SEA LEVEL RISE: TRANSPORTATION ASSET VULNERABILITY 
Chris Witt, acting Supervising Planner RI Statewide Planning Program
•Provide an overview for state, local staff, and the public of the exposure of our transportation assets to sea level rise inundation 
•Provide transportation stakeholders with best estimation of the exposure of specific roads 
Project Objectives 
•Develop desktop vulnerability method for ranking adaptation priorities 
•ID state transportation assets at highest risk
Sea Level Rise Scenarios 
3 Feet 
1 Foot 
5 Feet 
DATA SOURCES 
National Oceanic and Atmospheric Administration (NOAA) Univ. of Rhode Island Environmental Data Center 
METHOD 
“Bathtub” model Vertical increase in sea level rise over existing terrain
Mapping
Vulnerability 
Likelihood and magnitude of hazard 
Social or transportation impact of hazard occurring 
+
Social / transportation impact 
Likelihood & magnitude of hazard 
Vulnerability 
1 
2 
3 
4 
5 
1 
2 
3 
4 
5 
6 
2 
3 
4 
5 
6 
7 
3 
4 
5 
6 
7 
8 
4 
5 
6 
7 
8 
9 
5 
6 
7 
8 
9 
10
Vulnerability Index: Basic Elements 
Indicators 
Scoring and weighting system 
Gut check 
Magnitude/urgency of physical hazard 
Magnitude of social/transportation impact
For example… 
Physical Impact Indicators 
•Length/area flooded 
•How soon asset will flood 
•Age of infrastructure 
•Elevation of infrastructure 
•Condition of infrastructure 
Social and Transportation Indicators 
•Use level 
•Capacity 
•Existence of alternatives
Transportation categories 
Roads 
RIPTA Bus 
Bridges 
Bicycle 
Intermodal 
Rail 
Ports and Harbors 
Airports
Roads Vulnerability Index 
Indicator 
Type 
Weight 
Scoring 
SLR Zone 
Hazard 
0.3 
1 foot = 10, 3 feet = 6, 5 foot = 2 
1 ft. Inundation 
Hazard 
0.1 
0-15 feet = 3, 15-100 feet = 7, 100+ feet = 10 
3 ft. Inundation 
Hazard 
0.1 
0-100 feet = 3, 100-800 feet = 7, 800+ feet = 10 
5 ft. Inundation 
Hazard 
0.1 
0-500 feet = 3, 500-1500 feet = 7, 1500+ feet = 10 
Functional Class 
Social Impact 
0.3 
See table 
Evacuation Route 
Social Impact 
0.1 
Yes = 10, No = 0
Roads Vulnerability Findings 
Top 10 State-Owned or Maintained Road Segments Most Vulnerable to Sea Level Rise 
Rank 
Road Name 
Municipality 
Feet of SLR When Any Part of Road Segment Floods 
Functional Classification 
Hurricane Evacuation Route 
Linear Feet Flooded at: 
Vulnerability Index Score 
1ft SLR 
3ft SLR 
5ft SLR 
1 
County Rd (103) 
Barrington 
1 
Principal Art. 
Yes 
31 
248 
2888 
8.8 
2 
Main St 
Warren 
1 
Principal Art. 
Yes 
25 
318 
883 
8.1 
2 
Child St 
Warren 
1 
Principal Art. 
Yes 
13 
283 
1179 
8.1 
4 
Massasoit Ave 
Barrington 
1 
Minor Art. 
Yes 
15 
59 
630 
7.5 
5 
Wampanoag Trail (114) 
Barrington 
3 
Principal Art., Urban Non Classified 
Yes 
0 
141 
6368 
7.3 
6 
Old Main Rd* 
Tiverton 
1 
Collector 
Yes 
150 
834 
953 
7.2 
7 
Hope St 
Bristol 
3 
Principal Art. 
Yes 
0 
583 
2021 
6.9 
8 
Market St 
Warren 
3 
Principal Art., Minor Art. 
Yes 
0 
1129 
2164 
6.7 
9 
Ocean Ave 
New Shoreham 
1 
Minor Art., Rural Non Classified 
No 
14 
1007 
2962 
6.6 
9 
Phillips St 
N. Kingstown 
3 
Principal Art. 
Yes 
0 
209 
583 
6.6
RIPTA Route Vulnerability Index 
Indicator 
Type 
Weight 
Scoring 
Frequency 
Social Impact 
0.15 
Under 50 = 0, 50-250 = 2, 250-400 = 6, 400+ = 10 
Ridership 
Social Impact 
0.2 
Under 20,000 = 0, 20-100,000 = 2, 100K-200K = 6, 200K+ = 10 
SLR Zone 
Hazard 
0.2 
1 foot = 10, 3 feet = 6, 5 foot = 2 
Stops Flooded 3 ft. 
Hazard 
0.15 
0 = 0, 1 stop = 2, 2 stops = 4, 5 stops = 10 
Stops Flooded 5 ft. 
Hazard 
0.15 
0 stops = 0, 1 stop = 2, 4-5 stops = 4, 6-7 stops = 6, 8-20 stops = 8, 20+ stops = 10 
5 ft. Inundation 
Hazard 
0.15 
0-2,000 feet = 3; 2,000-8,000 feet = 7, 8,000+ feet = 10
RIPTA Route Vulnerability Findings 
Top 11 RIPTA Routes Most Vulnerable to Sea Level Rise 
Rank 
# 
Name 
Ridership - Weekly 
Frequency - Weekly Trips 
SLR Scenario When Route First Impacted 
Stops Flooded at 3 ft SLR 
Stops Flooded at 5 ft SLR 
Length Flooded at 5 ft 
Vulnerability Index Score 
1 
60 
PROVIDENCE/NEWPORT 
332,983 
551 
1 
5 
33 
15,918 
10.0 
2 
66 
URI/GALILEE 
192,375 
278 
3 
1 
6 
7,561 
5.6 
3 
14 
WEST BAY 
85,518 
190 
3 
2 
9 
8,660 
5.2 
4 
33 
RIVERSIDE 
158,398 
404 
3 
0 
4 
1,485 
4.5 
5 
64 
NEWPORT/URI 
41,475 
118 
3 
0 
7 
6,430 
3.9 
5 
65 
WAKEFIELD EXPRESS 
28,935 
55 
3 
1 
4 
5,605 
3.9 
7 
3 
WARWICK AVE 
148,719 
399 
3 
0 
0 
1,195 
3.8 
8 
67 
BELLEVUE MANSION/SALVE REGINS 
54,220 
514 
5 
0 
1 
2,576 
3.7 
9 
1 
EDDY ST 
197,685 
516 
5 
0 
0 
801 
3.6 
10 
32 
EAST PROVIDENCE/WAMPANOAG 
24,958 
189 
3 
0 
4 
1,485 
3.0 
10 
34 
EAST PROVIDENCE 
55,565 
209 
3 
0 
4 
1,485 
3.0
Bridge Vulnerability Index 
Indicator* 
Type 
Weight 
Scoring 
Freeboard 
Hazard 
0.25 
Freeboard problem or unknown = 10; No problem = 0 
Access 
Hazard 
0.2 
Access problem = 10; no problem = 0 
Height of freeboard 
Hazard 
0.1 
less than 40" = 10; 41-75“ = 6; more than 75" = 2 
Over MHHW 
Hazard 
0.2 
Yes = 10; No = 0 
Carries road facility 
Social Impact 
0 
Carries road facility = 10; other = 0 
AADT 
Social Impact 
0.25 
0-1 = 0, 2-5000 = 3, 5000-15000 = 7, 15000+ = 10
Bridge Vulnerability Findings 
Top 10 State-Owned Bridges Most Vulnerable to Sea Level Rise 
Bridge Name 
Town 
Facility 
Feature Intersected 
Year Built 
AADT 
Inches of Freeboard4 
Currently over tidal water? 
Access Problem 
Vulnerability Index Score 
Barrington 
Barrington 
RI 114/103 CNTY RD 
Barrington River 
2009 
26,000 
74 
Y 
problem 
9.6 
Warren 
Barrington 
RI 114/103 CNTY RD 
Warren River 
1914 
19,900 
98 
Y 
problem 
9 
C.L. Hussey Memorial 
North Kingstown 
US 1A BSTN NCK RD 
Wickford Cove 
1925 
9,100 
48 
Y 
problem 
8.85 
Wickford 
North Kingstown 
US 1A Bstn Nck Rd 
Academy Cove 
1951 
9,100 
61 
Y 
problem 
8.85 
New Harbor Road 
New Shoreham 
Ocean Av 
Trimms Pond 
1925 
7,000 
70 
Y 
problem 
8.85 
New Shoreham 
New Shoreham 
Beach Av 
Harbor Pond 
1997 
7,000 
73 
Y 
problem 
8.85 
Barrington Parkway 
East Providence 
Veterans Mem Pkwy 
Watchemoket Cove 
1973 
12,700 
80 
Y 
problem 
8.25 
Bridgetown 
Narragansett 
Bridgetown Rd 
Pettaquamscutt River 
1934 
9,800 
86 
Y 
problem 
8.25 
Central 
Barrington 
Massasoit Av 
Barrington River 
1940 
8,800 
99 
Y 
problem 
8.25 
Silver Creek 
Bristol 
RI 114 Hope St 
Tidal Inlet 
1922 
18,200 
20 
N 
problem 
8
General Adaptation Strategies 
PROTECT 
ACCOMODATE 
RETREAT 
DO NOTHING 
Armor 
Enhance natural protections 
Accommodate in place 
Realignment
How to Use Project Findings 
Spending 
•Asset management 
•Project selection (TIP or CIP) 
•Construction contracts 
Planning 
•Hazard mitigation plans 
•Long range transportation plan 
•Local comprehensive plans 
Goal-setting 
•MAP-21 performance measures 
•Other performance management
Questions and Discussion

More Related Content

Viewers also liked

A5 thursday inclusive community_engagement
A5 thursday inclusive community_engagementA5 thursday inclusive community_engagement
A5 thursday inclusive community_engagement
Planning_1
 
Learning
LearningLearning
TogetherWeServed - Rocco J. Youmans, DPC
TogetherWeServed - Rocco J. Youmans, DPCTogetherWeServed - Rocco J. Youmans, DPC
TogetherWeServed - Rocco J. Youmans, DPC
Rocco Youmans, CHS-V, FABCHS, USN (Retired)
 
C1 discover beautiful rhode island
C1 discover beautiful rhode islandC1 discover beautiful rhode island
C1 discover beautiful rhode island
Planning_1
 
A2 planning for a changing climate
A2   planning for a changing climateA2   planning for a changing climate
A2 planning for a changing climate
Planning_1
 
G3 friday oct24_corridor re-mix_marstons mills
G3 friday oct24_corridor re-mix_marstons millsG3 friday oct24_corridor re-mix_marstons mills
G3 friday oct24_corridor re-mix_marstons mills
Planning_1
 
C3 g+¬+£ watson sneapa
C3 g+¬+£ watson sneapaC3 g+¬+£ watson sneapa
C3 g+¬+£ watson sneapa
Planning_1
 
C3 [et 2] darrin connecticut 2014 nhma
C3 [et 2] darrin connecticut 2014 nhma C3 [et 2] darrin connecticut 2014 nhma
C3 [et 2] darrin connecticut 2014 nhma
Planning_1
 

Viewers also liked (8)

A5 thursday inclusive community_engagement
A5 thursday inclusive community_engagementA5 thursday inclusive community_engagement
A5 thursday inclusive community_engagement
 
Learning
LearningLearning
Learning
 
TogetherWeServed - Rocco J. Youmans, DPC
TogetherWeServed - Rocco J. Youmans, DPCTogetherWeServed - Rocco J. Youmans, DPC
TogetherWeServed - Rocco J. Youmans, DPC
 
C1 discover beautiful rhode island
C1 discover beautiful rhode islandC1 discover beautiful rhode island
C1 discover beautiful rhode island
 
A2 planning for a changing climate
A2   planning for a changing climateA2   planning for a changing climate
A2 planning for a changing climate
 
G3 friday oct24_corridor re-mix_marstons mills
G3 friday oct24_corridor re-mix_marstons millsG3 friday oct24_corridor re-mix_marstons mills
G3 friday oct24_corridor re-mix_marstons mills
 
C3 g+¬+£ watson sneapa
C3 g+¬+£ watson sneapaC3 g+¬+£ watson sneapa
C3 g+¬+£ watson sneapa
 
C3 [et 2] darrin connecticut 2014 nhma
C3 [et 2] darrin connecticut 2014 nhma C3 [et 2] darrin connecticut 2014 nhma
C3 [et 2] darrin connecticut 2014 nhma
 

Similar to B5 slr presentation 8-6-sneapa-102214

CAAF Submital for PIT
CAAF  Submital for PITCAAF  Submital for PIT
CAAF Submital for PIT
Castro Onix
 
Stormwater Asset Management Using Gis V5
Stormwater Asset Management Using Gis V5Stormwater Asset Management Using Gis V5
Stormwater Asset Management Using Gis V5
Vithal Deshpande
 
The Condition of Anderson County [SC] Roads (2015)
The Condition of Anderson County [SC] Roads (2015)The Condition of Anderson County [SC] Roads (2015)
The Condition of Anderson County [SC] Roads (2015)
Holt Hopkins
 
Projected Climate Change Impacts for Rhode Island’s Coast: A Summary of the S...
Projected Climate Change Impacts for Rhode Island’s Coast: A Summary of the S...Projected Climate Change Impacts for Rhode Island’s Coast: A Summary of the S...
Projected Climate Change Impacts for Rhode Island’s Coast: A Summary of the S...
riseagrant
 
Crooked Lake Comp Plan Summary for 2009 CLAA Winter Meeting
Crooked Lake Comp Plan Summary for 2009 CLAA Winter MeetingCrooked Lake Comp Plan Summary for 2009 CLAA Winter Meeting
Crooked Lake Comp Plan Summary for 2009 CLAA Winter Meeting
Coon Creek Watershed District
 
Georgia Project Implementation presentation
Georgia Project Implementation presentationGeorgia Project Implementation presentation
Georgia Project Implementation presentation
Iwl Pcu
 
EOPS_2011_07_06.pdf
EOPS_2011_07_06.pdfEOPS_2011_07_06.pdf
EOPS_2011_07_06.pdf
EOPS EOPS
 
Mammoth Lakes HSIP 2013 (Application and Attachments)
Mammoth Lakes HSIP 2013 (Application and Attachments)Mammoth Lakes HSIP 2013 (Application and Attachments)
Mammoth Lakes HSIP 2013 (Application and Attachments)
Carson Quam
 
Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015
Fairfax County
 
Intro To Lid 9.17.09
Intro To Lid 9.17.09Intro To Lid 9.17.09
Intro To Lid 9.17.09
Robert Emanuel
 
Crossman Site
Crossman SiteCrossman Site
Crossman Site
Brendan O'Connor
 
Tom Clark, SRBC, “AMD Restoration Protection Through Delisting and Reclassifi...
Tom Clark, SRBC, “AMD Restoration Protection Through Delisting and Reclassifi...Tom Clark, SRBC, “AMD Restoration Protection Through Delisting and Reclassifi...
Tom Clark, SRBC, “AMD Restoration Protection Through Delisting and Reclassifi...
Michael Hewitt, GISP
 
9900800-050-061-PPT-01-Rev0 (Deep Cove)
9900800-050-061-PPT-01-Rev0 (Deep Cove)9900800-050-061-PPT-01-Rev0 (Deep Cove)
9900800-050-061-PPT-01-Rev0 (Deep Cove)
Floris van Weelderen
 
Environmental Health and Safety Survey - Brokers' Bay 2019
Environmental Health and Safety Survey  - Brokers' Bay 2019Environmental Health and Safety Survey  - Brokers' Bay 2019
Environmental Health and Safety Survey - Brokers' Bay 2019
LOWaterkeeper
 
Aldergrove Aquifer Issues
Aldergrove Aquifer IssuesAldergrove Aquifer Issues
Aldergrove Aquifer Issues
jgabateman
 
See Again
See AgainSee Again
See Again
SoozAnn
 
2011 04-26 powell-street_urban_design_plan
2011 04-26 powell-street_urban_design_plan2011 04-26 powell-street_urban_design_plan
2011 04-26 powell-street_urban_design_plan
E'ville Eye
 
2011 04-26 powell-street_urban_design_plan
2011 04-26 powell-street_urban_design_plan2011 04-26 powell-street_urban_design_plan
2011 04-26 powell-street_urban_design_plan
E'ville Eye
 
The Cooks River
The Cooks RiverThe Cooks River
The Cooks River
Mr Shipp
 
Beach samp stakeholder_tools_071415
Beach samp stakeholder_tools_071415Beach samp stakeholder_tools_071415
Beach samp stakeholder_tools_071415
riseagrant
 

Similar to B5 slr presentation 8-6-sneapa-102214 (20)

CAAF Submital for PIT
CAAF  Submital for PITCAAF  Submital for PIT
CAAF Submital for PIT
 
Stormwater Asset Management Using Gis V5
Stormwater Asset Management Using Gis V5Stormwater Asset Management Using Gis V5
Stormwater Asset Management Using Gis V5
 
The Condition of Anderson County [SC] Roads (2015)
The Condition of Anderson County [SC] Roads (2015)The Condition of Anderson County [SC] Roads (2015)
The Condition of Anderson County [SC] Roads (2015)
 
Projected Climate Change Impacts for Rhode Island’s Coast: A Summary of the S...
Projected Climate Change Impacts for Rhode Island’s Coast: A Summary of the S...Projected Climate Change Impacts for Rhode Island’s Coast: A Summary of the S...
Projected Climate Change Impacts for Rhode Island’s Coast: A Summary of the S...
 
Crooked Lake Comp Plan Summary for 2009 CLAA Winter Meeting
Crooked Lake Comp Plan Summary for 2009 CLAA Winter MeetingCrooked Lake Comp Plan Summary for 2009 CLAA Winter Meeting
Crooked Lake Comp Plan Summary for 2009 CLAA Winter Meeting
 
Georgia Project Implementation presentation
Georgia Project Implementation presentationGeorgia Project Implementation presentation
Georgia Project Implementation presentation
 
EOPS_2011_07_06.pdf
EOPS_2011_07_06.pdfEOPS_2011_07_06.pdf
EOPS_2011_07_06.pdf
 
Mammoth Lakes HSIP 2013 (Application and Attachments)
Mammoth Lakes HSIP 2013 (Application and Attachments)Mammoth Lakes HSIP 2013 (Application and Attachments)
Mammoth Lakes HSIP 2013 (Application and Attachments)
 
Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015
 
Intro To Lid 9.17.09
Intro To Lid 9.17.09Intro To Lid 9.17.09
Intro To Lid 9.17.09
 
Crossman Site
Crossman SiteCrossman Site
Crossman Site
 
Tom Clark, SRBC, “AMD Restoration Protection Through Delisting and Reclassifi...
Tom Clark, SRBC, “AMD Restoration Protection Through Delisting and Reclassifi...Tom Clark, SRBC, “AMD Restoration Protection Through Delisting and Reclassifi...
Tom Clark, SRBC, “AMD Restoration Protection Through Delisting and Reclassifi...
 
9900800-050-061-PPT-01-Rev0 (Deep Cove)
9900800-050-061-PPT-01-Rev0 (Deep Cove)9900800-050-061-PPT-01-Rev0 (Deep Cove)
9900800-050-061-PPT-01-Rev0 (Deep Cove)
 
Environmental Health and Safety Survey - Brokers' Bay 2019
Environmental Health and Safety Survey  - Brokers' Bay 2019Environmental Health and Safety Survey  - Brokers' Bay 2019
Environmental Health and Safety Survey - Brokers' Bay 2019
 
Aldergrove Aquifer Issues
Aldergrove Aquifer IssuesAldergrove Aquifer Issues
Aldergrove Aquifer Issues
 
See Again
See AgainSee Again
See Again
 
2011 04-26 powell-street_urban_design_plan
2011 04-26 powell-street_urban_design_plan2011 04-26 powell-street_urban_design_plan
2011 04-26 powell-street_urban_design_plan
 
2011 04-26 powell-street_urban_design_plan
2011 04-26 powell-street_urban_design_plan2011 04-26 powell-street_urban_design_plan
2011 04-26 powell-street_urban_design_plan
 
The Cooks River
The Cooks RiverThe Cooks River
The Cooks River
 
Beach samp stakeholder_tools_071415
Beach samp stakeholder_tools_071415Beach samp stakeholder_tools_071415
Beach samp stakeholder_tools_071415
 

More from Planning_1

F5 friday making waves in ponds
F5 friday   making waves in pondsF5 friday   making waves in ponds
F5 friday making waves in ponds
Planning_1
 
G1 sneapa scenario
G1 sneapa scenarioG1 sneapa scenario
G1 sneapa scenario
Planning_1
 
G1 sneapa handout
G1 sneapa handoutG1 sneapa handout
G1 sneapa handout
Planning_1
 
B5 slr presentation 8-6-sneapa-102214
B5 slr presentation 8-6-sneapa-102214B5 slr presentation 8-6-sneapa-102214
B5 slr presentation 8-6-sneapa-102214
Planning_1
 
G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22
G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22
G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22
Planning_1
 
G1 sneapa handout
G1 sneapa handoutG1 sneapa handout
G1 sneapa handout
Planning_1
 
G1 sneapa scenario
G1 sneapa scenarioG1 sneapa scenario
G1 sneapa scenario
Planning_1
 
G1 necap sneapa presentation final no notes
G1 necap sneapa presentation final no notesG1 necap sneapa presentation final no notes
G1 necap sneapa presentation final no notes
Planning_1
 
C5 thursday the ties that bind connecting community plans
C5 thursday   the ties that bind connecting community plansC5 thursday   the ties that bind connecting community plans
C5 thursday the ties that bind connecting community plans
Planning_1
 
C5 sneapa 2014
C5 sneapa 2014C5 sneapa 2014
C5 sneapa 2014
Planning_1
 
C3 sneapa risk & resiliency harrigan
C3 sneapa risk & resiliency harriganC3 sneapa risk & resiliency harrigan
C3 sneapa risk & resiliency harrigan
Planning_1
 
C3 sneapa 2014 punchard integration
C3 sneapa 2014 punchard integrationC3 sneapa 2014 punchard integration
C3 sneapa 2014 punchard integration
Planning_1
 
C1 highway murals i 95
C1 highway murals i 95C1 highway murals i 95
C1 highway murals i 95
Planning_1
 
C1 apa pres bri_comp
C1 apa pres bri_compC1 apa pres bri_comp
C1 apa pres bri_comp
Planning_1
 
C1 2014 sneapa, ronald lee fleming
C1 2014 sneapa, ronald lee flemingC1 2014 sneapa, ronald lee fleming
C1 2014 sneapa, ronald lee fleming
Planning_1
 
A4 thursday planning for neighborhood health
A4 thursday   planning for neighborhood healthA4 thursday   planning for neighborhood health
A4 thursday planning for neighborhood health
Planning_1
 
Lunch sneapa fultineer lunch
Lunch sneapa fultineer lunchLunch sneapa fultineer lunch
Lunch sneapa fultineer lunch
Planning_1
 
F4 friday getting tactical in the creative capital with pop up providence
F4 friday   getting tactical in the creative capital with pop up providenceF4 friday   getting tactical in the creative capital with pop up providence
F4 friday getting tactical in the creative capital with pop up providence
Planning_1
 
F3 seeing is believing
F3 seeing is believingF3 seeing is believing
F3 seeing is believing
Planning_1
 
F1 friday sustainable energy
F1 friday   sustainable energyF1 friday   sustainable energy
F1 friday sustainable energy
Planning_1
 

More from Planning_1 (20)

F5 friday making waves in ponds
F5 friday   making waves in pondsF5 friday   making waves in ponds
F5 friday making waves in ponds
 
G1 sneapa scenario
G1 sneapa scenarioG1 sneapa scenario
G1 sneapa scenario
 
G1 sneapa handout
G1 sneapa handoutG1 sneapa handout
G1 sneapa handout
 
B5 slr presentation 8-6-sneapa-102214
B5 slr presentation 8-6-sneapa-102214B5 slr presentation 8-6-sneapa-102214
B5 slr presentation 8-6-sneapa-102214
 
G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22
G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22
G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22
 
G1 sneapa handout
G1 sneapa handoutG1 sneapa handout
G1 sneapa handout
 
G1 sneapa scenario
G1 sneapa scenarioG1 sneapa scenario
G1 sneapa scenario
 
G1 necap sneapa presentation final no notes
G1 necap sneapa presentation final no notesG1 necap sneapa presentation final no notes
G1 necap sneapa presentation final no notes
 
C5 thursday the ties that bind connecting community plans
C5 thursday   the ties that bind connecting community plansC5 thursday   the ties that bind connecting community plans
C5 thursday the ties that bind connecting community plans
 
C5 sneapa 2014
C5 sneapa 2014C5 sneapa 2014
C5 sneapa 2014
 
C3 sneapa risk & resiliency harrigan
C3 sneapa risk & resiliency harriganC3 sneapa risk & resiliency harrigan
C3 sneapa risk & resiliency harrigan
 
C3 sneapa 2014 punchard integration
C3 sneapa 2014 punchard integrationC3 sneapa 2014 punchard integration
C3 sneapa 2014 punchard integration
 
C1 highway murals i 95
C1 highway murals i 95C1 highway murals i 95
C1 highway murals i 95
 
C1 apa pres bri_comp
C1 apa pres bri_compC1 apa pres bri_comp
C1 apa pres bri_comp
 
C1 2014 sneapa, ronald lee fleming
C1 2014 sneapa, ronald lee flemingC1 2014 sneapa, ronald lee fleming
C1 2014 sneapa, ronald lee fleming
 
A4 thursday planning for neighborhood health
A4 thursday   planning for neighborhood healthA4 thursday   planning for neighborhood health
A4 thursday planning for neighborhood health
 
Lunch sneapa fultineer lunch
Lunch sneapa fultineer lunchLunch sneapa fultineer lunch
Lunch sneapa fultineer lunch
 
F4 friday getting tactical in the creative capital with pop up providence
F4 friday   getting tactical in the creative capital with pop up providenceF4 friday   getting tactical in the creative capital with pop up providence
F4 friday getting tactical in the creative capital with pop up providence
 
F3 seeing is believing
F3 seeing is believingF3 seeing is believing
F3 seeing is believing
 
F1 friday sustainable energy
F1 friday   sustainable energyF1 friday   sustainable energy
F1 friday sustainable energy
 

Recently uploaded

Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
Partito democratico
 
Bharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdfBharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdf
Bharat Mata
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
ahcitycouncil
 
IEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- StatisticsIEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- Statistics
Energy for One World
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
Scalabrini Institute for Human Mobility in Africa
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
Marked12
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
ii2sh2v
 
karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
narinav14
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
odmqk
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
3woawyyl
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
dj1cx4ex
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
JSchaus & Associates
 
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
yemqpj
 
Item # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. DistrictsItem # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. Districts
ahcitycouncil
 
China Politics social economic political
China Politics social economic politicalChina Politics social economic political
China Politics social economic political
ajatjamwal123
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
JSchaus & Associates
 
Researching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssssResearching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssss
DanielOliver74
 
PPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code AmendmentsPPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code Amendments
ahcitycouncil
 
World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.
Christina Parmionova
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
narinav14
 

Recently uploaded (20)

Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 
Bharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdfBharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdf
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
 
IEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- StatisticsIEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- Statistics
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
 
karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
 
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
 
Item # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. DistrictsItem # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. Districts
 
China Politics social economic political
China Politics social economic politicalChina Politics social economic political
China Politics social economic political
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
 
Researching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssssResearching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssss
 
PPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code AmendmentsPPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code Amendments
 
World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
 

B5 slr presentation 8-6-sneapa-102214

  • 1. SEA LEVEL RISE: TRANSPORTATION ASSET VULNERABILITY Chris Witt, acting Supervising Planner RI Statewide Planning Program
  • 2. •Provide an overview for state, local staff, and the public of the exposure of our transportation assets to sea level rise inundation •Provide transportation stakeholders with best estimation of the exposure of specific roads Project Objectives •Develop desktop vulnerability method for ranking adaptation priorities •ID state transportation assets at highest risk
  • 3. Sea Level Rise Scenarios 3 Feet 1 Foot 5 Feet DATA SOURCES National Oceanic and Atmospheric Administration (NOAA) Univ. of Rhode Island Environmental Data Center METHOD “Bathtub” model Vertical increase in sea level rise over existing terrain
  • 5. Vulnerability Likelihood and magnitude of hazard Social or transportation impact of hazard occurring +
  • 6. Social / transportation impact Likelihood & magnitude of hazard Vulnerability 1 2 3 4 5 1 2 3 4 5 6 2 3 4 5 6 7 3 4 5 6 7 8 4 5 6 7 8 9 5 6 7 8 9 10
  • 7. Vulnerability Index: Basic Elements Indicators Scoring and weighting system Gut check Magnitude/urgency of physical hazard Magnitude of social/transportation impact
  • 8. For example… Physical Impact Indicators •Length/area flooded •How soon asset will flood •Age of infrastructure •Elevation of infrastructure •Condition of infrastructure Social and Transportation Indicators •Use level •Capacity •Existence of alternatives
  • 9. Transportation categories Roads RIPTA Bus Bridges Bicycle Intermodal Rail Ports and Harbors Airports
  • 10. Roads Vulnerability Index Indicator Type Weight Scoring SLR Zone Hazard 0.3 1 foot = 10, 3 feet = 6, 5 foot = 2 1 ft. Inundation Hazard 0.1 0-15 feet = 3, 15-100 feet = 7, 100+ feet = 10 3 ft. Inundation Hazard 0.1 0-100 feet = 3, 100-800 feet = 7, 800+ feet = 10 5 ft. Inundation Hazard 0.1 0-500 feet = 3, 500-1500 feet = 7, 1500+ feet = 10 Functional Class Social Impact 0.3 See table Evacuation Route Social Impact 0.1 Yes = 10, No = 0
  • 11. Roads Vulnerability Findings Top 10 State-Owned or Maintained Road Segments Most Vulnerable to Sea Level Rise Rank Road Name Municipality Feet of SLR When Any Part of Road Segment Floods Functional Classification Hurricane Evacuation Route Linear Feet Flooded at: Vulnerability Index Score 1ft SLR 3ft SLR 5ft SLR 1 County Rd (103) Barrington 1 Principal Art. Yes 31 248 2888 8.8 2 Main St Warren 1 Principal Art. Yes 25 318 883 8.1 2 Child St Warren 1 Principal Art. Yes 13 283 1179 8.1 4 Massasoit Ave Barrington 1 Minor Art. Yes 15 59 630 7.5 5 Wampanoag Trail (114) Barrington 3 Principal Art., Urban Non Classified Yes 0 141 6368 7.3 6 Old Main Rd* Tiverton 1 Collector Yes 150 834 953 7.2 7 Hope St Bristol 3 Principal Art. Yes 0 583 2021 6.9 8 Market St Warren 3 Principal Art., Minor Art. Yes 0 1129 2164 6.7 9 Ocean Ave New Shoreham 1 Minor Art., Rural Non Classified No 14 1007 2962 6.6 9 Phillips St N. Kingstown 3 Principal Art. Yes 0 209 583 6.6
  • 12. RIPTA Route Vulnerability Index Indicator Type Weight Scoring Frequency Social Impact 0.15 Under 50 = 0, 50-250 = 2, 250-400 = 6, 400+ = 10 Ridership Social Impact 0.2 Under 20,000 = 0, 20-100,000 = 2, 100K-200K = 6, 200K+ = 10 SLR Zone Hazard 0.2 1 foot = 10, 3 feet = 6, 5 foot = 2 Stops Flooded 3 ft. Hazard 0.15 0 = 0, 1 stop = 2, 2 stops = 4, 5 stops = 10 Stops Flooded 5 ft. Hazard 0.15 0 stops = 0, 1 stop = 2, 4-5 stops = 4, 6-7 stops = 6, 8-20 stops = 8, 20+ stops = 10 5 ft. Inundation Hazard 0.15 0-2,000 feet = 3; 2,000-8,000 feet = 7, 8,000+ feet = 10
  • 13. RIPTA Route Vulnerability Findings Top 11 RIPTA Routes Most Vulnerable to Sea Level Rise Rank # Name Ridership - Weekly Frequency - Weekly Trips SLR Scenario When Route First Impacted Stops Flooded at 3 ft SLR Stops Flooded at 5 ft SLR Length Flooded at 5 ft Vulnerability Index Score 1 60 PROVIDENCE/NEWPORT 332,983 551 1 5 33 15,918 10.0 2 66 URI/GALILEE 192,375 278 3 1 6 7,561 5.6 3 14 WEST BAY 85,518 190 3 2 9 8,660 5.2 4 33 RIVERSIDE 158,398 404 3 0 4 1,485 4.5 5 64 NEWPORT/URI 41,475 118 3 0 7 6,430 3.9 5 65 WAKEFIELD EXPRESS 28,935 55 3 1 4 5,605 3.9 7 3 WARWICK AVE 148,719 399 3 0 0 1,195 3.8 8 67 BELLEVUE MANSION/SALVE REGINS 54,220 514 5 0 1 2,576 3.7 9 1 EDDY ST 197,685 516 5 0 0 801 3.6 10 32 EAST PROVIDENCE/WAMPANOAG 24,958 189 3 0 4 1,485 3.0 10 34 EAST PROVIDENCE 55,565 209 3 0 4 1,485 3.0
  • 14. Bridge Vulnerability Index Indicator* Type Weight Scoring Freeboard Hazard 0.25 Freeboard problem or unknown = 10; No problem = 0 Access Hazard 0.2 Access problem = 10; no problem = 0 Height of freeboard Hazard 0.1 less than 40" = 10; 41-75“ = 6; more than 75" = 2 Over MHHW Hazard 0.2 Yes = 10; No = 0 Carries road facility Social Impact 0 Carries road facility = 10; other = 0 AADT Social Impact 0.25 0-1 = 0, 2-5000 = 3, 5000-15000 = 7, 15000+ = 10
  • 15. Bridge Vulnerability Findings Top 10 State-Owned Bridges Most Vulnerable to Sea Level Rise Bridge Name Town Facility Feature Intersected Year Built AADT Inches of Freeboard4 Currently over tidal water? Access Problem Vulnerability Index Score Barrington Barrington RI 114/103 CNTY RD Barrington River 2009 26,000 74 Y problem 9.6 Warren Barrington RI 114/103 CNTY RD Warren River 1914 19,900 98 Y problem 9 C.L. Hussey Memorial North Kingstown US 1A BSTN NCK RD Wickford Cove 1925 9,100 48 Y problem 8.85 Wickford North Kingstown US 1A Bstn Nck Rd Academy Cove 1951 9,100 61 Y problem 8.85 New Harbor Road New Shoreham Ocean Av Trimms Pond 1925 7,000 70 Y problem 8.85 New Shoreham New Shoreham Beach Av Harbor Pond 1997 7,000 73 Y problem 8.85 Barrington Parkway East Providence Veterans Mem Pkwy Watchemoket Cove 1973 12,700 80 Y problem 8.25 Bridgetown Narragansett Bridgetown Rd Pettaquamscutt River 1934 9,800 86 Y problem 8.25 Central Barrington Massasoit Av Barrington River 1940 8,800 99 Y problem 8.25 Silver Creek Bristol RI 114 Hope St Tidal Inlet 1922 18,200 20 N problem 8
  • 16. General Adaptation Strategies PROTECT ACCOMODATE RETREAT DO NOTHING Armor Enhance natural protections Accommodate in place Realignment
  • 17. How to Use Project Findings Spending •Asset management •Project selection (TIP or CIP) •Construction contracts Planning •Hazard mitigation plans •Long range transportation plan •Local comprehensive plans Goal-setting •MAP-21 performance measures •Other performance management