This document summarizes the economics of grass-based dairy farming compared to conventional dairy farming. Some key points:
- Grass-based dairies can significantly reduce feed costs by allowing cows to graze pasture, but require different management skills focused on pasture and animal observation.
- Studies found grass-based dairies to be economically competitive with conventional dairies, with similar labor costs per cow but less use of technology and purchased feed.
- Non-transitional grass-based dairies that started as low-capital operations tended to have lower costs per cow and higher profits than conventional or higher-capital grazing dairies, but profitability varied widely across all farm types.