June 2012

                                             Forthcoming Meeting
              CIB World Building Congress 2013: Construction and Society

       Congress Session on Architectural Management & IDDS;
   Improving Societal Performance of Architectural Design through
   Better Collaboration and Integration with the Aid of Information
               Technology and Knowledge Management




                                 Brisbane, Australia, 5th - 9th May 2013

                                               Call for Abstracts

                  W078 - Information Technology for Construction
                          W096 - Architectural Management
             W102 - Information and Knowledge Management in Building
    Core Group CIB Priority Theme: Integrated Design and Delivery Solution (IDDS)


Architectural Management and IDDS                          societal performance of architectural design through
                                                           better integration and collaboration by means of
New information, communication and knowledge               information, communication and knowledge
management technologies are drastically influencing        management technologies. The three main themes of
architectural design. The way architects collaborate       this special session are:
with other parties, how they exchange information and            Integrated architectural design
share knowledge increasingly is changing traditional             Design process integration and collaboration
procedures and roles. This is enforced by a range of             Improving societal performance.
societal pressures directed at delivering buildings with
proven and guaranteed quality and performance              Themes
throughout the life span. This asks for better
integration of knowledge in the process, better            Abstracts are invited concerning improving societal
collaboration, whether or not forced by integrated         performance of architectural design through better
procurement, resulting in better societal performance      integration and collaboration by means of information
in its widest sense.                                       communication and knowledge management
In this special session of CIB’s World Building Congress   processes, techniques, and technologies. Theoretical
2013 the organisers will explore the issue of improving    models, practical approaches, case studies and
CIB Newsletter




recently completed doctoral work are welcome.                  CIB W078 Information Technology for
Abstracts should address one or more of the following          Construction
sub-themes (specified sub-themes are for guidance
and should be interpreted widely):                             The scope of W078’s work is broad in terms of the
     The integrated architectural design                      design, construction and occupation and occupancy of
      - The concept of design integration                      constructed facilities, but primarily it relates to the
      - Evidence and measurement of design product             integration and communication of data, information
          integration                                          and knowledge in the facility’s life cycle. Information
      - Integrating architecture with technology, and          and Communication Technologies (ICT) are relevant to
          construction                                         all aspects of the workplace and are seen as a major
     Design process integration and collaboration             enabler of productivity improvement as well as more
      - The concept of design process integration              sophisticated and integrated design and construction.
      - The concept of design collaboration.                   Against this background the Commission focuses on:
      - Improving design collaboration through                       Development and application of integrated IT
          Knowledge Management                                        throughout the life-cycle of the design,
      - Design collaboration improvement by means                     construction and occupancy of buildings and
          of ICT.                                                     related facilities
      - Big BIM and Little BIM, effects on integration               Demonstration of capabilities developed in
          and collaboration                                           collaborative research projects on Construction
      - Changing roles by implementing IDDS                           IT.
          technologies
     Improving societal performance
      - Design integration through collaboration
      - Sustainable design integration
      - Creating, Sustaining, Reusing and
          Disseminating Knowledge for Sustainable
          Design
      - Supply chain optimisation through design               CIB W096 Architectural Management
      - Lean design through better integration and
                                                               Since its formation in 1993 Architectural Management
          collaboration
                                                               (AM) has developed into a well-established domain.
      - Life cycle integration of architectural design
                                                               Early years were focused on defining the scope of the
                                                               commission, since which time the majority of the work
                                                               has been centered around the theme of creating value
                                                               through design, or more specifically through the
                                                               effective management of design. In April 2009 the
                                                               commission published its first state of the art book,
                                                               (Architectural Management: international research and
                                                               practice) providing a number of theoretical and
Abstracts Submission                                           practical applications of architectural management.
                                                               Now, the commission’s aim is to look in more detail at
Abstracts of no more than 300 words should be
                                                               specific methods, tools and techniques for helping to
submitted here. All abstracts are due by 30 June
                                                               deliver better-integrated designs within the boarders
2012 and should be no more than 300 words in
                                                               of the changing contemporary developments in
length. If you like to be involved in this stream of the
                                                               construction.
conference, please indicate that you are submitting
your abstract to this special session, by selecting            CIB W102 Information and Knowledge
AMIDDS as the option under the ‘CIB Commission                 Management in Building
number’ drop down box at the submission page of the
WBC.                                                           The Objective for the Working Commission is to cover
                                                               concerns that are related to information and
The paper submission time schedule is as follows:              knowledge management, both theoretical and
Call for Abstract closed              30 June 2012             practical. Special points of attention are the following:
Notification to Authors                23 July 2012                  interface between general information and the
Full Paper due                      5 October 2012                    building process and especially the dysfunction
Reviewing Decisions due          7 December 2012                      in the flow of information between researchers
Final Papers due                22 February 2013                      and practitioners. The questions why research
                                                                      results are not put into practice, and how
                                                                      research results and feedback information can
                                                                      be converted and refined to be of practical use
                                                                      will be considered



Info Section:                                                                                         Forthcoming Meetings
CIB Area of Scientific Interest:                           Design of Buildings and Management, Organisation and Economics
CIB Theme:                                                                          Integrated Design and Delivery Solutions
Page 2 of 3                                                                                                     07-06-2012
CIB Newsletter




      contemporary information systems bearing on              Prof Charles Egbu
       the information needs of the building industry.          c.o.egbu@salford.ac.uk
                                                                and Dr Malik M A Khalfan
CIB Priority Theme: Integrated Design Delivery                  malik.khalfan@rmit.edu.au, Joint
Solutions                                                       Coordinators CIB W102 Information
                                                                and Knowledge Management in Building
The focus of the Integrated Design and Delivery
Solutions CIB Priority theme is on pursuing a vision of         Bob Owen senior research fellow
a revitalised sector through the rapid adoption of new          r.l.owen@salford.ac.uk Joint coordinator CIB
processes, developing a workforce with enhanced skills          Priority Theme: IDDS on Integrated Design
and supported by information and knowledge                      Delivery Solutions
technologies. The goal is a sector where people with
traditional and new skills practice more collaborative          Assoc. Prof. Dr. Ir. Matthijs Prins
and communicative processes supported by pervasive,             M.Prins@tudelft.nl Coordinator W096 on
but nearly transparent, knowledge and information               Architectural Management
based technology. These professionals will be working
towards continuous improvements across every phase              You can find more information on the activities of CIB
and significant task of the project: conceptual planning        W078 here, CIB W096 here and CIB W102 here.
and making the business case; all parts of design,
supply chain, construction, commissioning; operation;
retrofit; and even decommissioning and carrying the
lessons learned into subsequent projects.




Additional Information

The full Call for Papers, of which this News article is a
brief summary, can be downloaded here.

If your need more information please don’t hesitate to
contact the organisers via: M.Prins@tudelft.nl

Prof. Robert Amor trebor@cs.auckland.ac.nz
Coordinator W078 on Information
Technology for Construction and Joint
Coordinator CIB Priority Theme IDDS on
Integrated Design Delivery Solutions




Info Section:                                                                                          Forthcoming Meetings
CIB Area of Scientific Interest:                            Design of Buildings and Management, Organisation and Economics
CIB Theme:                                                                           Integrated Design and Delivery Solutions
Page 3 of 3                                                                                                      07-06-2012

Architectural Management & IDDS call for abstracts

  • 1.
    June 2012 Forthcoming Meeting CIB World Building Congress 2013: Construction and Society Congress Session on Architectural Management & IDDS; Improving Societal Performance of Architectural Design through Better Collaboration and Integration with the Aid of Information Technology and Knowledge Management Brisbane, Australia, 5th - 9th May 2013 Call for Abstracts W078 - Information Technology for Construction W096 - Architectural Management W102 - Information and Knowledge Management in Building Core Group CIB Priority Theme: Integrated Design and Delivery Solution (IDDS) Architectural Management and IDDS societal performance of architectural design through better integration and collaboration by means of New information, communication and knowledge information, communication and knowledge management technologies are drastically influencing management technologies. The three main themes of architectural design. The way architects collaborate this special session are: with other parties, how they exchange information and  Integrated architectural design share knowledge increasingly is changing traditional  Design process integration and collaboration procedures and roles. This is enforced by a range of  Improving societal performance. societal pressures directed at delivering buildings with proven and guaranteed quality and performance Themes throughout the life span. This asks for better integration of knowledge in the process, better Abstracts are invited concerning improving societal collaboration, whether or not forced by integrated performance of architectural design through better procurement, resulting in better societal performance integration and collaboration by means of information in its widest sense. communication and knowledge management In this special session of CIB’s World Building Congress processes, techniques, and technologies. Theoretical 2013 the organisers will explore the issue of improving models, practical approaches, case studies and
  • 2.
    CIB Newsletter recently completeddoctoral work are welcome. CIB W078 Information Technology for Abstracts should address one or more of the following Construction sub-themes (specified sub-themes are for guidance and should be interpreted widely): The scope of W078’s work is broad in terms of the  The integrated architectural design design, construction and occupation and occupancy of - The concept of design integration constructed facilities, but primarily it relates to the - Evidence and measurement of design product integration and communication of data, information integration and knowledge in the facility’s life cycle. Information - Integrating architecture with technology, and and Communication Technologies (ICT) are relevant to construction all aspects of the workplace and are seen as a major  Design process integration and collaboration enabler of productivity improvement as well as more - The concept of design process integration sophisticated and integrated design and construction. - The concept of design collaboration. Against this background the Commission focuses on: - Improving design collaboration through  Development and application of integrated IT Knowledge Management throughout the life-cycle of the design, - Design collaboration improvement by means construction and occupancy of buildings and of ICT. related facilities - Big BIM and Little BIM, effects on integration  Demonstration of capabilities developed in and collaboration collaborative research projects on Construction - Changing roles by implementing IDDS IT. technologies  Improving societal performance - Design integration through collaboration - Sustainable design integration - Creating, Sustaining, Reusing and Disseminating Knowledge for Sustainable Design - Supply chain optimisation through design CIB W096 Architectural Management - Lean design through better integration and Since its formation in 1993 Architectural Management collaboration (AM) has developed into a well-established domain. - Life cycle integration of architectural design Early years were focused on defining the scope of the commission, since which time the majority of the work has been centered around the theme of creating value through design, or more specifically through the effective management of design. In April 2009 the commission published its first state of the art book, (Architectural Management: international research and practice) providing a number of theoretical and Abstracts Submission practical applications of architectural management. Now, the commission’s aim is to look in more detail at Abstracts of no more than 300 words should be specific methods, tools and techniques for helping to submitted here. All abstracts are due by 30 June deliver better-integrated designs within the boarders 2012 and should be no more than 300 words in of the changing contemporary developments in length. If you like to be involved in this stream of the construction. conference, please indicate that you are submitting your abstract to this special session, by selecting CIB W102 Information and Knowledge AMIDDS as the option under the ‘CIB Commission Management in Building number’ drop down box at the submission page of the WBC. The Objective for the Working Commission is to cover concerns that are related to information and The paper submission time schedule is as follows: knowledge management, both theoretical and Call for Abstract closed 30 June 2012 practical. Special points of attention are the following: Notification to Authors 23 July 2012  interface between general information and the Full Paper due 5 October 2012 building process and especially the dysfunction Reviewing Decisions due 7 December 2012 in the flow of information between researchers Final Papers due 22 February 2013 and practitioners. The questions why research results are not put into practice, and how research results and feedback information can be converted and refined to be of practical use will be considered Info Section: Forthcoming Meetings CIB Area of Scientific Interest: Design of Buildings and Management, Organisation and Economics CIB Theme: Integrated Design and Delivery Solutions Page 2 of 3 07-06-2012
  • 3.
    CIB Newsletter  contemporary information systems bearing on Prof Charles Egbu the information needs of the building industry. c.o.egbu@salford.ac.uk and Dr Malik M A Khalfan CIB Priority Theme: Integrated Design Delivery malik.khalfan@rmit.edu.au, Joint Solutions Coordinators CIB W102 Information and Knowledge Management in Building The focus of the Integrated Design and Delivery Solutions CIB Priority theme is on pursuing a vision of Bob Owen senior research fellow a revitalised sector through the rapid adoption of new r.l.owen@salford.ac.uk Joint coordinator CIB processes, developing a workforce with enhanced skills Priority Theme: IDDS on Integrated Design and supported by information and knowledge Delivery Solutions technologies. The goal is a sector where people with traditional and new skills practice more collaborative Assoc. Prof. Dr. Ir. Matthijs Prins and communicative processes supported by pervasive, M.Prins@tudelft.nl Coordinator W096 on but nearly transparent, knowledge and information Architectural Management based technology. These professionals will be working towards continuous improvements across every phase You can find more information on the activities of CIB and significant task of the project: conceptual planning W078 here, CIB W096 here and CIB W102 here. and making the business case; all parts of design, supply chain, construction, commissioning; operation; retrofit; and even decommissioning and carrying the lessons learned into subsequent projects. Additional Information The full Call for Papers, of which this News article is a brief summary, can be downloaded here. If your need more information please don’t hesitate to contact the organisers via: M.Prins@tudelft.nl Prof. Robert Amor trebor@cs.auckland.ac.nz Coordinator W078 on Information Technology for Construction and Joint Coordinator CIB Priority Theme IDDS on Integrated Design Delivery Solutions Info Section: Forthcoming Meetings CIB Area of Scientific Interest: Design of Buildings and Management, Organisation and Economics CIB Theme: Integrated Design and Delivery Solutions Page 3 of 3 07-06-2012