SlideShare a Scribd company logo
ARMAN A. VIDRA
PHASE 2 BLOCK 6 LOT 19,DENDROBIUM ST. DONA MARIA
SUBDIVISION, BARAAS ILIGANCITY, PHILIPPINES.
E mail: armanvedra111@yahoo.com
Mobileno: +966 501083275
HIGHLIGHTS OF QUALIFICATION:
• 7 years of experience in piping discipline (both erection and fabrication) in power plant,
refineries, oil and gas plant, building and
• Multi skilled worker knowledgeable in vessel and tank fabrication, steel fabrication,
mechanical fitting and material expediting.
• Well knowledgeable in reading and interpreting orthographic drawing, isometric drawing, line
arrangement drawing and area construction drawing.
• Excellent work performance rating in quality, productivity and safety.
• Can calculate fast and accurate in piping and mechanical formulas and computation.
WORK HISTORY
COMPANY: NES GLOBAL TALENT/CLIENT: SADARA CHEMICAL CO.
JUBAIL, KSA
POSITION: MULTICRAFT, MECHANICAL MAINTENANCE
INCLUSIVE DATES: JULY 18, 2014 – PRESENT
Dutiesand Responsibilities:
● Commissioning and start - up.
● Maintenance Technician,(MULTI-CRAFT)
COMPANY: GROUP FIVE CONSTRUCTION (GHANA) LIMITED
CLIENT: AKYEM GOLD MINNING, GHANA AFRICA
POSITION: MECHANICAL FITTER/PIPE FITTER
INCLUSIVE DATES: JAN 2, 2013 TO JULY 10,2013
Duties and Responsibilities:
• Assignincommissioning.Pre commissioning activitiessuchasleakrestoredandreinstate pipelines
base incompany procedures.
• Assemblyandfitupof threadedandsocketweldpipe linesandfittings.
•Assigninpre-commissioningandcommissioningactivities.
• Maintenance
COMPANY: KHARAFI NATIONAL UAE LLC.
POSITION: PIPE FITTER
PROJECT: HABSHAN 5 INTEGRATED GAS DEVELOPMENT PROCESS PLANT PROJECT
ABU DHABI, UNITED ARAB EMIRATES
INCLUSIVE DATES: FEBRUARY 15, 2011 TO JULY 17, 2012
Duties and Responsibilities:
• Fitup anderectionof steel pipes(carbonsteel,stainlesssteel,alloysteel andduplexstainlesssteel)
and spool andfittings.
• Fabricationof steel andironsupports,small bore,andbigbore infabricationandelevatedareas.
• Erectionof spool,fittingsanderectionmaterials,valves,orifice flangesandmiteredfittings.
• Fitup andalignmentof small andbigbore @ elevatedareas.
• Assemblyandfitupof threadedandsocketweldpipe linesandfittings.
• Installationanderectionof pipe spools,supportsanderectionmaterials.
• Fabricationof spoolsandfittingsatfabricationareawhichfollowsproperspecificationsand
procedure.
• Assignincommissioning.Pre commissioningactivitiessuchasleakrestoredandreinstate pipelines
base inSABIC standard.
• Installation of valves,pipesupports,anderectionmaterialsandpipe andspools.
• Fabricationof bigandsmall bore in fabricationareaandelevatedarea.
COMPANY: NASSER S. AL HAJRI CORPORATION
POSITION: PIPE FITTER
PROJECT: SAUDI KAYAN PETROCHEMICAL PLANT PROJECT
JUBAIL KINGDOM OF SAUDI ARABIA
INCLUSIVE DATES: DECEMBER 22, 2008 TO DECEMBER 22, 2010
Duties and Responsibilities:
• Fitup andalignmentof small andbigbore @ elevatedareas.
• Assemblyandfitupof threadedandsocketweldpipe lines andfittings.
• Installationanderectionof pipe spools,supportsanderectionmaterials.
• Fabricationof spoolsandfittingsatfabricationareawhichfollowsproperspecificationsand
procedure.
• Assignincommissioning.Pre commissioningactivitiessuchasleakrestoredandreinstate pipelines
base inSABIC standard.
• Installationof valves,pipesupports,anderectionmaterialsandpipe andspools.
• Fabricationof bigandsmall bore in fabricationareaandelevatedarea.
COMPANY: DASMARINAS INDUSTRIAL& STEELWORKS CORPORATION
POSITION: PIPE FITTER
PROJECT: COMPANY MAINTAINANCE PROJECT
ILIGAN CITY PHILIPPINES
INCLUSIVE DATES: FEBRUARY 15,2003 TO NOVEMBER 30, 2006
Duties and Responsibilities:
• Fitup andalignmentof small andbigbore @ elevatedareas.
• Assemblyandfitupof threadedandsocketweldpipe linesandfittings.
• Installationanderectionof pipe spools,supportsanderectionmaterials.
• Fabricationof spools andfittingsatfabricationareawhichfollowsproperspecificationsand
procedure. Fabricatedof bigandsmall bore infabricationareaand elevatedarea.Installationof valves,
Pipe supports,anderectionmaterialsandpipe andspool.
EDUCATIONAL ATTAINMENT:
TERTIARY
ILIGAN CITY TECHNICAL INSTITUTE
A/C TECHNICIAN
SECONDARY
ILIGAN CITY EAST HIGH SCHOOL
ILIGAN CITY, PHILIPPINES
PRIMARY
LUINAB ELEMENTARY SCHOOL
ILIGAN CITY, PHILIPPINES
______________________________________________________________________________
PERSONAL DATA:
DATE OF BIRTH: MAY 1, 1975 RELIGION : ROMAN CATHOLIC
PLACE OF BIRTH: HINAPLANON ILIGAN CITY WEIGHT : 65 KGS
SEX : MALE HEIGHT : 5’6
CIVIL STATUS : MARRIED PASSPORT NO. : EB6171082
NATIONALITY : FILIPINO
TRAINING AND SEMINAR ATTENDED:
HSE TRAINING
SADARA CHEMICAL CAMPANY GENERAL SAFETY
2014
HSE TRAINING
NEWMONT SAFETY TRAINING
2013
HSE TRAINING
GASCO/TECHNIMONT GENERAL WORK SAFETY
2011
HSE TRAINING
TECHNICAS REUNIDAS GULF CO. LTD
2008
HSE TRAINING
DASMARINAS INDUSTRIAL SAFETY TRAINING
2003
CHARACTER REFFERENCES:
VANTILLARD PASCAL ISO-MAINTENANCE SUPERVISOR
SADARA CHEMICAL COMPANY
CEL # +966 502530123
JAMES RANDEL HALEY MAINTENANCE MANAGER
SADARA CHEMICAL COMPANY
TEL# 013-345-8432
I HEREBY ACKNOWLEDGE THAT THE INFORMATION GIVEN IN THIS DATA WAS
TRUE AND CORRECT IN THE BEST OF MY KNOWLEGDE AND BELIEF.
ARMAN A. VIDRA

More Related Content

What's hot

GPolidoros.doc
GPolidoros.docGPolidoros.doc
GPolidoros.doc
Gerasimos Polidoros
 
SGM-PURCHASE-PROCUREMENT-MATERIALS
SGM-PURCHASE-PROCUREMENT-MATERIALSSGM-PURCHASE-PROCUREMENT-MATERIALS
SGM-PURCHASE-PROCUREMENT-MATERIALS
R NANDAKUMAR RAMACHANDRAN
 
Michael Rhame RESUME 12-12
Michael Rhame RESUME 12-12Michael Rhame RESUME 12-12
Michael Rhame RESUME 12-12
Michael Rhame
 
CV_Mark Fayle _Brief
CV_Mark Fayle _BriefCV_Mark Fayle _Brief
CV_Mark Fayle _Brief
Mark Fayle
 
Resume - W. Travis Scott
Resume - W. Travis ScottResume - W. Travis Scott
Resume - W. Travis Scott
W. Travis Scott
 
Matt 2014 resume
Matt 2014 resumeMatt 2014 resume
Matt 2014 resume
Matt Blackwell
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
ahmad dodo
 
CV-Mohamed Abulila 01- 2016
CV-Mohamed Abulila 01- 2016CV-Mohamed Abulila 01- 2016
CV-Mohamed Abulila 01- 2016
Mohamed Abulila
 
Resume
ResumeResume
updated Kessouar's Resume
updated Kessouar's Resumeupdated Kessouar's Resume
updated Kessouar's Resume
Mehdi Kessouar
 
Resume 2016C
Resume 2016CResume 2016C
Resume 2016C
Rich Thomas
 
Shane connely romero 2016 resume p
Shane connely romero 2016 resume pShane connely romero 2016 resume p
Shane connely romero 2016 resume p
Shane C. Romero
 
Andy B Espada Resume (7)
Andy B  Espada Resume (7)Andy B  Espada Resume (7)
Andy B Espada Resume (7)
Andy Espada
 
Kevin J Hill S3
Kevin J Hill S3Kevin J Hill S3
Kevin J Hill S3
Kevin Hill
 
NAIYAR CV 1st FEB 2015
NAIYAR CV 1st  FEB 2015NAIYAR CV 1st  FEB 2015
NAIYAR CV 1st FEB 2015
naiyar yazdani
 
Resume_Deopura
Resume_DeopuraResume_Deopura
Resume_Deopura
SANJAY DEOPURA
 
E. Thor Anderson resume 2016
E. Thor Anderson resume 2016E. Thor Anderson resume 2016
E. Thor Anderson resume 2016
Thor Anderson
 
Mechanical Engineer. WTP Pipeline
Mechanical Engineer. WTP PipelineMechanical Engineer. WTP Pipeline
Mechanical Engineer. WTP Pipeline
Awaiz 766
 
Robert Sasser (1) (1) (1)
Robert Sasser (1) (1) (1)Robert Sasser (1) (1) (1)
Robert Sasser (1) (1) (1)
Robert Sasser
 
Resume - Christopher Neil, PE
Resume - Christopher Neil, PEResume - Christopher Neil, PE
Resume - Christopher Neil, PE
Christopher Neil, P.E.
 

What's hot (20)

GPolidoros.doc
GPolidoros.docGPolidoros.doc
GPolidoros.doc
 
SGM-PURCHASE-PROCUREMENT-MATERIALS
SGM-PURCHASE-PROCUREMENT-MATERIALSSGM-PURCHASE-PROCUREMENT-MATERIALS
SGM-PURCHASE-PROCUREMENT-MATERIALS
 
Michael Rhame RESUME 12-12
Michael Rhame RESUME 12-12Michael Rhame RESUME 12-12
Michael Rhame RESUME 12-12
 
CV_Mark Fayle _Brief
CV_Mark Fayle _BriefCV_Mark Fayle _Brief
CV_Mark Fayle _Brief
 
Resume - W. Travis Scott
Resume - W. Travis ScottResume - W. Travis Scott
Resume - W. Travis Scott
 
Matt 2014 resume
Matt 2014 resumeMatt 2014 resume
Matt 2014 resume
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
CV-Mohamed Abulila 01- 2016
CV-Mohamed Abulila 01- 2016CV-Mohamed Abulila 01- 2016
CV-Mohamed Abulila 01- 2016
 
Resume
ResumeResume
Resume
 
updated Kessouar's Resume
updated Kessouar's Resumeupdated Kessouar's Resume
updated Kessouar's Resume
 
Resume 2016C
Resume 2016CResume 2016C
Resume 2016C
 
Shane connely romero 2016 resume p
Shane connely romero 2016 resume pShane connely romero 2016 resume p
Shane connely romero 2016 resume p
 
Andy B Espada Resume (7)
Andy B  Espada Resume (7)Andy B  Espada Resume (7)
Andy B Espada Resume (7)
 
Kevin J Hill S3
Kevin J Hill S3Kevin J Hill S3
Kevin J Hill S3
 
NAIYAR CV 1st FEB 2015
NAIYAR CV 1st  FEB 2015NAIYAR CV 1st  FEB 2015
NAIYAR CV 1st FEB 2015
 
Resume_Deopura
Resume_DeopuraResume_Deopura
Resume_Deopura
 
E. Thor Anderson resume 2016
E. Thor Anderson resume 2016E. Thor Anderson resume 2016
E. Thor Anderson resume 2016
 
Mechanical Engineer. WTP Pipeline
Mechanical Engineer. WTP PipelineMechanical Engineer. WTP Pipeline
Mechanical Engineer. WTP Pipeline
 
Robert Sasser (1) (1) (1)
Robert Sasser (1) (1) (1)Robert Sasser (1) (1) (1)
Robert Sasser (1) (1) (1)
 
Resume - Christopher Neil, PE
Resume - Christopher Neil, PEResume - Christopher Neil, PE
Resume - Christopher Neil, PE
 

Similar to ARMAN VIDRA (RESUME)

00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
Mohammad Khan
 
razwan ali cv
razwan ali cvrazwan ali cv
razwan ali cv
Rizwan Ali
 
Resume
ResumeResume
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
Raghavendra Velayutharaja
 
Muhammed RAFI 2016 SD
Muhammed RAFI 2016 SDMuhammed RAFI 2016 SD
NABEEL_SME_23012015
NABEEL_SME_23012015NABEEL_SME_23012015
NABEEL_SME_23012015
Mohammed Nabeel
 
Jerry Ingalls Resume 06.27.16
Jerry Ingalls Resume 06.27.16Jerry Ingalls Resume 06.27.16
Jerry Ingalls Resume 06.27.16
Jerry Ingalls
 
Ravi CV
Ravi CVRavi CV
Ravi CV
RAVI KUMAR
 
R K MISHRA CV
R K MISHRA CVR K MISHRA CV
R K MISHRA CV
Ritu kumar mishra
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designer
bharath kumar
 
ramCV
ramCVramCV
CAWI resumee
CAWI resumeeCAWI resumee
CAWI resumee
Micah Marcella
 
Gurunathan resume
Gurunathan resumeGurunathan resume
Gurunathan resume
Gurunathan Somu
 
Michael CV.
Michael CV.Michael CV.
Michael CV.
michael sobhy
 
NICHOLAS RADER SANFRANDetailedRESUME2014-2
NICHOLAS RADER SANFRANDetailedRESUME2014-2NICHOLAS RADER SANFRANDetailedRESUME2014-2
NICHOLAS RADER SANFRANDetailedRESUME2014-2
Nicholas Rader
 
Inspection Engineer Taufeeque cv
Inspection Engineer Taufeeque cvInspection Engineer Taufeeque cv
Inspection Engineer Taufeeque cv
TAUFEEQUE AHMAD
 
Topher2016
Topher2016Topher2016
Topher2016
Christopher Balgua
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-
Shyamal Sahu
 
Nadeem cv n
Nadeem cv nNadeem cv n
Nadeem cv n
Muhammad Nadeem
 
Nadeem cv n
Nadeem cv nNadeem cv n
Nadeem cv n
Muhammad Nadeem
 

Similar to ARMAN VIDRA (RESUME) (20)

00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
razwan ali cv
razwan ali cvrazwan ali cv
razwan ali cv
 
Resume
ResumeResume
Resume
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
Muhammed RAFI 2016 SD
Muhammed RAFI 2016 SDMuhammed RAFI 2016 SD
Muhammed RAFI 2016 SD
 
NABEEL_SME_23012015
NABEEL_SME_23012015NABEEL_SME_23012015
NABEEL_SME_23012015
 
Jerry Ingalls Resume 06.27.16
Jerry Ingalls Resume 06.27.16Jerry Ingalls Resume 06.27.16
Jerry Ingalls Resume 06.27.16
 
Ravi CV
Ravi CVRavi CV
Ravi CV
 
R K MISHRA CV
R K MISHRA CVR K MISHRA CV
R K MISHRA CV
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designer
 
ramCV
ramCVramCV
ramCV
 
CAWI resumee
CAWI resumeeCAWI resumee
CAWI resumee
 
Gurunathan resume
Gurunathan resumeGurunathan resume
Gurunathan resume
 
Michael CV.
Michael CV.Michael CV.
Michael CV.
 
NICHOLAS RADER SANFRANDetailedRESUME2014-2
NICHOLAS RADER SANFRANDetailedRESUME2014-2NICHOLAS RADER SANFRANDetailedRESUME2014-2
NICHOLAS RADER SANFRANDetailedRESUME2014-2
 
Inspection Engineer Taufeeque cv
Inspection Engineer Taufeeque cvInspection Engineer Taufeeque cv
Inspection Engineer Taufeeque cv
 
Topher2016
Topher2016Topher2016
Topher2016
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-
 
Nadeem cv n
Nadeem cv nNadeem cv n
Nadeem cv n
 
Nadeem cv n
Nadeem cv nNadeem cv n
Nadeem cv n
 

ARMAN VIDRA (RESUME)

  • 1. ARMAN A. VIDRA PHASE 2 BLOCK 6 LOT 19,DENDROBIUM ST. DONA MARIA SUBDIVISION, BARAAS ILIGANCITY, PHILIPPINES. E mail: armanvedra111@yahoo.com Mobileno: +966 501083275 HIGHLIGHTS OF QUALIFICATION: • 7 years of experience in piping discipline (both erection and fabrication) in power plant, refineries, oil and gas plant, building and • Multi skilled worker knowledgeable in vessel and tank fabrication, steel fabrication, mechanical fitting and material expediting. • Well knowledgeable in reading and interpreting orthographic drawing, isometric drawing, line arrangement drawing and area construction drawing. • Excellent work performance rating in quality, productivity and safety. • Can calculate fast and accurate in piping and mechanical formulas and computation. WORK HISTORY COMPANY: NES GLOBAL TALENT/CLIENT: SADARA CHEMICAL CO. JUBAIL, KSA POSITION: MULTICRAFT, MECHANICAL MAINTENANCE INCLUSIVE DATES: JULY 18, 2014 – PRESENT Dutiesand Responsibilities: ● Commissioning and start - up. ● Maintenance Technician,(MULTI-CRAFT) COMPANY: GROUP FIVE CONSTRUCTION (GHANA) LIMITED CLIENT: AKYEM GOLD MINNING, GHANA AFRICA POSITION: MECHANICAL FITTER/PIPE FITTER INCLUSIVE DATES: JAN 2, 2013 TO JULY 10,2013
  • 2. Duties and Responsibilities: • Assignincommissioning.Pre commissioning activitiessuchasleakrestoredandreinstate pipelines base incompany procedures. • Assemblyandfitupof threadedandsocketweldpipe linesandfittings. •Assigninpre-commissioningandcommissioningactivities. • Maintenance COMPANY: KHARAFI NATIONAL UAE LLC. POSITION: PIPE FITTER PROJECT: HABSHAN 5 INTEGRATED GAS DEVELOPMENT PROCESS PLANT PROJECT ABU DHABI, UNITED ARAB EMIRATES INCLUSIVE DATES: FEBRUARY 15, 2011 TO JULY 17, 2012 Duties and Responsibilities: • Fitup anderectionof steel pipes(carbonsteel,stainlesssteel,alloysteel andduplexstainlesssteel) and spool andfittings. • Fabricationof steel andironsupports,small bore,andbigbore infabricationandelevatedareas. • Erectionof spool,fittingsanderectionmaterials,valves,orifice flangesandmiteredfittings. • Fitup andalignmentof small andbigbore @ elevatedareas. • Assemblyandfitupof threadedandsocketweldpipe linesandfittings. • Installationanderectionof pipe spools,supportsanderectionmaterials. • Fabricationof spoolsandfittingsatfabricationareawhichfollowsproperspecificationsand procedure. • Assignincommissioning.Pre commissioningactivitiessuchasleakrestoredandreinstate pipelines base inSABIC standard. • Installation of valves,pipesupports,anderectionmaterialsandpipe andspools. • Fabricationof bigandsmall bore in fabricationareaandelevatedarea. COMPANY: NASSER S. AL HAJRI CORPORATION POSITION: PIPE FITTER PROJECT: SAUDI KAYAN PETROCHEMICAL PLANT PROJECT JUBAIL KINGDOM OF SAUDI ARABIA
  • 3. INCLUSIVE DATES: DECEMBER 22, 2008 TO DECEMBER 22, 2010 Duties and Responsibilities: • Fitup andalignmentof small andbigbore @ elevatedareas. • Assemblyandfitupof threadedandsocketweldpipe lines andfittings. • Installationanderectionof pipe spools,supportsanderectionmaterials. • Fabricationof spoolsandfittingsatfabricationareawhichfollowsproperspecificationsand procedure. • Assignincommissioning.Pre commissioningactivitiessuchasleakrestoredandreinstate pipelines base inSABIC standard. • Installationof valves,pipesupports,anderectionmaterialsandpipe andspools. • Fabricationof bigandsmall bore in fabricationareaandelevatedarea. COMPANY: DASMARINAS INDUSTRIAL& STEELWORKS CORPORATION POSITION: PIPE FITTER PROJECT: COMPANY MAINTAINANCE PROJECT ILIGAN CITY PHILIPPINES INCLUSIVE DATES: FEBRUARY 15,2003 TO NOVEMBER 30, 2006 Duties and Responsibilities: • Fitup andalignmentof small andbigbore @ elevatedareas. • Assemblyandfitupof threadedandsocketweldpipe linesandfittings. • Installationanderectionof pipe spools,supportsanderectionmaterials. • Fabricationof spools andfittingsatfabricationareawhichfollowsproperspecificationsand procedure. Fabricatedof bigandsmall bore infabricationareaand elevatedarea.Installationof valves, Pipe supports,anderectionmaterialsandpipe andspool. EDUCATIONAL ATTAINMENT: TERTIARY ILIGAN CITY TECHNICAL INSTITUTE A/C TECHNICIAN SECONDARY ILIGAN CITY EAST HIGH SCHOOL ILIGAN CITY, PHILIPPINES
  • 4. PRIMARY LUINAB ELEMENTARY SCHOOL ILIGAN CITY, PHILIPPINES ______________________________________________________________________________ PERSONAL DATA: DATE OF BIRTH: MAY 1, 1975 RELIGION : ROMAN CATHOLIC PLACE OF BIRTH: HINAPLANON ILIGAN CITY WEIGHT : 65 KGS SEX : MALE HEIGHT : 5’6 CIVIL STATUS : MARRIED PASSPORT NO. : EB6171082 NATIONALITY : FILIPINO TRAINING AND SEMINAR ATTENDED: HSE TRAINING SADARA CHEMICAL CAMPANY GENERAL SAFETY 2014 HSE TRAINING NEWMONT SAFETY TRAINING 2013 HSE TRAINING GASCO/TECHNIMONT GENERAL WORK SAFETY 2011 HSE TRAINING TECHNICAS REUNIDAS GULF CO. LTD 2008 HSE TRAINING
  • 5. DASMARINAS INDUSTRIAL SAFETY TRAINING 2003 CHARACTER REFFERENCES: VANTILLARD PASCAL ISO-MAINTENANCE SUPERVISOR SADARA CHEMICAL COMPANY CEL # +966 502530123 JAMES RANDEL HALEY MAINTENANCE MANAGER SADARA CHEMICAL COMPANY TEL# 013-345-8432 I HEREBY ACKNOWLEDGE THAT THE INFORMATION GIVEN IN THIS DATA WAS TRUE AND CORRECT IN THE BEST OF MY KNOWLEGDE AND BELIEF. ARMAN A. VIDRA