Khairul Azmi Bin Muhammad is a Malaysian citizen currently working as an RF Drive Test Engineer. He holds an Advanced Diploma in Oil and Gas Technology and a Diploma in Electronic Engineering. His work experience includes positions as an On-Site Technician and Process Technician during internships. He has skills in wireless network optimization, drive test data analysis, and troubleshooting. His goals are to develop technical skills and grow with his employer.
In this document
Powered by AI
Details personal information, education qualifications including diplomas and CGPA scores.
Describes work experience in RF engineering, on-site technical support, and industrial training.
Highlights skills, certifications, leadership roles, and training experiences.
Lists personal interests, expected salary, and professional references.
1 | Pa g e
EDUCATION & QUALIFICATION
CURRICULUM VITAE (CV)
IC No : 930411 – 03 – 5349 Race : Malay
Date of
Birth
: 11.04.1993 Nationality : Malaysian
Religion : Islam Health : Good
Gender : Male Driving License : Yes
Marital
Status
: Single Possess Own
Vehicle
: Motorcycle/Car
Passport : Yes
ď‚· Institute Technology Petroleum PETRONAS (INSTEP)
05 January 2015-27 December 2015
Level 2 and 3 Advanced Diploma (SRF) in Oil and Gas Technology (Process) and
Certificate of Process Technician (Petroleum Technology) (with multi-skilling
maintenance in Instrument, Electrical and Mechanical). (NON-BONDING)
CGPA: 3.43
ď‚· University Technical Malaysia Melaka (UTeM)
July 2011- June 2014
Diploma of Electronic Engineering
CGPA: 2.79
ď‚· Sekolah Menengah Kebangsaan Kedai Buloh
January 2008- December 2010
SPM (Pure Science)
ď‚· Sekolah Menengah Kebangsaan Kedai Buloh
January 2005- December 2007
PMR
Name : Khairul Azmi Bin Muhammad@Mohd Sudin
Address : Lot 157, Kampung Pulau Kundor, Badang,
15350 Kota Bharu,
Kelantan.
Mobile No : +6013-2951672
Email : mieky23@gmail.com
PERSONAL PARTICULAR
2.
2 | Pa g e
WORKING EXPERIENCES
ď‚· RF Drive Test Engineer at Fusion Beat Sdn Bhd
18 November 2016- Present
Responsibility
a) UMTS and LTE(4G) wireless network optimization and performance tuning.
b) Analysis of drive test data and OSS performance statistics.
c) Investigation and troubleshooting network quality problems.
d) Implementation new wireless network features.
e) Radio parameter fine tuning.
f) Performs RF performances activities in customer projects independently and
according to project plan.
g) Provide support to customers in field of expertise.
ď‚· On-Site Technician at JST Power Solution Sdn Bhd
04 May 2016- 31 October 2016
Responsibility
h) To provide on-site support to customers including trouble shooting, breakdown
calls and resolve their area of concern.
i) To fix Technical problems and issue reported by customer.
j) To install, Commission and Service UPS system at customer site
k) To assist in project implantation.
ď‚· Process Technician (Industrial Training) at Simulation Plant Process at INSTEP.
05 June 2015- 27 December 2015
Responsibility
a) Perform plant and equipment start-up and shutdown plant based on the unit.
b) Monitor the equipment and process flow.
c) Routine check of parameter (Level, Temperature and Pressure).
d) Switching rotating and static equipment.
e) Take sampling Water, sampling gas and analysis.
f) Handling handover (Condition of Plant Process).
g) Being a maintenance coordinator.
h) Zero check of transmitter.
i) Respond to incidents, hazardous conditions or emergencies.
j) Manage HSE requirements.
-Maintain safe working area
-Maintain safety of self and others
-Maintain environmental standards
-Maintain safety equipment
-Maintain readiness of firefighting equipment/system
-Enforce permit to work compliance in the field
ď‚· Technician (Industrial Training) at MicroTech Computer Sdn Bhd
03 February 2013- 28 May 2013
3.
3 | Pa g e
SKILLS / STRENGTHS
RESPONSIBILITIES & KEY ABILITIES
AWARDS AND ACHIEVEMENTS
Responsibility
a) Customer Service
-Troubleshoot basic software and hardware.
-Take a report from customer before send computer to technician.
-Take calling from customer and supplier.
b) Assistant Technician
-Repair software and replace component of computer.
-Assist field technician to install CCTV and install electrical wiring.
ď‚· CSMO-Construction Manager (CIDB MALAYSIA).
ď‚· Malaysian Society for Traumatology and Emergency Medicine (MASTEM)-First
Aider.
ď‚· Multiskilling maintenance (zero check of transmitter, change bulb, service
filter/strainer greasing, soldering and troubleshooting of electronic component).
ď‚· Experience working with various Microsoft Offices (Word & Power Point).
ď‚· Experience working Window 7, 8, and software and hardware computer.
ď‚· Leadership- Lead for some witching equipment, sampling and lead after Turn
Around (TA) for startup plant and shutdown plant.
ď‚· Flexible- Willing to try new things and am interested in improving efficiency on
assigned tasks.
ď‚· Interpersonal skills- able to get along well with co-workers and accept supervision.
ď‚· Reliable- Excellent attendance record.
ď‚· Can work under pressure and meet tight deadlines.
ď‚· Able to work for long hour and overtime.
ď‚· Speak fluent Bahasa Malaysia and English.
ď‚· Good health and positive attitude.
ď‚· Others- Learned discipline, teamwork, how to follow instruction and hard work,
ambitious, outgoing, reliable and have solid work ethic.
ď‚· Certificate of Completion of Radio Frequency Measurement Engineering by ACE
Training.
ď‚· Organizers for Nasyid contest at Sungai Melaka.
ď‚· Certification of the chairman of Civic Organization.
ď‚· Certification of the chairman of the Football club.
ď‚· Malaysian University English Test (Band 2).
ď‚· Industrial Training Assessment (Excellent).
ď‚· Soft skill Module (Excellent).
ď‚· Certification of participant in FitMalaysiaRun 2014.
4.
4 | Pa g e
OTHER INFORMATION
INTEREST
EXPECTED SALARY
REFERENCES
ď‚· Certification in Futsal Competition.
ď‚· Certification in Hockey Competition.
ď‚· Futsal Competition INSTEP Sport Carnival.
To grow along with the company and develop technical skills. . Be able to serve the employer
with full commitment.
ď‚· Travelling.
ď‚· Outdoor and indoor games.
ď‚· Exploring new and adventurous things.
 RM 1500 – RM 2000
Abir Bin Abd Patah
Executive (Process Trainer)
Training Plant Operations Department
Institute Technology Petroleum
PETRONAS (INSTEP)
019-5530663
Mohd Farrid Bin Ahmad Termizi
Executive Shift Supervisor (Process
Trainer)
Training Plant Operations Department
Institute Technology Petroleum
PETRONAS (INSTEP)
017-5516906