The document provides information on Arunachal Pradesh's physical and economic infrastructure. Some key points:
- Arunachal Pradesh has huge hydropower potential of 50,328 MW, but currently has only 116.55 MW installed capacity. Railway lines are being constructed to improve connectivity.
- The economy is growing with GSDP increasing at a 14% CAGR between 2011-12 and 2017-18. The primary sector contributes the most to GSVA.
- Exports have increased but remain low at $5.32 million in FY18 and $1.84 million in FY19. Carpet making and textiles are key sectors.