1st Qatar BIM User DAY BIM processes Case Study #2BIM User Day
Speaker: Armin Krimpmann, HOCHTIEF Solutions Middle East
-Progress and cost monitoring
About the Qatar BIM User Day:
Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM. More information: www.bimuserday.com Follow BUD on Twitter @bimuserday
BIM - Changing Perceptions of Design-BuildAjaz Hasan
Presentation at the 2011 Canadian Design-Build Institute's National Conference in Edmonton, Alberta. Conference theme was "Embracing the Challenge of Change". Presentation topic was "BIM - Changing Perception of Design-Build" Presentation is built upon the experience of design and construction of the Chilliwack Cultural Centre in Chilliwack, British Columbia, Canada.
1st Qatar BIM User DAY BIM processes Case Study #2BIM User Day
Speaker: Armin Krimpmann, HOCHTIEF Solutions Middle East
-Progress and cost monitoring
About the Qatar BIM User Day:
Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM. More information: www.bimuserday.com Follow BUD on Twitter @bimuserday
BIM - Changing Perceptions of Design-BuildAjaz Hasan
Presentation at the 2011 Canadian Design-Build Institute's National Conference in Edmonton, Alberta. Conference theme was "Embracing the Challenge of Change". Presentation topic was "BIM - Changing Perception of Design-Build" Presentation is built upon the experience of design and construction of the Chilliwack Cultural Centre in Chilliwack, British Columbia, Canada.
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...CCT International
Webinar presented by Mr. Zuhair Haddad, CCT's Chairman for the Lean Construction Institute on 1 September 2016.
Hospitals are ecosystems of diverse functions: laboratories, imaging units, ERs, surgery and operating rooms, inpatient quarters, etc. This makes building them one of the most complex tasks, specifically room completion systems as each set of rooms have their own furnishing and finishing requirements. This entails the existence of several number of trades, where coordination grows exponentially in importance. King Hussein Cancer Center in Jordan is a prime example with fast track requirements (3 years delivery) which increase the complexity further.
Join in this webinar Consolidated Contractors Company (CCC), a leading global construction contractor who will share the above case study where BIM, advanced work packaging and Lean were implemented in an integrated approach to manage the finishing activities for the hospital. The presenter will share some of key drivers for the success of this implementation:
• BIM authoring requirements to suit project controls
• Leveraging BIM to manage schedule, cost, sub-contractors, and material delivery.
• Installation Work Packages (IWPs) creation
• IWPs management using Lean approach
• Collaboration using BIM to support Lean processes
• Lessons learned.
About the Presenter:
Zuhair Haddad is the CIO, Corporate Asset and Risk Management for Consolidated Contractors Company (CCC). He is in charge of mapping out and implementing the Project Control IT and Communication strategy for CCC group as well as directly overseeing CCC’s Information Systems, Corporate Risk, Communication and E-procurement Departments. He also leads the Plants Machinery and Vehicles (PMV) Department which manages CCC’s extensive fleet of construction equipment. Zuhair holds a Masters in Construction Management from Stanford University and a Bachelor of Science from the California State University of Chico in Civil Engineering. In 2014, Zuhair and two other inventors were granted a US Patent for their invention entitled: “System and method for hybrid solid and surface modeling for computer-aided design environments."
5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoptionBIM User Day
Author: Muhammad Jabakhanji | Alpin Limited
Content:
- Understanding main concepts of the UK BIM (and ISO) standards
- Recognition of the role of BIM in the project lifecycle
- Appreciation of steps required to adopt best practices, if not the entire standards
About the Qatar BIM User Day: Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM.
BIM Lecture Note (6/6)
Objectives
* To understand how BIM project is implemented and its challenges
Question
* How to execute a successful BIM project?
www.mtech.com.hk
BIM Execution Plan (BEP) helps to define a foundational framework to ensure successful deployment of advanced design technologies on our BIM-enabled project.
Property Name: Broward County Judicial Complex (BCJC) Midrise Office
Location: 540 SE 3rd Avenue, Fort Lauderdale, Florida
Project Type: Full Renovation
Sector: Government
Services Rendered: Architectural Designing
Property Owner: Broward County
LEED Certification: GOLD
BIM ROLES AND RESPONSIBLITIES DURING CONSTRUCTION:
The Architecture/Engineering (A/E) design team will develop LOD 300 BIM models during the bidding/permitting phase to incorporate County comments, permitting comments, pre-construction RFI’s, and any coordination changes prior to construction.
The construction team (GC) shall work with Owner and design team to develop the Virtual design & Construction (VDC) plan based on BEP version 3.5 for implementation during construction, to include BIM uses such as: 3D Coordination (clash detection), Phase Planning (4D Modeling), Digital Fabrication, Cost Estimation (quantity take-offs), Existing Conditions Modeling, Space Management and Tracking, and COBie information input into Revit models.
Latest Revit models shall be provided to the GC after permits are approved and at issuance of Notice to Proceed 1 to GC, for development of the LOD 350/400/500 models (shop drawings) as defined by BIM forum and as required by County.
Not all items may need to be developed to LOD 350/400. GC shall coordinate with County and develop MEP-FP, Architectural & Structural items to LOD level required for each discipline as directed by County.
Once construction begins, the GC shall be responsible for all LOD 350/400/500 Revit model developments and any changes to COBie data based on field verification, constructability, final product selection & installation.
The GC shall use BIM 360 Field for the gathering of COBie field data from Construction Manager/ Superintendent and all sub-contractors in order to integrate all information into the BIM models throughout construction.
GC shall review subcontractors BIM proficiency and qualifications.
For instances where drawing modifications are required from A/E team to provide sketches, Supplemental Instructions, etc.
Construction team (GC) shall be responsible to provide a location and access for the upload/ download of the latest Revit models by A/E teams to add information, answer RFI’s, etc. Construction team (GC) shall keep daily backups of all models. Should the GC give ownership of the same model to multiple subcontractors, the GC shall be responsible for organizing and merging all new information into one model including, but not limited to: shop drawing sheets, views, updated Revit components, COBie information, etc.
At the end of construction phase, the GC shall provide as-built full size drawings and PDFs and transfer the latest Revit models to the A/E team for Review.
Innovative BIM Solution For Project Management And Quantity Surveying
Mr. Ken Leung, Product Specialist, Exactal Ltd.
HKIBIM-CIC BIM Conference 2014
Date: 29-Oct-2014 (Wed)
Time: 9:30 a.m. – 5:00 p.m.
Venue: Room 201 B & C, Asia World Expo, Hong Kong International Airport, Lantau, Hong Kong
Organizers:
The Hong Kong Institute of Building Information Modelling (HKIBIM)
http://www.hkibim.org
Co-organizers:
The Construction Industry Council
http://www.hkcic.org
HKTDC Hong Kong International Building and Hardware Fair
http://www.hktdc.com/fair/hkbdh-en/HKTDC-Hong-Kong-International-Building-and-Decoration-Materials-and-Hardware-Fair.html
The HKIBIM - CIC BIM Conference 2014 is the 5th Annual Conference organized by the Hong Kong Institute of Building Information Modelling (HKIBIM). It is the premier annual event for experienced AEC professionals to demonstrate the practical use of Building Information Modelling (BIM) processes using real cases. The speakers will illustrate lessons learned in practical projects so that others can improve their efficient use of BIM and advance practical knowledge.
1st Qatar BIM User Day Business processes supported by BIM methodology, part 2BIM User Day
Speaker: Peter Barker, BIM Academy
-O&M and facility management
-Asset management
About the Qatar BIM User Day:
Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM.
More information: www.bimuserday.com
Follow BUD on Twitter @bimuserday
BIM status report 2016 - BIM use casesDaan Moreels
BIM use cases presented by Besix and deBIMspecialist during the BIM manifest event in Brussels, October 2015
Video about real-time collaboration from www.gdaas.com
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...CCT International
Webinar presented by Mr. Zuhair Haddad, CCT's Chairman for the Lean Construction Institute on 1 September 2016.
Hospitals are ecosystems of diverse functions: laboratories, imaging units, ERs, surgery and operating rooms, inpatient quarters, etc. This makes building them one of the most complex tasks, specifically room completion systems as each set of rooms have their own furnishing and finishing requirements. This entails the existence of several number of trades, where coordination grows exponentially in importance. King Hussein Cancer Center in Jordan is a prime example with fast track requirements (3 years delivery) which increase the complexity further.
Join in this webinar Consolidated Contractors Company (CCC), a leading global construction contractor who will share the above case study where BIM, advanced work packaging and Lean were implemented in an integrated approach to manage the finishing activities for the hospital. The presenter will share some of key drivers for the success of this implementation:
• BIM authoring requirements to suit project controls
• Leveraging BIM to manage schedule, cost, sub-contractors, and material delivery.
• Installation Work Packages (IWPs) creation
• IWPs management using Lean approach
• Collaboration using BIM to support Lean processes
• Lessons learned.
About the Presenter:
Zuhair Haddad is the CIO, Corporate Asset and Risk Management for Consolidated Contractors Company (CCC). He is in charge of mapping out and implementing the Project Control IT and Communication strategy for CCC group as well as directly overseeing CCC’s Information Systems, Corporate Risk, Communication and E-procurement Departments. He also leads the Plants Machinery and Vehicles (PMV) Department which manages CCC’s extensive fleet of construction equipment. Zuhair holds a Masters in Construction Management from Stanford University and a Bachelor of Science from the California State University of Chico in Civil Engineering. In 2014, Zuhair and two other inventors were granted a US Patent for their invention entitled: “System and method for hybrid solid and surface modeling for computer-aided design environments."
5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoptionBIM User Day
Author: Muhammad Jabakhanji | Alpin Limited
Content:
- Understanding main concepts of the UK BIM (and ISO) standards
- Recognition of the role of BIM in the project lifecycle
- Appreciation of steps required to adopt best practices, if not the entire standards
About the Qatar BIM User Day: Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM.
BIM Lecture Note (6/6)
Objectives
* To understand how BIM project is implemented and its challenges
Question
* How to execute a successful BIM project?
www.mtech.com.hk
BIM Execution Plan (BEP) helps to define a foundational framework to ensure successful deployment of advanced design technologies on our BIM-enabled project.
Property Name: Broward County Judicial Complex (BCJC) Midrise Office
Location: 540 SE 3rd Avenue, Fort Lauderdale, Florida
Project Type: Full Renovation
Sector: Government
Services Rendered: Architectural Designing
Property Owner: Broward County
LEED Certification: GOLD
BIM ROLES AND RESPONSIBLITIES DURING CONSTRUCTION:
The Architecture/Engineering (A/E) design team will develop LOD 300 BIM models during the bidding/permitting phase to incorporate County comments, permitting comments, pre-construction RFI’s, and any coordination changes prior to construction.
The construction team (GC) shall work with Owner and design team to develop the Virtual design & Construction (VDC) plan based on BEP version 3.5 for implementation during construction, to include BIM uses such as: 3D Coordination (clash detection), Phase Planning (4D Modeling), Digital Fabrication, Cost Estimation (quantity take-offs), Existing Conditions Modeling, Space Management and Tracking, and COBie information input into Revit models.
Latest Revit models shall be provided to the GC after permits are approved and at issuance of Notice to Proceed 1 to GC, for development of the LOD 350/400/500 models (shop drawings) as defined by BIM forum and as required by County.
Not all items may need to be developed to LOD 350/400. GC shall coordinate with County and develop MEP-FP, Architectural & Structural items to LOD level required for each discipline as directed by County.
Once construction begins, the GC shall be responsible for all LOD 350/400/500 Revit model developments and any changes to COBie data based on field verification, constructability, final product selection & installation.
The GC shall use BIM 360 Field for the gathering of COBie field data from Construction Manager/ Superintendent and all sub-contractors in order to integrate all information into the BIM models throughout construction.
GC shall review subcontractors BIM proficiency and qualifications.
For instances where drawing modifications are required from A/E team to provide sketches, Supplemental Instructions, etc.
Construction team (GC) shall be responsible to provide a location and access for the upload/ download of the latest Revit models by A/E teams to add information, answer RFI’s, etc. Construction team (GC) shall keep daily backups of all models. Should the GC give ownership of the same model to multiple subcontractors, the GC shall be responsible for organizing and merging all new information into one model including, but not limited to: shop drawing sheets, views, updated Revit components, COBie information, etc.
At the end of construction phase, the GC shall provide as-built full size drawings and PDFs and transfer the latest Revit models to the A/E team for Review.
Innovative BIM Solution For Project Management And Quantity Surveying
Mr. Ken Leung, Product Specialist, Exactal Ltd.
HKIBIM-CIC BIM Conference 2014
Date: 29-Oct-2014 (Wed)
Time: 9:30 a.m. – 5:00 p.m.
Venue: Room 201 B & C, Asia World Expo, Hong Kong International Airport, Lantau, Hong Kong
Organizers:
The Hong Kong Institute of Building Information Modelling (HKIBIM)
http://www.hkibim.org
Co-organizers:
The Construction Industry Council
http://www.hkcic.org
HKTDC Hong Kong International Building and Hardware Fair
http://www.hktdc.com/fair/hkbdh-en/HKTDC-Hong-Kong-International-Building-and-Decoration-Materials-and-Hardware-Fair.html
The HKIBIM - CIC BIM Conference 2014 is the 5th Annual Conference organized by the Hong Kong Institute of Building Information Modelling (HKIBIM). It is the premier annual event for experienced AEC professionals to demonstrate the practical use of Building Information Modelling (BIM) processes using real cases. The speakers will illustrate lessons learned in practical projects so that others can improve their efficient use of BIM and advance practical knowledge.
1st Qatar BIM User Day Business processes supported by BIM methodology, part 2BIM User Day
Speaker: Peter Barker, BIM Academy
-O&M and facility management
-Asset management
About the Qatar BIM User Day:
Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM.
More information: www.bimuserday.com
Follow BUD on Twitter @bimuserday
BIM status report 2016 - BIM use casesDaan Moreels
BIM use cases presented by Besix and deBIMspecialist during the BIM manifest event in Brussels, October 2015
Video about real-time collaboration from www.gdaas.com
AEC Digital Solutions LLC (www.aecdsl.co) is a pioneering Building Information Modelling (BIM) services firm, providing Virtual Design & Construction (VDC) technology services, and global sourcing solutions to leading international architects, engineering and construction firms. AEC's objective is to leverage international best practices and latest advancements in BIM technology, to add value to clients businesses, and help client's save time and money.
BIM for Building Services Engineering - HKIE seminar in 2014Stephen Au
As building construction project becomes more complex and shorter time to market. By adopting the BIM, simulation, mobile and cloud computing technology, an integrated collaboration platform allows owners, architects, engineers, constructors and sales & marketing working together at any place and any time to get the instant correct information with controlled business process. This can greatly improve design innovation, productivity, safety and cost effectiveness under the GREEN design-build-sell-maintain lifecycle. This seminar will focus on how to use BIM for building services from design, build to facility management.
www.mtech.com.hk
We integrate all sets of BIM software and deliver the best
Scan to BIM services from Laser scan raw data to
different LOD levels in Revit DSP Consultants
also provide CAD plans and elevations from scanned
data to help our customers with information extraction
DSP
Consultants provide Scan to BIM Services Abu
Dhabi, to convert scans of existing buildings including
commercial buildings, educational institutes, historical
monuments, hotels, and train stations or structures to
information rich 3 D models
DSP
Conserve Technical Services LLC in UAE, has core strength in implementing BIM, MEP, Plant Designs, Architectural & Structural Engineering Solution and 3D Laser Scanning in Abu Dhabi & Dubai
Offshore Outsourcing India takes pride in leading the AEC Industry with excellence. We provide exceptional Structural BIM Services that go above and beyond the expectations of our USA-based clients. Our services seamlessly integrate strategic planning, rigorous analysis, and precise structural simulation to deliver outstanding results.
What does BIM mean for Civil Engineers?Chun Keung Ng
BIM is a norm for the building industry. How about for infrastructures? Some countries are over confident on the implementation of BIM in both building and civil engineering industries. Is the BIM technology for infrastructures mature and easily available? Are the professionals ready for BIM?
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
Premium MEAN Stack Development Solutions for Modern BusinessesSynapseIndia
Stay ahead of the curve with our premium MEAN Stack Development Solutions. Our expert developers utilize MongoDB, Express.js, AngularJS, and Node.js to create modern and responsive web applications. Trust us for cutting-edge solutions that drive your business growth and success.
Know more: https://www.synapseindia.com/technology/mean-stack-development-company.html
[Note: This is a partial preview. To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
Sustainability has become an increasingly critical topic as the world recognizes the need to protect our planet and its resources for future generations. Sustainability means meeting our current needs without compromising the ability of future generations to meet theirs. It involves long-term planning and consideration of the consequences of our actions. The goal is to create strategies that ensure the long-term viability of People, Planet, and Profit.
Leading companies such as Nike, Toyota, and Siemens are prioritizing sustainable innovation in their business models, setting an example for others to follow. In this Sustainability training presentation, you will learn key concepts, principles, and practices of sustainability applicable across industries. This training aims to create awareness and educate employees, senior executives, consultants, and other key stakeholders, including investors, policymakers, and supply chain partners, on the importance and implementation of sustainability.
LEARNING OBJECTIVES
1. Develop a comprehensive understanding of the fundamental principles and concepts that form the foundation of sustainability within corporate environments.
2. Explore the sustainability implementation model, focusing on effective measures and reporting strategies to track and communicate sustainability efforts.
3. Identify and define best practices and critical success factors essential for achieving sustainability goals within organizations.
CONTENTS
1. Introduction and Key Concepts of Sustainability
2. Principles and Practices of Sustainability
3. Measures and Reporting in Sustainability
4. Sustainability Implementation & Best Practices
To download the complete presentation, visit: https://www.oeconsulting.com.sg/training-presentations
Memorandum Of Association Constitution of Company.pptseri bangash
www.seribangash.com
A Memorandum of Association (MOA) is a legal document that outlines the fundamental principles and objectives upon which a company operates. It serves as the company's charter or constitution and defines the scope of its activities. Here's a detailed note on the MOA:
Contents of Memorandum of Association:
Name Clause: This clause states the name of the company, which should end with words like "Limited" or "Ltd." for a public limited company and "Private Limited" or "Pvt. Ltd." for a private limited company.
https://seribangash.com/article-of-association-is-legal-doc-of-company/
Registered Office Clause: It specifies the location where the company's registered office is situated. This office is where all official communications and notices are sent.
Objective Clause: This clause delineates the main objectives for which the company is formed. It's important to define these objectives clearly, as the company cannot undertake activities beyond those mentioned in this clause.
www.seribangash.com
Liability Clause: It outlines the extent of liability of the company's members. In the case of companies limited by shares, the liability of members is limited to the amount unpaid on their shares. For companies limited by guarantee, members' liability is limited to the amount they undertake to contribute if the company is wound up.
https://seribangash.com/promotors-is-person-conceived-formation-company/
Capital Clause: This clause specifies the authorized capital of the company, i.e., the maximum amount of share capital the company is authorized to issue. It also mentions the division of this capital into shares and their respective nominal value.
Association Clause: It simply states that the subscribers wish to form a company and agree to become members of it, in accordance with the terms of the MOA.
Importance of Memorandum of Association:
Legal Requirement: The MOA is a legal requirement for the formation of a company. It must be filed with the Registrar of Companies during the incorporation process.
Constitutional Document: It serves as the company's constitutional document, defining its scope, powers, and limitations.
Protection of Members: It protects the interests of the company's members by clearly defining the objectives and limiting their liability.
External Communication: It provides clarity to external parties, such as investors, creditors, and regulatory authorities, regarding the company's objectives and powers.
https://seribangash.com/difference-public-and-private-company-law/
Binding Authority: The company and its members are bound by the provisions of the MOA. Any action taken beyond its scope may be considered ultra vires (beyond the powers) of the company and therefore void.
Amendment of MOA:
While the MOA lays down the company's fundamental principles, it is not entirely immutable. It can be amended, but only under specific circumstances and in compliance with legal procedures. Amendments typically require shareholder
Kseniya Leshchenko: Shared development support service model as the way to ma...Lviv Startup Club
Kseniya Leshchenko: Shared development support service model as the way to make small projects with small budgets profitable for the company (UA)
Kyiv PMDay 2024 Summer
Website – www.pmday.org
Youtube – https://www.youtube.com/startuplviv
FB – https://www.facebook.com/pmdayconference
Putting the SPARK into Virtual Training.pptxCynthia Clay
This 60-minute webinar, sponsored by Adobe, was delivered for the Training Mag Network. It explored the five elements of SPARK: Storytelling, Purpose, Action, Relationships, and Kudos. Knowing how to tell a well-structured story is key to building long-term memory. Stating a clear purpose that doesn't take away from the discovery learning process is critical. Ensuring that people move from theory to practical application is imperative. Creating strong social learning is the key to commitment and engagement. Validating and affirming participants' comments is the way to create a positive learning environment.
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
HR recruiter services offer top talents to companies according to their specific needs. They handle all recruitment tasks from job posting to onboarding and help companies concentrate on their business growth. With their expertise and years of experience, they streamline the hiring process and save time and resources for the company.
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraAvirahi City Dholera
The Tata Group, a titan of Indian industry, is making waves with its advanced talks with Taiwanese chipmakers Powerchip Semiconductor Manufacturing Corporation (PSMC) and UMC Group. The goal? Establishing a cutting-edge semiconductor fabrication unit (fab) in Dholera, Gujarat. This isn’t just any project; it’s a potential game changer for India’s chipmaking aspirations and a boon for investors seeking promising residential projects in dholera sir.
Visit : https://www.avirahi.com/blog/tata-group-dials-taiwan-for-its-chipmaking-ambition-in-gujarats-dholera/
2. Benefits of BIM
• Better visualisation of the design, providing earlier, more
accurate and more easily understood designs;
• Provides better quality design, which is integrated and
optimised;
ti i d
• Improves communication and collaboration across multiple
design disciplines;
•R d
Reduces risk th
i k through d t ti of clashes and errors ;
h detection f l h d
• Reduces rework resulting in reduced abortive material and
time, thus reducing cost;
•R d
Reduces errors and omissions i construction d
d i i in t ti documents;
t
• Reduces cycle time of specific workflows;
3. Benefits of BIM
• Brings forward clash detection within the design cycle,
thereby introducing cost efficiencies to the project –
earlier/faster design decisions/problem resolution;
• P id greater certainty th t th d i i f ll coordinated
Provides t t i t that the design is fully di t d
and design documentation is consistent;
• Improved project process outcomes, such as fewer RFIs and
site coordination problems;
• Better multi-party communication and understanding from
3D visualisation;
• Reduced construction cost through reduced changes during
construction;
t ti
• Fewer claims/litigation/disputes/conflicts;
4. BIM Projects
j
• Dubai Metro
– G L Al Qusais 2 Station
G.L.
– G.L. Metro Entrance pods (27 No.)
• Mekkah Metro, KSA
– Arafat 1 station
– Muzadlifah 1 station (WIP)
– Jamarat St ti (WIP)
J t Station
– Operation and Control Centre (OCC)
• Kolkata Metro, India
Metro
– Howrah Maidan Station UG 2 Line
• Abu Dhabi Pumping Station
p g
• Lusail Metro, Qatar
5. Design Co-ordination and BIM
g
External Façade view
BIM (Revit) – Ab
(R it) Above ground station, Dubai M t
d t ti D b i Metro
6. Design Co-ordination and BIM
g
Structures and E&M Services view
BIM (Revit) – Ab
(R it) Above ground station, Dubai M t
d t ti D b i Metro
9. Design Coordination and BIM
g
Dubai Metro Entrance Pods
Better Co-ordination of all disciplines:
Co ordination
Station Entrance Pod showing MEP Services with Architectural Envelope