Alliance of CSOs working on Extractives, Anti-Corruption, and Good Governance
Statement on the Relocation of the Ameri Plant
Date: 11th August 2022
The Alliance of CSOs working on Extractives, Anti-Corruption, and Good Governance has followed
developments in the power sector, particularly the proposed relocation of the Ameri Power Plant
from Takoradi to Kumasi. Last week, ACEP issued a statement on the relocation of the Ameri
plant, highlighting governance and proprietary concerns within the broader context of the energy
sector.
Instead of addressing the issues raised in ACEP's statement, the Minister of Energy has been on
a media campaign to deflect attention from the core concerns raised. The Minister threw two
significant unsubstantiated comments that:
1. ACEP is against the relocation of the plant only because it is going to Kumasi.
2. ACEP has instigated the chiefs and people in the Western Region to demonstrate against
the relocation of the plant from Takoradi to Kumasi because the Minister is from Kumasi.
ACEP issued a rejoinder to help steer conversations to focus on the core issues. The Alliance
supports constructive public engagements and evidenced based discussions on the issues raised
rather than diverting public attention from the main concerns raised. The Minister's choice of
language on multiple radio and television platforms is unacceptable. The Alliance is therefore
demanding that the Minister of Energy engages on the issues raised and provide opportunity for
further discussions on the relocation of the Ameri plant.
Ladies and gentlemen, the governance issues around the proposed relocation of the Ameri plant
are still pertinent and remain unaddressed. These include:
1. The decision to sole source the EPC contract
The Ministry of Energy's decision to sole source the EPC contract on the relocation of the Ameri
plant was not based on any of the exceptional justifications provided by the PPA Act. The
communications from the Ministry of Energy to parliament on two occasions (15th June 2022 and
1st July 2022) indicate that the justification for sole sourcing the EPC contract to Mytilineos SA
was that the company had managed the plant on behalf of Ameri for six years and were the right
people to be engaged. However, this does not necessarily mean that Ghana has to contract
Mytilineos or that they are the only company that is able to do the relocation of the plant. We
believe that a competitive tendering approach would yield optimum results and cost.
2. Ameri was relieved of its responsibility to the government of Ghana before the expiration
of the contract
The Build, Own, Operate, and Transfer (BOOT) agreement between AMERI Energy and the
Government of Ghana (GoG) required Ameri to maintain the plant per the Original Equipment
Manufacturer (OEM) standards at their own cost before handing it over to Ghana, subject to an
2
independent assessment three months to the expiration of the contract. However, Ameri was
relieved of this responsibility before the independent assessment was conducted. This raises the
fundamental question of why Ameri was relieved of its responsibilities under the agreement and
who bears the liabilities for rectification works upon transfer of the plant to the government. It
appears that Ameri was relieved of their responsibility under the agreement as a prelude to the
sole source arrangement with Mytilineos because the Ministry has agreed with Mytilineos to
assume those responsibilities.
3. Cost of the relocation of the plant
The proposal from Mytilineos indicated that the contractor would be responsible for the
Engineering, Procurement, and Construction works, including the balance of plant associated
with the relocation, installation, and commissioning of the Ameri plant. The cost quoted for this
scope of work was $25.48 million. However, the Ministry's communications to both Parliament
and VRA indicate a contract cost of $35.6 million, raising questions about what accounts for the
increase in the proposed amount by 40 percent. The Ministry responds that VRA's employer's
requirement occasioned the additional cost of $10.12 million for a Water Supply and Continuous
Emissions Monitoring System, which expands the scope of the EPC contract. This response
assumes that these additional requirements are not part of the balance of plant indicated by
Mytilineos, which we find quite confusing. More importantly, water supply components and the
Continuous Emissions Monitoring System are not expensive components (would not exceed $1
million) of the balance of plant, which requires clarity from the Ministry on the total cost
breakdown of the EPC contract for relocating the plant.
4. The capacity of VRA to maintain and operate the plant
The Minister of Energy has consistently claimed that VRA does not have the capacity to maintain
and operate the plant because they have not been trained to operate the plant. The claims of
VRA's lack of capacity are used to justify the sole sourcing of the Operations and Maintenance
(O&M) at the cost of $1 million to Mytilineos. Such claim must be evidenced based as it forms
the basis of critical decision making with cost implications. This position flies against the
provisions in Section 8(h) of the BOOT Agreement:
(h) AMERI ENERGY shall from six (6) months prior to the end of the Term, provide onsite
practical training to such appropriately qualified and designated employees
In fact, the Ministry wrote to Ameri on 27th January 2021, prior to the handover of the plant, to
remind the company of this obligation, among others. It has come to our attention that VRA
Senior Staff Association also petitioned the Minister to allow VRA to operate and manage the
plant in the national interest on account of their established capacity and technical know-how
(knowledge, skill mix, experience, etc.) in hydro, thermal (heavy duty and aeroderivative) and
solar power generation. We understand that VRA currently manages much more complex
combined cycle thermal plants in both the Aboadze and Tema power generation enclave.
Specifically:
i. The Aboadze power complex where TAPCO (T1) and TICO (T2) runs is managed by
VRA.
3
ii. VRA also runs the Tema and Kpone Thermal Plants, including the Siemens
aeroderivative plant.
The Minister of Energy must provide evidence to support his claims on VRA’s capacity.
5. The decision to relocate the Ameri plant
The Ministry of Energy decided to relocate the Ameri plant to Kumasi to stabilize the power
supply to the middle belt of the power corridor. The Minister insists that the decision was based
on the technical advice from the power system planning agencies, including GRIDCo. However, it
is important to note that relocating the plant to achieve grid stability is only one of the options
available to the Minister, according to the same planning agencies. The other available options
include:
i. Retooling the transmission system that evacuates power from the Eastern and Western
power generation enclaves to the region.
ii. Investing in static VAr compensators at the Kumasi substation to provide the required
reactive power and voltage support, and
iii. Optimizing supply from Bui to the middle belt
We believe that these options remain cheaper and quicker fixes to the instability in the middle
belt. Exploring these options to save costs must be prioritized over unnecessary cost additions,
particularly within the context of the power sector's current debt and payment challenges.
Demands
1. We demand that the Minister of Energy should constructively engage on the core issues
raised rather than divert public attention from them. We understand that the overall aim
is to stabilize power in the middle belt and hence discussion should focus on how to
efficiently achieve this objective.
2. The Ministry of Energy should revisit the concerns on the need for adopting a competitive
bidding process to accommodates local contractors to achieve the most optimal contract
cost.
3. We maintain that the Minister should consider other options which we believe are far
optimal option than the attempts to relocate plants and its attendant unnecessary cost
additions. For instance, retooling National Interconnected Transmission Systems (NITS)
4. Cabinet and Parliament should assume critical responsibility for the efficient planning of
the sector as these decisions among others have contributed to the current economic
difficulties being faced today.
Conclusion
The challenges in the energy sector have contributed significantly to the current economic
challenges that Ghana faces. The inefficiencies and losses in the sector have cost the country over
GHS14 billion in 2020 and 2021, with an outstanding debt of about GHS17.6 billion. Without a
handle on debt accumulation and the fiscal challenges, the sector would continue to exacerbate
4
the country's economic challenges and stifle social investments to fight poverty and inequality.
Addressing the debt accumulation challenges requires the government to be efficient in its
decision-making and make changes to ensure system planning that employs sound policy,
financial, and legal expertise to holistically examine the energy sector's problems.
Participating Organizations and Individuals
1. ACT Africa
2. CEDA
3. ACEP
4. Oil Watch Ghana
5. TAMA Foundation
6. Ghana Anti Corruption Coalition
7. TWN Africa
8. NRGI
9. IMANI Ghana
10. ISODEC
11. Tax Justice Coalition
12. Revenue Mobilization Africa
13. OXFAM
14. Civil Society Platform on Oil and Gas

More Related Content

Similar to Alliance of CSOs Statement on Ameri.pdf

VIETNAM – POWER SECTOR REFORM COMPETITIVE AUCTION MECHANISM FOR NEW GENERATI...
VIETNAM – POWER SECTOR REFORM  COMPETITIVE AUCTION MECHANISM FOR NEW GENERATI...VIETNAM – POWER SECTOR REFORM  COMPETITIVE AUCTION MECHANISM FOR NEW GENERATI...
VIETNAM – POWER SECTOR REFORM COMPETITIVE AUCTION MECHANISM FOR NEW GENERATI...
Dr. Oliver Massmann
 
Omass - Decarbonization - PDP 8
Omass - Decarbonization - PDP 8 Omass - Decarbonization - PDP 8
Omass - Decarbonization - PDP 8
Dr. Oliver Massmann
 
Vietnam – Green Growth – 2015
Vietnam – Green Growth – 2015Vietnam – Green Growth – 2015
Vietnam – Green Growth – 2015
Dr. Oliver Massmann
 
Castle Terminal Co. (Pty) Ltd and Oupa Teke requesting a meeting with preside...
Castle Terminal Co. (Pty) Ltd and Oupa Teke requesting a meeting with preside...Castle Terminal Co. (Pty) Ltd and Oupa Teke requesting a meeting with preside...
Castle Terminal Co. (Pty) Ltd and Oupa Teke requesting a meeting with preside...
Oupa Teke
 
Renewable Energies in Argentina. The Outlook.
Renewable Energies in Argentina. The Outlook.Renewable Energies in Argentina. The Outlook.
Renewable Energies in Argentina. The Outlook.
Florencia Ortiz Freuler
 
VIETNAM - DIRECT POWER PURCHASE AGREEMENTS (DPPA) - Latest development - What...
VIETNAM - DIRECT POWER PURCHASE AGREEMENTS (DPPA) - Latest development - What...VIETNAM - DIRECT POWER PURCHASE AGREEMENTS (DPPA) - Latest development - What...
VIETNAM - DIRECT POWER PURCHASE AGREEMENTS (DPPA) - Latest development - What...
Dr. Oliver Massmann
 
Reaction to presentations on PH Energy Outlook
Reaction to presentations on PH Energy OutlookReaction to presentations on PH Energy Outlook
Reaction to presentations on PH Energy Outlook
Bienvenido "Nonoy" Oplas, Jr.
 
QRM Q-2 2019.pptx
QRM Q-2 2019.pptxQRM Q-2 2019.pptx
QRM Q-2 2019.pptx
ssuser1d6ff4
 
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
Dr. Oliver Massmann
 
Lag 305 siddiqsons generation lic 14-09-2015-13666-71
Lag 305 siddiqsons generation lic 14-09-2015-13666-71Lag 305 siddiqsons generation lic 14-09-2015-13666-71
Lag 305 siddiqsons generation lic 14-09-2015-13666-71
zubeditufail
 
Privatization of orissa
Privatization of orissaPrivatization of orissa
Privatization of orissa
thempa61
 
Regulatory requirements for the integration of wind projects into the grid
Regulatory requirements for the integration of wind projects into the gridRegulatory requirements for the integration of wind projects into the grid
Regulatory requirements for the integration of wind projects into the grid
RCREEE
 
WIND RESOURCES, INC. In July 2005, Mr. Charl.docx
 WIND RESOURCES, INC.    In July 2005, Mr. Charl.docx WIND RESOURCES, INC.    In July 2005, Mr. Charl.docx
WIND RESOURCES, INC. In July 2005, Mr. Charl.docx
mayank272369
 
Renewable Energy Act of 2008 - Seven Years After
Renewable Energy Act of 2008 - Seven Years AfterRenewable Energy Act of 2008 - Seven Years After
Renewable Energy Act of 2008 - Seven Years After
Fernando Penarroyo
 
Omass Law Asia 2009 Financing Renewable Energy 10 Nov
Omass Law Asia 2009 Financing Renewable Energy 10 NovOmass Law Asia 2009 Financing Renewable Energy 10 Nov
Omass Law Asia 2009 Financing Renewable Energy 10 Nov
Dr. Oliver Massmann
 
Economics of electric service
Economics of electric service Economics of electric service
Economics of electric service
Maria Romina Angustia
 
Energy crisis in Pakistan and its management
Energy crisis in Pakistan and its managementEnergy crisis in Pakistan and its management
Energy crisis in Pakistan and its management
pakistanvisionaryforum
 
A present energy scenario
A present energy scenarioA present energy scenario
A present energy scenario
Ashish Kulshreshtha
 
Mesc
MescMesc
Agatha Biomass Power Project Brief
Agatha Biomass Power Project BriefAgatha Biomass Power Project Brief
Agatha Biomass Power Project Brief
Mamiki Matlawa
 

Similar to Alliance of CSOs Statement on Ameri.pdf (20)

VIETNAM – POWER SECTOR REFORM COMPETITIVE AUCTION MECHANISM FOR NEW GENERATI...
VIETNAM – POWER SECTOR REFORM  COMPETITIVE AUCTION MECHANISM FOR NEW GENERATI...VIETNAM – POWER SECTOR REFORM  COMPETITIVE AUCTION MECHANISM FOR NEW GENERATI...
VIETNAM – POWER SECTOR REFORM COMPETITIVE AUCTION MECHANISM FOR NEW GENERATI...
 
Omass - Decarbonization - PDP 8
Omass - Decarbonization - PDP 8 Omass - Decarbonization - PDP 8
Omass - Decarbonization - PDP 8
 
Vietnam – Green Growth – 2015
Vietnam – Green Growth – 2015Vietnam – Green Growth – 2015
Vietnam – Green Growth – 2015
 
Castle Terminal Co. (Pty) Ltd and Oupa Teke requesting a meeting with preside...
Castle Terminal Co. (Pty) Ltd and Oupa Teke requesting a meeting with preside...Castle Terminal Co. (Pty) Ltd and Oupa Teke requesting a meeting with preside...
Castle Terminal Co. (Pty) Ltd and Oupa Teke requesting a meeting with preside...
 
Renewable Energies in Argentina. The Outlook.
Renewable Energies in Argentina. The Outlook.Renewable Energies in Argentina. The Outlook.
Renewable Energies in Argentina. The Outlook.
 
VIETNAM - DIRECT POWER PURCHASE AGREEMENTS (DPPA) - Latest development - What...
VIETNAM - DIRECT POWER PURCHASE AGREEMENTS (DPPA) - Latest development - What...VIETNAM - DIRECT POWER PURCHASE AGREEMENTS (DPPA) - Latest development - What...
VIETNAM - DIRECT POWER PURCHASE AGREEMENTS (DPPA) - Latest development - What...
 
Reaction to presentations on PH Energy Outlook
Reaction to presentations on PH Energy OutlookReaction to presentations on PH Energy Outlook
Reaction to presentations on PH Energy Outlook
 
QRM Q-2 2019.pptx
QRM Q-2 2019.pptxQRM Q-2 2019.pptx
QRM Q-2 2019.pptx
 
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
 
Lag 305 siddiqsons generation lic 14-09-2015-13666-71
Lag 305 siddiqsons generation lic 14-09-2015-13666-71Lag 305 siddiqsons generation lic 14-09-2015-13666-71
Lag 305 siddiqsons generation lic 14-09-2015-13666-71
 
Privatization of orissa
Privatization of orissaPrivatization of orissa
Privatization of orissa
 
Regulatory requirements for the integration of wind projects into the grid
Regulatory requirements for the integration of wind projects into the gridRegulatory requirements for the integration of wind projects into the grid
Regulatory requirements for the integration of wind projects into the grid
 
WIND RESOURCES, INC. In July 2005, Mr. Charl.docx
 WIND RESOURCES, INC.    In July 2005, Mr. Charl.docx WIND RESOURCES, INC.    In July 2005, Mr. Charl.docx
WIND RESOURCES, INC. In July 2005, Mr. Charl.docx
 
Renewable Energy Act of 2008 - Seven Years After
Renewable Energy Act of 2008 - Seven Years AfterRenewable Energy Act of 2008 - Seven Years After
Renewable Energy Act of 2008 - Seven Years After
 
Omass Law Asia 2009 Financing Renewable Energy 10 Nov
Omass Law Asia 2009 Financing Renewable Energy 10 NovOmass Law Asia 2009 Financing Renewable Energy 10 Nov
Omass Law Asia 2009 Financing Renewable Energy 10 Nov
 
Economics of electric service
Economics of electric service Economics of electric service
Economics of electric service
 
Energy crisis in Pakistan and its management
Energy crisis in Pakistan and its managementEnergy crisis in Pakistan and its management
Energy crisis in Pakistan and its management
 
A present energy scenario
A present energy scenarioA present energy scenario
A present energy scenario
 
Mesc
MescMesc
Mesc
 
Agatha Biomass Power Project Brief
Agatha Biomass Power Project BriefAgatha Biomass Power Project Brief
Agatha Biomass Power Project Brief
 

More from Kweku Zurek

CAA Region II Day 1 Morning Result Accra event
CAA Region II Day 1 Morning Result Accra eventCAA Region II Day 1 Morning Result Accra event
CAA Region II Day 1 Morning Result Accra event
Kweku Zurek
 
Ghana High Commission on list of diplomats including US & China who owe £143m...
Ghana High Commission on list of diplomats including US & China who owe £143m...Ghana High Commission on list of diplomats including US & China who owe £143m...
Ghana High Commission on list of diplomats including US & China who owe £143m...
Kweku Zurek
 
HONOURABLE LAWRENCE BANDASOA TABASE funeral brochure
HONOURABLE LAWRENCE BANDASOA TABASE funeral brochureHONOURABLE LAWRENCE BANDASOA TABASE funeral brochure
HONOURABLE LAWRENCE BANDASOA TABASE funeral brochure
Kweku Zurek
 
HONOURABLE LAWRENCE BANDASOA TABASE funeral brochure
HONOURABLE LAWRENCE BANDASOA TABASE funeral brochureHONOURABLE LAWRENCE BANDASOA TABASE funeral brochure
HONOURABLE LAWRENCE BANDASOA TABASE funeral brochure
Kweku Zurek
 
LAWRENCE BANDASOA TABASE funeral brochure
LAWRENCE BANDASOA TABASE funeral brochureLAWRENCE BANDASOA TABASE funeral brochure
LAWRENCE BANDASOA TABASE funeral brochure
Kweku Zurek
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024
Kweku Zurek
 
See the 2,456 pharmacies on the National E-Pharmacy Platform
See the 2,456 pharmacies on the National E-Pharmacy PlatformSee the 2,456 pharmacies on the National E-Pharmacy Platform
See the 2,456 pharmacies on the National E-Pharmacy Platform
Kweku Zurek
 
All you need to know about your new MTN Momo transaction limits
All you need to know about your new MTN Momo transaction limitsAll you need to know about your new MTN Momo transaction limits
All you need to know about your new MTN Momo transaction limits
Kweku Zurek
 
See the list of companies who were paid judgement debts by govt between 2017-...
See the list of companies who were paid judgement debts by govt between 2017-...See the list of companies who were paid judgement debts by govt between 2017-...
See the list of companies who were paid judgement debts by govt between 2017-...
Kweku Zurek
 
2024 Message on the State of the Nation (1).pdf
2024 Message on the State of the Nation (1).pdf2024 Message on the State of the Nation (1).pdf
2024 Message on the State of the Nation (1).pdf
Kweku Zurek
 
NAA NORLEY BROCHURE.pdf
NAA NORLEY BROCHURE.pdfNAA NORLEY BROCHURE.pdf
NAA NORLEY BROCHURE.pdf
Kweku Zurek
 
Mr. Henry Lantei France
Mr. Henry Lantei FranceMr. Henry Lantei France
Mr. Henry Lantei France
Kweku Zurek
 
PAUL KWABENA OPOKU Brochure
PAUL KWABENA OPOKU BrochurePAUL KWABENA OPOKU Brochure
PAUL KWABENA OPOKU Brochure
Kweku Zurek
 
The Best FIFA Football Awards 2023 Result Breakdown_The Best FIFA Men's Playe...
The Best FIFA Football Awards 2023 Result Breakdown_The Best FIFA Men's Playe...The Best FIFA Football Awards 2023 Result Breakdown_The Best FIFA Men's Playe...
The Best FIFA Football Awards 2023 Result Breakdown_The Best FIFA Men's Playe...
Kweku Zurek
 
AFCON 2023: See the Ghana Black Stars 55-man provisional squad
AFCON 2023: See the Ghana Black Stars 55-man provisional squadAFCON 2023: See the Ghana Black Stars 55-man provisional squad
AFCON 2023: See the Ghana Black Stars 55-man provisional squad
Kweku Zurek
 
AFCON 2023 Provisional Squad lists
AFCON 2023 Provisional Squad listsAFCON 2023 Provisional Squad lists
AFCON 2023 Provisional Squad lists
Kweku Zurek
 
UG CUT OFF POINTS 2023.docx
UG CUT OFF POINTS 2023.docxUG CUT OFF POINTS 2023.docx
UG CUT OFF POINTS 2023.docx
Kweku Zurek
 
20th Edition GC100- Top 100 Companies.pdf
20th Edition GC100- Top 100 Companies.pdf20th Edition GC100- Top 100 Companies.pdf
20th Edition GC100- Top 100 Companies.pdf
Kweku Zurek
 
COP 28 GHANA DELEGATES.docx
COP 28 GHANA DELEGATES.docxCOP 28 GHANA DELEGATES.docx
COP 28 GHANA DELEGATES.docx
Kweku Zurek
 
Mobile Money Agents to limit cash withdrawals to GH₵1,000 per transaction
Mobile Money Agents to limit cash withdrawals to GH₵1,000 per transactionMobile Money Agents to limit cash withdrawals to GH₵1,000 per transaction
Mobile Money Agents to limit cash withdrawals to GH₵1,000 per transaction
Kweku Zurek
 

More from Kweku Zurek (20)

CAA Region II Day 1 Morning Result Accra event
CAA Region II Day 1 Morning Result Accra eventCAA Region II Day 1 Morning Result Accra event
CAA Region II Day 1 Morning Result Accra event
 
Ghana High Commission on list of diplomats including US & China who owe £143m...
Ghana High Commission on list of diplomats including US & China who owe £143m...Ghana High Commission on list of diplomats including US & China who owe £143m...
Ghana High Commission on list of diplomats including US & China who owe £143m...
 
HONOURABLE LAWRENCE BANDASOA TABASE funeral brochure
HONOURABLE LAWRENCE BANDASOA TABASE funeral brochureHONOURABLE LAWRENCE BANDASOA TABASE funeral brochure
HONOURABLE LAWRENCE BANDASOA TABASE funeral brochure
 
HONOURABLE LAWRENCE BANDASOA TABASE funeral brochure
HONOURABLE LAWRENCE BANDASOA TABASE funeral brochureHONOURABLE LAWRENCE BANDASOA TABASE funeral brochure
HONOURABLE LAWRENCE BANDASOA TABASE funeral brochure
 
LAWRENCE BANDASOA TABASE funeral brochure
LAWRENCE BANDASOA TABASE funeral brochureLAWRENCE BANDASOA TABASE funeral brochure
LAWRENCE BANDASOA TABASE funeral brochure
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024
 
See the 2,456 pharmacies on the National E-Pharmacy Platform
See the 2,456 pharmacies on the National E-Pharmacy PlatformSee the 2,456 pharmacies on the National E-Pharmacy Platform
See the 2,456 pharmacies on the National E-Pharmacy Platform
 
All you need to know about your new MTN Momo transaction limits
All you need to know about your new MTN Momo transaction limitsAll you need to know about your new MTN Momo transaction limits
All you need to know about your new MTN Momo transaction limits
 
See the list of companies who were paid judgement debts by govt between 2017-...
See the list of companies who were paid judgement debts by govt between 2017-...See the list of companies who were paid judgement debts by govt between 2017-...
See the list of companies who were paid judgement debts by govt between 2017-...
 
2024 Message on the State of the Nation (1).pdf
2024 Message on the State of the Nation (1).pdf2024 Message on the State of the Nation (1).pdf
2024 Message on the State of the Nation (1).pdf
 
NAA NORLEY BROCHURE.pdf
NAA NORLEY BROCHURE.pdfNAA NORLEY BROCHURE.pdf
NAA NORLEY BROCHURE.pdf
 
Mr. Henry Lantei France
Mr. Henry Lantei FranceMr. Henry Lantei France
Mr. Henry Lantei France
 
PAUL KWABENA OPOKU Brochure
PAUL KWABENA OPOKU BrochurePAUL KWABENA OPOKU Brochure
PAUL KWABENA OPOKU Brochure
 
The Best FIFA Football Awards 2023 Result Breakdown_The Best FIFA Men's Playe...
The Best FIFA Football Awards 2023 Result Breakdown_The Best FIFA Men's Playe...The Best FIFA Football Awards 2023 Result Breakdown_The Best FIFA Men's Playe...
The Best FIFA Football Awards 2023 Result Breakdown_The Best FIFA Men's Playe...
 
AFCON 2023: See the Ghana Black Stars 55-man provisional squad
AFCON 2023: See the Ghana Black Stars 55-man provisional squadAFCON 2023: See the Ghana Black Stars 55-man provisional squad
AFCON 2023: See the Ghana Black Stars 55-man provisional squad
 
AFCON 2023 Provisional Squad lists
AFCON 2023 Provisional Squad listsAFCON 2023 Provisional Squad lists
AFCON 2023 Provisional Squad lists
 
UG CUT OFF POINTS 2023.docx
UG CUT OFF POINTS 2023.docxUG CUT OFF POINTS 2023.docx
UG CUT OFF POINTS 2023.docx
 
20th Edition GC100- Top 100 Companies.pdf
20th Edition GC100- Top 100 Companies.pdf20th Edition GC100- Top 100 Companies.pdf
20th Edition GC100- Top 100 Companies.pdf
 
COP 28 GHANA DELEGATES.docx
COP 28 GHANA DELEGATES.docxCOP 28 GHANA DELEGATES.docx
COP 28 GHANA DELEGATES.docx
 
Mobile Money Agents to limit cash withdrawals to GH₵1,000 per transaction
Mobile Money Agents to limit cash withdrawals to GH₵1,000 per transactionMobile Money Agents to limit cash withdrawals to GH₵1,000 per transaction
Mobile Money Agents to limit cash withdrawals to GH₵1,000 per transaction
 

Recently uploaded

The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
Scribe
 
SPONSORED CONTENT - Palmetier Law - Unleashing Small Business Innovations: A ...
SPONSORED CONTENT - Palmetier Law - Unleashing Small Business Innovations: A ...SPONSORED CONTENT - Palmetier Law - Unleashing Small Business Innovations: A ...
SPONSORED CONTENT - Palmetier Law - Unleashing Small Business Innovations: A ...
JSchaus & Associates
 
G7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdfG7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdf
Energy for One World
 
Draft CP-Baggao on Landslide final copyocx
Draft CP-Baggao on Landslide final copyocxDraft CP-Baggao on Landslide final copyocx
Draft CP-Baggao on Landslide final copyocx
DivineLapada
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
Energy for One World
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
teeaszt
 
History Of Balochistan amazing .pptx / HOB
History Of Balochistan amazing .pptx      / HOBHistory Of Balochistan amazing .pptx      / HOB
History Of Balochistan amazing .pptx / HOB
uzma baloch
 
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
afsebu
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
odmqk
 
EI Statistical Review of World Energy 2024
EI Statistical Review of World Energy 2024EI Statistical Review of World Energy 2024
EI Statistical Review of World Energy 2024
Energy for One World
 
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdfLecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
tshree896
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
dj1cx4ex
 
GUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdf
GUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdfGUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdf
GUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdf
ProexportColombia1
 
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRISTTRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
Cheong Man Keong
 
Health Insurance Coverage for the U.S. Population, 2024 to 2034
Health Insurance Coverage for the U.S. Population, 2024 to 2034Health Insurance Coverage for the U.S. Population, 2024 to 2034
Health Insurance Coverage for the U.S. Population, 2024 to 2034
Congressional Budget Office
 
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
vfefek
 
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdfGUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
ProexportColombia1
 
UN SDSN Sustainable Development Report 2024
UN SDSN Sustainable Development Report 2024UN SDSN Sustainable Development Report 2024
UN SDSN Sustainable Development Report 2024
Energy for One World
 
CBO's Immigration Projections - Presentation
CBO's Immigration Projections - PresentationCBO's Immigration Projections - Presentation
CBO's Immigration Projections - Presentation
Congressional Budget Office
 
How To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity JourneyHow To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity Journey
Aggregage
 

Recently uploaded (20)

The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
 
SPONSORED CONTENT - Palmetier Law - Unleashing Small Business Innovations: A ...
SPONSORED CONTENT - Palmetier Law - Unleashing Small Business Innovations: A ...SPONSORED CONTENT - Palmetier Law - Unleashing Small Business Innovations: A ...
SPONSORED CONTENT - Palmetier Law - Unleashing Small Business Innovations: A ...
 
G7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdfG7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdf
 
Draft CP-Baggao on Landslide final copyocx
Draft CP-Baggao on Landslide final copyocxDraft CP-Baggao on Landslide final copyocx
Draft CP-Baggao on Landslide final copyocx
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
 
History Of Balochistan amazing .pptx / HOB
History Of Balochistan amazing .pptx      / HOBHistory Of Balochistan amazing .pptx      / HOB
History Of Balochistan amazing .pptx / HOB
 
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
 
EI Statistical Review of World Energy 2024
EI Statistical Review of World Energy 2024EI Statistical Review of World Energy 2024
EI Statistical Review of World Energy 2024
 
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdfLecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
 
GUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdf
GUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdfGUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdf
GUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdf
 
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRISTTRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
 
Health Insurance Coverage for the U.S. Population, 2024 to 2034
Health Insurance Coverage for the U.S. Population, 2024 to 2034Health Insurance Coverage for the U.S. Population, 2024 to 2034
Health Insurance Coverage for the U.S. Population, 2024 to 2034
 
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
 
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdfGUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
 
UN SDSN Sustainable Development Report 2024
UN SDSN Sustainable Development Report 2024UN SDSN Sustainable Development Report 2024
UN SDSN Sustainable Development Report 2024
 
CBO's Immigration Projections - Presentation
CBO's Immigration Projections - PresentationCBO's Immigration Projections - Presentation
CBO's Immigration Projections - Presentation
 
How To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity JourneyHow To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity Journey
 

Alliance of CSOs Statement on Ameri.pdf

  • 1. 1 Alliance of CSOs working on Extractives, Anti-Corruption, and Good Governance Statement on the Relocation of the Ameri Plant Date: 11th August 2022 The Alliance of CSOs working on Extractives, Anti-Corruption, and Good Governance has followed developments in the power sector, particularly the proposed relocation of the Ameri Power Plant from Takoradi to Kumasi. Last week, ACEP issued a statement on the relocation of the Ameri plant, highlighting governance and proprietary concerns within the broader context of the energy sector. Instead of addressing the issues raised in ACEP's statement, the Minister of Energy has been on a media campaign to deflect attention from the core concerns raised. The Minister threw two significant unsubstantiated comments that: 1. ACEP is against the relocation of the plant only because it is going to Kumasi. 2. ACEP has instigated the chiefs and people in the Western Region to demonstrate against the relocation of the plant from Takoradi to Kumasi because the Minister is from Kumasi. ACEP issued a rejoinder to help steer conversations to focus on the core issues. The Alliance supports constructive public engagements and evidenced based discussions on the issues raised rather than diverting public attention from the main concerns raised. The Minister's choice of language on multiple radio and television platforms is unacceptable. The Alliance is therefore demanding that the Minister of Energy engages on the issues raised and provide opportunity for further discussions on the relocation of the Ameri plant. Ladies and gentlemen, the governance issues around the proposed relocation of the Ameri plant are still pertinent and remain unaddressed. These include: 1. The decision to sole source the EPC contract The Ministry of Energy's decision to sole source the EPC contract on the relocation of the Ameri plant was not based on any of the exceptional justifications provided by the PPA Act. The communications from the Ministry of Energy to parliament on two occasions (15th June 2022 and 1st July 2022) indicate that the justification for sole sourcing the EPC contract to Mytilineos SA was that the company had managed the plant on behalf of Ameri for six years and were the right people to be engaged. However, this does not necessarily mean that Ghana has to contract Mytilineos or that they are the only company that is able to do the relocation of the plant. We believe that a competitive tendering approach would yield optimum results and cost. 2. Ameri was relieved of its responsibility to the government of Ghana before the expiration of the contract The Build, Own, Operate, and Transfer (BOOT) agreement between AMERI Energy and the Government of Ghana (GoG) required Ameri to maintain the plant per the Original Equipment Manufacturer (OEM) standards at their own cost before handing it over to Ghana, subject to an
  • 2. 2 independent assessment three months to the expiration of the contract. However, Ameri was relieved of this responsibility before the independent assessment was conducted. This raises the fundamental question of why Ameri was relieved of its responsibilities under the agreement and who bears the liabilities for rectification works upon transfer of the plant to the government. It appears that Ameri was relieved of their responsibility under the agreement as a prelude to the sole source arrangement with Mytilineos because the Ministry has agreed with Mytilineos to assume those responsibilities. 3. Cost of the relocation of the plant The proposal from Mytilineos indicated that the contractor would be responsible for the Engineering, Procurement, and Construction works, including the balance of plant associated with the relocation, installation, and commissioning of the Ameri plant. The cost quoted for this scope of work was $25.48 million. However, the Ministry's communications to both Parliament and VRA indicate a contract cost of $35.6 million, raising questions about what accounts for the increase in the proposed amount by 40 percent. The Ministry responds that VRA's employer's requirement occasioned the additional cost of $10.12 million for a Water Supply and Continuous Emissions Monitoring System, which expands the scope of the EPC contract. This response assumes that these additional requirements are not part of the balance of plant indicated by Mytilineos, which we find quite confusing. More importantly, water supply components and the Continuous Emissions Monitoring System are not expensive components (would not exceed $1 million) of the balance of plant, which requires clarity from the Ministry on the total cost breakdown of the EPC contract for relocating the plant. 4. The capacity of VRA to maintain and operate the plant The Minister of Energy has consistently claimed that VRA does not have the capacity to maintain and operate the plant because they have not been trained to operate the plant. The claims of VRA's lack of capacity are used to justify the sole sourcing of the Operations and Maintenance (O&M) at the cost of $1 million to Mytilineos. Such claim must be evidenced based as it forms the basis of critical decision making with cost implications. This position flies against the provisions in Section 8(h) of the BOOT Agreement: (h) AMERI ENERGY shall from six (6) months prior to the end of the Term, provide onsite practical training to such appropriately qualified and designated employees In fact, the Ministry wrote to Ameri on 27th January 2021, prior to the handover of the plant, to remind the company of this obligation, among others. It has come to our attention that VRA Senior Staff Association also petitioned the Minister to allow VRA to operate and manage the plant in the national interest on account of their established capacity and technical know-how (knowledge, skill mix, experience, etc.) in hydro, thermal (heavy duty and aeroderivative) and solar power generation. We understand that VRA currently manages much more complex combined cycle thermal plants in both the Aboadze and Tema power generation enclave. Specifically: i. The Aboadze power complex where TAPCO (T1) and TICO (T2) runs is managed by VRA.
  • 3. 3 ii. VRA also runs the Tema and Kpone Thermal Plants, including the Siemens aeroderivative plant. The Minister of Energy must provide evidence to support his claims on VRA’s capacity. 5. The decision to relocate the Ameri plant The Ministry of Energy decided to relocate the Ameri plant to Kumasi to stabilize the power supply to the middle belt of the power corridor. The Minister insists that the decision was based on the technical advice from the power system planning agencies, including GRIDCo. However, it is important to note that relocating the plant to achieve grid stability is only one of the options available to the Minister, according to the same planning agencies. The other available options include: i. Retooling the transmission system that evacuates power from the Eastern and Western power generation enclaves to the region. ii. Investing in static VAr compensators at the Kumasi substation to provide the required reactive power and voltage support, and iii. Optimizing supply from Bui to the middle belt We believe that these options remain cheaper and quicker fixes to the instability in the middle belt. Exploring these options to save costs must be prioritized over unnecessary cost additions, particularly within the context of the power sector's current debt and payment challenges. Demands 1. We demand that the Minister of Energy should constructively engage on the core issues raised rather than divert public attention from them. We understand that the overall aim is to stabilize power in the middle belt and hence discussion should focus on how to efficiently achieve this objective. 2. The Ministry of Energy should revisit the concerns on the need for adopting a competitive bidding process to accommodates local contractors to achieve the most optimal contract cost. 3. We maintain that the Minister should consider other options which we believe are far optimal option than the attempts to relocate plants and its attendant unnecessary cost additions. For instance, retooling National Interconnected Transmission Systems (NITS) 4. Cabinet and Parliament should assume critical responsibility for the efficient planning of the sector as these decisions among others have contributed to the current economic difficulties being faced today. Conclusion The challenges in the energy sector have contributed significantly to the current economic challenges that Ghana faces. The inefficiencies and losses in the sector have cost the country over GHS14 billion in 2020 and 2021, with an outstanding debt of about GHS17.6 billion. Without a handle on debt accumulation and the fiscal challenges, the sector would continue to exacerbate
  • 4. 4 the country's economic challenges and stifle social investments to fight poverty and inequality. Addressing the debt accumulation challenges requires the government to be efficient in its decision-making and make changes to ensure system planning that employs sound policy, financial, and legal expertise to holistically examine the energy sector's problems. Participating Organizations and Individuals 1. ACT Africa 2. CEDA 3. ACEP 4. Oil Watch Ghana 5. TAMA Foundation 6. Ghana Anti Corruption Coalition 7. TWN Africa 8. NRGI 9. IMANI Ghana 10. ISODEC 11. Tax Justice Coalition 12. Revenue Mobilization Africa 13. OXFAM 14. Civil Society Platform on Oil and Gas