This document provides a summary of Amr Emara's experience in oilfield chemicals, corrosion mitigation, and production operations over 29 years. It highlights his roles managing production chemical business for various service companies in multiple countries. It also lists his accomplishments reducing costs and improving efficiency through lean manufacturing practices and overcoming production challenges. His expertise includes areas like cathodic protection, water treatment, corrosion engineering, and oilfield management.
A post graduate of petroleum Engineer (from PME) with 10 years of experience in project engineering and project management from conception to commissioning of multi-discipline EPC contracts related to chemical, refinery, oil & gas and LNG sectors including Egypt, Qatar, Abu Dhabi and Oman.
Working in Arabian Industries (AI) LLC for nearly 6 years in feasibility, detailed engineering, EPC, EMC and IMC Projects for PDO (Petroleum Development Oman) and ORPIC.
I’m a petroleum Engineer with an Excellent experience In Oil & Gas Projects and industries such as exploration ,drilling ,work over , Oil & Gas well drilling & ALS Production services and Projects in oil & Gas Energy field section ,My experience in the Drilling , Well control & wellhead equipment Inspection ,Refurbishment , Maintenance , Testing , Recertification and Installation As per API(6A , 6D , 16A , 16D, 16C & 7K ) Specification. Oil & Gas artificial lift production technology and solution. Maintenance, Installation and Overhaul of well head and well control tools and equipment; furthermore, many projects for new rigs (on shore) and offshore rig (ST-Bahari1- Jack up), Prove leadership skills involving managing, developing and motivating teams to achieve their objectives. Reliable, trustworthy and meticulous, gained a good understanding of what is required of Oil & Gas engineering.
A post graduate of petroleum Engineer (from PME) with 10 years of experience in project engineering and project management from conception to commissioning of multi-discipline EPC contracts related to chemical, refinery, oil & gas and LNG sectors including Egypt, Qatar, Abu Dhabi and Oman.
Working in Arabian Industries (AI) LLC for nearly 6 years in feasibility, detailed engineering, EPC, EMC and IMC Projects for PDO (Petroleum Development Oman) and ORPIC.
I’m a petroleum Engineer with an Excellent experience In Oil & Gas Projects and industries such as exploration ,drilling ,work over , Oil & Gas well drilling & ALS Production services and Projects in oil & Gas Energy field section ,My experience in the Drilling , Well control & wellhead equipment Inspection ,Refurbishment , Maintenance , Testing , Recertification and Installation As per API(6A , 6D , 16A , 16D, 16C & 7K ) Specification. Oil & Gas artificial lift production technology and solution. Maintenance, Installation and Overhaul of well head and well control tools and equipment; furthermore, many projects for new rigs (on shore) and offshore rig (ST-Bahari1- Jack up), Prove leadership skills involving managing, developing and motivating teams to achieve their objectives. Reliable, trustworthy and meticulous, gained a good understanding of what is required of Oil & Gas engineering.
An Improved Energy Efficiency Algorithm in Wireless Sensor Network Using Quer...IJSRD
Wireless Sensor Networks (WSN) is an essential guide foe anyone interested in wireless communications for sensor networks, home networking, environment monitoring, target tracking, and surveillance. In wireless sensor network sensor nodes have very limited supply of energy, and also should be available in function for extremely long time (e.g. a couple of years) without being recharged. So consider the energy resource of sensor node and the life time of the sensors, to optimize the query plan, based on user specified accuracy for wireless sensor network. This proposed method aims at optimization of periodical query, with careful consideration of accuracy, along with energy consumption in data communication. User may specify a value/time accuracy constraint, according to which an optimized query plan can be created to minimize the energy consumption. The main objective is to propose an energy efficient algorithm to reduce data transmission and to increase the life time of wireless sensor network.
1. SUMMARY
HIGHLIGHTS
ACCOMPLISHMENTS
EXPERIENCE
AMR EMARA
amremara51@yahoo.com
Have great experience in the oilfield Chemicals, Lab works, Cathodic Protection and corrosion
mitigation, in addition to Manufacturing and production professional skilled in leading high-producing
teams and using lean manufacturing to reduce costs and increase process efficiency in Oil Field
Operations throughout my career (29 yeasrs) on both sides of the table (Owner Co. side ex. Agiba,
Qarun, Badr pet. co.) and as Service Co.(Dyno, Dynea, M-I Swaco, Schlumberger) in Egypt ,Libya,
Sudan, ..
* Contact Info.:
1) E-Mail: amremara51@yahoo.com
2) Mobile: 00201001155113 , 00905377450711
Petroleum, Microsoft Office,
Engineering, Oil & Gas Management,
Project Planning Customer Service,
Petrochemical Science, Chemistry,
Oilfield, Corrosion, Water, Onshore,
Chemical processing expertise,
Knowledgeable of quality control
standards.
Qarun Pet. Co.: Succeeded to reduce the treating cost / BBL Oil and overcome
many of the crude early production obstacles.
M-I Swaco: succeede to find many products that can treat crude processings
Demulsifiers, Paraffin Dispersants, PPDs).
10/2010 to 10/2015 M-I PT Business Line Mgr. - Egypt
M-I Swaco - A Schlumberger Co.
Fully responsible about production chemicals marketing and business
development in Egypt-Manage the operations, improve efficiency,
coordinate sales efforts, implement new technology.
Prepare all the sales, marketing and operations.
Manage SOE and implement improvements for areas with poor
performance, prepare and respond to all bids related to Production
Chemicals.-Lead tender processes and establish pricing strategy with
both Country Manager and PT Business Regional Manager.
Bottle testing, Technical recommendations and support for the clients,
and performing Field trials together with the technical service Engineer.
Coordinated and developed new product design in collaboration with
engineering staff.
Reviewed production orders, schedules, delivery dates and inventory
levels to determine product availability.
Trained, developed and counseled employees to develop a high
performing team.
Trained, developed and counseled employees to develop a high
performing team.
Budgeted monthly departmental expenses and implemented cost
controls.
Coached employees in developing and achieving individual performance
goals.
07/2006 to 10/2010 M-I PT Egypt-Lybia Area Mgr.
M-I Swaco
Leading M-I PT business team - Egypt.
2. Fully responsible about production chemicals marketing & business
development in Egypt - Libya.- Developing and implementing short and
long term plans in addition to performing Technical studies and market
surveys.
Obtain and maintain market intelligence.
Bottle testing, Technical recommendations and support for the clients,
and performing Field trials together with the technical service Engineer.
Preparation of business plan, sales forecast and tenders.
Created workforce planning and development models to inform quarterly
scheduling and processes.
07/2005 to 06/2006 Flow Improver Business Line Tech. Mgr - MI PC ME
M-I Swaco - Dubai, JA FZ
Establishment of the PPD chemical kit for the ME region (Directly
reported to ME regional Mgr. and Europe technical Mgr.) .
Handling all wax and Asphaltene projects in the Middle East Region.
Technical support and advise in some other oilfield applications in ME
Region (Pakistan, Syria, Yemen, Libya,Sudan,..).
Developed and maintained strong and clear communication and rapport
with plant personnel.
05/2003 to 06/2005 M-I PC Country Mgr.- Sudan
M-I Swaco - Dubai, JA FZ
Introduce and Start up M-I production chemicals activities in Sudan,
Market survey and customer relationship.
Market Penetration and Business Development.
Bottle testing, Technical recommendations,and Field trials.
Training courses for Sudanese Customers (Field and Head office).
Start up M-I PC business and ended up with 7,000 K US$ / Yr.
Developed and maintained strong and clear communication and rapport
with customers personnel.
08/2001 to 04/2003 County Mgr.- Egypt
Dyno , Dynea Oilfield Chemicals
Fully responsible about production chemicals marketing and business
development in Egypt according to short and long term business plan.
Building new business relationship with oil companies and oil service
companies by Tailor making and pre-qualifying products for potential new
projects.
Obtain and maintain market intelligence.
Bottle testing, Technical recommendations, and Field trials.
Completed key projects on time, on budget and with a high level of
accuracy.
Collaborated with the procurement team to adjust and modify
production products.
12/1999 to 08/2001 Chem. Treatment and Corrosion Eng. Div. Mgr.
Badr Petroleum Company - (EGPC - Shell JV)
Evaluation for the production treating chemicals.-Evaluation for the field
reports (corrosion & scale analysis).
Cathodic protection supervision on system installation and
performance.Supervising the installation and retrieval of the corrosion
and scale monitoring devices.
Interpretation for the gathered cathodic protection and corrosion
monitoring results.
Preparing and evaluating tender documents for cathodic protection
systems, corrosion monitoring tools in addition to the oil production
treating chemicals, water injection treating chemicals, chemical
injection packages, water desalination plants.
Trained, developed and counseled employees to develop a high
performing team.
Diligently maintained safety and quality standards.
Assessed and trained personnel for promotion to cross-functional
3. EDUCATION
operations.
11/1995 to 12/1999 Chem. Treatment and Corrosion Eng. Depr. Head.
Qarun petroleum Co. - (EGPC / Apache JV)
Preparing and evaluating tender documents for Cathodic protection
systems, corrosion monitoring tools in addition to the oil production
chemicals, water injection treating chemicals, chemical injection
packages, water desalination plants.
Evaluation for the production treating chemicals.
Evaluation for the field reports corrosion & scale analysis).
Cathodic protection supervision on system installation and performance
Supervising the installation and retrieval of the corrosion and scale
monitoring devices.
Interpretation for the gathered cathodic protection and corrosion
monitoring results.
Implemented root cause and corrective actions to remove production
constraints and improve produced crude quality.
04/1986 to 10/1995 Corrosion engineering section Head
Agiba Petroleum Co. (EGPC / Agip JV)
Chemical analysis (Complete crude oil / water / scale analysis),
Chemical treatment for the crude oil and water injection systems.
Corrosion monitoring (coupons, LPR, ER, Iron counts) & Cathodic
protection surveys-Follow up corrosion monitoring and cathodic
protection systems (insertion, retrieving, ...) In addition to Lab testing,
selection, field evaluation and Optimization for the oil and water
treating chemicals Pour Point Depressants, Paraffin Dispersants,
Demulsifiers, corrosion inhibitor, scale inhibitor, biocides)- Head of the
corrosion team taking care of the corrosion related problems for all the
Co. fields (western desert fields).
As a group leader for the fields corrosion mitigation team.
Installation and retrieving of corrosion and scale coupons, corrosion
monitoring probes, bioprobes.
Installation and evaluation for the cathodic protection systems.
Painting jobs, inspection jobs (downhole and surface equipment.
Evaluation for the treating chemicals efficiency (regarding corrosion,
scale and bacteria).
Supervision and planning for corrosion mitigation activities (on / off shore
fields) Preparing tender documents for the corrosion monitoring, cathodic
protection tools and oil and water treating chemicals.
Corrosion monitoring and cathodic protection systems for all the
company fields (field surveys) Installation of the cathodic protection
system for the treating facilities in Meleiha Field.
All the corrosion related jobs (well logging, wire line jobs, well casing
cathodic protection project, crude oil and water storage tanks cathodic
protection systems.
Down hole corrosion problems, surface facilities corrosion
problems.Scaling problems (down hole and surface).
Implemented root cause and corrective actions to remove production
constraints and improve produced crude quality.
Diligently maintained safety and quality standards.
04/1985 to 04/1986 Industrial Water Treatment Chemicals - Sales Engineer
Chemical and technical service Company
Selecting, Testing & Marketing industrial water treatment chemicals
(corrosion inhibitor, scale inhibitor, biocides, polyelectrolytes, softeners,
filters and boilers).
Bachelor of Science: Chemistry
Cairo University - Cairo - Egypt
1979 - 1983
4. CERTIFICATIONS
LANGUAGES
PUBLICATIONS
ADDITIONAL INFORMATION
Grade: Very Good
Chem. Treatment and Corrosion Eng. Depr. Head. Qarun petroleum Co. -
(EGPC / Apache JV) Production Chemicals Testing and Applications June 1996
BAKER Water Flood Project Study June 1997 OIL P Corrosion engineering section
Head Agiba Petroleum Co. (EGPC / Agip JV) Oil and Water Treating Chemicals
October 1990 Petrolite - Oil and Gas Processing Technology June 1995 AGIP -
Chem. Treatment and Corrosion Eng. Div. Mgr. Badr Petroleum Company -
(EGPC - Shell JV) Corrosion in Oil & Gas fields October 1998 RIKE SE Cathodic
Protection November 1998 NACE - U.
English - Arabic - Turkish
Well casing Cathodic Protection MEOS October 13, 1995
(Joint Authors: Amr Emara, Dr.Mohammad Hattab)
Case study on actual wells where stage cementing for the casing. the bare
areas of the casing were in direct contact with the well bore and fluids that
facilitate (good areas) the stray and eddy current to leave the casing leading
to casing corrosion and / or cracks. Casing cathodic protection could be
achieved by applying impressed current from the surface for each group of
wells in the same cluster / area.
Football, Chess, Cycling. Charity activities. Cooking.