RAVI SANKAR ARJUNAN
BIM PORTFOLIO
[TYPE HERE]
BIM STADARDS I am aware of:
 UAE Revit Standards
 ANZRS: Australian & New Zealand Revit Standards
 NBIMS: National Building Information Modeling Standards
 Singapore BIM Guide Version 01
LEVEL OF DEVELOPMENT (LOD):
Worked on Overseas projects with LOD 300
Worked on Indian Projects with LOD 400
BIM DELIVERABLES:
 Revit Model,
 Sheets with construction detailing
 3D Sheets
 4D simulation (Navisworks)
Project Samples:
MRT STATION – KG BARU SG BULOU, MALAYSIA
Public Infrastructure Project
MRT STATION – KG BARU SG BULOU,
MALAYSIA
Public Infrastructure Project
[TYPE HERE]
SCOPE OF THE PROJECT WORK:
 Modeling with quantity takeoff
 Construction Simulation
 Clash Detection between all disciplines
 As – built
STORAGE G+M WAREHOUSE,
DUBAI
CLIENT
DUBAI POLICE GERERAL H.Q
STEEL ROOF FRAMING LAYOUT
SCOPE OF THE PROJECT WORK:
 Modeling
 Sheets as per DM approval
 Detailing for shop drawings.
 As – built
[TYPE HERE]
RESIDENTIAL &COMMERCIAL BUILDING
G+4P+17TYP+ROOF,
DUBAI
CLIENT
B&M FZCO.
ELEVATION
G+2 LABOR ACCOMMODATION,
DUBAI
CLIENT
DUBAI LIMITED INVESTMENT - L.L.C
FLOOR FRAMING LAYOUT
[TYPE HERE]
GYM + SPORTS HALL=SWIMMING POOL,
DUBAI
GABLE FRAME DETAIL DRAWING

BIM Portfolio

  • 1.
  • 2.
    [TYPE HERE] BIM STADARDSI am aware of:  UAE Revit Standards  ANZRS: Australian & New Zealand Revit Standards  NBIMS: National Building Information Modeling Standards  Singapore BIM Guide Version 01 LEVEL OF DEVELOPMENT (LOD): Worked on Overseas projects with LOD 300 Worked on Indian Projects with LOD 400 BIM DELIVERABLES:  Revit Model,  Sheets with construction detailing  3D Sheets  4D simulation (Navisworks) Project Samples: MRT STATION – KG BARU SG BULOU, MALAYSIA Public Infrastructure Project MRT STATION – KG BARU SG BULOU, MALAYSIA Public Infrastructure Project
  • 3.
    [TYPE HERE] SCOPE OFTHE PROJECT WORK:  Modeling with quantity takeoff  Construction Simulation  Clash Detection between all disciplines  As – built STORAGE G+M WAREHOUSE, DUBAI CLIENT DUBAI POLICE GERERAL H.Q STEEL ROOF FRAMING LAYOUT SCOPE OF THE PROJECT WORK:  Modeling  Sheets as per DM approval  Detailing for shop drawings.  As – built
  • 4.
    [TYPE HERE] RESIDENTIAL &COMMERCIALBUILDING G+4P+17TYP+ROOF, DUBAI CLIENT B&M FZCO. ELEVATION G+2 LABOR ACCOMMODATION, DUBAI CLIENT DUBAI LIMITED INVESTMENT - L.L.C FLOOR FRAMING LAYOUT
  • 5.
    [TYPE HERE] GYM +SPORTS HALL=SWIMMING POOL, DUBAI GABLE FRAME DETAIL DRAWING