SlideShare a Scribd company logo
1 of 3
RESUME
NAGAMALLESWARARAO BHATTU
Email: nagamalli202@gmail.com
Contact no: +91 7036802411
Career Objective:
To joininan environmentwhere there isachance to show my skillsandchance toget the
reorganizationtomyworkwhich will usefulforthe growthfororganizationandme too.
Educational Qualification:
B. tech in electrical and electronics engineering from SRI SATYA NARAYANA ENGINEERING
COLLEGE, ONGOLE (A.P) with77.15%
Diploma in electrical and electronics engineeringfrom SRI VENKATESWARA GOVT POLYTECHNIC,
TIRUPATI (A.P) with75.88%
Experience Summary:
 Presently I am working as an Electrical operation and maintenance Engineer in 2MWP solar
power plant at SOLON INDIA PVTLTD
 I worked as an operation and maintenance engineer in 3 MW solar power plant at SOLAR
INTEGRATION SYATEMS INDIA PVTLTD fromMarch 2014 to 25/09/2015
 Previously I worked as a SITE ENGINEER in 400220 KV Substation at ECI ENGINEERING AND
CONSTRUCTIONS LTD from FEB 2013 to FEB 2014
Job Rolesand Responsibilities:
I. Organizationname : SOLON INDIA PVTLTD
Designation : OperationandMaintenance Engineer
Duration : NOVEMBER 2015 TO PRESENT
II. Organizationname: SOLARINTEGRATION SYATEMSINDIA PVTLTD
Designation : OperationandMaintenance Engineer
Duration : march 2014 to 25/09/2015
Rolesand Responsibilities:
 Preventive maintenance: which includes routine inspection and servicing of all equipments to
preventbreakdownandreduce yieldenergylosses.
 Proper monitoring of equipments which is used to find the potential problem at early stage,
whichisusedto reduce the downtime.
 Carrying out preventive, predictive and breakdown maintenance of HT & LT power distribution
system, invertersand33 KV Transformer.
 Managing, operation and maintenance of earth faults, over voltage faults, under voltage faults
and clear the faults for the properoperationof the plant.
 Checking the inverter and taken care to protect it from the extreme hot, humid and dusty
conditionsto reduce the down time of the inverter.
 I have clearideaon the Inverterfaults and its prevention.
 I have knowledge oncommunication problemand its preventive maintenance.
 Maintenance of 2.25 MVA and 3.5 MVA Transformers and 33KV /415 V and 400/33 KV
Substations.
 AchievingGenerationtargetsas per PR agreements.
 Monitoringof INVERTERs and SMBs through online data system.
 Preparationof DGR (DailyGenerationReport),andannual generationreports.
 Checkingof stringperformances
 Check the warranty terms from the suppliers they should be very useful at damage to that
equipment
 Maintainingof spare parts inventorymanagement
 Installation and commissioning of PV SOLAR module.
 Installation and commissioning of SMB or SCBs and Inverters.
 Responsible for completion of project punch points.
Highlights:
 Successfullyexecuted 3MW gridtie SPV systemforprojectexecution
 Got complete knowledgeonmaintenanceof 3 MW and 2 MW solarplants.
III. Organizationname: ECIENGINEERINGANDCONSTRUCTION LTD
Designation : SITE ENGINEER
Duration : FEB 2013 to FEB 2014
Job Rolesand Responsibilities:
 Able to understand the design of the plant layout and checking the layout alignment with
helpof plant layout diagram
 Checking of the civil constructions of all power plant installations and take the responsible
actions
 Proper planning and allotment of man power, material and equipment for the particular work
by consideringthe construction criteria and integrityof the total project
 Monitoringthe installationson LT & HT side and transformer
 Experience in installation,commissioningandtesting of transformerupto 20 MVA range
 Experience in the erection and testing of breakers, lightning arresters, current transformers,
potential transformers and bus polar isolators.
 Experience inmeasuringandlayingof conductor in400/220 KV substation
Software Skills:
MS office,MSexcel,MSpowerpoint,and MATLAB (SIMULATION)
Technical Skills:
 Strong technical back ground and good communication skills which are used to communicate
well withmyteam.
 Good knowledge in electrical power systems and real time knowledge in overall 400/220 KV
substation layout
Personal Skills:
 Self motivatingandself controllable.
 Readyto relocate anywhere if Iselected.
 Active participantasindividual ingroupalso.
 Good teamleaderandteamplayertoo.
 If it is neededIwouldreadytotravel.
Personal information:
Name : BHATTU NAGAMALLESWARA RAO
Fathername : BHATTU SANJEEVA KONDA
Mother name : BHATTU RUKMINI
Gender : MALE
Date of birth : 06 th
April 1991
Nationality : INDIAN
Marital status : Unmarried
Languagesknown : ENGLISH, TELUGU, HINDI
Addressforcorresponding : Chandraju palem(Post),Bellamkonda(Mandal),Guntur(District)
pin:522411
Current CTC : 2.0 lac/Annum
ExpectedCTC : 2.5 - 3.0 lac/ annum
Notice period : 15 days
Declaration:
Here by I informedthatall the informationgivenabove istrue andcorrectaccording to the bestof
knowledge
PLACE:Hyderabad
DATE: BHATTU NAGAMALLESWARA RAO

More Related Content

What's hot (20)

rashgggg
rashggggrashgggg
rashgggg
 
H TYAGI LATEST (1)
H TYAGI LATEST (1)H TYAGI LATEST (1)
H TYAGI LATEST (1)
 
Electrical engg 3 year
Electrical engg 3 yearElectrical engg 3 year
Electrical engg 3 year
 
Electrical Maintenance Technician
Electrical Maintenance TechnicianElectrical Maintenance Technician
Electrical Maintenance Technician
 
Rao cv supervisor
Rao cv supervisorRao cv supervisor
Rao cv supervisor
 
JP Letter of Experience
JP Letter of ExperienceJP Letter of Experience
JP Letter of Experience
 
ELECTRICAL ENGINEER cv one
ELECTRICAL ENGINEER cv oneELECTRICAL ENGINEER cv one
ELECTRICAL ENGINEER cv one
 
RAVI SONI
RAVI SONIRAVI SONI
RAVI SONI
 
Santhu CV Resume.
Santhu CV Resume.Santhu CV Resume.
Santhu CV Resume.
 
CV - Srinivas Reddy Nasirepally
CV - Srinivas Reddy NasirepallyCV - Srinivas Reddy Nasirepally
CV - Srinivas Reddy Nasirepally
 
Cv (5) converted
Cv (5) convertedCv (5) converted
Cv (5) converted
 
CV Vijay_Vora
CV Vijay_VoraCV Vijay_Vora
CV Vijay_Vora
 
Cover letter
Cover letterCover letter
Cover letter
 
ajit-cv-updated
ajit-cv-updatedajit-cv-updated
ajit-cv-updated
 
Ravi cv
Ravi cvRavi cv
Ravi cv
 
Amit Kumar_CV_100_MW
Amit Kumar_CV_100_MWAmit Kumar_CV_100_MW
Amit Kumar_CV_100_MW
 
resumee
resumeeresumee
resumee
 
Resume
ResumeResume
Resume
 
new-2-2 (1)
new-2-2 (1)new-2-2 (1)
new-2-2 (1)
 
update 1
update 1update 1
update 1
 

Viewers also liked

Ace Interviewers_Business Plan_2016-02-27
Ace Interviewers_Business Plan_2016-02-27Ace Interviewers_Business Plan_2016-02-27
Ace Interviewers_Business Plan_2016-02-27
Anijaah Brown, MBA
 

Viewers also liked (12)

Moving beyond google forms for assessment -CUE Annual 2016
Moving beyond google forms for assessment -CUE Annual 2016Moving beyond google forms for assessment -CUE Annual 2016
Moving beyond google forms for assessment -CUE Annual 2016
 
Charla kde españa
Charla kde españaCharla kde españa
Charla kde españa
 
How to Use Relationships and Referrals to Get a Job
How to Use Relationships and Referrals to Get a JobHow to Use Relationships and Referrals to Get a Job
How to Use Relationships and Referrals to Get a Job
 
Rams 2007 paper pdf
Rams 2007 paper pdfRams 2007 paper pdf
Rams 2007 paper pdf
 
Charla kde españa transparencias
Charla kde españa transparenciasCharla kde españa transparencias
Charla kde españa transparencias
 
Sistema de puesta a tierra
Sistema de puesta a tierraSistema de puesta a tierra
Sistema de puesta a tierra
 
Borandá! Programa de Parceria Empresas
Borandá!  Programa de Parceria Empresas Borandá!  Programa de Parceria Empresas
Borandá! Programa de Parceria Empresas
 
Ace Interviewers_Business Plan_2016-02-27
Ace Interviewers_Business Plan_2016-02-27Ace Interviewers_Business Plan_2016-02-27
Ace Interviewers_Business Plan_2016-02-27
 
Paintball game in india
Paintball game in indiaPaintball game in india
Paintball game in india
 
Educational platform
Educational platform Educational platform
Educational platform
 
Area Sales Manager - FMCG
Area Sales Manager - FMCGArea Sales Manager - FMCG
Area Sales Manager - FMCG
 
Trabajo de miguel
Trabajo de miguelTrabajo de miguel
Trabajo de miguel
 

Similar to Nagamalleswara rao cv

Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Upendra Kumar Yadav
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
Naveed Akhtar
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
tanweer alam
 
CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..
Keshari Mishra
 
manzoorali.project engg
manzoorali.project engg manzoorali.project engg
manzoorali.project engg
manzoor ali
 
Nagaganesh M_original
Nagaganesh M_originalNagaganesh M_original
Nagaganesh M_original
Nagaganesh M
 

Similar to Nagamalleswara rao cv (20)

Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
cv
cvcv
cv
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
bala.1
bala.1bala.1
bala.1
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
MUHAMMAD IQBAL
MUHAMMAD IQBALMUHAMMAD IQBAL
MUHAMMAD IQBAL
 
JAM_RESUME
JAM_RESUMEJAM_RESUME
JAM_RESUME
 
CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..
 
Mn cv (777)
Mn cv (777)Mn cv (777)
Mn cv (777)
 
Janardhan resume
Janardhan resumeJanardhan resume
Janardhan resume
 
shoaib CV
shoaib CVshoaib CV
shoaib CV
 
Afzal CV,
Afzal CV,Afzal CV,
Afzal CV,
 
My resume
My resumeMy resume
My resume
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
dharma cv . Ts
dharma cv . Tsdharma cv . Ts
dharma cv . Ts
 
Resume of Dileep K 2017
Resume of Dileep K 2017Resume of Dileep K 2017
Resume of Dileep K 2017
 
Satish_Reddy_resume
Satish_Reddy_resumeSatish_Reddy_resume
Satish_Reddy_resume
 
manzoorali.project engg
manzoorali.project engg manzoorali.project engg
manzoorali.project engg
 
Nagaganesh M_original
Nagaganesh M_originalNagaganesh M_original
Nagaganesh M_original
 

Nagamalleswara rao cv

  • 1. RESUME NAGAMALLESWARARAO BHATTU Email: nagamalli202@gmail.com Contact no: +91 7036802411 Career Objective: To joininan environmentwhere there isachance to show my skillsandchance toget the reorganizationtomyworkwhich will usefulforthe growthfororganizationandme too. Educational Qualification: B. tech in electrical and electronics engineering from SRI SATYA NARAYANA ENGINEERING COLLEGE, ONGOLE (A.P) with77.15% Diploma in electrical and electronics engineeringfrom SRI VENKATESWARA GOVT POLYTECHNIC, TIRUPATI (A.P) with75.88% Experience Summary:  Presently I am working as an Electrical operation and maintenance Engineer in 2MWP solar power plant at SOLON INDIA PVTLTD  I worked as an operation and maintenance engineer in 3 MW solar power plant at SOLAR INTEGRATION SYATEMS INDIA PVTLTD fromMarch 2014 to 25/09/2015  Previously I worked as a SITE ENGINEER in 400220 KV Substation at ECI ENGINEERING AND CONSTRUCTIONS LTD from FEB 2013 to FEB 2014 Job Rolesand Responsibilities: I. Organizationname : SOLON INDIA PVTLTD Designation : OperationandMaintenance Engineer Duration : NOVEMBER 2015 TO PRESENT II. Organizationname: SOLARINTEGRATION SYATEMSINDIA PVTLTD Designation : OperationandMaintenance Engineer Duration : march 2014 to 25/09/2015 Rolesand Responsibilities:  Preventive maintenance: which includes routine inspection and servicing of all equipments to preventbreakdownandreduce yieldenergylosses.  Proper monitoring of equipments which is used to find the potential problem at early stage, whichisusedto reduce the downtime.  Carrying out preventive, predictive and breakdown maintenance of HT & LT power distribution system, invertersand33 KV Transformer.
  • 2.  Managing, operation and maintenance of earth faults, over voltage faults, under voltage faults and clear the faults for the properoperationof the plant.  Checking the inverter and taken care to protect it from the extreme hot, humid and dusty conditionsto reduce the down time of the inverter.  I have clearideaon the Inverterfaults and its prevention.  I have knowledge oncommunication problemand its preventive maintenance.  Maintenance of 2.25 MVA and 3.5 MVA Transformers and 33KV /415 V and 400/33 KV Substations.  AchievingGenerationtargetsas per PR agreements.  Monitoringof INVERTERs and SMBs through online data system.  Preparationof DGR (DailyGenerationReport),andannual generationreports.  Checkingof stringperformances  Check the warranty terms from the suppliers they should be very useful at damage to that equipment  Maintainingof spare parts inventorymanagement  Installation and commissioning of PV SOLAR module.  Installation and commissioning of SMB or SCBs and Inverters.  Responsible for completion of project punch points. Highlights:  Successfullyexecuted 3MW gridtie SPV systemforprojectexecution  Got complete knowledgeonmaintenanceof 3 MW and 2 MW solarplants. III. Organizationname: ECIENGINEERINGANDCONSTRUCTION LTD Designation : SITE ENGINEER Duration : FEB 2013 to FEB 2014 Job Rolesand Responsibilities:  Able to understand the design of the plant layout and checking the layout alignment with helpof plant layout diagram  Checking of the civil constructions of all power plant installations and take the responsible actions  Proper planning and allotment of man power, material and equipment for the particular work by consideringthe construction criteria and integrityof the total project  Monitoringthe installationson LT & HT side and transformer  Experience in installation,commissioningandtesting of transformerupto 20 MVA range  Experience in the erection and testing of breakers, lightning arresters, current transformers, potential transformers and bus polar isolators.  Experience inmeasuringandlayingof conductor in400/220 KV substation
  • 3. Software Skills: MS office,MSexcel,MSpowerpoint,and MATLAB (SIMULATION) Technical Skills:  Strong technical back ground and good communication skills which are used to communicate well withmyteam.  Good knowledge in electrical power systems and real time knowledge in overall 400/220 KV substation layout Personal Skills:  Self motivatingandself controllable.  Readyto relocate anywhere if Iselected.  Active participantasindividual ingroupalso.  Good teamleaderandteamplayertoo.  If it is neededIwouldreadytotravel. Personal information: Name : BHATTU NAGAMALLESWARA RAO Fathername : BHATTU SANJEEVA KONDA Mother name : BHATTU RUKMINI Gender : MALE Date of birth : 06 th April 1991 Nationality : INDIAN Marital status : Unmarried Languagesknown : ENGLISH, TELUGU, HINDI Addressforcorresponding : Chandraju palem(Post),Bellamkonda(Mandal),Guntur(District) pin:522411 Current CTC : 2.0 lac/Annum ExpectedCTC : 2.5 - 3.0 lac/ annum Notice period : 15 days Declaration: Here by I informedthatall the informationgivenabove istrue andcorrectaccording to the bestof knowledge PLACE:Hyderabad DATE: BHATTU NAGAMALLESWARA RAO