Months Team Size: 12
o Responsibilities:
• Designed Display Controller module for the system.
• Gather requirements and contributes in Architecture, Schematics, Layout, Board Testing and debugging
for display controller module of the system.
• Provide Hardware support to the software team for their testing and development for flash file.
• Production support and successfully delivered the Boards to the Client.
• Performed Environmental Tests, Thermal Chamber Tests, ESD Tests for the Module.
• Performance testing for Audio, Bluetooth and RF section for the Module.
• Maintained a proper Inventory for the entire stocks for the project.
• Worked at Assembly House Vendor location for rework.
• Support to client to instruct the usage of entire module.
• Worked on Timing Analysis, DC Analysis.
• Respin of design has been done individually to release different versions of the module.
3. USB 3.0 FMC based evaluation Board:
To enhance the capabilities of Xilinx Virtex 6 FPGA Based ML605 board, FMC Based Adapter Card is developed for
USB 3.0 Validation and Testing Purpose.
Duration: 4 Month Team Size: 3
o Responsibilities:
• Designed and delivered the Board from requirements gathering to testing phase.
• Performed Hardware Testing and analysis for Power Management.
• Gather requirements and contributes in Architecture, Schematics, Layout and Board Testing.
• Customer support in Hardware Design relative to their requirement.
4. System Validation Board:
System Validation Board is designed for the validation of Intel based SoC for multimedia application platform.
Duration: 8 Months Team Size: 6
o Responsibilities:
• Involved in design respin and contributes in Engineering Specification document, Schematics drafting,
Layout review, Hardware Board Testing, debugging and production support.
• Involved in Hardware Testing and used equipments like R&S CMU200, CBT.
• Setup preparation for Volume Build Testing at Vendor’s place. Testing includes Chip Screening of the
newly developed Chip and after assembly of System Validation Board (SVB) perform Effusing, Flashing,
Calibration, GSM 900/DCS 1800 call & GPRS functional Testing.
• Run different Charger Test Cases and analyze the results.
• Making FF phone ready for the measurements by flashing System SW into the phone using Flash Tool,
Calibration using Calibration Tool .
• To perform worst case analysis and Smoke test to determine stress on components for the given set of
circuits.
5. CAN IP Validation Board:
The goal of this project is to design the CAN validation board compatible to the Zynq ZC702 Board. Application
specific to this board is to validate the CAN transceivers according to Automotive standards.
Duration: 2 Month Team Size: 2
o Responsibilities:
• Gather requirements and contributes in Architecture, Schematics, Layout and Board Testing.
• Performed Hardware Testing and analysis for Power Management.
• Customer support in Hardware Design relative to their requirement.
6. Interface circuit simulation for BCM:
For a given set of circuits used in design of Body control Module (BCM), steady state analysis and transient pulses
analysis needs to be done.
Duration: 4 Month Team Size: 2
o Responsibilities:
• To perform worst case analysis, monte-carlo analysis for the circuits.
• To run Smoke test for the given set of circuits.
• Transient & steady state analysis for the circuit.
• Customer support in Hardware Design relative to their requirement.
7. Interposer Card design:
Interposer card designed for pin to pin communication between two base boards.
Duration: 1 Month Team Size: 1
o Responsibilities:
• Gather requirements and contributes in Schematics, Layout, Board Testing.
• Customer support in Hardware Design relative to their requirement.
8. FPGA Virtex VI Based PCIe Evaluation Platform:
The Virtex-6 FPGA x8 PCI Express Gen 2 kit is a comprehensive design environment for rapid prototyping and
development of PCI Express Gen 1 & 2. This kit is supported by a series of FMC Vita57 modules which expand the
functionality for wide range of high-speed serial connectivity applications.
Duration: 6 Months Team Size: 6
o Responsibilities:
• Contribution in interfacing FPGA to FMC Connectors.
• Component Placement and Layout guidelines for the PCB designer.
• Review Layout and Schematics for the entire Design.
• Coordination with Assembly House Vendors.
• Performed Hardware Testing and analysis for Thermal and Power Management.
9. IP Board based on TI’s DM3730 processor:
This is a Tablet Computer platform based on TI’s DM3730 ARM based processor. This is low cost 7” tablet platform which
includes all the basic features for the tablet and some of the special features are GSM Call & GPRS, 3G & Wi-Fi Connectivity,
Finger print Sensor etc.
Duration: 4 Months Team Size: 6
o Responsibilities:
• Design of the Power Architecture and Power budget analysis of the board.
• Design of Audio Codec Section of the Board.
• Design & Interfacing of different Sensors (like Accelerometer, Gyroscope, Magnetometer, Light &
Proximity, Temperature sensor) to the processor.
• Schematic Capture using ORCAD Design entry CIS ver. 16.3.
• BOM & Net-list generation.
Academic Qualification:
 Bachelor of Engineering in Elex & Comm. Engineering from ITM, Gwalior in 2010 with an aggregate of 72.63%.
 HSC from Kiddy’s Corner Hr. Sr. School in 2005 with an aggregate of 75.33%.
 SSC from Kiddy’s Corner Hr. Sr. School in 2003 with an aggregate of 67.8%.
Personal Details:
 D.O.B : 11 Jul 1988
 Passport No : K7874782
I hereby solemnly affirm that all the details provided above are true to the best of my knowledge. I shall carry myself in a
manner that lends dignity to the organization.
Date: Vikas Gupta

More Related Content

What's hot

PCB Design and Layout - Checklist of What You Need Before You Start
PCB Design and Layout - Checklist of What You Need Before You StartPCB Design and Layout - Checklist of What You Need Before You Start
PCB Design and Layout - Checklist of What You Need Before You StartEpec Engineered Technologies
 
Richard William Ivy Resume
Richard William Ivy ResumeRichard William Ivy Resume
Richard William Ivy ResumeRichardIvy
 
Design Considerations for Lithium Batteries Used in Portable Devices
Design Considerations for Lithium Batteries Used in Portable DevicesDesign Considerations for Lithium Batteries Used in Portable Devices
Design Considerations for Lithium Batteries Used in Portable DevicesEpec Engineered Technologies
 
2011 年會-IC封測產業技術發展現況與未來挑戰
2011 年會-IC封測產業技術發展現況與未來挑戰2011 年會-IC封測產業技術發展現況與未來挑戰
2011 年會-IC封測產業技術發展現況與未來挑戰CHENHuiMei
 
Politecnico di Torino Test Engineering Lecture
Politecnico di Torino Test Engineering LecturePolitecnico di Torino Test Engineering Lecture
Politecnico di Torino Test Engineering LecturePete Sarson, PH.D
 
How to Ensure Your Flex Circuit Quick-Turn Will Not Get Delayed
How to Ensure Your Flex Circuit Quick-Turn Will Not Get DelayedHow to Ensure Your Flex Circuit Quick-Turn Will Not Get Delayed
How to Ensure Your Flex Circuit Quick-Turn Will Not Get DelayedEpec Engineered Technologies
 
Quick Turn PCBs - Why an Experienced Supply Chain Matters
Quick Turn PCBs - Why an Experienced Supply Chain MattersQuick Turn PCBs - Why an Experienced Supply Chain Matters
Quick Turn PCBs - Why an Experienced Supply Chain MattersEpec Engineered Technologies
 
MonicaNguyenResume2016
MonicaNguyenResume2016MonicaNguyenResume2016
MonicaNguyenResume2016Monica Nguyen
 
EMI Shielding Methods for Flex & Rigid-Flex PCB Designs
EMI Shielding Methods for Flex & Rigid-Flex PCB DesignsEMI Shielding Methods for Flex & Rigid-Flex PCB Designs
EMI Shielding Methods for Flex & Rigid-Flex PCB DesignsEpec Engineered Technologies
 
Heavy and Extreme Copper PCBs for Military/Aerospace Applications
Heavy and Extreme Copper PCBs for Military/Aerospace ApplicationsHeavy and Extreme Copper PCBs for Military/Aerospace Applications
Heavy and Extreme Copper PCBs for Military/Aerospace ApplicationsEpec Engineered Technologies
 
papiska_resume_HP_5_16
papiska_resume_HP_5_16papiska_resume_HP_5_16
papiska_resume_HP_5_16Ron Papiska
 
Arizona State University Test Lecture
Arizona State University Test LectureArizona State University Test Lecture
Arizona State University Test LecturePete Sarson, PH.D
 
Current Resume' - Jim Prater
Current Resume' - Jim PraterCurrent Resume' - Jim Prater
Current Resume' - Jim PraterJim Prater
 

What's hot (20)

New updated eet klf
New updated eet klfNew updated eet klf
New updated eet klf
 
Resume
ResumeResume
Resume
 
PCB Design and Layout - Checklist of What You Need Before You Start
PCB Design and Layout - Checklist of What You Need Before You StartPCB Design and Layout - Checklist of What You Need Before You Start
PCB Design and Layout - Checklist of What You Need Before You Start
 
Richard William Ivy Resume
Richard William Ivy ResumeRichard William Ivy Resume
Richard William Ivy Resume
 
Christopher_Reder_2016
Christopher_Reder_2016Christopher_Reder_2016
Christopher_Reder_2016
 
Design Considerations for Lithium Batteries Used in Portable Devices
Design Considerations for Lithium Batteries Used in Portable DevicesDesign Considerations for Lithium Batteries Used in Portable Devices
Design Considerations for Lithium Batteries Used in Portable Devices
 
2011 年會-IC封測產業技術發展現況與未來挑戰
2011 年會-IC封測產業技術發展現況與未來挑戰2011 年會-IC封測產業技術發展現況與未來挑戰
2011 年會-IC封測產業技術發展現況與未來挑戰
 
Politecnico di Torino Test Engineering Lecture
Politecnico di Torino Test Engineering LecturePolitecnico di Torino Test Engineering Lecture
Politecnico di Torino Test Engineering Lecture
 
How to Ensure Your Flex Circuit Quick-Turn Will Not Get Delayed
How to Ensure Your Flex Circuit Quick-Turn Will Not Get DelayedHow to Ensure Your Flex Circuit Quick-Turn Will Not Get Delayed
How to Ensure Your Flex Circuit Quick-Turn Will Not Get Delayed
 
Product Design For Medical Devices Webinar
Product Design For Medical Devices WebinarProduct Design For Medical Devices Webinar
Product Design For Medical Devices Webinar
 
Domestic PCB Capabilities
Domestic PCB CapabilitiesDomestic PCB Capabilities
Domestic PCB Capabilities
 
Quick Turn PCBs - Why an Experienced Supply Chain Matters
Quick Turn PCBs - Why an Experienced Supply Chain MattersQuick Turn PCBs - Why an Experienced Supply Chain Matters
Quick Turn PCBs - Why an Experienced Supply Chain Matters
 
MonicaNguyenResume2016
MonicaNguyenResume2016MonicaNguyenResume2016
MonicaNguyenResume2016
 
Resume Sept2015
Resume Sept2015Resume Sept2015
Resume Sept2015
 
EMI Shielding Methods for Flex & Rigid-Flex PCB Designs
EMI Shielding Methods for Flex & Rigid-Flex PCB DesignsEMI Shielding Methods for Flex & Rigid-Flex PCB Designs
EMI Shielding Methods for Flex & Rigid-Flex PCB Designs
 
Heavy and Extreme Copper PCBs for Military/Aerospace Applications
Heavy and Extreme Copper PCBs for Military/Aerospace ApplicationsHeavy and Extreme Copper PCBs for Military/Aerospace Applications
Heavy and Extreme Copper PCBs for Military/Aerospace Applications
 
papiska_resume_HP_5_16
papiska_resume_HP_5_16papiska_resume_HP_5_16
papiska_resume_HP_5_16
 
Unit II- Hardware design & testing methods1 - Electronic Product Design
Unit II- Hardware design & testing methods1 - Electronic Product DesignUnit II- Hardware design & testing methods1 - Electronic Product Design
Unit II- Hardware design & testing methods1 - Electronic Product Design
 
Arizona State University Test Lecture
Arizona State University Test LectureArizona State University Test Lecture
Arizona State University Test Lecture
 
Current Resume' - Jim Prater
Current Resume' - Jim PraterCurrent Resume' - Jim Prater
Current Resume' - Jim Prater
 

Viewers also liked

Anger management
Anger managementAnger management
Anger managementtlassiter80
 
Chemistry presentation 2
Chemistry presentation 2Chemistry presentation 2
Chemistry presentation 2Realistsam_
 
Poppy’s adventures with Mr Carr
Poppy’s adventures with Mr CarrPoppy’s adventures with Mr Carr
Poppy’s adventures with Mr CarrMrCarr
 
Seo коучинг 6.0 [пиксель плюс] - копирайтинг
Seo коучинг 6.0 [пиксель плюс] - копирайтингSeo коучинг 6.0 [пиксель плюс] - копирайтинг
Seo коучинг 6.0 [пиксель плюс] - копирайтингSergey Yurkov
 
Brandoo Films - براندوو فيلمز
Brandoo Films - براندوو فيلمزBrandoo Films - براندوو فيلمز
Brandoo Films - براندوو فيلمزBrandoo Films
 
MWD PRESS RELEASE WWF Concludes FINAL (2)
MWD PRESS RELEASE WWF Concludes FINAL (2)MWD PRESS RELEASE WWF Concludes FINAL (2)
MWD PRESS RELEASE WWF Concludes FINAL (2)Benita Horn
 
Roadway condition survey
Roadway condition surveyRoadway condition survey
Roadway condition surveyStone Rayhan
 
Hemorroides internas
Hemorroides internasHemorroides internas
Hemorroides internasmeyrosama
 
Resultados de la primera jornada Campeonato Nacional de pista
Resultados de la primera jornada Campeonato Nacional de pistaResultados de la primera jornada Campeonato Nacional de pista
Resultados de la primera jornada Campeonato Nacional de pistaLasBielas
 
ACUITY THEORY AND FAKING RESISTENCE(4)
ACUITY THEORY AND FAKING RESISTENCE(4)ACUITY THEORY AND FAKING RESISTENCE(4)
ACUITY THEORY AND FAKING RESISTENCE(4)Phillip Hash
 
Clasificaciones completas transcurrida la etapa 2 #itzulia
Clasificaciones completas transcurrida la etapa 2 #itzuliaClasificaciones completas transcurrida la etapa 2 #itzulia
Clasificaciones completas transcurrida la etapa 2 #itzuliaLasBielas
 
PAP Final - Phillip Hash
PAP Final - Phillip HashPAP Final - Phillip Hash
PAP Final - Phillip HashPhillip Hash
 

Viewers also liked (20)

Anger management
Anger managementAnger management
Anger management
 
PSCE gruppo 5
PSCE gruppo 5PSCE gruppo 5
PSCE gruppo 5
 
boozallen_1_ppt
boozallen_1_pptboozallen_1_ppt
boozallen_1_ppt
 
Chemistry presentation 2
Chemistry presentation 2Chemistry presentation 2
Chemistry presentation 2
 
乔治洛伦佐个人简历
乔治洛伦佐个人简历乔治洛伦佐个人简历
乔治洛伦佐个人简历
 
Poppy’s adventures with Mr Carr
Poppy’s adventures with Mr CarrPoppy’s adventures with Mr Carr
Poppy’s adventures with Mr Carr
 
Seo коучинг 6.0 [пиксель плюс] - копирайтинг
Seo коучинг 6.0 [пиксель плюс] - копирайтингSeo коучинг 6.0 [пиксель плюс] - копирайтинг
Seo коучинг 6.0 [пиксель плюс] - копирайтинг
 
3D nyomtatás
3D nyomtatás3D nyomtatás
3D nyomtatás
 
Brandoo Films - براندوو فيلمز
Brandoo Films - براندوو فيلمزBrandoo Films - براندوو فيلمز
Brandoo Films - براندوو فيلمز
 
Contoh rp pkis1br
Contoh rp pkis1brContoh rp pkis1br
Contoh rp pkis1br
 
MWD PRESS RELEASE WWF Concludes FINAL (2)
MWD PRESS RELEASE WWF Concludes FINAL (2)MWD PRESS RELEASE WWF Concludes FINAL (2)
MWD PRESS RELEASE WWF Concludes FINAL (2)
 
Roadway condition survey
Roadway condition surveyRoadway condition survey
Roadway condition survey
 
Hemorroides internas
Hemorroides internasHemorroides internas
Hemorroides internas
 
Resultados de la primera jornada Campeonato Nacional de pista
Resultados de la primera jornada Campeonato Nacional de pistaResultados de la primera jornada Campeonato Nacional de pista
Resultados de la primera jornada Campeonato Nacional de pista
 
Sill survey
Sill surveySill survey
Sill survey
 
Rainforest
RainforestRainforest
Rainforest
 
ACUITY THEORY AND FAKING RESISTENCE(4)
ACUITY THEORY AND FAKING RESISTENCE(4)ACUITY THEORY AND FAKING RESISTENCE(4)
ACUITY THEORY AND FAKING RESISTENCE(4)
 
Clasificaciones completas transcurrida la etapa 2 #itzulia
Clasificaciones completas transcurrida la etapa 2 #itzuliaClasificaciones completas transcurrida la etapa 2 #itzulia
Clasificaciones completas transcurrida la etapa 2 #itzulia
 
cvpaynojhonna
cvpaynojhonnacvpaynojhonna
cvpaynojhonna
 
PAP Final - Phillip Hash
PAP Final - Phillip HashPAP Final - Phillip Hash
PAP Final - Phillip Hash
 

Similar to VIKAS _SENIOR HARDWARE

Chandan Kumar_3+_Years _EXP
Chandan Kumar_3+_Years _EXPChandan Kumar_3+_Years _EXP
Chandan Kumar_3+_Years _EXPChandan kumar
 
Joel Amzallag
Joel AmzallagJoel Amzallag
Joel Amzallagjamzallag
 
Resume - Richard Shall
Resume - Richard ShallResume - Richard Shall
Resume - Richard ShallRick Shall
 
2016 NCS ASE short
2016 NCS ASE short2016 NCS ASE short
2016 NCS ASE shortSteve Stuck
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profileGreg Sleeper
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profileGreg Sleeper
 
William Check Resume
William Check ResumeWilliam Check Resume
William Check ResumeBill Check
 
Resume_DharshanBM
Resume_DharshanBMResume_DharshanBM
Resume_DharshanBMDarshan Bm
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profileGreg Sleeper
 
Chandan Kumar_3+_Years _EXP
Chandan Kumar_3+_Years _EXPChandan Kumar_3+_Years _EXP
Chandan Kumar_3+_Years _EXPChandan kumar
 
Pratik Shah_Revised Resume
Pratik Shah_Revised ResumePratik Shah_Revised Resume
Pratik Shah_Revised ResumePratik Shah
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profileGreg Sleeper
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profileGreg Sleeper
 
Matthew Chau_Resume
Matthew Chau_ResumeMatthew Chau_Resume
Matthew Chau_ResumeMatthew Chau
 
Chandan Kumar_3+_Years _EXP
Chandan Kumar_3+_Years _EXPChandan Kumar_3+_Years _EXP
Chandan Kumar_3+_Years _EXPChandan kumar
 

Similar to VIKAS _SENIOR HARDWARE (20)

GeneCernilliResume
GeneCernilliResumeGeneCernilliResume
GeneCernilliResume
 
Chandan Kumar_3+_Years _EXP
Chandan Kumar_3+_Years _EXPChandan Kumar_3+_Years _EXP
Chandan Kumar_3+_Years _EXP
 
VLMADHUSUDAN Resume
VLMADHUSUDAN ResumeVLMADHUSUDAN Resume
VLMADHUSUDAN Resume
 
Joel Amzallag
Joel AmzallagJoel Amzallag
Joel Amzallag
 
Mathew Bibin_2016
Mathew Bibin_2016Mathew Bibin_2016
Mathew Bibin_2016
 
Resume - Richard Shall
Resume - Richard ShallResume - Richard Shall
Resume - Richard Shall
 
2016 NCS ASE short
2016 NCS ASE short2016 NCS ASE short
2016 NCS ASE short
 
Résumé -Zain-Dec-2015
Résumé -Zain-Dec-2015Résumé -Zain-Dec-2015
Résumé -Zain-Dec-2015
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
William Check Resume
William Check ResumeWilliam Check Resume
William Check Resume
 
Resume_DharshanBM
Resume_DharshanBMResume_DharshanBM
Resume_DharshanBM
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
Chandan Kumar_3+_Years _EXP
Chandan Kumar_3+_Years _EXPChandan Kumar_3+_Years _EXP
Chandan Kumar_3+_Years _EXP
 
Pratik Shah_Revised Resume
Pratik Shah_Revised ResumePratik Shah_Revised Resume
Pratik Shah_Revised Resume
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
Matthew Chau_Resume
Matthew Chau_ResumeMatthew Chau_Resume
Matthew Chau_Resume
 
Chandan Kumar_3+_Years _EXP
Chandan Kumar_3+_Years _EXPChandan Kumar_3+_Years _EXP
Chandan Kumar_3+_Years _EXP
 
Unit2 soc
Unit2 socUnit2 soc
Unit2 soc
 

VIKAS _SENIOR HARDWARE

  • 1. VIKAS G Email: gupta_vikas101@yahoo.com, Cell Phone: +91-9066509770, +91-8792739070 Work Experience:  4+ Years of experience in Embedded Board Design and currently working as a Senior Hardware Design Engineer at UTC Aerospace Systems and prior to that worked in L&T Technology Services.  Responsible for Porting Project from requirement to production phase, Platform architecture, Engineering Specification, Schematic design, Layout design co-ordination and review, Bring up and debugging of board, Hardware Testing, Power management, Environmental testing and Production support.  Experience in High speed Board design in Consumer and Automotive electronics domain & expertise in developing Analog, Digital and Mixed Signals High Speed and Multilayer board design. Profile Summary: Platform: TI, Intel, NXP based Processors and Micro-controllers. Interfaces: I2C, SPI, USB3.0, UART, 10/100 BaseT Ethernet, Memory Interfacing (DDR3,SDRAM,NAND,NOR). Testing Equipments: Digital Oscilloscope, DPO, DMM, Power Supplies, Ni-DAQ, Current Probe, Soldering Equipments, RF Shield box, Logic Analyzer, Thermal Chamber and Function Generator. Software tools: ORCAD 16.6, Allegro PCB Editor, Flash tool, Mathcad, LT Powerplay, PSpice, Sigrity SI etc. Software Exposure: Basic Embedded C, KEIL Compiler Component Engineering: Selection of Active and Passive components (like Op-Amps ,MOSFETs, Transistors, Regulators, Buffers, Switches, Connectors etc.) based on their electrical, mechanical, availability and cost parameters. Technical Exposure:  To prepare Engineering Specification document, Test plan, Test setup presentations for the project.  Good hands on simulation tools like PSpice, LTspice and exposure to SI and PI tool Cadence Sigrity.  Create designs for IP & systems validation boards, determine component placement, review layout and hand-off for manufacturing.  Good experience in designing Power supplies, LDO’s, SMPS, AC-DC, DC-DC converters.  Exposure to Aeronautics Electronics Domain.  To perform worst case analysis, simulations and design verification.  Manage & Optimize Bill of Material (BOM).  Provide hardware support to Software team in testing and debugging.  Hands on experience in Soldering and handling the Lab equipments.  Experience in AC –DC Analysis, Timing Analysis & EMI/EMC aspects of Hardware Product Design.  Good documentation, communication & interpersonal skills.  Signal Integrity Analysis: Experience in Signal Integrity Analysis i.e. ringing, crosstalk, signal loss, and power supply noise within a Board design. Project Details: 1. 2.5 inch and M.2 SSD SI and PI Validation : Solid State Drive Design Validation has to be done which includes Signal Integrity Validation, Power Integrity Validation and Simulation . Duration: 6 Months Team Size: 8
  • 2. o Responsibilities: • Respin of the design for the two Form factor of the SSD i.e. 2.5 inch and M.2 . • Gather requirements for the added circuitary, Documentation, Schematics, Layout Coordination, Test Plan, Board Testing and Bring up . • Coordination with the Onsite Team in their testing requirements. • Entire power validation has performed individually. • Coordination with the SI and PCB Engineer during the simulation and Layout. • Exposure to Pre Layout and Post Layout SI and PI Analysis. • Completely involved in documentation like Test Plan and Test Report. • Involved in NAND , DDR3 , SATA validation for electrical and timing parameters. • Involved in EMI/EMC Testing for Noise Immunity and Noise Coupling parameters. • Gather requirements for the NGFF SSD for PCIe based solution. 2. Digital Multimedia Infotainment Receiver: A Digital Multimedia System has been developed for Marine application which having three Modules to make a complete system i.e. BlackBox, MW4 & Display Controller to display and control the multimedia information. Duration: 10 Months Team Size: 12 o Responsibilities: • Designed Display Controller module for the system. • Gather requirements and contributes in Architecture, Schematics, Layout, Board Testing and debugging for display controller module of the system. • Provide Hardware support to the software team for their testing and development for flash file. • Production support and successfully delivered the Boards to the Client. • Performed Environmental Tests, Thermal Chamber Tests, ESD Tests for the Module. • Performance testing for Audio, Bluetooth and RF section for the Module. • Maintained a proper Inventory for the entire stocks for the project. • Worked at Assembly House Vendor location for rework. • Support to client to instruct the usage of entire module. • Worked on Timing Analysis, DC Analysis. • Respin of design has been done individually to release different versions of the module. 3. USB 3.0 FMC based evaluation Board: To enhance the capabilities of Xilinx Virtex 6 FPGA Based ML605 board, FMC Based Adapter Card is developed for USB 3.0 Validation and Testing Purpose. Duration: 4 Month Team Size: 3 o Responsibilities: • Designed and delivered the Board from requirements gathering to testing phase. • Performed Hardware Testing and analysis for Power Management. • Gather requirements and contributes in Architecture, Schematics, Layout and Board Testing. • Customer support in Hardware Design relative to their requirement. 4. System Validation Board: System Validation Board is designed for the validation of Intel based SoC for multimedia application platform. Duration: 8 Months Team Size: 6 o Responsibilities: • Involved in design respin and contributes in Engineering Specification document, Schematics drafting, Layout review, Hardware Board Testing, debugging and production support. • Involved in Hardware Testing and used equipments like R&S CMU200, CBT. • Setup preparation for Volume Build Testing at Vendor’s place. Testing includes Chip Screening of the newly developed Chip and after assembly of System Validation Board (SVB) perform Effusing, Flashing, Calibration, GSM 900/DCS 1800 call & GPRS functional Testing. • Run different Charger Test Cases and analyze the results. • Making FF phone ready for the measurements by flashing System SW into the phone using Flash Tool, Calibration using Calibration Tool . • To perform worst case analysis and Smoke test to determine stress on components for the given set of circuits.
  • 3. 5. CAN IP Validation Board: The goal of this project is to design the CAN validation board compatible to the Zynq ZC702 Board. Application specific to this board is to validate the CAN transceivers according to Automotive standards. Duration: 2 Month Team Size: 2 o Responsibilities: • Gather requirements and contributes in Architecture, Schematics, Layout and Board Testing. • Performed Hardware Testing and analysis for Power Management. • Customer support in Hardware Design relative to their requirement. 6. Interface circuit simulation for BCM: For a given set of circuits used in design of Body control Module (BCM), steady state analysis and transient pulses analysis needs to be done. Duration: 4 Month Team Size: 2 o Responsibilities: • To perform worst case analysis, monte-carlo analysis for the circuits. • To run Smoke test for the given set of circuits. • Transient & steady state analysis for the circuit. • Customer support in Hardware Design relative to their requirement. 7. Interposer Card design: Interposer card designed for pin to pin communication between two base boards. Duration: 1 Month Team Size: 1 o Responsibilities: • Gather requirements and contributes in Schematics, Layout, Board Testing. • Customer support in Hardware Design relative to their requirement. 8. FPGA Virtex VI Based PCIe Evaluation Platform: The Virtex-6 FPGA x8 PCI Express Gen 2 kit is a comprehensive design environment for rapid prototyping and development of PCI Express Gen 1 & 2. This kit is supported by a series of FMC Vita57 modules which expand the functionality for wide range of high-speed serial connectivity applications. Duration: 6 Months Team Size: 6 o Responsibilities: • Contribution in interfacing FPGA to FMC Connectors. • Component Placement and Layout guidelines for the PCB designer. • Review Layout and Schematics for the entire Design. • Coordination with Assembly House Vendors. • Performed Hardware Testing and analysis for Thermal and Power Management. 9. IP Board based on TI’s DM3730 processor: This is a Tablet Computer platform based on TI’s DM3730 ARM based processor. This is low cost 7” tablet platform which includes all the basic features for the tablet and some of the special features are GSM Call & GPRS, 3G & Wi-Fi Connectivity, Finger print Sensor etc. Duration: 4 Months Team Size: 6 o Responsibilities: • Design of the Power Architecture and Power budget analysis of the board. • Design of Audio Codec Section of the Board. • Design & Interfacing of different Sensors (like Accelerometer, Gyroscope, Magnetometer, Light & Proximity, Temperature sensor) to the processor. • Schematic Capture using ORCAD Design entry CIS ver. 16.3. • BOM & Net-list generation.
  • 4. Academic Qualification:  Bachelor of Engineering in Elex & Comm. Engineering from ITM, Gwalior in 2010 with an aggregate of 72.63%.  HSC from Kiddy’s Corner Hr. Sr. School in 2005 with an aggregate of 75.33%.  SSC from Kiddy’s Corner Hr. Sr. School in 2003 with an aggregate of 67.8%. Personal Details:  D.O.B : 11 Jul 1988  Passport No : K7874782 I hereby solemnly affirm that all the details provided above are true to the best of my knowledge. I shall carry myself in a manner that lends dignity to the organization. Date: Vikas Gupta