HINDALCO INDUSTRIES LIMITED
RENUKOOT
Presented by-
Anshika Srivastava
OP JINDAL UNIVERSITY
(EEE)
RECTIFIER
INTRODUCTION
 A flagship company of ADITYA BIRLA GROUP
 Set up by Shri Ghanshyam Das Birla.
 Located in RENUKOOT, Sonebhadra (Uttar Pradesh)
 Commenced its operations in 1962 with initial capacity of 20,000 TPY
Metal and 40,000 TPY Alumina
 Emerged as the largest integrated aluminium manufacturing company
in INDIA
 Globally 12th largest Aluminium and Alumina Producer
VALUES
Hindalco products cater to numerous markets, and provide for all industrial and
commercial requirements like:
• Automotive and transport
• Building and construction
• Defense
• Electrical and Electronics
Industrial applications
• Medical and packaging
• White goods
Finished products include alumina, primary aluminium in the form of
ingots, billets and wire rods, value-added products such as rolled
products, extrusions and foils.
COMMERCE
CAPACITIES OVERVIEW
 1/3 rd Strength to weight ratio
 Corrosion resistant
 Thermal Conductivity High
 Cost effective
 Electrical Conductivity high
 Workability High
WHAT MAKES ALUMINIUM BETTER?
**Hindalco’s captive bauxite mines in
Jharkhand, Chhattisgarh, Maharashtra and
Odisha, provide the raw material to alumina
refineries located at Belgaum in Karnataka,
Muri in Jharkhand and Renukoot in Uttar
Pradesh, India.
PROFILE OF
RECTIFIER PLANT
BASIC AIM
UNINTERRUPTED ELECTRICAL
POWER SUPPLY TO SMELTER
AND EACH & EVERY SECTION OF
THE PLANTS AND COLONY.
Generating Capacity & Break-up of
Power Consumption
10
GENERATION
Renusagar 801.70 MW
Co-Gen Plant 84.00 MW
Total 885.70 MW
CONSUMPTION
Alumina Plant(Including Blr#1&2) 32.00 MW
Fabrication Plant 15.00 MW
Smelter Dry Scrubbing System 12.75 MW
Reduction Plant 13.25 MW
Colony &Pumping Station 5.00 MW
Rectifier-I&II 2.00 MW
Smelter Plant 675.00 MW
Total 755.00 MW
11
Single Line Diagram (Total Network)
RIHAND
TG # 8
80 MW
TG # 1
71 MW
TG # 2
71 MW
TG # 3
83 MW
TG # 4
83 MW
TG # 5
71 MW
TG # 6
82MW
TG # 7
82 MW
RIHAND FDR #2
RIHAND FDR # 1
TIE FDR # 2
TG # 9
88.5 MW
TG # 10
88.5 MW
TIE FDR # 1
RENUSAGAR FDR #10
RENUSAGAR FDR
#9
POTLINE # 1,2,3 & Aux Power
PL # 4,5 & Aux Power
POTLINE
#
9,10&11
& Aux
Power
5 4 1 2 3
RENUSAGARFDR#3
RENUSAGAR FDR #5
RENUSAGAR FDR
#6
RENUSAGAR FDR #7
RENUSAGAR FDR #8
Co-Gen-II (41 MW)
& Alumina Plant
NTPC
RENUSAGARFDR#4
RENUSAGARFDR#2
RENUSAGARFDR#1
Co-Gen-I &Sun Shine
(37+6 MW)
& Alumina Plant
1000A 1200A1200A1200A1200A
2000A
UP Grid
PL # 6,7,8 & Aux Power
3150A
12
132 KV Transmission Line’s Details
AMP MW
Rihand
Line#1&2
Panther 10 3 480 80 1961
Renusagar
Line#1&2
AL59 107 30 900 180
1966 (Conductor
Replacedfrom GOAT
to AL59 in 2012)
Renusagar
Line#3&4
Goat 104 30 630 120 1983
Renusagar
Line#5&6
TWIN Zebra 95 30 736 *2 240
1998 (TWIN
ZEBRAConductor
providedin 2012)
Renusagar
Line#7,8, 9&10
AAAC 120 31 960 180 2004
YEAR OF
COMISSIONI
NG
TRANS. LINE#
CONDUCTOR
USED
No. OF
TOWERS
LENGTH
OF LINES
(Km)
RATING
 7 rectifier transformers each
 Rectification is the process of obtaining an E.M.F. of
definite mean value from one of zero mean value.
In our system we have used silicon rectifier/high
power silicon diodes for rectification.
 PL#1 Half wave rectifiers
 PL#2&3 Full wave rectifiers
POT LINE # 1,2&3
14
Rectification System (PL#1,2&3)
DC Supply to Pot Room
132 KV Bus
11.5 KV Bus
11.5 KVRegulated Bus
Main Transformer
(132 KV/11.5 KV)
Regulating Transformer
(with On load Taps)
70 KA Standby
Rectifier unit
For PL#1,2&3
DC Bus
7 Nos Rectifier Units
10 KA each for PL#1
&
6 Nos Rectifier Units
13.2 KA each for PL#2&3
810 V & 65 KA for PL#1
825 V & 64.2 KA for PL#2&3
DC Isolators
15
Rectification System (PL#4,5&6)
DC Supply to Pot Room
132 KV Bus
33 KV Bus
Main Transformer
(132 KV/33 KV)
(with On load Taps)
Regulating Transformer
Rectifier Transformer
Transductor Control
DC Bus
4 Nos Rectifier
Units 22 KA each
850 V& 66 KA
DC Isolators
16
Rectification System (PL#7&8)
DC Supply to PotRoom
132 KV Bus
DC Bus
850 V& 66 KA
Transformers
2 Nos. 132 KV/ 850 V DC
66 KA each
Thyristor Controlled
Rectifier vUniys
Thyristors
gate gate
DC Isolators
17
Rectification System (PL#9,10&11)
DC Supply to PotRoom
132 KV Bus
DC Bus
900 V& 66 KA
2 Nos. 132 KV/ 900 V DC
70 KA each
Rectifier Units
Regulating Transformers
(with on load taps)
Rectifier Transformers
PLC controlled Transductors
Diode Rectifiers
DC Isolators
Power is stepped down from 132KV to 11.5KV by the four power
transformers having the following ratings.
 T-1: 75 MVA
 T-2 : 75 MVA
 T-3 : 75 MVA
 T-4 : 75 MVA
 Above transformers supply power to Potline #1, 2 & 3, Auxiliaries to
Smelter Plant, Fabrication plant, Colony etc.
 Capacitor are installed on the 11.5KV side of transformers T1 & T2 to
improve power factor
LOAD DISTRIBUTION AT
PLANT 1ST RECTIFIER
 Power Transformer
 Regulating Transformer
 Rectifier Transformer
 Instrument Transformer
 Auto Transformer
 Distribution Transformer
Types Of Transformers
 Buchholz (Gas) Relay
 Pressure Relay
 Oil Level Monitor Device
 Winding Thermometer
TRANSFORMER PROTECTION
SWITCH YARD EQUIPMENTS
• Lightning Arrestor
• Isolators (Disconnecting Switches)
• Circuit Breaker
• CT & PT
Hindalco plant 1 Substation
 Cooling tower is an enclosed device in which water is
cooled by bringing it in direct contact with
atmospheric air.
COOLING TOWERS
23
Major Tasks & Targets
 Monitoring of all the High Voltage Equipments Including 132
kV Transmission lines, Switch Yards, Transformers & Switch
Gears.
 Revamping & upgradation of old Electrical Equipments to
match present requirement & minimise break down
 Upkeep of SCADA (Supervisory Control & Data Acquisition)
System installed on Electrical Network for minimum power
disturbances.
 Power Supply Management & Co-ordination amongst Rihand
Power Station, Renusagar Power, Co-gen,& Load Centres during
Power Crisis, Lightning and System Trouble
 Compliance of Electricity Acts/ Rules and Power Agreement
between hindalco & UPPCL
 Computation, Reporting & Monitoring of Energy
Consumption of different sections.
THANKYOU!!!

More Related Content

What's hot

Training at BHEL Haridwar
Training at BHEL Haridwar Training at BHEL Haridwar
Training at BHEL Haridwar
Harshit Bhandari
 
compressed air vehicle
compressed air vehiclecompressed air vehicle
compressed air vehicle
Abhishek Agarwal
 
Daedalus Stirling Presentation
Daedalus Stirling PresentationDaedalus Stirling Presentation
Daedalus Stirling Presentation
Vin Ken Low
 
Steam Turbine - biomass
Steam Turbine - biomassSteam Turbine - biomass
Steam Turbine - biomass
Olivier De Block
 
Bhel presentation
 Bhel presentation Bhel presentation
Bhel presentation
Ishant Gautam.
 
BHEL SUMMER TRAAINING RANIPUR HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
BHEL SUMMER TRAAINING RANIPUR  HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA BHEL SUMMER TRAAINING RANIPUR  HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
BHEL SUMMER TRAAINING RANIPUR HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
Jatin Tiwari
 
bhel report file on turbine shop & blade
 bhel report file on turbine shop & blade bhel report file on turbine shop & blade
bhel report file on turbine shop & blade
ABHISHEK SINGH
 
BHEL INDUSTRIAL TRAINNING REPORT
BHEL INDUSTRIAL TRAINNING REPORTBHEL INDUSTRIAL TRAINNING REPORT
BHEL INDUSTRIAL TRAINNING REPORT
Sai Chandu Chandu
 
Fabrication of air compressed vehicle
Fabrication of air compressed vehicle Fabrication of air compressed vehicle
Fabrication of air compressed vehicle
Gopikrishna Krissh
 
Solar Ice Production
Solar Ice ProductionSolar Ice Production
Solar Ice Production
Martin van der Jagt
 
Powerplant : Coal Handling
Powerplant : Coal HandlingPowerplant : Coal Handling
Powerplant : Coal Handling
Neel Patel
 
JPCL,Internship Report
JPCL,Internship ReportJPCL,Internship Report
JPCL,Internship Report
Gotam Das Suthar
 
Parveen bhel
Parveen bhelParveen bhel
Parveen bhel
S PARVEEN SINGH
 
Bhel ppt
Bhel pptBhel ppt
Bhel ppt
S PARVEEN SINGH
 
Siemens Steam Turbines 2MW-250MW
Siemens Steam Turbines 2MW-250MWSiemens Steam Turbines 2MW-250MW
Siemens Steam Turbines 2MW-250MW
Wim Van Den Mosselaer
 
A presentation on turbogenerator and excitor
A presentation on turbogenerator and excitorA presentation on turbogenerator and excitor
A presentation on turbogenerator and excitor
PRAKHAR MEHROTRA
 
Powerplant 150830061520-lva1-app6892
Powerplant 150830061520-lva1-app6892Powerplant 150830061520-lva1-app6892
Powerplant 150830061520-lva1-app6892
cit-cit
 
Cambridge | Jan-14 | Biomass-fuelled Stirling Engine for off-grid applications
Cambridge | Jan-14 | Biomass-fuelled Stirling Engine for off-grid applicationsCambridge | Jan-14 | Biomass-fuelled Stirling Engine for off-grid applications
Cambridge | Jan-14 | Biomass-fuelled Stirling Engine for off-grid applications
Smart Villages
 
COMPRESSED AIR VEHICLES THE FUTURE HYBRIDS
 COMPRESSED AIR VEHICLES THE FUTURE HYBRIDS     COMPRESSED AIR VEHICLES THE FUTURE HYBRIDS
COMPRESSED AIR VEHICLES THE FUTURE HYBRIDS
Maley Vamshi Kiran
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plant
Abhinaw kapoor
 

What's hot (20)

Training at BHEL Haridwar
Training at BHEL Haridwar Training at BHEL Haridwar
Training at BHEL Haridwar
 
compressed air vehicle
compressed air vehiclecompressed air vehicle
compressed air vehicle
 
Daedalus Stirling Presentation
Daedalus Stirling PresentationDaedalus Stirling Presentation
Daedalus Stirling Presentation
 
Steam Turbine - biomass
Steam Turbine - biomassSteam Turbine - biomass
Steam Turbine - biomass
 
Bhel presentation
 Bhel presentation Bhel presentation
Bhel presentation
 
BHEL SUMMER TRAAINING RANIPUR HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
BHEL SUMMER TRAAINING RANIPUR  HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA BHEL SUMMER TRAAINING RANIPUR  HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
BHEL SUMMER TRAAINING RANIPUR HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
 
bhel report file on turbine shop & blade
 bhel report file on turbine shop & blade bhel report file on turbine shop & blade
bhel report file on turbine shop & blade
 
BHEL INDUSTRIAL TRAINNING REPORT
BHEL INDUSTRIAL TRAINNING REPORTBHEL INDUSTRIAL TRAINNING REPORT
BHEL INDUSTRIAL TRAINNING REPORT
 
Fabrication of air compressed vehicle
Fabrication of air compressed vehicle Fabrication of air compressed vehicle
Fabrication of air compressed vehicle
 
Solar Ice Production
Solar Ice ProductionSolar Ice Production
Solar Ice Production
 
Powerplant : Coal Handling
Powerplant : Coal HandlingPowerplant : Coal Handling
Powerplant : Coal Handling
 
JPCL,Internship Report
JPCL,Internship ReportJPCL,Internship Report
JPCL,Internship Report
 
Parveen bhel
Parveen bhelParveen bhel
Parveen bhel
 
Bhel ppt
Bhel pptBhel ppt
Bhel ppt
 
Siemens Steam Turbines 2MW-250MW
Siemens Steam Turbines 2MW-250MWSiemens Steam Turbines 2MW-250MW
Siemens Steam Turbines 2MW-250MW
 
A presentation on turbogenerator and excitor
A presentation on turbogenerator and excitorA presentation on turbogenerator and excitor
A presentation on turbogenerator and excitor
 
Powerplant 150830061520-lva1-app6892
Powerplant 150830061520-lva1-app6892Powerplant 150830061520-lva1-app6892
Powerplant 150830061520-lva1-app6892
 
Cambridge | Jan-14 | Biomass-fuelled Stirling Engine for off-grid applications
Cambridge | Jan-14 | Biomass-fuelled Stirling Engine for off-grid applicationsCambridge | Jan-14 | Biomass-fuelled Stirling Engine for off-grid applications
Cambridge | Jan-14 | Biomass-fuelled Stirling Engine for off-grid applications
 
COMPRESSED AIR VEHICLES THE FUTURE HYBRIDS
 COMPRESSED AIR VEHICLES THE FUTURE HYBRIDS     COMPRESSED AIR VEHICLES THE FUTURE HYBRIDS
COMPRESSED AIR VEHICLES THE FUTURE HYBRIDS
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plant
 

Similar to Anshpptrect

transformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationtransformer Sales, after sales & service presentation
transformer Sales, after sales & service presentation
Fawaz Baik
 
DPL Training .doc file
DPL Training .doc file DPL Training .doc file
DPL Training .doc file
Subhojeet Sinha ☁
 
Challenges in Transformer Technology -by Mr. Krishnaiah (Kryfs)
Challenges in Transformer Technology -by Mr. Krishnaiah (Kryfs)Challenges in Transformer Technology -by Mr. Krishnaiah (Kryfs)
Challenges in Transformer Technology -by Mr. Krishnaiah (Kryfs)
ProSIM R & D Pvt. Ltd.
 
Ieema your link to electricity
Ieema    your link to electricityIeema    your link to electricity
Ieema your link to electricity
Nvc Gowda
 
Inovative Solution by Transformers Manufacturers in India
Inovative Solution by Transformers Manufacturers in IndiaInovative Solution by Transformers Manufacturers in India
Inovative Solution by Transformers Manufacturers in India
Synergy Transformers
 
Industrial visit report uttam transformers
Industrial visit report  uttam transformersIndustrial visit report  uttam transformers
Industrial visit report uttam transformers
MahipalSoni4
 
Chapter no 1 mukeshg
Chapter no  1 mukeshgChapter no  1 mukeshg
Chapter no 1 mukeshg
Mukesh gurjar
 
Catalog máy biến áp Lerand ( Cast Resin Transformers )
Catalog máy biến áp Lerand ( Cast Resin Transformers )Catalog máy biến áp Lerand ( Cast Resin Transformers )
Catalog máy biến áp Lerand ( Cast Resin Transformers )
CTY TNHH HẠO PHƯƠNG
 
40220130406001 2
40220130406001 240220130406001 2
40220130406001 2
IAEME Publication
 
ACTOM Distribution Transformers.pdf
ACTOM Distribution Transformers.pdfACTOM Distribution Transformers.pdf
ACTOM Distribution Transformers.pdf
Thabang3
 
220 kv gss renwal ppt
220 kv gss renwal ppt220 kv gss renwal ppt
220 kv gss renwal ppt
अनिल कुमावत
 
transformer Manufactures and exporters in India
transformer Manufactures and exporters in Indiatransformer Manufactures and exporters in India
transformer Manufactures and exporters in India
seo27poogle
 
02- Manual Motor Starter - Fuji Electric
02- Manual Motor Starter - Fuji Electric02- Manual Motor Starter - Fuji Electric
02- Manual Motor Starter - Fuji Electric
CTY TNHH HẠO PHƯƠNG
 
Fuji thiet bi dien-elcbfuji-160413044256
Fuji thiet bi dien-elcbfuji-160413044256Fuji thiet bi dien-elcbfuji-160413044256
Fuji thiet bi dien-elcbfuji-160413044256
Thuan Kieu
 
Fuji thiet bi dien-elcbfuji-160413044256 dienhathe.org
Fuji thiet bi dien-elcbfuji-160413044256 dienhathe.orgFuji thiet bi dien-elcbfuji-160413044256 dienhathe.org
Fuji thiet bi dien-elcbfuji-160413044256 dienhathe.org
Dien Ha The
 
40220140504007
4022014050400740220140504007
40220140504007
IAEME Publication
 
Summer training presentation on thermal plant in jindal steel and power limit...
Summer training presentation on thermal plant in jindal steel and power limit...Summer training presentation on thermal plant in jindal steel and power limit...
Summer training presentation on thermal plant in jindal steel and power limit...
Amit Bansal
 
RCS-3N Capactitor switch
RCS-3N Capactitor switchRCS-3N Capactitor switch
SETfuse All Product and Application ENG Version Jun 2 2015
SETfuse All Product and Application ENG Version Jun 2 2015SETfuse All Product and Application ENG Version Jun 2 2015
SETfuse All Product and Application ENG Version Jun 2 2015
Apple Yu
 
EID_Unit 01_000.ppt
EID_Unit 01_000.pptEID_Unit 01_000.ppt
EID_Unit 01_000.ppt
ssuser1b882d
 

Similar to Anshpptrect (20)

transformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationtransformer Sales, after sales & service presentation
transformer Sales, after sales & service presentation
 
DPL Training .doc file
DPL Training .doc file DPL Training .doc file
DPL Training .doc file
 
Challenges in Transformer Technology -by Mr. Krishnaiah (Kryfs)
Challenges in Transformer Technology -by Mr. Krishnaiah (Kryfs)Challenges in Transformer Technology -by Mr. Krishnaiah (Kryfs)
Challenges in Transformer Technology -by Mr. Krishnaiah (Kryfs)
 
Ieema your link to electricity
Ieema    your link to electricityIeema    your link to electricity
Ieema your link to electricity
 
Inovative Solution by Transformers Manufacturers in India
Inovative Solution by Transformers Manufacturers in IndiaInovative Solution by Transformers Manufacturers in India
Inovative Solution by Transformers Manufacturers in India
 
Industrial visit report uttam transformers
Industrial visit report  uttam transformersIndustrial visit report  uttam transformers
Industrial visit report uttam transformers
 
Chapter no 1 mukeshg
Chapter no  1 mukeshgChapter no  1 mukeshg
Chapter no 1 mukeshg
 
Catalog máy biến áp Lerand ( Cast Resin Transformers )
Catalog máy biến áp Lerand ( Cast Resin Transformers )Catalog máy biến áp Lerand ( Cast Resin Transformers )
Catalog máy biến áp Lerand ( Cast Resin Transformers )
 
40220130406001 2
40220130406001 240220130406001 2
40220130406001 2
 
ACTOM Distribution Transformers.pdf
ACTOM Distribution Transformers.pdfACTOM Distribution Transformers.pdf
ACTOM Distribution Transformers.pdf
 
220 kv gss renwal ppt
220 kv gss renwal ppt220 kv gss renwal ppt
220 kv gss renwal ppt
 
transformer Manufactures and exporters in India
transformer Manufactures and exporters in Indiatransformer Manufactures and exporters in India
transformer Manufactures and exporters in India
 
02- Manual Motor Starter - Fuji Electric
02- Manual Motor Starter - Fuji Electric02- Manual Motor Starter - Fuji Electric
02- Manual Motor Starter - Fuji Electric
 
Fuji thiet bi dien-elcbfuji-160413044256
Fuji thiet bi dien-elcbfuji-160413044256Fuji thiet bi dien-elcbfuji-160413044256
Fuji thiet bi dien-elcbfuji-160413044256
 
Fuji thiet bi dien-elcbfuji-160413044256 dienhathe.org
Fuji thiet bi dien-elcbfuji-160413044256 dienhathe.orgFuji thiet bi dien-elcbfuji-160413044256 dienhathe.org
Fuji thiet bi dien-elcbfuji-160413044256 dienhathe.org
 
40220140504007
4022014050400740220140504007
40220140504007
 
Summer training presentation on thermal plant in jindal steel and power limit...
Summer training presentation on thermal plant in jindal steel and power limit...Summer training presentation on thermal plant in jindal steel and power limit...
Summer training presentation on thermal plant in jindal steel and power limit...
 
RCS-3N Capactitor switch
RCS-3N Capactitor switchRCS-3N Capactitor switch
RCS-3N Capactitor switch
 
SETfuse All Product and Application ENG Version Jun 2 2015
SETfuse All Product and Application ENG Version Jun 2 2015SETfuse All Product and Application ENG Version Jun 2 2015
SETfuse All Product and Application ENG Version Jun 2 2015
 
EID_Unit 01_000.ppt
EID_Unit 01_000.pptEID_Unit 01_000.ppt
EID_Unit 01_000.ppt
 

Recently uploaded

Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
amberjdewit93
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
Academy of Science of South Africa
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
Priyankaranawat4
 
Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
NgcHiNguyn25
 
The Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collectionThe Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collection
Israel Genealogy Research Association
 
Top five deadliest dog breeds in America
Top five deadliest dog breeds in AmericaTop five deadliest dog breeds in America
Top five deadliest dog breeds in America
Bisnar Chase Personal Injury Attorneys
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
David Douglas School District
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
Celine George
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
Dr. Shivangi Singh Parihar
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
adhitya5119
 

Recently uploaded (20)

Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
 
Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
 
The Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collectionThe Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collection
 
Top five deadliest dog breeds in America
Top five deadliest dog breeds in AmericaTop five deadliest dog breeds in America
Top five deadliest dog breeds in America
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
 

Anshpptrect

  • 1. HINDALCO INDUSTRIES LIMITED RENUKOOT Presented by- Anshika Srivastava OP JINDAL UNIVERSITY (EEE) RECTIFIER
  • 2. INTRODUCTION  A flagship company of ADITYA BIRLA GROUP  Set up by Shri Ghanshyam Das Birla.  Located in RENUKOOT, Sonebhadra (Uttar Pradesh)  Commenced its operations in 1962 with initial capacity of 20,000 TPY Metal and 40,000 TPY Alumina  Emerged as the largest integrated aluminium manufacturing company in INDIA  Globally 12th largest Aluminium and Alumina Producer
  • 4. Hindalco products cater to numerous markets, and provide for all industrial and commercial requirements like: • Automotive and transport • Building and construction • Defense • Electrical and Electronics Industrial applications • Medical and packaging • White goods Finished products include alumina, primary aluminium in the form of ingots, billets and wire rods, value-added products such as rolled products, extrusions and foils. COMMERCE
  • 6.  1/3 rd Strength to weight ratio  Corrosion resistant  Thermal Conductivity High  Cost effective  Electrical Conductivity high  Workability High WHAT MAKES ALUMINIUM BETTER? **Hindalco’s captive bauxite mines in Jharkhand, Chhattisgarh, Maharashtra and Odisha, provide the raw material to alumina refineries located at Belgaum in Karnataka, Muri in Jharkhand and Renukoot in Uttar Pradesh, India.
  • 8. BASIC AIM UNINTERRUPTED ELECTRICAL POWER SUPPLY TO SMELTER AND EACH & EVERY SECTION OF THE PLANTS AND COLONY.
  • 9. Generating Capacity & Break-up of Power Consumption
  • 10. 10 GENERATION Renusagar 801.70 MW Co-Gen Plant 84.00 MW Total 885.70 MW CONSUMPTION Alumina Plant(Including Blr#1&2) 32.00 MW Fabrication Plant 15.00 MW Smelter Dry Scrubbing System 12.75 MW Reduction Plant 13.25 MW Colony &Pumping Station 5.00 MW Rectifier-I&II 2.00 MW Smelter Plant 675.00 MW Total 755.00 MW
  • 11. 11 Single Line Diagram (Total Network) RIHAND TG # 8 80 MW TG # 1 71 MW TG # 2 71 MW TG # 3 83 MW TG # 4 83 MW TG # 5 71 MW TG # 6 82MW TG # 7 82 MW RIHAND FDR #2 RIHAND FDR # 1 TIE FDR # 2 TG # 9 88.5 MW TG # 10 88.5 MW TIE FDR # 1 RENUSAGAR FDR #10 RENUSAGAR FDR #9 POTLINE # 1,2,3 & Aux Power PL # 4,5 & Aux Power POTLINE # 9,10&11 & Aux Power 5 4 1 2 3 RENUSAGARFDR#3 RENUSAGAR FDR #5 RENUSAGAR FDR #6 RENUSAGAR FDR #7 RENUSAGAR FDR #8 Co-Gen-II (41 MW) & Alumina Plant NTPC RENUSAGARFDR#4 RENUSAGARFDR#2 RENUSAGARFDR#1 Co-Gen-I &Sun Shine (37+6 MW) & Alumina Plant 1000A 1200A1200A1200A1200A 2000A UP Grid PL # 6,7,8 & Aux Power 3150A
  • 12. 12 132 KV Transmission Line’s Details AMP MW Rihand Line#1&2 Panther 10 3 480 80 1961 Renusagar Line#1&2 AL59 107 30 900 180 1966 (Conductor Replacedfrom GOAT to AL59 in 2012) Renusagar Line#3&4 Goat 104 30 630 120 1983 Renusagar Line#5&6 TWIN Zebra 95 30 736 *2 240 1998 (TWIN ZEBRAConductor providedin 2012) Renusagar Line#7,8, 9&10 AAAC 120 31 960 180 2004 YEAR OF COMISSIONI NG TRANS. LINE# CONDUCTOR USED No. OF TOWERS LENGTH OF LINES (Km) RATING
  • 13.  7 rectifier transformers each  Rectification is the process of obtaining an E.M.F. of definite mean value from one of zero mean value. In our system we have used silicon rectifier/high power silicon diodes for rectification.  PL#1 Half wave rectifiers  PL#2&3 Full wave rectifiers POT LINE # 1,2&3
  • 14. 14 Rectification System (PL#1,2&3) DC Supply to Pot Room 132 KV Bus 11.5 KV Bus 11.5 KVRegulated Bus Main Transformer (132 KV/11.5 KV) Regulating Transformer (with On load Taps) 70 KA Standby Rectifier unit For PL#1,2&3 DC Bus 7 Nos Rectifier Units 10 KA each for PL#1 & 6 Nos Rectifier Units 13.2 KA each for PL#2&3 810 V & 65 KA for PL#1 825 V & 64.2 KA for PL#2&3 DC Isolators
  • 15. 15 Rectification System (PL#4,5&6) DC Supply to Pot Room 132 KV Bus 33 KV Bus Main Transformer (132 KV/33 KV) (with On load Taps) Regulating Transformer Rectifier Transformer Transductor Control DC Bus 4 Nos Rectifier Units 22 KA each 850 V& 66 KA DC Isolators
  • 16. 16 Rectification System (PL#7&8) DC Supply to PotRoom 132 KV Bus DC Bus 850 V& 66 KA Transformers 2 Nos. 132 KV/ 850 V DC 66 KA each Thyristor Controlled Rectifier vUniys Thyristors gate gate DC Isolators
  • 17. 17 Rectification System (PL#9,10&11) DC Supply to PotRoom 132 KV Bus DC Bus 900 V& 66 KA 2 Nos. 132 KV/ 900 V DC 70 KA each Rectifier Units Regulating Transformers (with on load taps) Rectifier Transformers PLC controlled Transductors Diode Rectifiers DC Isolators
  • 18. Power is stepped down from 132KV to 11.5KV by the four power transformers having the following ratings.  T-1: 75 MVA  T-2 : 75 MVA  T-3 : 75 MVA  T-4 : 75 MVA  Above transformers supply power to Potline #1, 2 & 3, Auxiliaries to Smelter Plant, Fabrication plant, Colony etc.  Capacitor are installed on the 11.5KV side of transformers T1 & T2 to improve power factor LOAD DISTRIBUTION AT PLANT 1ST RECTIFIER
  • 19.  Power Transformer  Regulating Transformer  Rectifier Transformer  Instrument Transformer  Auto Transformer  Distribution Transformer Types Of Transformers
  • 20.  Buchholz (Gas) Relay  Pressure Relay  Oil Level Monitor Device  Winding Thermometer TRANSFORMER PROTECTION
  • 21. SWITCH YARD EQUIPMENTS • Lightning Arrestor • Isolators (Disconnecting Switches) • Circuit Breaker • CT & PT Hindalco plant 1 Substation
  • 22.  Cooling tower is an enclosed device in which water is cooled by bringing it in direct contact with atmospheric air. COOLING TOWERS
  • 23. 23 Major Tasks & Targets  Monitoring of all the High Voltage Equipments Including 132 kV Transmission lines, Switch Yards, Transformers & Switch Gears.  Revamping & upgradation of old Electrical Equipments to match present requirement & minimise break down  Upkeep of SCADA (Supervisory Control & Data Acquisition) System installed on Electrical Network for minimum power disturbances.  Power Supply Management & Co-ordination amongst Rihand Power Station, Renusagar Power, Co-gen,& Load Centres during Power Crisis, Lightning and System Trouble  Compliance of Electricity Acts/ Rules and Power Agreement between hindalco & UPPCL  Computation, Reporting & Monitoring of Energy Consumption of different sections.