Lausanne recently got its new Olympic house names after the 3XN’s Olympic house and the city had a celebration time for this amazing construction. Beauty!!To Know More Visit: https://bit.ly/2KJ6cfD
young call girls in Lajpat Nagar,🔝 9953056974 🔝 escort Service
All you need to know about the all new olympic house in lausanne
1. All You Need To Know About The All New Olympic
House In Lausanne
Lausanne recently got its new Olympic house names after the 3XN’s Olympic house and
the city had a celebration time for this amazing construction. Since a long time the
construction was going on and on the auspicious day of the international Olympic day
celebration, the inauguration of this beautiful Olympic house took place which done by the
international Olympic committee.
2. This headquarter is said to be modern and has better facilities as compared to
the old one and this construction exactly took place in Lausanne which comes under
Switzerland. The construction of this Olympic headquarter was done by the 3XN
architectural firm and that is the reason that this new Olympic house is known by the
name of 3XN.
The idea or you can say the aim behind the construction of this Olympic
house was to bring the international Olympic committee staffs together and also they
wanted to bring the 500 Olympic employees under a single rooftop as the previous staff had
to work in different places in the Lausanne city which seems to be quite tough so this
construction seems to be beneficial for the staffs as well which is a great thing for sure.
3.
4. Apart from this aim of bringing every single person associated with Olympic
of Switzerland together, they also thought of future use of the area and it can be said that
the new Olympic building would provide with better opportunities for the employees as
well as for the country. Olympic is no doubt one of the biggest game tournament worldwide
so it has to be grand and when it comes to the Olympic headquarter, it has to be grand as
well.
5. It was the year 2014 when the International Olympic Committee decided to
bring up the development for Olympics so the decision of making the new Olympic house
was taken. 3XN’s selection was not easy at all rather they were selected by a grand
architectural competition and they had to win the competition for being a part of the
construction of the Olympic house.
6.
7. The 3XN team was not the alone team to lead the construction of the
Olympic house rather Swiss architecture firm from IttenBrechbuhl was also selected and
had an equal contribution in the construction of this new Olympic house of Lausanne and
it can be said that both the teams worked really well to come up with such amazing
construction. The international Olympic committee had some points to brief the
architectural teams and based on those briefs, this Olympic headquarter was formed.
8. The main objectives of this Olympic house were transparency, movement,
collaboration, sustainability as well as flexibility and all of these objectives has direct links
with the Olympic games rather these objectives on the long run would help in the
betterment of the Olympic games of the place. The Temporary Structures of this building
was awesome. The building construction was done in such a way that it could be perfect for
the Olympic games of the place. Now coming to the building itself, you would see that it
seems like a designer broad structure which has reflective mirror allover which beautified
the building. The surrounding of the building is not crowded rather you would be able to
see greenery as well as huge trees around the building which is a great thing for sure.
9.
10. It is a huge building which has got lots of halls and sections inside and the
interior of the building seems to be of a different level. The co-founder of the 3XN
architectural company stated that the construction of this building was not about good
presentation but it was more about understanding the purpose and serving the best so that
the Olympic work could not be hampered in any way. You would be amazed to know that
this building has already named three sustainable building certificates making it the most
sustainable building of the time. These were everything that you need to know about the
Olympic House in Lausanne and for more such amazing information you can stick to
Architecturesideas.
11. Contact Us :
Website : https://architecturesideas.com/
Email Id : architecturesideas@gmail.com
To Connect With Us Visit