The document proposes a visual overhaul of Mule Studio to improve the user interface. It identifies issues with the existing design such as outdated visual styling and inconsistencies. The proposed redesign aims to streamline the workflow with a cleaner interface, clearer hierarchy, updated icons, and improved usability of features like the palette, properties view and XML editing. The redesign will be implemented in phases over several release cycles through 2022. Risks include resource allocation and compatibility with the Eclipse platform.