Bin Wang 
Contact Address Flat 4,39 The Walk, Roath, Cardiff,CF24 3AG 
E-mail Address hdswb1@gmail.com 
Telephone No. 07729 769825 
Date of Birth 21st August 1984 
Nationality Chinese 
CCAARREEEERR OOBBJJEECCTTIIVVEE 
 Job Role in Building Information Modelling (BIM)–I have spent more than 
three years in my PhD to research this area and intend to implement it in practice. 
EEDDUUCCAATTIIOONN 
♦ Jan.2011–Present 
PhD “Towards BIM based Virtual Reality Environment for Building Emergency 
Management”, Cardiff University 
Supervised by Dr Haijiang Li and Prof Yacine Rezgui 
 This is an industry-led collaboration with BRE Institute of Sustainable 
Engineering, focusing on Building Information Modeling (BIM) visualization. 
 Built Virtual Reality Lab of Cardiff University based BIM and Game. This has 
resulted in kinds of VR applications/extensions. 
 Published 4 conference papers and 2 journal paper. 
♦ Sep.2009–Sep.2010 
MSc Civil Engineering (Distinction), Cardiff University 
 Modules covered various aspects of Civil Engineering included Design of 
Steel Structures, Advanced Concrete Materials and Structures, Advanced 
Structural Mechanics, Engineering Management, Soil Mechanics, Hydraulics etc. 
 Dissertation– “The In-Plane Mechanical Property of Irregular Honeycombs at 
Macro Scale” supervised by Dr Haixing Zhu. 
 Graduated with outstanding average score (73/100) 
♦ Sep.2004–Jul.2008 
Bachelor of Civil Engineering (First Class), HeBei University of Technology, 
Tianjin, P. R. China 
 Average score 83/ 100 passed Courses of Civil Engineering. 
 Dissertation– “The early warning technology and equipment research under road 
running and bad weather conditions” was awarded Best Final-Design Title. 
WWOORRKK EEXXPPEERRIIEENNCCEE 
♦ Jan.2012–Present 
Project Coordinator, Cardiff University 
Organized regular social events and science visits for BIM; built and managed Cardiff 
Virtual Reality Lab in Cardiff University; introduced the Cardiff VR lab with BIM 
concept to different potential financial sponsors; involved in different BIM project 
such as SPORTE, RegBIM, and OntoFM. 
♦ Jan.2011–Present
Demonstrator and Teaching Assistant, Cardiff University 
After receiving training and acquiring corresponding qualifications, employed to 
teach various courses such as Integrated Building Design, Revit, AutoCAD, Matlab, 
C++. 
♦ Jul.2008–Apr.2009 
Industrial and civil construction works, Handan Construction Company 
Took part in organization and management and understood the basic process of 
construction in the construction site; learnt the relevant operational skills; learnt the 
skills of experiments as well as the collation of technical information. 
♦ Jul.2007–Jul.2008 
Long Xi Highway line modification works (Bid B), XingTai Highway and Bridge 
Construction General Corporation 
Participated in roadbed construction, structural construction; understood basic process 
of construction; learnt relevant skills for operation and surveying. 
♦ Jun.2006–Jul.2007 
Budget and survey for Civil Engineering, Hebei University of Technology 
While focusing on project preparation and application of the scale, worked over the 
budget preparation principles, methods and steps. Use theodolite and a tape to 
measure parameters of my school’s buildings and draw the views of building plans. 
RREELLEEVVAANNTT SSKKIILLLLSS 
 Expertise in BIM software (e.g. Revit etc.), building design software (e.g. 
AutoCAD etc.) –the key software I used for my previous work and current PhD. 
 An excellent ability to self-study–the essential skill for BIM projects during my 
PhD ( i.e. SPORTE2 related to energy simulations, RegBIM referenced to BIM 
standard integration, and OntoFM linked to building data collection) 
 Working to deadlines under pressure–successfully finished all distributed tasks 
or jobs during the period of my internships, work and academic studies. 
 Having sound knowledge of programming language VB, C# and C++ – 
utilized these programming languages to develop Revit extensions for my PhD. 
 Flexibility and originality of approach–the key capacity to undertake PhD 
research and to satisfy financial sponsors’ requirements of BIM projects. 
 Efficient management and organizational abilities–organized regular social 
events and science visits for local students as class president in China; built and 
Cardiff Virtual Reality Lab in Cardiff and introduced it with BIM concept to 
different potential financial sponsors. 
 Team working and communication skills –attached importance to collaboration 
between group members as a class president in university; valued others’ 
suggestions to improve my views in previous work and study; help students solve 
academic problems by emails or face-to-face talking as a teaching assistant. 
IINNTTEERREESSTTSS 
BBaasskkeettbbaallll && BBiilllliiaarrddss--PPllaayy bbaasskkeettbbaallll rreegguullaarrllyy aanndd wwoonn tthhiirrdd iinn RRiilleeyyss ppooooll ccoonntteesstt.. 
RREEFFEERREEEESS
Available on request

CV for BIM

  • 1.
    Bin Wang ContactAddress Flat 4,39 The Walk, Roath, Cardiff,CF24 3AG E-mail Address hdswb1@gmail.com Telephone No. 07729 769825 Date of Birth 21st August 1984 Nationality Chinese CCAARREEEERR OOBBJJEECCTTIIVVEE  Job Role in Building Information Modelling (BIM)–I have spent more than three years in my PhD to research this area and intend to implement it in practice. EEDDUUCCAATTIIOONN ♦ Jan.2011–Present PhD “Towards BIM based Virtual Reality Environment for Building Emergency Management”, Cardiff University Supervised by Dr Haijiang Li and Prof Yacine Rezgui  This is an industry-led collaboration with BRE Institute of Sustainable Engineering, focusing on Building Information Modeling (BIM) visualization.  Built Virtual Reality Lab of Cardiff University based BIM and Game. This has resulted in kinds of VR applications/extensions.  Published 4 conference papers and 2 journal paper. ♦ Sep.2009–Sep.2010 MSc Civil Engineering (Distinction), Cardiff University  Modules covered various aspects of Civil Engineering included Design of Steel Structures, Advanced Concrete Materials and Structures, Advanced Structural Mechanics, Engineering Management, Soil Mechanics, Hydraulics etc.  Dissertation– “The In-Plane Mechanical Property of Irregular Honeycombs at Macro Scale” supervised by Dr Haixing Zhu.  Graduated with outstanding average score (73/100) ♦ Sep.2004–Jul.2008 Bachelor of Civil Engineering (First Class), HeBei University of Technology, Tianjin, P. R. China  Average score 83/ 100 passed Courses of Civil Engineering.  Dissertation– “The early warning technology and equipment research under road running and bad weather conditions” was awarded Best Final-Design Title. WWOORRKK EEXXPPEERRIIEENNCCEE ♦ Jan.2012–Present Project Coordinator, Cardiff University Organized regular social events and science visits for BIM; built and managed Cardiff Virtual Reality Lab in Cardiff University; introduced the Cardiff VR lab with BIM concept to different potential financial sponsors; involved in different BIM project such as SPORTE, RegBIM, and OntoFM. ♦ Jan.2011–Present
  • 2.
    Demonstrator and TeachingAssistant, Cardiff University After receiving training and acquiring corresponding qualifications, employed to teach various courses such as Integrated Building Design, Revit, AutoCAD, Matlab, C++. ♦ Jul.2008–Apr.2009 Industrial and civil construction works, Handan Construction Company Took part in organization and management and understood the basic process of construction in the construction site; learnt the relevant operational skills; learnt the skills of experiments as well as the collation of technical information. ♦ Jul.2007–Jul.2008 Long Xi Highway line modification works (Bid B), XingTai Highway and Bridge Construction General Corporation Participated in roadbed construction, structural construction; understood basic process of construction; learnt relevant skills for operation and surveying. ♦ Jun.2006–Jul.2007 Budget and survey for Civil Engineering, Hebei University of Technology While focusing on project preparation and application of the scale, worked over the budget preparation principles, methods and steps. Use theodolite and a tape to measure parameters of my school’s buildings and draw the views of building plans. RREELLEEVVAANNTT SSKKIILLLLSS  Expertise in BIM software (e.g. Revit etc.), building design software (e.g. AutoCAD etc.) –the key software I used for my previous work and current PhD.  An excellent ability to self-study–the essential skill for BIM projects during my PhD ( i.e. SPORTE2 related to energy simulations, RegBIM referenced to BIM standard integration, and OntoFM linked to building data collection)  Working to deadlines under pressure–successfully finished all distributed tasks or jobs during the period of my internships, work and academic studies.  Having sound knowledge of programming language VB, C# and C++ – utilized these programming languages to develop Revit extensions for my PhD.  Flexibility and originality of approach–the key capacity to undertake PhD research and to satisfy financial sponsors’ requirements of BIM projects.  Efficient management and organizational abilities–organized regular social events and science visits for local students as class president in China; built and Cardiff Virtual Reality Lab in Cardiff and introduced it with BIM concept to different potential financial sponsors.  Team working and communication skills –attached importance to collaboration between group members as a class president in university; valued others’ suggestions to improve my views in previous work and study; help students solve academic problems by emails or face-to-face talking as a teaching assistant. IINNTTEERREESSTTSS BBaasskkeettbbaallll && BBiilllliiaarrddss--PPllaayy bbaasskkeettbbaallll rreegguullaarrllyy aanndd wwoonn tthhiirrdd iinn RRiilleeyyss ppooooll ccoonntteesstt.. RREEFFEERREEEESS
  • 3.