CIS 599 Week 2 Project Deliverable 1 Project
Plan Inception
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 120 points
This assignment consists of two (2) sections: a project introduction and
a project plan. You must submit both sections as separate files for the
completion of this assignment. Label each file name according to the
section of the assignment it is written for. Additionally, you may create
and / or assume all necessary assumptions needed for the completion of
this assignment.
You are currently the Chief Information Officer (CIO) for an innovative
Internet-based company with gross revenues of more than $35 million
dollars per year. During an executive leadership meeting, you were told
that your company will be merging with a multinationalcompany of
equal size and you will be responsible for developing a project plan to
strategically integrate all systems, including databases and
infrastructure. The Chief Executive Officer has given you sixty (60) days
to deliver an information technology project plan in anticipation of the
company merger. Your company will be expanding from one (1) floor to
three (3) floors within six (6) months. Since this merger will be bringing
two (2) fairly equal-sized companies together under one roof, the
infrastructure must be redesigned to accommodate the increased needs.
Your company currently uses operational systems and relational
databases but desires to expand into data warehousing. All information
technology (hardware and software) must be redesigned to meet
organizationalneeds. The solution should be implemented in either a
hosted solution, on-site solution, or a hybrid model. The CEO is
expecting you to integrate different technologies from different solution
providers and incorporate industry best practices in connection with the
development of technological systems. In addition,the CEO is extremely
interested in cloud technologies and virtualization but is leery of
security issues; however, the CEO is sure that you will implement
proper security protocols. The company currently consists of twenty five
(25) employees but is expected to increase to sixty five (65) employees
when the merger is complete.
Section 1: Project Introduction
Write a four to six (4-6) page project introduction that documents the
current state of the organization prior to any development or
enhancements, takes into account all the information given above, and
includes the following:
Background information of the company.
Details regarding the type of business activities that the company is
involved in.
Speculation on outsourcing and offshoring opportunities.
A description of the current information systems that the company has to
support the business. The description should include an overview of the
following:
operational systems, databases, and data warehousing.
cloud technology and virtualization.
network infrastructure and security.
The use of at least two (2) quality resources in this assignment.Note:
Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with
one-inch margins on all sides; citations and references must follow APA
or school-specific format. Check with your professor for any additional
instructions.
Include a cover page containing the title of the assignment, the student’s
name, the professor’s name, the course title, and the date. The cover
page and the reference page are not included in the required assignment
page length.
Section 2: Project Plan
Use Microsoft Project to:
Create a project plan (summary and detailed) template. The project plan
should:
Record all tasks, subtasks, resources, and time related to the project.
Outline the planning,analysis, design, and implementation phases.
Develop in accordance with the SDLC.
The specific course learning outcomes associated with this assignment
are:
Describe the integrative functions and activities within the information
systems area, including the role of the CIO and technologies managed
within the organization.
Use technology and information resources to research issues in
information systems.
Write clearly and concisely about leadership issues and strategic insight
of the Information systems domain using proper writing mechanics and
technical style conventions.
Grading for this assignment will be based on answer quality, logic /
organization of the paper, and languageand writing skills, using the
following rubric.
**********************************************************
CIS 599 Week 4 Project Deliverable 2 Business
Requirements
For more classes visit
www.snaptutorial.com
Project Deliverable 2: Business Requirements
Due Week 4 and worth 120 points
This assignment consists of two (2) sections: a business requirements
document and a project plan.You must submit both sections as separate
files for the completion of this assignment. Label each file name
according to the section of the assignment it is written for. Additionally,
you may create and / or assume all necessary assumptions needed for
the completion of this assignment.
Documenting the existing IT network and system is an important first
step, but you, the CIO, know that capturing the needed changes can be
critical to your success as an executive. You know that procuring and
documenting quality business requirements is an important step toward
the design of quality information systems. Completion of a quality
requirements document allows user needs and expectations to be
captured, so that infrastructure and information systems can be
designed properly. Using the requirements document provided in the
course shell as a part of the requirements gathering process, you are to
assess the needs of the company as it prepares to become a
multinationalorganization. You must consider current and future trends
and requirements; however, assumptions should be realistic and
carefully considered. The needs of the organization should be
documented. Later deliverables will focus on specifics of all
requirements.
Section 1: Business Requirements Document
Write a four to six (4-6) page original business requirements document
for the project plan using the template provided.Note: The template can
be found in the Student Center of the online course shell.
Describe the project needs, including the following:
Describe the scope and analyze how to control the scope.
Speculate and give justifications for how to control scope.
Identify possible risks, constraints, and assumptions.
Describe the needed integration with other systems and infrastructure.
Note: Database and Data Warehousing, Cloud Technology and
Virtualization, and Network Infrastructure and Security.
Assess the human capital that may be needed to complete the project,
ensuring that necessary skill sets are identified.
Speculate on possible outsourcing or offshoring needs that may be
required to accomplish project.
Define relevant terms that will be used throughoutthe project.
Include cost projections for staffing, infrastructure, and other resources.
Use at least two (2) quality resources in this assignment. Note:
Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with
one-inch margins on all sides; citations and references must follow APA
or school-specific format. Check with your professor for any additional
instructions.
Include a cover page containing the title of the assignment, the student’s
name, the professor’s name, the course title, and the date. The cover
page and the reference page are not included in the required assignment
page length.
Section 2: Revised Project Plan
Use Microsoft Project to:
Update the project plan (summary and detail) template, from Project
Deliverable 1: Project Plan Inception, with three to five (3-5) new
project tasks, each consisting of five to ten (5-10) subtasks.
The specific course learning outcomes associated with this assignment
are:
Describe the integrative functions and activities within the information
systems area, including the role of the CIO and technologies managed
within the organization.
Evaluate how information technology (IT) is aligned with the strategy of
the organization, and how to make appropriate choices about
architecture in relationship to overall organization goals.
Use technology and information resources to research issues in
information systems.
Write clearly and concisely about leadership issues and strategic insight
of the Information systems domain using proper writing mechanics and
technical style conventions.
Grading for this assignment will be based on answer quality, logic /
organization of the paper, and languageand writing skills, using the
following rubric.
**********************************************************
CIS 599 Week 6 Project Deliverable 3 Database
and Data Warehousing Design
For more classes visit
www.snaptutorial.com
Project Deliverable 3: Database and Data Warehousing Design
Due Week 6 and worth 120 points
This assignment consists of two (2) sections: a design document and a
revised project plan. You must submit both sections as separate files for
the completion of this assignment. Label each file name according to the
section of the assignment it is written for. Additionally, you may create
and / or assume all necessary assumptions needed for the completion of
this assignment.
One of the main functions of any business is to transform data into
information. The use of relational databases and data warehousing has
gained recognition as a standard for organizations. A quality database
design makes the flow of data seamless. The database schema is the
foundation of the relational database. The schema defines the tables,
fields, relationships, views, indexes, and other elements. The schema
should be created by envisioning the business, processes, and workflow
of the company. Since your company is an innovative Internet-based
company, movement toward data warehousing seems to be one of the
most viable options to give your company a competitive advantage;
however, these concepts must be explained to the executive board in a
manner to garner support.
Section 1: Design Document
Write a six to ten (6-10) page design document in which you:
Support the need for the use of relational databases and data
warehousing. From a management standpoint, it may be important to
show the efficiencies that can be gained for executive oversight.
Create a database schema that supports the company’s business and
processes. Explain and support the database schema with relevant
arguments that support the rationale for the structure. Note: The
minimum requirement for the schema should entail the tables, fields,
relationships, views, and indexes.
Identify and create database tables with appropriate field-naming
conventions. Then, identify primary keys and foreign keys, and explain
how referential integrity will be achieved. Normalize the database tables
to third normal form (3NF).
Identify and create an Entity-Relationship (E-R) Diagram relating the
tables of the database schema through the use of graphical tools in
Microsoft Visio or an open source alternative such as Dia. Note: The
graphically depicted solution is not included in the required page length
but must be included in the design document appendix. Explain your
rationale behind the design of the E-R Diagram.
Identify and create a Data Flow Diagram (DFD) relating the tables of
your database schema through the use of graphical tools in Microsoft
Visio or an open source alternative such as Dia. Note: The graphically
depicted solution is not included in the required page length but must be
included in the design document appendix. Explain the rationale behind
the design of your DFD.
Illustrate the flow of data including both inputs and outputs for the use
of a data warehouse. The diagram should map data between source
systems, operational systems, data warehouses and specified data
marts.Note: The graphically depicted solution is not included in the
required page length.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with
one-inch margins on all sides; citations and references must follow APA
or school-specific format. Check with your professor for any additional
instructions.
Include a cover page containing the title of the assignment, the student’s
name, the professor’s name, the course title, and the date. The cover
page and the reference page are not included in the required assignment
page length.
Include charts or diagrams created in MS Visio or Dia as an appendix
of the design document. All references to these diagrams must be
included in the body of the design document.
Section 2: Revised Project Plan
Use Microsoft Project to:
Update the project plan (summary and detail) template, from Project
Deliverable 2: Business Requirements, with three to five (3-5) new
project tasks each consisting of five to ten (5-10) subtasks.
The specific course learning outcomes associated with this assignment
are:
Describe the methods and best practices in implementing process
change in IT organizations.
Describe the role and methods of technology-induced process
improvement in organizations.
Use technology and information resources to research issues in
information systems.
Write clearly and concisely about leadership issues and strategic insight
of the Information systems domain using proper writing mechanics and
technical style conventions.
Grading for this assignment will be based on answer quality, logic /
organization of the paper, and languageand writing skills, using the
following rubric.
**********************************************************
CIS 599 Week 7 Project Deliverable 4 Cloud
Technology and Virtualization
For more classes visit
www.snaptutorial.com
Project Deliverable 4 Cloud Technology and Virtualization
Due Week 7 and worth 120 points
With the merger of your company with a multinationalcompany, you
have come to realize that progressive solutions are necessary to defray
some of the associated information technology costs. Company
executives believe that using cloud technology and virtualization is
becoming the standard for companies that are engaged in Internet-based
technologies. Your company is on the verge of global marketing and
competition; therefore, your company needs to make smarter decisions
and improve global business performance. Cloud technology and
virtualization are believed to provide business insights without
enormous infrastructure enhancements. The executive board is aware of
the profound benefits of cloud technology and virtualization but is
apprehensive because they are unfamiliar with the look and feel of the
technology. The executive team is interested in your recommendations
and eagerly waiting for your forward-thinking viewpoint.
Section 1 Design Document
1. Write a four to six (4-6) page design document in which you
1. Support the need for the use of cloud technology and virtualization
within the company.
2. Assess expected cost savings in hardware infrastructure.
3. Determine the possible reductions of human capital that can be
realized from implementing cloud and virtualization technologies.
4. Create a diagram through the use of Microsoft Visio or an open
source alternative such as Dia to illustrate how cloud and virtualization
technology could align with the company’s business processes and assist
with attainment of organizationalgoals. Note The graphically depicted
solution is not included in the required page length but must be included
in the design document appendix.
5. Provide a compelling recommendation for solution providers and
partners that could help the company secure a firm competitive
advantage by using cloud and virtualization technologies.
Your assignment must follow these formatting requirements
• Be typed, double spaced, using Times New Roman font (size 12), with
one-inch margins on all sides; citations and references must follow APA
or school-specific format. Check with your professor for any additional
instructions.
• Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the date. The
cover page and the reference page are not included in the required
assignment page length.
• Include charts or diagrams created in MS Visio or Dia as an appendix
of the design document. All references to these diagrams must be
included in the body of the design document.
Section 2 Revised Project Plan
Use Microsoft Project to
1. Update the project plan (summary and detail) template, from Project
Deliverable 3 Database and Data Warehousing Design, with three to
five (3-5) new project tasks each consisting of five to ten (5-10) subtasks.
The specific course learning outcomes associated with this assignment
are
• Demonstrate an understanding of existing and emerging information
technologies and strategic impact on organizationaloperations.
• Explain how to develop reasoned responses to the major forces
shaping the role of IT in organizations competing in a global economy.
• Use technology and information resources to research issues in
information systems.
• Write clearly and concisely about leadership issues and strategic
insight of the Information systems domain using proper writing
mechanics and technical style conventions.
**********************************************************
CIS 599 Week 7 Project Deliverable 4: Cloud
Technology and Virtualization
For more classes visit
www.snaptutorial.com
Project Deliverable 4 Cloud Technology and Virtualization
Due Week 7 and worth 120 points
With the merger of your company with a multinationalcompany, you
have come to realize that progressive solutions are necessary to defray
some of the associated information technology costs. Company
executives believe that using cloud technology and virtualization is
becoming the standard for companies that are engaged in Internet-based
technologies. Your company is on the verge of global marketing and
competition; therefore, your company needs to make smarter decisions
and improve global business performance. Cloud technology and
virtualization are believed to provide business insights without
enormous infrastructure enhancements. The executive board is aware of
the profound benefits of cloud technology and virtualization but is
apprehensive because they are unfamiliar with the look and feel of the
technology. The executive team is interested in your recommendations
and eagerly waiting for your forward-thinking viewpoint.
Section 1 Design Document
1. Write a four to six (4-6) page design document in which you
1. Support the need for the use of cloud technology and virtualization
within the company.
2. Assess expected cost savings in hardware infrastructure.
3. Determine the possible reductions of human capital that can be
realized from implementing cloud and virtualization technologies.
4. Create a diagram through the use of Microsoft Visio or an open
source alternative such as Dia to illustrate how cloud and virtualization
technology could align with the company’s business processes and assist
with attainment of organizationalgoals. Note The graphically depicted
solution is not included in the required page length but must be included
in the design document appendix.
5. Provide a compelling recommendation for solution providers and
partners that could help the company secure a firm competitive
advantage by using cloud and virtualization technologies.
Your assignment must follow these formatting requirements
• Be typed, double spaced, using Times New Roman font (size 12), with
one-inch margins on all sides; citations and references must follow APA
or school-specific format. Check with your professor for any additional
instructions.
• Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the date. The
cover page and the reference page are not included in the required
assignment page length.
• Include charts or diagrams created in MS Visio or Dia as an appendix
of the design document. All references to these diagrams must be
included in the body of the design document.
Section 2 Revised Project Plan
Use Microsoft Project to
1. Update the project plan (summary and detail) template, from Project
Deliverable 3 Database and Data Warehousing Design, with three to
five (3-5) new project tasks each consisting of five to ten (5-10) subtasks.
The specific course learning outcomes associated with this assignment
are
• Demonstrate an understanding of existing and emerging information
technologies and strategic impact on organizationaloperations.
• Explain how to develop reasoned responses to the major forces
shaping the role of IT in organizations competing in a global economy.
• Use technology and information resources to research issues in
information systems.
• Write clearly and concisely about leadership issues and strategic
insight of the Information systems domain using proper writing
mechanics and technical style conventions.
**********************************************************
CIS 599 Week 8 Project Deliverable 5 Network
Infrastructure and Security
For more classes visit
www.snaptutorial.com
Project Deliverable 5 Network Infrastructure and Security
Due Week 8 and worth 120 points
This assignment consists of two (2) sections an infrastructure document
and a revised project plan. You must submit both sections as separate
files for the completion of this assignment. Label each file name
according to the section of the assignment it is written for. Additionally,
you may create and / or assume all necessary assumptions needed for
the completion of this assignment.
With the parameters set forth at the onset of the project, present the
infrastructure and security policy that will support the expected
development and growth of the organization.The network solution that
is chosen should support the conceived information system and allow for
scalability. The network infrastructure will support organizational
operations; therefore, a pictorial view of workstations, servers, routers,
bridges, gateways, and access points should be used. Since the company
will be merging with a multinational company, virtualization and cloud
technology should be taken into consideration. In addition, access paths
for Internet access should be depicted. A narrative should be included to
explain all the nodes of the network and the rationale for the design.
Lastly, using the Confidentiality, Integrity and Availability (CIA)
Triangle, define the organizationalsecurity policy.
Section 1 Infrastructure Document
1. Write a five to ten (5-10) page infrastructure document in which you
1. Identify possible network infrastructure vulnerabilities. Address
network vulnerabilities with the appropriate security measures. Ensure
that consideration is given to virtualization and cloud technology.
2. Design a logical and physical topographicallayout of the planned
network through the use of graphical tools in Microsoft Word or Visio,
or an open source alternative such as Dia. Explain the rationale for the
logical and physical topographical layout of the planned network. Note
The graphically depicted solution is not included in the required page
length.
3. Illustrate the possible placement of servers, including access paths to
the Internet and firewalls. Notefacility limitations, workstations,
printers, routers, switches, bridges, and access points should be
considered in the illustration.
4. Create and describe a comprehensive security policy for the company
that will
1. Protect the company infrastructure and assets by applying the
principals of CIA. Note CIA is a widely used benchmark for evaluation
of information systems security, focusing on the three (3) core goals of
confidentiality, integrity, and availability of information.
2. Address ethical aspects related to employee behavior, contractors,
password usage, and access to networked resources and information.
Your assignment must follow these formatting requirements
• Be typed, double spaced, using Times New Roman font (size 12), with
one-inch margins on all sides; citations and references must follow APA
or school-specific format. Check with your professor for any additional
instructions.
• Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the date. The
cover page and the reference page are not included in the required
assignment page length.
• Include charts or diagrams created in MS Visio or Dia as an appendix
of the infrastructure document. All references to these diagrams must be
included in the body of the infrastructure document.
Section 2 Revised Project Plan
Use Microsoft Project to
1. Update the project plan (summary and detail) template, from Project
Deliverable 4 Cloud Technology and Virtualization,with three to five (3-
5) new project tasks each consisting of five to ten (5-10) subtasks.
The specific course learning outcomes associated with this assignment
are
• Describe the methods and best practices in implementing process
change in IT organizations.
• Describe the role and methods of technology-induced process
improvement in organizations.
• Use technology and information resources to research issues in
information systems.
• Write clearly and concisely about leadership issues and strategic
insight of the Information systems domain using proper writing
mechanics and technical style conventions.
**********************************************************
CIS 599 Week 8 Project Deliverable 5: Network
Infrastructure and Security
For more classes visit
www.snaptutorial.com
Project Deliverable 5 Network Infrastructure and Security
Due Week 8 and worth 120 points
This assignment consists of two (2) sections an infrastructure document
and a revised project plan. You must submit both sections as separate
files for the completion of this assignment. Label each file name
according to the section of the assignment it is written for. Additionally,
you may create and / or assume all necessary assumptions needed for
the completion of this assignment.
With the parameters set forth at the onset of the project, present the
infrastructure and security policy that will support the expected
development and growth of the organization.The network solution that
is chosen should support the conceived information system and allow for
scalability. The network infrastructure will support organizational
operations; therefore, a pictorial view of workstations, servers, routers,
bridges, gateways, and access points should be used. Since the company
will be merging with a multinational company, virtualization and cloud
technology should be taken into consideration. In addition, access paths
for Internet access should be depicted. A narrative should be included to
explain all the nodes of the network and the rationale for the design.
Lastly, using the Confidentiality, Integrity and Availability (CIA)
Triangle, define the organizationalsecurity policy.
Section 1 Infrastructure Document
1. Write a five to ten (5-10) page infrastructure document in which you
1. Identify possible network infrastructure vulnerabilities. Address
network vulnerabilities with the appropriate security measures. Ensure
that consideration is given to virtualization and cloud technology.
2. Design a logical and physical topographicallayout of the planned
network through the use of graphical tools in Microsoft Word or Visio,
or an open source alternative such as Dia. Explain the rationale for the
logical and physical topographical layout of the planned network. Note
The graphically depicted solution is not included in the required page
length.
3. Illustrate the possible placement of servers, including access paths to
the Internet and firewalls. Notefacility limitations, workstations,
printers, routers, switches, bridges, and access points should be
considered in the illustration.
4. Create and describe a comprehensive security policy for the company
that will
1. Protect the company infrastructure and assets by applying the
principals of CIA. Note CIA is a widely used benchmark for evaluation
of information systems security, focusing on the three (3) core goals of
confidentiality, integrity, and availability of information.
2. Address ethical aspects related to employee behavior, contractors,
password usage, and access to networked resources and information.
Your assignment must follow these formatting requirements
• Be typed, double spaced, using Times New Roman font (size 12), with
one-inch margins on all sides; citations and references must follow APA
or school-specific format. Check with your professor for any additional
instructions.
• Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the date. The
cover page and the reference page are not included in the required
assignment page length.
• Include charts or diagrams created in MS Visio or Dia as an appendix
of the infrastructure document. All references to these diagrams must be
included in the body of the infrastructure document.
Section 2 Revised Project Plan
Use Microsoft Project to
1. Update the project plan (summary and detail) template, from Project
Deliverable 4 Cloud Technology and Virtualization,with three to five (3-
5) new project tasks each consisting of five to ten (5-10) subtasks.
The specific course learning outcomes associated with this assignment
are
• Describe the methods and best practices in implementing process
change in IT organizations.
• Describe the role and methods of technology-induced process
improvement in organizations.
• Use technology and information resources to research issues in
information systems.
• Write clearly and concisely about leadership issues and strategic
insight of the Information systems domain using proper writing
mechanics and technical style conventions.
**********************************************************
CIS 599 Week 10 Project Deliverable 6 Final
Project Plan
For more classes visit
www.snaptutorial.com
Project Deliverable 6: Final Project Plan
Due Week 10 and worth 200 points
This assignment consists of four (4) sections: a written project plan, a
revised business requirements document, a project plan PowerPoint
presentation, and the finalized project plan. You must submit the four (4)
sections as separate files for the completion of this assignment. Label
each file name according to the section of the assignment it is written
for. Additionally, you may create and / or assume all necessary
assumptions needed for the completion of this assignment.
While taking all business and project parameters into consideration,
make quality assumptions to support the following requirements.
Section 1: Written Project Plan
You are now in the final stage of the project plan development. All
previous documentation should be combined into one (1) document that
will serve as the statement of work for the project. Your goal is to have
the project approved by the executive team. The project plan should be
very detailed, which is appropriate to accomplish the monumental task
of implementation; however, the executive team is only interested in a
thirty (30) minute summation. Therefore, you also must create a
compelling executive summary that is supported by your detail that
convinces the executive team that it should move forward with your
solution.
Develop a thirty to forty (30-40) page project plan in which you:
Write a five to ten (5-10) page executive summary in which you provide
a high-level technical overview of your project where you address the
following:
Describe the scope of the project and control measures.
Describe the goals and objectives of the project.
Give a detailed, realistically estimated cost analysis of the entire
project, including technical resources (human capital) that may be
needed to complete the project.
Relate the value of the project plan solution to the competitive
advantage that information technology will afford the organization.
Provide all aspects of the information technology implementation into
the project plan.
Recommend solution providers who can assist with development and
implementation. Include a cost analysis of at least three (3) providers.
Provide all aspects of the information technology implementation into
the project plan.
Revise the documentation based on feedback from the earlier evaluation
of the deliverable.
Combine all previous documentation for Project Deliverables 1-5 in
which you:
Use at least five (5) quality resources in this assignment. Note:
Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with
one-inch margins on all sides; citations and references must follow APA
or school-specific format. Check with your professor for any additional
instructions.
Include a cover page containing the title of the assignment, the student’s
name, the professor’s name, the course title, and the date. The cover
page and the reference page are not included in the required assignment
page length.
Include charts or diagrams created in MS Visio and MS Project as
appendix of the Word document. Make reference of these files in the
body of the Word document.
Section 2: Revised Business Requirements Document
Document all revisions made to the written project plan in the Document
Control section of the business requirements document from Project
Deliverable 2: Business Requirements. Note: This documentation must
outline the revisions made to the previous deliverables required in
Section 1: Written Project Plan.
Section 3: Project Plan PowerPoint Presentation
Additional to your detailed executive summary you must present your
findings to the executive team and the venture capital group that along
with the executive summary will convince the group that your solution is
optimal.
Create a ten to fifteen (10-15) slide PowerPoint presentation in which
you:
Illustrate the concepts from the executive summary in Section 1 of this
assignment.
Create bulleted speaking notes for your presentation to the executive
board in the Notes section of the PowerPoint. Note: You may create or
assume any fictitious names, data, or scenarios that have not been
established in this assignment for a realistic flow of communication.
Use a professional technically written style to graphically convey the
information.
Section 4: Finalized Project Plan
Use Microsoft project to:
Finalize your project plan from Project Deliverable 5: Network
Infrastructure and Security to include all necessary changes in
assumptions, tasks, and / or subtasks.
The specific course learning outcomes associated with this assignment
are:
Describe the methods and best practices in implementing process
change in IT organizations.
Describe the role and methods of technology-induced process
improvement in organizations.
Develop an integrative technology project plan to address and solve a
proposed business problem.
Use technology and information resources to research issues in
information systems.
Write clearly and concisely about leadership issues and strategic insight
of the Information systems domain using proper writing mechanics and
technical style conventions
**********************************************************
CIS 599 Week 10 Project Deliverable 6 Final
Project Plan
For more classes visit
www.snaptutorial.com
Project Deliverable 6: Final Project Plan
Due Week 10 and worth 200 points
This assignment consists of four (4) sections: a written project plan, a
revised business requirements document, a project plan PowerPoint
presentation, and the finalized project plan. You must submit the four (4)
sections as separate files for the completion of this assignment. Label
each file name according to the section of the assignment it is written
for. Additionally, you may create and / or assume all necessary
assumptions needed for the completion of this assignment.
While taking all business and project parameters into consideration,
make quality assumptions to support the following requirements.
Section 1: Written Project Plan
You are now in the final stage of the project plan development. All
previous documentation should be combined into one (1) document that
will serve as the statement of work for the project. Your goal is to have
the project approved by the executive team. The project plan should be
very detailed, which is appropriate to accomplish the monumental task
of implementation; however, the executive team is only interested in a
thirty (30) minute summation. Therefore, you also must create a
compelling executive summary that is supported by your detail that
convinces the executive team that it should move forward with your
solution.
Develop a thirty to forty (30-40) page project plan in which you:
Write a five to ten (5-10) page executive summary in which you provide
a high-level technical overview of your project where you address the
following:
Describe the scope of the project and control measures.
Describe the goals and objectives of the project.
Give a detailed, realistically estimated cost analysis of the entire
project, including technical resources (human capital) that may be
needed to complete the project.
Relate the value of the project plan solution to the competitive
advantage that information technology will afford the organization.
Provide all aspects of the information technology implementation into
the project plan.
Recommend solution providers who can assist with development and
implementation. Include a cost analysis of at least three (3) providers.
Provide all aspects of the information technology implementation into
the project plan.
Revise the documentation based on feedback from the earlier evaluation
of the deliverable.
Combine all previous documentation for Project Deliverables 1-5 in
which you:
Use at least five (5) quality resources in this assignment. Note:
Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with
one-inch margins on all sides; citations and references must follow APA
or school-specific format. Check with your professor for any additional
instructions.
Include a cover page containing the title of the assignment, the student’s
name, the professor’s name, the course title, and the date. The cover
page and the reference page are not included in the required assignment
page length.
Include charts or diagrams created in MS Visio and MS Project as
appendix of the Word document. Make reference of these files in the
body of the Word document.
Section 2: Revised Business Requirements Document
Document all revisions made to the written project plan in the Document
Control section of the business requirements document from Project
Deliverable 2: Business Requirements. Note: This documentation must
outline the revisions made to the previous deliverables required in
Section 1: Written Project Plan.
Section 3: Project Plan PowerPoint Presentation
Additional to your detailed executive summary you must present your
findings to the executive team and the venture capital group that along
with the executive summary will convince the group that your solution is
optimal.
Create a ten to fifteen (10-15) slide PowerPoint presentation in which
you:
Illustrate the concepts from the executive summary in Section 1 of this
assignment.
Create bulleted speaking notes for your presentation to the executive
board in the Notes section of the PowerPoint. Note: You may create or
assume any fictitious names, data, or scenarios that have not been
established in this assignment for a realistic flow of communication.
Use a professional technically written style to graphically convey the
information.
Section 4: Finalized Project Plan
Use Microsoft project to:
Finalize your project plan from Project Deliverable 5: Network
Infrastructure and Security to include all necessary changes in
assumptions, tasks, and / or subtasks.
The specific course learning outcomes associated with this assignment
are:
Describe the methods and best practices in implementing process
change in IT organizations.
Describe the role and methods of technology-induced process
improvement in organizations.
Develop an integrative technology project plan to address and solve a
proposed business problem.
Use technology and information resources to research issues in
information systems.
Write clearly and concisely about leadership issues and strategic insight
of the Information systems domain using proper writing mechanics and
technical style conventions
**********************************************************

Cis 599 Enthusiastic Study / snaptutorial.com

  • 1.
    CIS 599 Week2 Project Deliverable 1 Project Plan Inception For more classes visit www.snaptutorial.com Project Deliverable 1: Project Plan Inception Due Week 2 and worth 120 points This assignment consists of two (2) sections: a project introduction and a project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment. You are currently the Chief Information Officer (CIO) for an innovative Internet-based company with gross revenues of more than $35 million dollars per year. During an executive leadership meeting, you were told that your company will be merging with a multinationalcompany of equal size and you will be responsible for developing a project plan to strategically integrate all systems, including databases and infrastructure. The Chief Executive Officer has given you sixty (60) days to deliver an information technology project plan in anticipation of the company merger. Your company will be expanding from one (1) floor to three (3) floors within six (6) months. Since this merger will be bringing two (2) fairly equal-sized companies together under one roof, the infrastructure must be redesigned to accommodate the increased needs.
  • 2.
    Your company currentlyuses operational systems and relational databases but desires to expand into data warehousing. All information technology (hardware and software) must be redesigned to meet organizationalneeds. The solution should be implemented in either a hosted solution, on-site solution, or a hybrid model. The CEO is expecting you to integrate different technologies from different solution providers and incorporate industry best practices in connection with the development of technological systems. In addition,the CEO is extremely interested in cloud technologies and virtualization but is leery of security issues; however, the CEO is sure that you will implement proper security protocols. The company currently consists of twenty five (25) employees but is expected to increase to sixty five (65) employees when the merger is complete. Section 1: Project Introduction Write a four to six (4-6) page project introduction that documents the current state of the organization prior to any development or enhancements, takes into account all the information given above, and includes the following: Background information of the company. Details regarding the type of business activities that the company is involved in. Speculation on outsourcing and offshoring opportunities. A description of the current information systems that the company has to support the business. The description should include an overview of the following: operational systems, databases, and data warehousing. cloud technology and virtualization. network infrastructure and security.
  • 3.
    The use ofat least two (2) quality resources in this assignment.Note: Wikipedia and similar Websites do not qualify as quality resources. Your assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. Section 2: Project Plan Use Microsoft Project to: Create a project plan (summary and detailed) template. The project plan should: Record all tasks, subtasks, resources, and time related to the project. Outline the planning,analysis, design, and implementation phases. Develop in accordance with the SDLC. The specific course learning outcomes associated with this assignment are: Describe the integrative functions and activities within the information systems area, including the role of the CIO and technologies managed within the organization. Use technology and information resources to research issues in information systems.
  • 4.
    Write clearly andconcisely about leadership issues and strategic insight of the Information systems domain using proper writing mechanics and technical style conventions. Grading for this assignment will be based on answer quality, logic / organization of the paper, and languageand writing skills, using the following rubric. ********************************************************** CIS 599 Week 4 Project Deliverable 2 Business Requirements For more classes visit www.snaptutorial.com Project Deliverable 2: Business Requirements Due Week 4 and worth 120 points This assignment consists of two (2) sections: a business requirements document and a project plan.You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally,
  • 5.
    you may createand / or assume all necessary assumptions needed for the completion of this assignment. Documenting the existing IT network and system is an important first step, but you, the CIO, know that capturing the needed changes can be critical to your success as an executive. You know that procuring and documenting quality business requirements is an important step toward the design of quality information systems. Completion of a quality requirements document allows user needs and expectations to be captured, so that infrastructure and information systems can be designed properly. Using the requirements document provided in the course shell as a part of the requirements gathering process, you are to assess the needs of the company as it prepares to become a multinationalorganization. You must consider current and future trends and requirements; however, assumptions should be realistic and carefully considered. The needs of the organization should be documented. Later deliverables will focus on specifics of all requirements. Section 1: Business Requirements Document Write a four to six (4-6) page original business requirements document for the project plan using the template provided.Note: The template can be found in the Student Center of the online course shell. Describe the project needs, including the following: Describe the scope and analyze how to control the scope. Speculate and give justifications for how to control scope. Identify possible risks, constraints, and assumptions. Describe the needed integration with other systems and infrastructure. Note: Database and Data Warehousing, Cloud Technology and Virtualization, and Network Infrastructure and Security.
  • 6.
    Assess the humancapital that may be needed to complete the project, ensuring that necessary skill sets are identified. Speculate on possible outsourcing or offshoring needs that may be required to accomplish project. Define relevant terms that will be used throughoutthe project. Include cost projections for staffing, infrastructure, and other resources. Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources. Your assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. Section 2: Revised Project Plan Use Microsoft Project to: Update the project plan (summary and detail) template, from Project Deliverable 1: Project Plan Inception, with three to five (3-5) new project tasks, each consisting of five to ten (5-10) subtasks. The specific course learning outcomes associated with this assignment are:
  • 7.
    Describe the integrativefunctions and activities within the information systems area, including the role of the CIO and technologies managed within the organization. Evaluate how information technology (IT) is aligned with the strategy of the organization, and how to make appropriate choices about architecture in relationship to overall organization goals. Use technology and information resources to research issues in information systems. Write clearly and concisely about leadership issues and strategic insight of the Information systems domain using proper writing mechanics and technical style conventions. Grading for this assignment will be based on answer quality, logic / organization of the paper, and languageand writing skills, using the following rubric. ********************************************************** CIS 599 Week 6 Project Deliverable 3 Database and Data Warehousing Design For more classes visit www.snaptutorial.com
  • 8.
    Project Deliverable 3:Database and Data Warehousing Design Due Week 6 and worth 120 points This assignment consists of two (2) sections: a design document and a revised project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment. One of the main functions of any business is to transform data into information. The use of relational databases and data warehousing has gained recognition as a standard for organizations. A quality database design makes the flow of data seamless. The database schema is the foundation of the relational database. The schema defines the tables, fields, relationships, views, indexes, and other elements. The schema should be created by envisioning the business, processes, and workflow of the company. Since your company is an innovative Internet-based company, movement toward data warehousing seems to be one of the most viable options to give your company a competitive advantage; however, these concepts must be explained to the executive board in a manner to garner support. Section 1: Design Document Write a six to ten (6-10) page design document in which you: Support the need for the use of relational databases and data warehousing. From a management standpoint, it may be important to show the efficiencies that can be gained for executive oversight. Create a database schema that supports the company’s business and processes. Explain and support the database schema with relevant
  • 9.
    arguments that supportthe rationale for the structure. Note: The minimum requirement for the schema should entail the tables, fields, relationships, views, and indexes. Identify and create database tables with appropriate field-naming conventions. Then, identify primary keys and foreign keys, and explain how referential integrity will be achieved. Normalize the database tables to third normal form (3NF). Identify and create an Entity-Relationship (E-R) Diagram relating the tables of the database schema through the use of graphical tools in Microsoft Visio or an open source alternative such as Dia. Note: The graphically depicted solution is not included in the required page length but must be included in the design document appendix. Explain your rationale behind the design of the E-R Diagram. Identify and create a Data Flow Diagram (DFD) relating the tables of your database schema through the use of graphical tools in Microsoft Visio or an open source alternative such as Dia. Note: The graphically depicted solution is not included in the required page length but must be included in the design document appendix. Explain the rationale behind the design of your DFD. Illustrate the flow of data including both inputs and outputs for the use of a data warehouse. The diagram should map data between source systems, operational systems, data warehouses and specified data marts.Note: The graphically depicted solution is not included in the required page length. Your assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
  • 10.
    Include a coverpage containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. Include charts or diagrams created in MS Visio or Dia as an appendix of the design document. All references to these diagrams must be included in the body of the design document. Section 2: Revised Project Plan Use Microsoft Project to: Update the project plan (summary and detail) template, from Project Deliverable 2: Business Requirements, with three to five (3-5) new project tasks each consisting of five to ten (5-10) subtasks. The specific course learning outcomes associated with this assignment are: Describe the methods and best practices in implementing process change in IT organizations. Describe the role and methods of technology-induced process improvement in organizations. Use technology and information resources to research issues in information systems. Write clearly and concisely about leadership issues and strategic insight of the Information systems domain using proper writing mechanics and technical style conventions. Grading for this assignment will be based on answer quality, logic / organization of the paper, and languageand writing skills, using the following rubric.
  • 11.
    ********************************************************** CIS 599 Week7 Project Deliverable 4 Cloud Technology and Virtualization For more classes visit www.snaptutorial.com Project Deliverable 4 Cloud Technology and Virtualization Due Week 7 and worth 120 points With the merger of your company with a multinationalcompany, you have come to realize that progressive solutions are necessary to defray some of the associated information technology costs. Company executives believe that using cloud technology and virtualization is becoming the standard for companies that are engaged in Internet-based technologies. Your company is on the verge of global marketing and competition; therefore, your company needs to make smarter decisions and improve global business performance. Cloud technology and virtualization are believed to provide business insights without enormous infrastructure enhancements. The executive board is aware of the profound benefits of cloud technology and virtualization but is apprehensive because they are unfamiliar with the look and feel of the
  • 12.
    technology. The executiveteam is interested in your recommendations and eagerly waiting for your forward-thinking viewpoint. Section 1 Design Document 1. Write a four to six (4-6) page design document in which you 1. Support the need for the use of cloud technology and virtualization within the company. 2. Assess expected cost savings in hardware infrastructure. 3. Determine the possible reductions of human capital that can be realized from implementing cloud and virtualization technologies. 4. Create a diagram through the use of Microsoft Visio or an open source alternative such as Dia to illustrate how cloud and virtualization technology could align with the company’s business processes and assist with attainment of organizationalgoals. Note The graphically depicted solution is not included in the required page length but must be included in the design document appendix. 5. Provide a compelling recommendation for solution providers and partners that could help the company secure a firm competitive advantage by using cloud and virtualization technologies. Your assignment must follow these formatting requirements • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
  • 13.
    • Include chartsor diagrams created in MS Visio or Dia as an appendix of the design document. All references to these diagrams must be included in the body of the design document. Section 2 Revised Project Plan Use Microsoft Project to 1. Update the project plan (summary and detail) template, from Project Deliverable 3 Database and Data Warehousing Design, with three to five (3-5) new project tasks each consisting of five to ten (5-10) subtasks. The specific course learning outcomes associated with this assignment are • Demonstrate an understanding of existing and emerging information technologies and strategic impact on organizationaloperations. • Explain how to develop reasoned responses to the major forces shaping the role of IT in organizations competing in a global economy. • Use technology and information resources to research issues in information systems. • Write clearly and concisely about leadership issues and strategic insight of the Information systems domain using proper writing mechanics and technical style conventions. **********************************************************
  • 14.
    CIS 599 Week7 Project Deliverable 4: Cloud Technology and Virtualization For more classes visit www.snaptutorial.com Project Deliverable 4 Cloud Technology and Virtualization Due Week 7 and worth 120 points With the merger of your company with a multinationalcompany, you have come to realize that progressive solutions are necessary to defray some of the associated information technology costs. Company executives believe that using cloud technology and virtualization is becoming the standard for companies that are engaged in Internet-based technologies. Your company is on the verge of global marketing and competition; therefore, your company needs to make smarter decisions and improve global business performance. Cloud technology and virtualization are believed to provide business insights without enormous infrastructure enhancements. The executive board is aware of the profound benefits of cloud technology and virtualization but is apprehensive because they are unfamiliar with the look and feel of the technology. The executive team is interested in your recommendations and eagerly waiting for your forward-thinking viewpoint. Section 1 Design Document
  • 15.
    1. Write afour to six (4-6) page design document in which you 1. Support the need for the use of cloud technology and virtualization within the company. 2. Assess expected cost savings in hardware infrastructure. 3. Determine the possible reductions of human capital that can be realized from implementing cloud and virtualization technologies. 4. Create a diagram through the use of Microsoft Visio or an open source alternative such as Dia to illustrate how cloud and virtualization technology could align with the company’s business processes and assist with attainment of organizationalgoals. Note The graphically depicted solution is not included in the required page length but must be included in the design document appendix. 5. Provide a compelling recommendation for solution providers and partners that could help the company secure a firm competitive advantage by using cloud and virtualization technologies. Your assignment must follow these formatting requirements • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
  • 16.
    • Include chartsor diagrams created in MS Visio or Dia as an appendix of the design document. All references to these diagrams must be included in the body of the design document. Section 2 Revised Project Plan Use Microsoft Project to 1. Update the project plan (summary and detail) template, from Project Deliverable 3 Database and Data Warehousing Design, with three to five (3-5) new project tasks each consisting of five to ten (5-10) subtasks. The specific course learning outcomes associated with this assignment are • Demonstrate an understanding of existing and emerging information technologies and strategic impact on organizationaloperations. • Explain how to develop reasoned responses to the major forces shaping the role of IT in organizations competing in a global economy. • Use technology and information resources to research issues in information systems. • Write clearly and concisely about leadership issues and strategic insight of the Information systems domain using proper writing mechanics and technical style conventions. **********************************************************
  • 17.
    CIS 599 Week8 Project Deliverable 5 Network Infrastructure and Security For more classes visit www.snaptutorial.com Project Deliverable 5 Network Infrastructure and Security Due Week 8 and worth 120 points This assignment consists of two (2) sections an infrastructure document and a revised project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment. With the parameters set forth at the onset of the project, present the infrastructure and security policy that will support the expected development and growth of the organization.The network solution that is chosen should support the conceived information system and allow for scalability. The network infrastructure will support organizational operations; therefore, a pictorial view of workstations, servers, routers, bridges, gateways, and access points should be used. Since the company will be merging with a multinational company, virtualization and cloud technology should be taken into consideration. In addition, access paths for Internet access should be depicted. A narrative should be included to
  • 18.
    explain all thenodes of the network and the rationale for the design. Lastly, using the Confidentiality, Integrity and Availability (CIA) Triangle, define the organizationalsecurity policy. Section 1 Infrastructure Document 1. Write a five to ten (5-10) page infrastructure document in which you 1. Identify possible network infrastructure vulnerabilities. Address network vulnerabilities with the appropriate security measures. Ensure that consideration is given to virtualization and cloud technology. 2. Design a logical and physical topographicallayout of the planned network through the use of graphical tools in Microsoft Word or Visio, or an open source alternative such as Dia. Explain the rationale for the logical and physical topographical layout of the planned network. Note The graphically depicted solution is not included in the required page length. 3. Illustrate the possible placement of servers, including access paths to the Internet and firewalls. Notefacility limitations, workstations, printers, routers, switches, bridges, and access points should be considered in the illustration. 4. Create and describe a comprehensive security policy for the company that will 1. Protect the company infrastructure and assets by applying the principals of CIA. Note CIA is a widely used benchmark for evaluation of information systems security, focusing on the three (3) core goals of confidentiality, integrity, and availability of information. 2. Address ethical aspects related to employee behavior, contractors, password usage, and access to networked resources and information.
  • 19.
    Your assignment mustfollow these formatting requirements • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. • Include charts or diagrams created in MS Visio or Dia as an appendix of the infrastructure document. All references to these diagrams must be included in the body of the infrastructure document. Section 2 Revised Project Plan Use Microsoft Project to 1. Update the project plan (summary and detail) template, from Project Deliverable 4 Cloud Technology and Virtualization,with three to five (3- 5) new project tasks each consisting of five to ten (5-10) subtasks. The specific course learning outcomes associated with this assignment are • Describe the methods and best practices in implementing process change in IT organizations. • Describe the role and methods of technology-induced process improvement in organizations.
  • 20.
    • Use technologyand information resources to research issues in information systems. • Write clearly and concisely about leadership issues and strategic insight of the Information systems domain using proper writing mechanics and technical style conventions. ********************************************************** CIS 599 Week 8 Project Deliverable 5: Network Infrastructure and Security For more classes visit www.snaptutorial.com Project Deliverable 5 Network Infrastructure and Security Due Week 8 and worth 120 points This assignment consists of two (2) sections an infrastructure document and a revised project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
  • 21.
    With the parametersset forth at the onset of the project, present the infrastructure and security policy that will support the expected development and growth of the organization.The network solution that is chosen should support the conceived information system and allow for scalability. The network infrastructure will support organizational operations; therefore, a pictorial view of workstations, servers, routers, bridges, gateways, and access points should be used. Since the company will be merging with a multinational company, virtualization and cloud technology should be taken into consideration. In addition, access paths for Internet access should be depicted. A narrative should be included to explain all the nodes of the network and the rationale for the design. Lastly, using the Confidentiality, Integrity and Availability (CIA) Triangle, define the organizationalsecurity policy. Section 1 Infrastructure Document 1. Write a five to ten (5-10) page infrastructure document in which you 1. Identify possible network infrastructure vulnerabilities. Address network vulnerabilities with the appropriate security measures. Ensure that consideration is given to virtualization and cloud technology. 2. Design a logical and physical topographicallayout of the planned network through the use of graphical tools in Microsoft Word or Visio, or an open source alternative such as Dia. Explain the rationale for the logical and physical topographical layout of the planned network. Note The graphically depicted solution is not included in the required page length. 3. Illustrate the possible placement of servers, including access paths to the Internet and firewalls. Notefacility limitations, workstations, printers, routers, switches, bridges, and access points should be considered in the illustration.
  • 22.
    4. Create anddescribe a comprehensive security policy for the company that will 1. Protect the company infrastructure and assets by applying the principals of CIA. Note CIA is a widely used benchmark for evaluation of information systems security, focusing on the three (3) core goals of confidentiality, integrity, and availability of information. 2. Address ethical aspects related to employee behavior, contractors, password usage, and access to networked resources and information. Your assignment must follow these formatting requirements • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. • Include charts or diagrams created in MS Visio or Dia as an appendix of the infrastructure document. All references to these diagrams must be included in the body of the infrastructure document. Section 2 Revised Project Plan Use Microsoft Project to 1. Update the project plan (summary and detail) template, from Project Deliverable 4 Cloud Technology and Virtualization,with three to five (3- 5) new project tasks each consisting of five to ten (5-10) subtasks. The specific course learning outcomes associated with this assignment are
  • 23.
    • Describe themethods and best practices in implementing process change in IT organizations. • Describe the role and methods of technology-induced process improvement in organizations. • Use technology and information resources to research issues in information systems. • Write clearly and concisely about leadership issues and strategic insight of the Information systems domain using proper writing mechanics and technical style conventions. ********************************************************** CIS 599 Week 10 Project Deliverable 6 Final Project Plan For more classes visit www.snaptutorial.com Project Deliverable 6: Final Project Plan Due Week 10 and worth 200 points
  • 24.
    This assignment consistsof four (4) sections: a written project plan, a revised business requirements document, a project plan PowerPoint presentation, and the finalized project plan. You must submit the four (4) sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment. While taking all business and project parameters into consideration, make quality assumptions to support the following requirements. Section 1: Written Project Plan You are now in the final stage of the project plan development. All previous documentation should be combined into one (1) document that will serve as the statement of work for the project. Your goal is to have the project approved by the executive team. The project plan should be very detailed, which is appropriate to accomplish the monumental task of implementation; however, the executive team is only interested in a thirty (30) minute summation. Therefore, you also must create a compelling executive summary that is supported by your detail that convinces the executive team that it should move forward with your solution. Develop a thirty to forty (30-40) page project plan in which you: Write a five to ten (5-10) page executive summary in which you provide a high-level technical overview of your project where you address the following: Describe the scope of the project and control measures. Describe the goals and objectives of the project. Give a detailed, realistically estimated cost analysis of the entire project, including technical resources (human capital) that may be needed to complete the project.
  • 25.
    Relate the valueof the project plan solution to the competitive advantage that information technology will afford the organization. Provide all aspects of the information technology implementation into the project plan. Recommend solution providers who can assist with development and implementation. Include a cost analysis of at least three (3) providers. Provide all aspects of the information technology implementation into the project plan. Revise the documentation based on feedback from the earlier evaluation of the deliverable. Combine all previous documentation for Project Deliverables 1-5 in which you: Use at least five (5) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources. Your assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. Include charts or diagrams created in MS Visio and MS Project as appendix of the Word document. Make reference of these files in the body of the Word document.
  • 26.
    Section 2: RevisedBusiness Requirements Document Document all revisions made to the written project plan in the Document Control section of the business requirements document from Project Deliverable 2: Business Requirements. Note: This documentation must outline the revisions made to the previous deliverables required in Section 1: Written Project Plan. Section 3: Project Plan PowerPoint Presentation Additional to your detailed executive summary you must present your findings to the executive team and the venture capital group that along with the executive summary will convince the group that your solution is optimal. Create a ten to fifteen (10-15) slide PowerPoint presentation in which you: Illustrate the concepts from the executive summary in Section 1 of this assignment. Create bulleted speaking notes for your presentation to the executive board in the Notes section of the PowerPoint. Note: You may create or assume any fictitious names, data, or scenarios that have not been established in this assignment for a realistic flow of communication. Use a professional technically written style to graphically convey the information. Section 4: Finalized Project Plan Use Microsoft project to: Finalize your project plan from Project Deliverable 5: Network Infrastructure and Security to include all necessary changes in assumptions, tasks, and / or subtasks.
  • 27.
    The specific courselearning outcomes associated with this assignment are: Describe the methods and best practices in implementing process change in IT organizations. Describe the role and methods of technology-induced process improvement in organizations. Develop an integrative technology project plan to address and solve a proposed business problem. Use technology and information resources to research issues in information systems. Write clearly and concisely about leadership issues and strategic insight of the Information systems domain using proper writing mechanics and technical style conventions ********************************************************** CIS 599 Week 10 Project Deliverable 6 Final Project Plan For more classes visit www.snaptutorial.com
  • 28.
    Project Deliverable 6:Final Project Plan Due Week 10 and worth 200 points This assignment consists of four (4) sections: a written project plan, a revised business requirements document, a project plan PowerPoint presentation, and the finalized project plan. You must submit the four (4) sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment. While taking all business and project parameters into consideration, make quality assumptions to support the following requirements. Section 1: Written Project Plan You are now in the final stage of the project plan development. All previous documentation should be combined into one (1) document that will serve as the statement of work for the project. Your goal is to have the project approved by the executive team. The project plan should be very detailed, which is appropriate to accomplish the monumental task of implementation; however, the executive team is only interested in a thirty (30) minute summation. Therefore, you also must create a compelling executive summary that is supported by your detail that convinces the executive team that it should move forward with your solution. Develop a thirty to forty (30-40) page project plan in which you: Write a five to ten (5-10) page executive summary in which you provide a high-level technical overview of your project where you address the following: Describe the scope of the project and control measures.
  • 29.
    Describe the goalsand objectives of the project. Give a detailed, realistically estimated cost analysis of the entire project, including technical resources (human capital) that may be needed to complete the project. Relate the value of the project plan solution to the competitive advantage that information technology will afford the organization. Provide all aspects of the information technology implementation into the project plan. Recommend solution providers who can assist with development and implementation. Include a cost analysis of at least three (3) providers. Provide all aspects of the information technology implementation into the project plan. Revise the documentation based on feedback from the earlier evaluation of the deliverable. Combine all previous documentation for Project Deliverables 1-5 in which you: Use at least five (5) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources. Your assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover
  • 30.
    page and thereference page are not included in the required assignment page length. Include charts or diagrams created in MS Visio and MS Project as appendix of the Word document. Make reference of these files in the body of the Word document. Section 2: Revised Business Requirements Document Document all revisions made to the written project plan in the Document Control section of the business requirements document from Project Deliverable 2: Business Requirements. Note: This documentation must outline the revisions made to the previous deliverables required in Section 1: Written Project Plan. Section 3: Project Plan PowerPoint Presentation Additional to your detailed executive summary you must present your findings to the executive team and the venture capital group that along with the executive summary will convince the group that your solution is optimal. Create a ten to fifteen (10-15) slide PowerPoint presentation in which you: Illustrate the concepts from the executive summary in Section 1 of this assignment. Create bulleted speaking notes for your presentation to the executive board in the Notes section of the PowerPoint. Note: You may create or assume any fictitious names, data, or scenarios that have not been established in this assignment for a realistic flow of communication. Use a professional technically written style to graphically convey the information. Section 4: Finalized Project Plan
  • 31.
    Use Microsoft projectto: Finalize your project plan from Project Deliverable 5: Network Infrastructure and Security to include all necessary changes in assumptions, tasks, and / or subtasks. The specific course learning outcomes associated with this assignment are: Describe the methods and best practices in implementing process change in IT organizations. Describe the role and methods of technology-induced process improvement in organizations. Develop an integrative technology project plan to address and solve a proposed business problem. Use technology and information resources to research issues in information systems. Write clearly and concisely about leadership issues and strategic insight of the Information systems domain using proper writing mechanics and technical style conventions **********************************************************