This document contains a research report on comparing the shoe sizes of students from two Design and Technology classes. The report includes an introduction outlining the objectives, methodology, and topic of the research. Data on shoe sizes is presented in a table and chart. Measures of central tendency (mean, median, mode) and dispersion (standard deviation) are calculated and interpreted for each class. The analysis finds the modes are the same but means and standard deviations are slightly different, likely due to similar age ranges among the students. A reflection discusses the process of researching and completing the assignment with the goal of applying statistical concepts correctly.