Asianet Services PDD Extracts – 2009 Emissions Reductions Operating margin Calculations EFgrid,Simple OM,y =  Σ FCi,m,y  ּ   NCVi,y  ּ   EFCO2,i,y,i,m   _____   _________________  ΣEGm,y Either the three most recent years for which data is available at the time of submission of the CDM-PDD to the DOE for validation (ex ante option)  =  y  All fossil fuel types combusted in power plant / unit m in year y  =  i  All power plants / units serving the grid in year y except low-cost / must-run power plants / units  =  m  Net electricity generated and delivered to the grid by power plant / unit m in year y (MWh)  =  EG m,y  CO2 emission factor of fossil fuel type i in year y (tCO2/GJ)  =  EF CO2,i,y   Net calorific value (energy content) of fossil fuel type i in year y (GJ / mass or volume unit)  =  NCV i,y  Amount of fossil fuel type i consumed by power plant / unit m in year y (mass or volume unit)  =  FC i,m,y   Simple operating margin CO2 emission factor in year y (tCO2/MWh)  =  EF grid,Simple OM,y
Asianet Services PDD Extracts – 2009 Emissions Reductions Build Margin Calculations EFgrid,BM,y  =  Σ EGm,y  ּ   EFEL,m,y __________ m____________  ΣEGm,y,m Most recent historical year for which power generation data is available  = y  Power units included in the build margin  = M  CO2 emission factor of power unit m in year y (tCO2/MWh)  = EF EL,m,y  Net quantity of electricity generated and delivered to the grid by power unit m in year y (MWh)  = EG m,y   Build margin CO2 emission factor in year y (tCO2/MWh)  = EF grid,BM,y
Asianet Services PDD Extracts – Project Emissions (a) If the power density ( PD ) of power plant is greater than 4 W/m2 and less than or equal to 10 W/m2: PEy =  EFRes  ·  TEGy    1000 Were: PEy  =  Emission from reservoir expressed as tCO2e/year EFRes =  is the default emission factor for emissions from reservoirs, and the default  value as perEB23 is 90 KgCO2e /MWh. TEGy =  Total electricity produced by the project activity, including the electricity  supplied to the grid and the electricity supplied to internal loads, in year  y  (MWh).
Asianet Services EFy= WOM ⋅EFOM,y + WBM ⋅EFBM ,y EFy =  (0.5)  ּ   (0.749 tCO2/MWh) + (0.5)  ּ   (0.737 tCO2/MWh) EFy = 0.743  tCO2/MWh Step 4. Calculate baseline emissions  BEy = EGy ⋅ EFy BEy = (6,478 Mwh/yr)  ּ   (0.743 tCO2/MWh) BEy = 4,813 tCO2 Step 5. Calculate project emissions PEy =  EFRes  ·  TEGy 1000 PEy =  (90 Kg CO2e /MWh)  ּ   (6.6 Gwh)   1000 PEy = 595 tCO2 Step 6. Calculate emission reductions ERy =BEy - PEy ERy = (4,813 tCO2) – (595 tCO2) ERy = 4,218  tCO2 PDD Extracts – 2009 Emissions Reductions
DNA (Host Country) Approval ,[object Object],[object Object],[object Object],[object Object]
Emissions Reductions Purchase Agreement (ERPA) Negotiations ,[object Object],[object Object]
Our Services – Risk Management ,[object Object],[object Object],[object Object],[object Object],[object Object]
Risk Management Solutions ,[object Object],[object Object]
Risk Management Solutions ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Risk Management Solutions ,[object Object],[object Object],[object Object],[object Object]
Risk Management Solutions ,[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],Thankyou for your Attention

More Related Content

What's hot

Modelling different Thermal Energy Storage (TES) options in a TIMES model
Modelling different Thermal Energy Storage (TES) options in a TIMES modelModelling different Thermal Energy Storage (TES) options in a TIMES model
Modelling different Thermal Energy Storage (TES) options in a TIMES model
IEA-ETSAP
 
LPG as a power source for small and medium sized power plants (zaw naing and ...
LPG as a power source for small and medium sized power plants (zaw naing and ...LPG as a power source for small and medium sized power plants (zaw naing and ...
LPG as a power source for small and medium sized power plants (zaw naing and ...
Zaw Naing
 
The IEA’s Energy Technology Perspectives project: analysis on the low-carbon ...
The IEA’s Energy Technology Perspectives project: analysis on the low-carbon ...The IEA’s Energy Technology Perspectives project: analysis on the low-carbon ...
The IEA’s Energy Technology Perspectives project: analysis on the low-carbon ...
Funseam - Fundación para la Sostenibilidad Energética y Ambiental
 
Andrew Coleman: We speak GI but must learn to speak business
Andrew Coleman: We speak GI but must learn to speak businessAndrew Coleman: We speak GI but must learn to speak business
Andrew Coleman: We speak GI but must learn to speak business
AGI Geocommunity
 
CCXG Oct 2019 Reducing GHG emissions in the power sector - Brent Wanner
CCXG Oct 2019 Reducing GHG emissions in the power sector - Brent WannerCCXG Oct 2019 Reducing GHG emissions in the power sector - Brent Wanner
CCXG Oct 2019 Reducing GHG emissions in the power sector - Brent Wanner
OECD Environment
 
Nobuo Tanaka, IEA: Cost-Effective Carbon Reduction
Nobuo Tanaka, IEA: Cost-Effective Carbon ReductionNobuo Tanaka, IEA: Cost-Effective Carbon Reduction
Nobuo Tanaka, IEA: Cost-Effective Carbon Reduction
Alliance To Save Energy
 
SEDA Solar Energy Development in Egypt, Khaled Gasser 20130611
SEDA Solar Energy Development in Egypt, Khaled Gasser 20130611SEDA Solar Energy Development in Egypt, Khaled Gasser 20130611
SEDA Solar Energy Development in Egypt, Khaled Gasser 20130611
Sekem Energy
 
Hydrogen roadmap and industrial development in France
Hydrogen roadmap and industrial development in FranceHydrogen roadmap and industrial development in France
Hydrogen roadmap and industrial development in France
Stéfan Le Dû
 
Offshore wind in France & Cooperation with Japan
Offshore wind in France & Cooperation with JapanOffshore wind in France & Cooperation with Japan
Offshore wind in France & Cooperation with Japan
Stéfan Le Dû
 
CO2 beprijzing in de bouw - Milieu kosten indicator
CO2 beprijzing in de bouw - Milieu kosten indicatorCO2 beprijzing in de bouw - Milieu kosten indicator
CO2 beprijzing in de bouw - Milieu kosten indicator
www.klimaatplein.com
 
Offshore wind energy Levelized cost of electricity
Offshore wind energy Levelized cost of electricityOffshore wind energy Levelized cost of electricity
Offshore wind energy Levelized cost of electricity
An Stroobandt
 
Energy technologies and climate change
Energy technologies and climate changeEnergy technologies and climate change
Energy saving ideas
Energy saving ideasEnergy saving ideas
Energy saving ideas
Balaji Sunder Raj
 
A holistic approach on Solar thermal Energy in Egypt
A holistic approach on Solar thermal Energy in EgyptA holistic approach on Solar thermal Energy in Egypt
A holistic approach on Solar thermal Energy in Egypt
Sekem Energy
 
Improving forecasting to optimise programme and project decisions by "Chris B...
Improving forecasting to optimise programme and project decisions by "Chris B...Improving forecasting to optimise programme and project decisions by "Chris B...
Improving forecasting to optimise programme and project decisions by "Chris B...
Project Controls Expo
 
GGSD 2019 Forum - Opening session - Keynote presentation
GGSD 2019 Forum -  Opening session - Keynote presentationGGSD 2019 Forum -  Opening session - Keynote presentation
GGSD 2019 Forum - Opening session - Keynote presentation
OECD Environment
 
Energy efficiency indicators in morocco aderee
Energy efficiency indicators in morocco adereeEnergy efficiency indicators in morocco aderee
Energy efficiency indicators in morocco aderee
RCREEE
 
Cb Low Carbon Sa Media Aug 09
Cb   Low Carbon Sa Media Aug 09Cb   Low Carbon Sa Media Aug 09
Cb Low Carbon Sa Media Aug 09
equitywatch
 
Assessing the impact of electricity trades restriction in achieving the carbo...
Assessing the impact of electricity trades restriction in achieving the carbo...Assessing the impact of electricity trades restriction in achieving the carbo...
Assessing the impact of electricity trades restriction in achieving the carbo...
IEA-ETSAP
 
Energy research and innovation for transformation of Ireland’s electricity se...
Energy research and innovation for transformation of Ireland’s electricity se...Energy research and innovation for transformation of Ireland’s electricity se...
Energy research and innovation for transformation of Ireland’s electricity se...
SustainableEnergyAut
 

What's hot (20)

Modelling different Thermal Energy Storage (TES) options in a TIMES model
Modelling different Thermal Energy Storage (TES) options in a TIMES modelModelling different Thermal Energy Storage (TES) options in a TIMES model
Modelling different Thermal Energy Storage (TES) options in a TIMES model
 
LPG as a power source for small and medium sized power plants (zaw naing and ...
LPG as a power source for small and medium sized power plants (zaw naing and ...LPG as a power source for small and medium sized power plants (zaw naing and ...
LPG as a power source for small and medium sized power plants (zaw naing and ...
 
The IEA’s Energy Technology Perspectives project: analysis on the low-carbon ...
The IEA’s Energy Technology Perspectives project: analysis on the low-carbon ...The IEA’s Energy Technology Perspectives project: analysis on the low-carbon ...
The IEA’s Energy Technology Perspectives project: analysis on the low-carbon ...
 
Andrew Coleman: We speak GI but must learn to speak business
Andrew Coleman: We speak GI but must learn to speak businessAndrew Coleman: We speak GI but must learn to speak business
Andrew Coleman: We speak GI but must learn to speak business
 
CCXG Oct 2019 Reducing GHG emissions in the power sector - Brent Wanner
CCXG Oct 2019 Reducing GHG emissions in the power sector - Brent WannerCCXG Oct 2019 Reducing GHG emissions in the power sector - Brent Wanner
CCXG Oct 2019 Reducing GHG emissions in the power sector - Brent Wanner
 
Nobuo Tanaka, IEA: Cost-Effective Carbon Reduction
Nobuo Tanaka, IEA: Cost-Effective Carbon ReductionNobuo Tanaka, IEA: Cost-Effective Carbon Reduction
Nobuo Tanaka, IEA: Cost-Effective Carbon Reduction
 
SEDA Solar Energy Development in Egypt, Khaled Gasser 20130611
SEDA Solar Energy Development in Egypt, Khaled Gasser 20130611SEDA Solar Energy Development in Egypt, Khaled Gasser 20130611
SEDA Solar Energy Development in Egypt, Khaled Gasser 20130611
 
Hydrogen roadmap and industrial development in France
Hydrogen roadmap and industrial development in FranceHydrogen roadmap and industrial development in France
Hydrogen roadmap and industrial development in France
 
Offshore wind in France & Cooperation with Japan
Offshore wind in France & Cooperation with JapanOffshore wind in France & Cooperation with Japan
Offshore wind in France & Cooperation with Japan
 
CO2 beprijzing in de bouw - Milieu kosten indicator
CO2 beprijzing in de bouw - Milieu kosten indicatorCO2 beprijzing in de bouw - Milieu kosten indicator
CO2 beprijzing in de bouw - Milieu kosten indicator
 
Offshore wind energy Levelized cost of electricity
Offshore wind energy Levelized cost of electricityOffshore wind energy Levelized cost of electricity
Offshore wind energy Levelized cost of electricity
 
Energy technologies and climate change
Energy technologies and climate changeEnergy technologies and climate change
Energy technologies and climate change
 
Energy saving ideas
Energy saving ideasEnergy saving ideas
Energy saving ideas
 
A holistic approach on Solar thermal Energy in Egypt
A holistic approach on Solar thermal Energy in EgyptA holistic approach on Solar thermal Energy in Egypt
A holistic approach on Solar thermal Energy in Egypt
 
Improving forecasting to optimise programme and project decisions by "Chris B...
Improving forecasting to optimise programme and project decisions by "Chris B...Improving forecasting to optimise programme and project decisions by "Chris B...
Improving forecasting to optimise programme and project decisions by "Chris B...
 
GGSD 2019 Forum - Opening session - Keynote presentation
GGSD 2019 Forum -  Opening session - Keynote presentationGGSD 2019 Forum -  Opening session - Keynote presentation
GGSD 2019 Forum - Opening session - Keynote presentation
 
Energy efficiency indicators in morocco aderee
Energy efficiency indicators in morocco adereeEnergy efficiency indicators in morocco aderee
Energy efficiency indicators in morocco aderee
 
Cb Low Carbon Sa Media Aug 09
Cb   Low Carbon Sa Media Aug 09Cb   Low Carbon Sa Media Aug 09
Cb Low Carbon Sa Media Aug 09
 
Assessing the impact of electricity trades restriction in achieving the carbo...
Assessing the impact of electricity trades restriction in achieving the carbo...Assessing the impact of electricity trades restriction in achieving the carbo...
Assessing the impact of electricity trades restriction in achieving the carbo...
 
Energy research and innovation for transformation of Ireland’s electricity se...
Energy research and innovation for transformation of Ireland’s electricity se...Energy research and innovation for transformation of Ireland’s electricity se...
Energy research and innovation for transformation of Ireland’s electricity se...
 

Similar to Asianet Services

Iniciativas de Eficiência Energética na Ásia e Pacífico
Iniciativas de Eficiência Energética na Ásia e Pacífico	Iniciativas de Eficiência Energética na Ásia e Pacífico
Iniciativas de Eficiência Energética na Ásia e Pacífico
slides-mci
 
Environment
Environment Environment
Environment
GHC
 
Modification of Cost Equation for Optimization of Cutting Parameters in Turni...
Modification of Cost Equation for Optimization of Cutting Parameters in Turni...Modification of Cost Equation for Optimization of Cutting Parameters in Turni...
Modification of Cost Equation for Optimization of Cutting Parameters in Turni...
IJLT EMAS
 
Estimation & Analysis of a 5KWP Solar Photovoltaic Power Plant at JIS College...
Estimation & Analysis of a 5KWP Solar Photovoltaic Power Plant at JIS College...Estimation & Analysis of a 5KWP Solar Photovoltaic Power Plant at JIS College...
Estimation & Analysis of a 5KWP Solar Photovoltaic Power Plant at JIS College...
IRJET Journal
 
"Overview of Renewable Technologies" Laurie Tennant, Engenius
"Overview of Renewable Technologies" Laurie Tennant, Engenius"Overview of Renewable Technologies" Laurie Tennant, Engenius
"Overview of Renewable Technologies" Laurie Tennant, Engenius
Sustainable Business Partnership
 
Energy Policy & Enonomics.
Energy Policy & Enonomics.Energy Policy & Enonomics.
Energy Policy & Enonomics.
Paul Derwin
 
Unit-V-Power Plant Economics and Environment.pptx
Unit-V-Power Plant Economics and Environment.pptxUnit-V-Power Plant Economics and Environment.pptx
Unit-V-Power Plant Economics and Environment.pptx
prakash0712
 
Copper's Contribution to Combat Climate Change
Copper's Contribution to Combat Climate ChangeCopper's Contribution to Combat Climate Change
Copper's Contribution to Combat Climate Change
Leonardo ENERGY
 
National plan Towards nearly zero-energy buildings in The Netherlands
National plan Towards nearly zero-energy buildings in The NetherlandsNational plan Towards nearly zero-energy buildings in The Netherlands
National plan Towards nearly zero-energy buildings in The Netherlands
Netherlands Enterprise Agency (RVO.nl)
 
Michel Sacotte - Schneider Electric
Michel Sacotte - Schneider ElectricMichel Sacotte - Schneider Electric
Michel Sacotte - Schneider Electric
cwiemeexpo
 
Melaka Greencity Cogeneration system
Melaka Greencity Cogeneration systemMelaka Greencity Cogeneration system
Melaka Greencity Cogeneration system
Dato Mat Isa
 
Comparative study of the price penalty factors approaches for Bi-objective di...
Comparative study of the price penalty factors approaches for Bi-objective di...Comparative study of the price penalty factors approaches for Bi-objective di...
Comparative study of the price penalty factors approaches for Bi-objective di...
IJECEIAES
 
New Renewable Energy Strategy UK - Adam Brown
New Renewable Energy Strategy UK - Adam BrownNew Renewable Energy Strategy UK - Adam Brown
New Renewable Energy Strategy UK - Adam Brown
uktila
 
Iseu efficiency april2011 final
Iseu efficiency april2011 finalIseu efficiency april2011 final
Iseu efficiency april2011 final
Factor-X
 
Advit Foundation - Energy Efficiency
Advit Foundation - Energy EfficiencyAdvit Foundation - Energy Efficiency
Advit Foundation - Energy Efficiency
Advit Foundaion
 
The Renewables EU Directive
The Renewables EU DirectiveThe Renewables EU Directive
The Renewables EU Directive
fernando nuño
 
EAM ASE Breakfast Seminar NSW - April 2008
EAM ASE Breakfast Seminar NSW - April 2008EAM ASE Breakfast Seminar NSW - April 2008
EAM ASE Breakfast Seminar NSW - April 2008
jmortensen
 
Optimal Expenditure and Benefit Cost Based Location, Size and Type of DGs in ...
Optimal Expenditure and Benefit Cost Based Location, Size and Type of DGs in ...Optimal Expenditure and Benefit Cost Based Location, Size and Type of DGs in ...
Optimal Expenditure and Benefit Cost Based Location, Size and Type of DGs in ...
TELKOMNIKA JOURNAL
 
Economics of wind energy
Economics of wind energyEconomics of wind energy
Economics of wind energy
ASHWANI BHARATI
 
The EU Renewables Directive
The EU Renewables DirectiveThe EU Renewables Directive
The EU Renewables Directive
Leonardo ENERGY
 

Similar to Asianet Services (20)

Iniciativas de Eficiência Energética na Ásia e Pacífico
Iniciativas de Eficiência Energética na Ásia e Pacífico	Iniciativas de Eficiência Energética na Ásia e Pacífico
Iniciativas de Eficiência Energética na Ásia e Pacífico
 
Environment
Environment Environment
Environment
 
Modification of Cost Equation for Optimization of Cutting Parameters in Turni...
Modification of Cost Equation for Optimization of Cutting Parameters in Turni...Modification of Cost Equation for Optimization of Cutting Parameters in Turni...
Modification of Cost Equation for Optimization of Cutting Parameters in Turni...
 
Estimation & Analysis of a 5KWP Solar Photovoltaic Power Plant at JIS College...
Estimation & Analysis of a 5KWP Solar Photovoltaic Power Plant at JIS College...Estimation & Analysis of a 5KWP Solar Photovoltaic Power Plant at JIS College...
Estimation & Analysis of a 5KWP Solar Photovoltaic Power Plant at JIS College...
 
"Overview of Renewable Technologies" Laurie Tennant, Engenius
"Overview of Renewable Technologies" Laurie Tennant, Engenius"Overview of Renewable Technologies" Laurie Tennant, Engenius
"Overview of Renewable Technologies" Laurie Tennant, Engenius
 
Energy Policy & Enonomics.
Energy Policy & Enonomics.Energy Policy & Enonomics.
Energy Policy & Enonomics.
 
Unit-V-Power Plant Economics and Environment.pptx
Unit-V-Power Plant Economics and Environment.pptxUnit-V-Power Plant Economics and Environment.pptx
Unit-V-Power Plant Economics and Environment.pptx
 
Copper's Contribution to Combat Climate Change
Copper's Contribution to Combat Climate ChangeCopper's Contribution to Combat Climate Change
Copper's Contribution to Combat Climate Change
 
National plan Towards nearly zero-energy buildings in The Netherlands
National plan Towards nearly zero-energy buildings in The NetherlandsNational plan Towards nearly zero-energy buildings in The Netherlands
National plan Towards nearly zero-energy buildings in The Netherlands
 
Michel Sacotte - Schneider Electric
Michel Sacotte - Schneider ElectricMichel Sacotte - Schneider Electric
Michel Sacotte - Schneider Electric
 
Melaka Greencity Cogeneration system
Melaka Greencity Cogeneration systemMelaka Greencity Cogeneration system
Melaka Greencity Cogeneration system
 
Comparative study of the price penalty factors approaches for Bi-objective di...
Comparative study of the price penalty factors approaches for Bi-objective di...Comparative study of the price penalty factors approaches for Bi-objective di...
Comparative study of the price penalty factors approaches for Bi-objective di...
 
New Renewable Energy Strategy UK - Adam Brown
New Renewable Energy Strategy UK - Adam BrownNew Renewable Energy Strategy UK - Adam Brown
New Renewable Energy Strategy UK - Adam Brown
 
Iseu efficiency april2011 final
Iseu efficiency april2011 finalIseu efficiency april2011 final
Iseu efficiency april2011 final
 
Advit Foundation - Energy Efficiency
Advit Foundation - Energy EfficiencyAdvit Foundation - Energy Efficiency
Advit Foundation - Energy Efficiency
 
The Renewables EU Directive
The Renewables EU DirectiveThe Renewables EU Directive
The Renewables EU Directive
 
EAM ASE Breakfast Seminar NSW - April 2008
EAM ASE Breakfast Seminar NSW - April 2008EAM ASE Breakfast Seminar NSW - April 2008
EAM ASE Breakfast Seminar NSW - April 2008
 
Optimal Expenditure and Benefit Cost Based Location, Size and Type of DGs in ...
Optimal Expenditure and Benefit Cost Based Location, Size and Type of DGs in ...Optimal Expenditure and Benefit Cost Based Location, Size and Type of DGs in ...
Optimal Expenditure and Benefit Cost Based Location, Size and Type of DGs in ...
 
Economics of wind energy
Economics of wind energyEconomics of wind energy
Economics of wind energy
 
The EU Renewables Directive
The EU Renewables DirectiveThe EU Renewables Directive
The EU Renewables Directive
 

Asianet Services

  • 2.
  • 3.
  • 4. Asianet Services PDD Extracts – 2009 Emissions Reductions Operating margin Calculations EFgrid,Simple OM,y = Σ FCi,m,y ּ NCVi,y ּ EFCO2,i,y,i,m _____ _________________ ΣEGm,y Either the three most recent years for which data is available at the time of submission of the CDM-PDD to the DOE for validation (ex ante option) = y All fossil fuel types combusted in power plant / unit m in year y = i All power plants / units serving the grid in year y except low-cost / must-run power plants / units = m Net electricity generated and delivered to the grid by power plant / unit m in year y (MWh) = EG m,y CO2 emission factor of fossil fuel type i in year y (tCO2/GJ) = EF CO2,i,y Net calorific value (energy content) of fossil fuel type i in year y (GJ / mass or volume unit) = NCV i,y Amount of fossil fuel type i consumed by power plant / unit m in year y (mass or volume unit) = FC i,m,y Simple operating margin CO2 emission factor in year y (tCO2/MWh) = EF grid,Simple OM,y
  • 5. Asianet Services PDD Extracts – 2009 Emissions Reductions Build Margin Calculations EFgrid,BM,y = Σ EGm,y ּ EFEL,m,y __________ m____________ ΣEGm,y,m Most recent historical year for which power generation data is available = y Power units included in the build margin = M CO2 emission factor of power unit m in year y (tCO2/MWh) = EF EL,m,y Net quantity of electricity generated and delivered to the grid by power unit m in year y (MWh) = EG m,y Build margin CO2 emission factor in year y (tCO2/MWh) = EF grid,BM,y
  • 6. Asianet Services PDD Extracts – Project Emissions (a) If the power density ( PD ) of power plant is greater than 4 W/m2 and less than or equal to 10 W/m2: PEy = EFRes · TEGy 1000 Were: PEy = Emission from reservoir expressed as tCO2e/year EFRes = is the default emission factor for emissions from reservoirs, and the default value as perEB23 is 90 KgCO2e /MWh. TEGy = Total electricity produced by the project activity, including the electricity supplied to the grid and the electricity supplied to internal loads, in year y (MWh).
  • 7. Asianet Services EFy= WOM ⋅EFOM,y + WBM ⋅EFBM ,y EFy = (0.5) ּ (0.749 tCO2/MWh) + (0.5) ּ (0.737 tCO2/MWh) EFy = 0.743 tCO2/MWh Step 4. Calculate baseline emissions BEy = EGy ⋅ EFy BEy = (6,478 Mwh/yr) ּ (0.743 tCO2/MWh) BEy = 4,813 tCO2 Step 5. Calculate project emissions PEy = EFRes · TEGy 1000 PEy = (90 Kg CO2e /MWh) ּ (6.6 Gwh) 1000 PEy = 595 tCO2 Step 6. Calculate emission reductions ERy =BEy - PEy ERy = (4,813 tCO2) – (595 tCO2) ERy = 4,218 tCO2 PDD Extracts – 2009 Emissions Reductions
  • 8.