T-Systems Solution:
Aras Converter Framework
Aras Converter Framework
Contact & Information


              Contact Person
              Jens Rollenmüller
              T-Systems International GmbH
              Production Delivery Center Engineering
              PLM Consultant
              Fasanenweg 5, 70771 Leinfelden-Echterdingen, Germany
              + 49 711 972-42125 (Tel.)
              + 49 160 820 9102 (Mobil)
              E-Mail: jens.rollenmueller@t-systems.com
              Internet: http://www.t-systems.com




Information                     – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010   2
Aras Converter Framework
Introduction
      The following slides describe the industry leading conversion solutions for
      the leading open enterprise PLM solution Aras Innovator.
      T-Systems provides a fully integrated framework to easily setup, administrate, manage and monitor file
      conversions within Aras Innovator
      Within this framework you are able to:
        - Setup new batch conversions like file conversions, data checking routines, ...
        - Convert / check files within Aras Innovator and automatically attach converted or checked files to your
           own Item Types.
        - Attach your own events to handle files. (e.g. OnAfterPromote Document).
        - Monitor your created files and logfiles within Aras Innovator.
        - Integrate your own custom file handling (e.g. doc => pdf, ppt => pdf, CATPart => 3dxml)



   Have a look at the next slides to see the flexibility and benefit of the high end Aras Solution




Information                                 – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010      3
Current situation.
    Our Solution.
    Benefit.




Information        –streng confidental –
                        – vertraulich, vertraulich, intern, öffentlich–
                                                              Jens Rollenmüller Autor / Thema der PLM
                                                                                   T-Systems / Präsentation15.12.2010   23.11.2009   4
Aras Converter Framework
Current situation

      Aras Innovator is a framework with existing solutions for Document Management and CAD File
      Management.

      There are many ready-to-use and customer-specific integrations for Microsoft Office and several CAD
      Systems, but there is no standard capability to convert files within Aras Innovator.

      All process dependent users, such as sales, manufacturing, project managers need expensive
      software and licenses to access CAD, MS Word, MS Project and other files.

      Each company using Aras Innovator must create its own solution for file conversions.


                       => Why waste time and money on own implementations ?




Information                                 – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010   5
Aras Converter Framework
Our solution

      T-Systems provides a high end solution framework that is easy to use, administrate, manage and
      monitor.
      Usecase:
        - Check in new and modified files into Aras Innovator ; e.g. save to Aras.
        - Framework automatically attaches converted or checked files to defined Item Types.




              User                                       Aras Innovator                                              Converter
                                  save to ARAS         + Converter Solution              convert
                                doc, CATPart, ppt, …


                                  read from ARAS                                       provide new file


                     pdf,3dxml,jt, …




Information                                              – confidental –      Jens Rollenmüller    T-Systems / PLM   15.12.2010   6
Aras Converter Framework
Benefit.
      All process dependent users are enabled to view data managed by Aras Innovator using cheap or free
      viewing software, such as:
       Acrobat Reader (all files like Word, Excel, Powerpoint, CAD Drawings)
       JT2Go (Siemens PLM *.jt files)
       3D xml Viewer (Dassault Systemes *.3dxml files)


      You can integrate your own custom conversion or file handling (e.g. doc => pdf, ppt => pdf, CATPart
      => 3dxml, cad checker).

      The Aras Innovator administrator can set up new jobs very easily within a few minutes and can review,
      reset and monitor all jobs within Aras Innovator.




Information                                 – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010   7
User experience.




Information       –streng confidental –
                       – vertraulich, vertraulich, intern, öffentlich–
                                                             Jens Rollenmüller Autor / Thema der PLM
                                                                                  T-Systems / Präsentation15.12.2010   23.11.2009   8
Aras Converter Framework
User experience

      Create your own file in MS Word and …




Information                        – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010   9
Aras Converter Framework
User experience

             … save it to Aras Innovator.




Information                                  – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010   10
Aras Converter Framework
User experience

             The T-Systems converter Toolkit will convert the MS Word Document to
              Acrobat PDF and html (as defined by the Administrator).


                                       (1)                         (2)
                                   Look for jobs              Convert jobs
                                     waiting                   as defined
                                     [*.doc]                [*.doc => *,pdf]




                                                        (3)
                                                   Attach new
                                                file to ItemType
                                             [*.pdf => Document]




Information                              – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010   11
Aras Converter Framework
User experience

             Secondary files will
              appear at your document.




Information                              – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010   12
Aras Converter Framework
User experience

             View the PDF files within ARAS Innovator.




Information                              – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010   13
Aras Converter Framework
User experience

             The same function is available for CAD documents




Information                             – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010   14
Administration.




Information           –streng confidental –
                           – vertraulich, vertraulich, intern, öffentlich–
                                                                 Jens Rollenmüller Autor / Thema der PLM
                                                                                      T-Systems / Präsentation15.12.2010   23.11.2009   15
                                                                                                                                        15
Aras Converter Framework
Administration

       Two new ItemTypes.
       “File Converters” for Administration.
       “Converter Jobs” for Monitoring.




Information                          – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010   16
Aras Converter Framework
Administration




                                          Define your own converter jobs.
                                          Use existing batch converters on your server.
                                          Attach custom “template macros”




Information          – confidental –         Jens Rollenmüller   T-Systems / PLM   15.12.2010   17
Aras Converter Framework
Administration
      Define your own job:                                                   Name and description
       Add a new “File Converter” Item Type.
                                                                             Command line for converter

                                                                             Command line parameters

                                                                             File types to convert

                                                                             Custom template scripts

                                                                              Introspection flag for Aras
                                                                               supporting Aras triggered events
                                                                               including files -> document
                                                                               relation




Information                        – confidental –   Jens Rollenmüller       T-Systems / PLM   15.12.2010         18
Aras Converter Framework
Monitoring

                                                              View your waiting, completed and
                                                               failed jobs.




                                                              Reset your jobs using lifecycle.



                                                              View attached Files
                                                                    Input
                                                                    Output
                                                                    Logfile




Information          – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010           19
Aras Converter Framework
Roadmap

             Include custom scripts (own batch files) to convert files.
             Scripts to test your conversion from converter form.
             Advanced reporting and dashboards regarding your jobs.




Information                              – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010   20
Packaging.




Information      –streng confidental –
                      – vertraulich, vertraulich, intern, öffentlich–
                                                            Jens Rollenmüller Autor / Thema der PLM
                                                                                 T-Systems / Präsentation15.12.2010   23.11.2009   21
                                                                                                                                   21
Aras Converter Framework
Packaging
Aras Framework



                +                                                                                 Enterprise
 Aras Solution:
 Converter Framework
                       Flexibility                                   Basic
        Enterprise
                                            Free
              Basic

              Free
                                                                Functionality




Information                          – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010        22
Aras Converter Framework
Packaging

                  Free:
                   Free of charge
                   Basis Framework
                    (Job Setup, Monitoring)
                   MS Word to Adobe PDF
                    (based on Open Office)
                   Standard Aras Innovator relation type:
                    Document => File




Information           – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010   23
Aras Converter Framework
Packaging

                  Basic [includes Free and adds]:
                   3 freely definable conversion types
                   Predefined Aras Innovator relation types
                   Basic Monitoring




Information           – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010   24
Aras Converter Framework
Packaging

                  Enterprise [includes Basic and adds]:
                   Unlimited conversion types
                   Unlimited relation types for Aras file introspection
                   Thumbnail generation
                   Enterprise Monitoring




Information           – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010   25
Aras Converter Framework
Additional converters
         Office   Office (Open Office Converter):
                   Microsoft Word => Adobe PDF
                   Microsoft Powerpoint => Adobe PDF
                   Microsoft Excel => Adobe PDF


                  Acrobat Distiller Server
                   Supported file formats (PS => Adobe PDF)
                    Details: http://www.adobe.com




Information           – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010   26
Aras Converter Framework
Additional converters
              CAD
                          COM/FOX-based
                           Supported file formats (CAD)
        COM/FOX             Details: servicenet.t-systems.de
                           COM/FOX enables high end applications of JT and
                            PLMXML; Details: servicenet.t-systems.de

                          CATIAV5-based:
                           CATDrawing => pdf, png, tif, …
               CATIA V5


                           CATProduct => 3dxml, png, tif, …
                           CATPart => 3dxml, png, tif, …




Information                   – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010   27
Aras Converter Framework
Additional converters
              CAD
                    NX-based
                     NX Assembly (prt) => JT
                     NX Part (prt) => JT
                     NX Drawing (prt) => PDF


                    If you need other converters, please contact us.




Information             – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010   28
Questions ?




Information   – confidental –   Jens Rollenmüller   T-Systems / PLM   15.12.2010   29

Aras Converter Framework Overview

  • 1.
  • 2.
    Aras Converter Framework Contact& Information Contact Person Jens Rollenmüller T-Systems International GmbH Production Delivery Center Engineering PLM Consultant Fasanenweg 5, 70771 Leinfelden-Echterdingen, Germany + 49 711 972-42125 (Tel.) + 49 160 820 9102 (Mobil) E-Mail: jens.rollenmueller@t-systems.com Internet: http://www.t-systems.com Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 2
  • 3.
    Aras Converter Framework Introduction The following slides describe the industry leading conversion solutions for the leading open enterprise PLM solution Aras Innovator. T-Systems provides a fully integrated framework to easily setup, administrate, manage and monitor file conversions within Aras Innovator Within this framework you are able to: - Setup new batch conversions like file conversions, data checking routines, ... - Convert / check files within Aras Innovator and automatically attach converted or checked files to your own Item Types. - Attach your own events to handle files. (e.g. OnAfterPromote Document). - Monitor your created files and logfiles within Aras Innovator. - Integrate your own custom file handling (e.g. doc => pdf, ppt => pdf, CATPart => 3dxml) Have a look at the next slides to see the flexibility and benefit of the high end Aras Solution Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 3
  • 4.
    Current situation. Our Solution. Benefit. Information –streng confidental – – vertraulich, vertraulich, intern, öffentlich– Jens Rollenmüller Autor / Thema der PLM T-Systems / Präsentation15.12.2010 23.11.2009 4
  • 5.
    Aras Converter Framework Currentsituation Aras Innovator is a framework with existing solutions for Document Management and CAD File Management. There are many ready-to-use and customer-specific integrations for Microsoft Office and several CAD Systems, but there is no standard capability to convert files within Aras Innovator. All process dependent users, such as sales, manufacturing, project managers need expensive software and licenses to access CAD, MS Word, MS Project and other files. Each company using Aras Innovator must create its own solution for file conversions. => Why waste time and money on own implementations ? Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 5
  • 6.
    Aras Converter Framework Oursolution T-Systems provides a high end solution framework that is easy to use, administrate, manage and monitor. Usecase: - Check in new and modified files into Aras Innovator ; e.g. save to Aras. - Framework automatically attaches converted or checked files to defined Item Types. User Aras Innovator Converter save to ARAS + Converter Solution convert doc, CATPart, ppt, … read from ARAS provide new file pdf,3dxml,jt, … Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 6
  • 7.
    Aras Converter Framework Benefit. All process dependent users are enabled to view data managed by Aras Innovator using cheap or free viewing software, such as:  Acrobat Reader (all files like Word, Excel, Powerpoint, CAD Drawings)  JT2Go (Siemens PLM *.jt files)  3D xml Viewer (Dassault Systemes *.3dxml files) You can integrate your own custom conversion or file handling (e.g. doc => pdf, ppt => pdf, CATPart => 3dxml, cad checker). The Aras Innovator administrator can set up new jobs very easily within a few minutes and can review, reset and monitor all jobs within Aras Innovator. Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 7
  • 8.
    User experience. Information –streng confidental – – vertraulich, vertraulich, intern, öffentlich– Jens Rollenmüller Autor / Thema der PLM T-Systems / Präsentation15.12.2010 23.11.2009 8
  • 9.
    Aras Converter Framework Userexperience  Create your own file in MS Word and … Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 9
  • 10.
    Aras Converter Framework Userexperience  … save it to Aras Innovator. Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 10
  • 11.
    Aras Converter Framework Userexperience  The T-Systems converter Toolkit will convert the MS Word Document to Acrobat PDF and html (as defined by the Administrator). (1) (2) Look for jobs Convert jobs waiting as defined [*.doc] [*.doc => *,pdf] (3) Attach new file to ItemType [*.pdf => Document] Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 11
  • 12.
    Aras Converter Framework Userexperience  Secondary files will appear at your document. Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 12
  • 13.
    Aras Converter Framework Userexperience  View the PDF files within ARAS Innovator. Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 13
  • 14.
    Aras Converter Framework Userexperience  The same function is available for CAD documents Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 14
  • 15.
    Administration. Information –streng confidental – – vertraulich, vertraulich, intern, öffentlich– Jens Rollenmüller Autor / Thema der PLM T-Systems / Präsentation15.12.2010 23.11.2009 15 15
  • 16.
    Aras Converter Framework Administration  Two new ItemTypes.  “File Converters” for Administration.  “Converter Jobs” for Monitoring. Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 16
  • 17.
    Aras Converter Framework Administration  Define your own converter jobs.  Use existing batch converters on your server.  Attach custom “template macros” Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 17
  • 18.
    Aras Converter Framework Administration Define your own job:  Name and description  Add a new “File Converter” Item Type.  Command line for converter  Command line parameters  File types to convert  Custom template scripts  Introspection flag for Aras supporting Aras triggered events including files -> document relation Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 18
  • 19.
    Aras Converter Framework Monitoring  View your waiting, completed and failed jobs.  Reset your jobs using lifecycle.  View attached Files  Input  Output  Logfile Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 19
  • 20.
    Aras Converter Framework Roadmap  Include custom scripts (own batch files) to convert files.  Scripts to test your conversion from converter form.  Advanced reporting and dashboards regarding your jobs. Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 20
  • 21.
    Packaging. Information –streng confidental – – vertraulich, vertraulich, intern, öffentlich– Jens Rollenmüller Autor / Thema der PLM T-Systems / Präsentation15.12.2010 23.11.2009 21 21
  • 22.
    Aras Converter Framework Packaging ArasFramework + Enterprise Aras Solution: Converter Framework Flexibility Basic Enterprise Free Basic Free Functionality Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 22
  • 23.
    Aras Converter Framework Packaging Free:  Free of charge  Basis Framework (Job Setup, Monitoring)  MS Word to Adobe PDF (based on Open Office)  Standard Aras Innovator relation type: Document => File Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 23
  • 24.
    Aras Converter Framework Packaging Basic [includes Free and adds]:  3 freely definable conversion types  Predefined Aras Innovator relation types  Basic Monitoring Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 24
  • 25.
    Aras Converter Framework Packaging Enterprise [includes Basic and adds]:  Unlimited conversion types  Unlimited relation types for Aras file introspection  Thumbnail generation  Enterprise Monitoring Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 25
  • 26.
    Aras Converter Framework Additionalconverters Office Office (Open Office Converter):  Microsoft Word => Adobe PDF  Microsoft Powerpoint => Adobe PDF  Microsoft Excel => Adobe PDF Acrobat Distiller Server  Supported file formats (PS => Adobe PDF) Details: http://www.adobe.com Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 26
  • 27.
    Aras Converter Framework Additionalconverters CAD COM/FOX-based  Supported file formats (CAD) COM/FOX Details: servicenet.t-systems.de  COM/FOX enables high end applications of JT and PLMXML; Details: servicenet.t-systems.de CATIAV5-based:  CATDrawing => pdf, png, tif, … CATIA V5  CATProduct => 3dxml, png, tif, …  CATPart => 3dxml, png, tif, … Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 27
  • 28.
    Aras Converter Framework Additionalconverters CAD NX-based  NX Assembly (prt) => JT  NX Part (prt) => JT  NX Drawing (prt) => PDF If you need other converters, please contact us. Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 28
  • 29.
    Questions ? Information – confidental – Jens Rollenmüller T-Systems / PLM 15.12.2010 29