The document outlines the processes and procedures for infrastructure projects participating in the Balcones Canyonlands Conservation Plan (BCCP) Mitigation Program. Key points include:
- The program streamlines compliance with the Endangered Species Act for projects impacting endangered species habitat within the BCCP area.
- Eligibility is determined by location within or outside the BCCP boundaries and infrastructure corridors. Mitigation ratios vary from 1:1 to 5:1 depending on location.
- The application process involves assessing habitat impacts, calculating mitigation requirements, and obtaining approval letters. Mitigation is satisfied through purchasing credits from the BCCP mitigation bank.
- Guidelines are provided for vegetation clearing dates,
Eia of township and area development projectsSandeep Kumar
Source : Environmental Impact Assessment Guidance Manual for BUILDING, CONSTRUCTION, TOWNSHIPS and AREA DEVELOPMENT PROJECTS Prepared by Administrative Staff College of India for Ministry of Environment & Forests, GOVERNMENT OF INDIA, NEW DELHI
A presentation about clean water in real estate development. Presented by Pallavi Kalia Mande with the Charles River Watershed Association during the Buzzards Bay Coalition's 2014 Decision Makers Workshop series. Learn more at www.savebuzzardsbay.org/DecisionMakers
Case studies on economic appraisal of adaptation options in some countriesNAP Events
Presented by: Paul Watkiss
8.4 Case studies on economic appraisal of adaptation options
This session will build on the plenary presentation on economic appraisal to go into detail about some of the methods that countries can use to appraise their adaptation options. The methods used in the recent UNEP adaptation finance gap report will set the scene for discussion of how the regional approaches can be reconciled with national efforts to estimate costs for adaptation.
A representative from the Network for Sustainable Hydropower Development for Mekong Region with the support of MRC-GIZ Cooperation Programme gave a presentation on hydropower siting, design, and operations in a changing climate.
Eia of township and area development projectsSandeep Kumar
Source : Environmental Impact Assessment Guidance Manual for BUILDING, CONSTRUCTION, TOWNSHIPS and AREA DEVELOPMENT PROJECTS Prepared by Administrative Staff College of India for Ministry of Environment & Forests, GOVERNMENT OF INDIA, NEW DELHI
A presentation about clean water in real estate development. Presented by Pallavi Kalia Mande with the Charles River Watershed Association during the Buzzards Bay Coalition's 2014 Decision Makers Workshop series. Learn more at www.savebuzzardsbay.org/DecisionMakers
Case studies on economic appraisal of adaptation options in some countriesNAP Events
Presented by: Paul Watkiss
8.4 Case studies on economic appraisal of adaptation options
This session will build on the plenary presentation on economic appraisal to go into detail about some of the methods that countries can use to appraise their adaptation options. The methods used in the recent UNEP adaptation finance gap report will set the scene for discussion of how the regional approaches can be reconciled with national efforts to estimate costs for adaptation.
A representative from the Network for Sustainable Hydropower Development for Mekong Region with the support of MRC-GIZ Cooperation Programme gave a presentation on hydropower siting, design, and operations in a changing climate.
Review of volunteer efforts on the City of Austin's Water Quality Protection Lands. Includes information on different solarization techniques and invasive plant species management.
Our Endangered Texas Native: The Golden-Cheeked Warblercoawildlands
This presentation will summarize what biologists have discovered about the behavior and life history of the endangered Golden-cheeked Warbler. In particular, we will examine some preliminary insights gleaned from the first three years of intensive study involving the color-banding of Golden-cheeks on the Balcones Canyonlands Preserve.
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Venturesgreendigital
Willie Nelson is a name that resonates within the world of music and entertainment. Known for his unique voice, and masterful guitar skills. and an extraordinary career spanning several decades. Nelson has become a legend in the country music scene. But, his influence extends far beyond the realm of music. with ventures in acting, writing, activism, and business. This comprehensive article delves into Willie Nelson net worth. exploring the various facets of his career that have contributed to his large fortune.
Follow us on: Pinterest
Introduction
Willie Nelson net worth is a testament to his enduring influence and success in many fields. Born on April 29, 1933, in Abbott, Texas. Nelson's journey from a humble beginning to becoming one of the most iconic figures in American music is nothing short of inspirational. His net worth, which estimated to be around $25 million as of 2024. reflects a career that is as diverse as it is prolific.
Early Life and Musical Beginnings
Humble Origins
Willie Hugh Nelson was born during the Great Depression. a time of significant economic hardship in the United States. Raised by his grandparents. Nelson found solace and inspiration in music from an early age. His grandmother taught him to play the guitar. setting the stage for what would become an illustrious career.
First Steps in Music
Nelson's initial foray into the music industry was fraught with challenges. He moved to Nashville, Tennessee, to pursue his dreams, but success did not come . Working as a songwriter, Nelson penned hits for other artists. which helped him gain a foothold in the competitive music scene. His songwriting skills contributed to his early earnings. laying the foundation for his net worth.
Rise to Stardom
Breakthrough Albums
The 1970s marked a turning point in Willie Nelson's career. His albums "Shotgun Willie" (1973), "Red Headed Stranger" (1975). and "Stardust" (1978) received critical acclaim and commercial success. These albums not only solidified his position in the country music genre. but also introduced his music to a broader audience. The success of these albums played a crucial role in boosting Willie Nelson net worth.
Iconic Songs
Willie Nelson net worth is also attributed to his extensive catalog of hit songs. Tracks like "Blue Eyes Crying in the Rain," "On the Road Again," and "Always on My Mind" have become timeless classics. These songs have not only earned Nelson large royalties but have also ensured his continued relevance in the music industry.
Acting and Film Career
Hollywood Ventures
In addition to his music career, Willie Nelson has also made a mark in Hollywood. His distinctive personality and on-screen presence have landed him roles in several films and television shows. Notable appearances include roles in "The Electric Horseman" (1979), "Honeysuckle Rose" (1980), and "Barbarosa" (1982). These acting gigs have added a significant amount to Willie Nelson net worth.
Television Appearances
Nelson's char
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...MMariSelvam4
The carbon cycle is a critical component of Earth's environmental system, governing the movement and transformation of carbon through various reservoirs, including the atmosphere, oceans, soil, and living organisms. This complex cycle involves several key processes such as photosynthesis, respiration, decomposition, and carbon sequestration, each contributing to the regulation of carbon levels on the planet.
Human activities, particularly fossil fuel combustion and deforestation, have significantly altered the natural carbon cycle, leading to increased atmospheric carbon dioxide concentrations and driving climate change. Understanding the intricacies of the carbon cycle is essential for assessing the impacts of these changes and developing effective mitigation strategies.
By studying the carbon cycle, scientists can identify carbon sources and sinks, measure carbon fluxes, and predict future trends. This knowledge is crucial for crafting policies aimed at reducing carbon emissions, enhancing carbon storage, and promoting sustainable practices. The carbon cycle's interplay with climate systems, ecosystems, and human activities underscores its importance in maintaining a stable and healthy planet.
In-depth exploration of the carbon cycle reveals the delicate balance required to sustain life and the urgent need to address anthropogenic influences. Through research, education, and policy, we can work towards restoring equilibrium in the carbon cycle and ensuring a sustainable future for generations to come.
WRI’s brand new “Food Service Playbook for Promoting Sustainable Food Choices” gives food service operators the very latest strategies for creating dining environments that empower consumers to choose sustainable, plant-rich dishes. This research builds off our first guide for food service, now with industry experience and insights from nearly 350 academic trials.
Natural farming @ Dr. Siddhartha S. Jena.pptxsidjena70
A brief about organic farming/ Natural farming/ Zero budget natural farming/ Subash Palekar Natural farming which keeps us and environment safe and healthy. Next gen Agricultural practices of chemical free farming.
Characterization and the Kinetics of drying at the drying oven and with micro...Open Access Research Paper
The objective of this work is to contribute to valorization de Nephelium lappaceum by the characterization of kinetics of drying of seeds of Nephelium lappaceum. The seeds were dehydrated until a constant mass respectively in a drying oven and a microwawe oven. The temperatures and the powers of drying are respectively: 50, 60 and 70°C and 140, 280 and 420 W. The results show that the curves of drying of seeds of Nephelium lappaceum do not present a phase of constant kinetics. The coefficients of diffusion vary between 2.09.10-8 to 2.98. 10-8m-2/s in the interval of 50°C at 70°C and between 4.83×10-07 at 9.04×10-07 m-8/s for the powers going of 140 W with 420 W the relation between Arrhenius and a value of energy of activation of 16.49 kJ. mol-1 expressed the effect of the temperature on effective diffusivity.
UNDERSTANDING WHAT GREEN WASHING IS!.pdfJulietMogola
Many companies today use green washing to lure the public into thinking they are conserving the environment but in real sense they are doing more harm. There have been such several cases from very big companies here in Kenya and also globally. This ranges from various sectors from manufacturing and goes to consumer products. Educating people on greenwashing will enable people to make better choices based on their analysis and not on what they see on marketing sites.
2. Infrastructure planning is critical to minimizing habitat
loss and fragmentation within the BCP
The City of Austin manages the infrastructure
mitigation program
Participation in the program will cover incidental take
of endangered species habitat, providing a
streamlined approach to comply with the Endangered
Species Act.
BCCP Infrastructure Mitigation
Program
3. BCCP Infrastructure Mitigation
Program Participation
Eligible if
within BCCP
participation
area and
outside BCP
within
infrastructure
corridor
within BCP
4. Overview
Project Within
BCCP
Participation
Area?
Project Within
BCP?
Project Able to
Participate in
BCCP
Mitigation
Program?
Project Need
Construction
Approval?
Project
Mitigation
Ratio
Yes No Yes No 1:1
Yes Yes Yes Yes 5:1
**Non-BCCP participants can also work directly with USFWS
BCCP Infrastructure Mitigation
Program Participation
5. Infrastructure Mitigation Process
Vegetation Clearing Dates
Vegetation Maintenance Plans
Emergency Maintenance
Oak Wilt Prevention Policy
Wildfire Prevention Plan
Scheduling BCP Access
Participating in the BCCP
Infrastructure Mitigation Program
Need to
Know
6. Project Pre-Planning
Submit Habitat Assessment Application
Receive Mitigation Determination Letter and
Construction Approval Letter (if required)
Satisfy Project Mitigation Requirement
BCP signatories mitigate through BCCP mitigation
credits (mitigation bank)
Non-BCCP participants purchase participation
certificates through Travis County BCCP Staff
Mitigation Process
Steps
7. Project Pre-Planning
Resources
BCCP Infrastructure Workshop and Booklet
City of Austin BCP Website www.balconescanyonlands.org
Downloadable Documents
Habitat Assessment Application
Appendix B – Infrastructure Management Plan
Wildfire Prevention Plan Template
Preapproved Vegetation Maintenance Plan Template
Mobile map application
Interactive Map
Search for project address to find BCCP information
pertinent to your project
8. If the project is within the BCCP Mitigation
Program Participation Area
If the project is within the Balcones
Canyonlands Preserve Acquisition Boundary
If the project is within a Karst BCCP Mitigation
Zone
If the project is within the Black-capped Vireo
BCCP Mitigation Zone
If the project is within a Golden-cheeked
Warbler Mitigation Zone
If a project inside of the BCP is in an already
established infrastructure corridor
Who manages the BCP property of the project
Contact information for the preserve manager
to schedule preserve access
Find out…
BCCP Interactive Map
https://austintexas.gov/department/wildland-maps
10. 1. Applicant Information
2. Landowner
3. Project Name
4. Brief Project Description
5. Description of Vegetation Disturbance
6. Dimensions of Disturbed Area
7. Total Acreage of Disturbed Area
8. Attachments
1. Maps & Spatial Data
9. USFWS Participation?
BCCP Habitat Assessment
Application Questions
Required
Information
11. Review application
Map the project impact area
Overlay impact area onto BCP boundaries and Habitat
Mitigation Zones to calculate project mitigation
requirement
Compose and distribute mitigation determination and
construction approval letter
Mitigation Analysis Process
Steps
12. Songbird Mitigation Zones
CWA Mitigation Zone 1 = $5,500 / ac
GCWA Mitigation Zone 2 = $2,750 / ac
BCVI Mitigation Zone = $5,500 / ac
Mitigation
Fees
14. USFWS Salamander Critical Habitat
Additional
USFWS
Consultation if
project is within
USFWS Salamander
Critical Habitat
zone
15. Clearing allowed September
through February.
After March 1st work must cease
unless
Bird-monitoring survey
conducted using USFWS
protocols
No nesting birds within 300 feet
Natural vegetation already
removed
Vegetation Clearing Dates
Photo by Amanda Aurora
16. Vegetation Maintenance Activity
Submit vegetation maintenance plan to BCCP Secretary
and Land Manager for review and approval
Preapproved Maintenance Plans
When vegetation maintenance work is repetitive
Proposed vegetation maintenance plan and schedule
submitted to BCCP Secretary and Land Manager for review
and approval
Work shall proceed under negotiated terms
Submit notification when ready to proceed with maintenance
Vegetation Maintenance Plans
17. Vegetation Maintenance Plans
Segment*
Danger
Zone**
Maximum
Vegetation
Height**
Maintenance
Frequency
(years)
Date Last
Maintained Trees to Remove*** Describe maintenance methodology****
*Expand the table on this form as needed to include all segments. Segments will be defined between each tower or valve.
** Height above ground surface ***List by species and number
****Manual or mechanical (if mechanical give detailed description of equipment and methodology.
Infrastructure Corridor:
Landowner/managing entity:
Infrastructure Owner:
Infrastructure Description
Type (electric, water, wastewater, other):
Length: Width:
Description (Voltage, pipe size, other):
Required
Information
**BCP Staff can meet onsite for guidance on best practices
18. Closed canopy minimizes
fragmentation
Leaving native shrubs & grasses
Minimal & strategic pruning
Removal of non-native trees
Special techniques for oak wilt
Measures to control
sedimentation
Revegetation with
appropriate natives
Avoid critical nesting season
(March 1-Sept 1)
Best Practices for Vegetation
Maintenance in the BCP
19. Closed canopy minimizes
fragmentation
Leaving native shrubs & grasses
Minimal & strategic pruning
Removal of non-native trees
Special techniques for oak wilt
Measures to control
sedimentation
Revegetation with
appropriate natives
Avoid critical nesting season
(March 1-Sept 1)
Best Practices for Vegetation
Maintenance in the BCP
20. Closed canopy minimizes
fragmentation
Leaving native shrubs & grasses
Minimal & strategic pruning
Removal of non-native trees
Special techniques for oak wilt
Measures to control
sedimentation
Revegetation with
appropriate natives
Avoid critical nesting season
(March 1-Sept 1)
Best Practices for Vegetation
Maintenance in the BCP
21. Closed canopy minimizes
fragmentation
Leaving native shrubs & grasses
Minimal & strategic pruning
Removal of non-native trees
Special techniques for oak wilt
Measures to control
sedimentation
Revegetation with
appropriate natives
Avoid critical nesting season
(March 1-Sept 1)
Best Practices for Vegetation
Maintenance in the BCP
22. Best Practices for Vegetation
Maintenance in the BCP
Closed canopy minimizes
fragmentation
Leaving native shrubs & grasses
Minimal & strategic pruning
Removal of non-native trees
Special techniques for oak wilt
Measures to control
sedimentation
Revegetation with
appropriate natives
Avoid critical nesting season
(March 1-Sept 1)
23. Best Practices for Vegetation
Maintenance in the BCP
Closed canopy minimizes
fragmentation
Leaving native shrubs & grasses
Minimal & strategic pruning
Removal of non-native trees
Special techniques for oak wilt
Measures to control
sedimentation
Revegetation with
appropriate natives
Avoid critical nesting season
(March 1-Sept 1)
24. Closed canopy minimizes
fragmentation
Leaving native shrubs & grasses
Minimal & strategic pruning
Removal of non-native trees
Special techniques for oak wilt
Measures to control
sedimentation
Revegetation with
appropriate natives
Avoid critical nesting season
(March 1-Sept 1)
Best Practices for Vegetation
Maintenance in the BCP
25. Closed canopy minimizes
fragmentation
Leaving native shrubs & grasses
Minimal & strategic pruning
Removal of non-native trees
Special techniques for oak wilt
Measures to control
sedimentation
Revegetation with
appropriate natives
Avoid critical nesting season
(March 1-Sept 1)
Best Practices for Vegetation
Maintenance in the BCP
26. When there is an existing
condition of, or
imminent threat to
public health
safety
property damage
loss of service
Emergency Maintenance
When does
it apply?
27. Eliminate emergency condition
Work still be performed in such manner to minimize
habitat destruction
Contact Coordinating Committee Secretary for
advice/guidance
Submit final incident report to Coordinating
Committee Secretary within 5 days, describing
emergency maintenance work completed
Emergency Maintenance
Expectations
28. Oak Wilt Prevention Policy
Avoid wounds
Paint wounds
Sanitize tools
Destroy diseased red oaks
Main
Components
Necessary to strictly adhere
to the City of Austin, Travis
County, and LCRA Oak Wilt
Prevention Policies.
29. A preaction plan used to
help prevent accidental
wildfire ignitions on
wildlands and to provide
initial response when
ignitions are
encountered
Wildfire Prevention Plan
What is it?
30. Required for all activities conducted by contractors,
consultants, and infrastructure providers on City of
Austin BCP
To reduce the risk to employees, the public,
emergency responders, and resources
Support City of Austin, Fire Adapted Community goals
Wildfire Prevention Plan
Why do it?
31. Accurate description of the area and duration of the work.
Identification of the nearest entry point for emergency
responders.
Expectations for personnel and equipment to prevent,
spot, and extinguish ignitions.
Contact information for partner field staff and BCP/WCD
staff.
Wildfire Prevention Plan
Elements
32. Accurate description of the area and duration of the work.
Identification of the nearest entry point for emergency
responders.
Expectations for personnel and equipment to prevent,
spot, and extinguish ignitions.
Contact information for partner field staff and BCP/WCD
staff.
Wildfire Prevention Plan
Expectations
34. Call or email BCCP Infrastructure
Coordinator
Provide BCP location information
Provide reason for requested access
BCP staff may need to accompany work
crew
Provide preferred access date and time
BCP staff can generally accommodate
access requests within 3 business days
Scheduling BCP Access
Do…
35. Show up unexpectedly at BCP gate and
expect to call and get gate codes and
immediate access
We will only accommodate same day
emergency maintenance access
Jump fences to gain access to BCP
Safety issue – animal management practices
in BCP
Trespassers will be prosecuted
Waste time and money by not scheduling
access in advance
Infrastructure Providers – supply preserve
access information to your contractors
Contractors – request preserve access
information from infrastructure providers
Scheduling BCP Access
Don’t…
36. Thank You for Participating
The BCCP Mitigation Program demonstrates
that economic growth and development,
and habitat protection
can coexist.