SlideShare a Scribd company logo
1 of 15
July 2018
Assembly jigs
Periodical inspection
‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬
‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬
July 2018
Assembly jigs
Periodical inspection
‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬
•‫مقدمة‬
•‫جيك‬ ‫لكل‬ ‫الفنية‬ ‫المستندات‬ ‫تحضير‬
•‫التجميع‬ ‫جيك‬ ‫تحضير‬/‫الماستر‬/‫الشبلونات‬/‫االجهزة‬ ‫و‬ ‫العدد‬
•‫النظرية‬ ‫الفنية‬ ‫الدراسة‬
•‫الدورى‬ ‫للتفتيش‬ ‫العام‬ ‫العمليات‬ ‫مخطط‬‫التجميع‬ ‫لجيك‬
• Introduction
• Documents Prepare technical documents for each assembly jig
• Preparation of assembly jig / Master jig / template / tools and and Equipment
• Technical Theoretical study
• General flow chart of assembly jig periodical inspection
Assembly jigs
Periodical inspection
July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬
Introduction ‫مقدمة‬
Assembly jigs
Periodical inspection
July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬
Aircraft assembly tooling
Aircraft assembly tooling is employed for holding the aircraft parts in space during
assembly.
Tooling is divided into two different principal groups:
fixtures ( position and hold parts during assembly)
Jigs not only position CLAMP (NOSE) AND NORMALITY, Lateral and Rotational
Alignment ,Location pin receptacle, Hooks and hold parts during assembly but
are also used to guide cutting tools. As aircraft parts have been attached to the
fixture clamps, the assembly process is engaged. The assembly process is
basically carried out by drilling holes followed by fastening. The joining elements
used in the aircraft assemblies are rivets. In detail a typical airframe assembly
process can be structured according to:
1. Pre-assembly
2. Drilling
3. Temporary fastening
4. Deburring
5. Sealant application
6. Fastening
Assembly jigs
Periodical inspection
July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬
Periodic inspection of an assembly tool
Jigs receiving inspection
All jigs and tools used in manufacturing, shall be inspected
prior to use for completeness, freedom from damage and shall establish
procedures to register, assure safe storage and periodically recertify all jigs
and tools, including those manufactured by the supplier in support of work
carried out.
Assembly jigs
Periodical inspection
July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬
Periodic inspection of an assembly tool
Monitoring displacements and shape change of deformation bodies
The importance of deformation monitoring is an a give an expectation of the likely behavior of
the object being measured
The subsequence analysis approach may differ depending on whether the aim of
measurements is to
establish the change in the shape of a body which expected to deform ( for deformation
modeling )
to determine if the deformation has occurred in an object which assumed to be stable ( jig)
in an age forming tool for tools for the aircraft wing ( single point displacements and localize
shape changes with respect to stable base)
In the most tooling application the deformation measurement type is absolute , since there is
virtually always a stable set of master tooling points of known coordinate against which the
movements of the individual locator points is referred . Stability of the tool is generally
assumed , and of the critical importance is the localization of the single and multiple point
Assembly jigs
Periodical inspection
July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬
‫الفنية‬ ‫الدراسة‬‫النظرية‬
Technical Theoretical study
Assembly jigs
Periodical inspection
July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬
‫النظرية‬ ‫الفنية‬ ‫الدراسة‬
•‫لمجمع‬‫النتاجه‬ ‫الجيك‬ ‫يستخدم‬ ‫الذى‬ ‫الطائرة‬
•Aircraft subassembly which is produced by this jig
•‫النتاجه‬ ‫الجيك‬ ‫يستخدم‬ ‫الذى‬ ‫الطائرة‬ ‫مجمع‬ ‫وظيفة‬
•The function of this aircraft subassembly
•‫الرسومات‬(‫لمجمع‬‫النتاجه‬ ‫الجيك‬ ‫يستخدم‬ ‫الذى‬ ‫الطائرة‬)
•The drawings of the subassembly explain the reference lines
‫المرجعية‬ ‫الخطوط‬ ‫عليها‬ ‫المبين‬ ‫النظرية‬ ‫التصميمية‬ ‫الرسومات‬reference lines
Horizontal reference line‫افقى‬ ‫مستوى‬
Symmetric reference line‫التماثل‬ ‫مستوى‬
‫الرسومات‬‫الهيكلية‬construction drawing
‫الهامة‬ ‫النقاط‬main support points
•‫التجميع‬ ‫خطوات‬‫المرت‬ ‫االخرى‬ ‫المجمعات‬ ‫رسومات‬ ‫و‬ ‫السابق‬ ‫و‬ ‫االعلى‬ ‫التجميع‬ ‫رسم‬ ‫من‬ ‫السابقة‬ ‫و‬ ‫االعلى‬‫بطة‬
(….,…. .. flap – aileron)
the assembly points between these subassembly and others subassembly
/* assembly tolerance */
‫للجناح‬ ‫التجميع‬ ‫رسومات‬ ‫من‬(‫الجيك‬ ‫هذا‬ ‫منتج‬)‫يمك‬ ‫االعلى‬ ‫المجع‬ ‫رسم‬ ‫و‬ ‫االخرى‬ ‫الفرعية‬ ‫المجمعات‬ ‫رسومات‬ ‫و‬‫ن‬
‫و‬ ‫معا‬ ‫التجميع‬ ‫كيفية‬ ‫و‬ ‫الرفض‬ ‫و‬ ‫القبول‬ ‫سماحيات‬ ‫مدى‬ ‫تحدد‬ ‫الى‬ ‫الفنية‬ ‫المعلومات‬ ‫من‬ ‫كثير‬ ‫على‬ ‫الحصول‬‫االبعاد‬ ‫هى‬ ‫ما‬
‫الحاكمة‬
Assembly jigs
Periodical inspection
July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬
Prepare technical Documents for each jig
‫المستندات‬ ‫تحضير‬‫الفنية‬‫جيك‬ ‫لكل‬
Assembly jigs
Periodical inspection
July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬
‫التجميع‬ ‫جيك‬ ‫عن‬ ‫فنية‬ ‫بيانات‬technical informationassembly jig
‫الجيك‬ ‫رسومات‬assembly jig drawings and operation manual
‫الماسىتر‬ ‫عن‬ ‫فنية‬ ‫بيانات‬Master jig
Master jig drawings and operation manual
‫الماسىتر‬ ‫قائمة‬ ‫مدون‬ ‫للجيك‬ ‫الرئيسى‬ ‫المجمع‬ ‫رسومات‬ ‫من‬Master jig‫المطلوب‬‫الدوري‬ ‫للتفتيش‬
‫البنوز‬ ‫او‬ ‫المسامير‬ ‫الى‬ ‫اشارة‬ ‫يوجد‬ ‫ال‬ ‫لكن‬ ‫و‬ ‫االتصال‬ ‫نقط‬ ‫و‬ ‫عام‬ ‫رسم‬ ‫الجيك‬ ‫على‬ ‫الماستر‬ ‫تركيب‬ ‫كيفية‬pins
‫التفاصيل‬ ‫بكل‬ ‫جيد‬ ‫الماستر‬ ‫رسم‬ ‫قرائة‬ ‫يجب‬(‫هامة‬ ‫جميعها‬ ‫الموضحة‬ ‫االبعاد‬ ‫و‬ ‫الجانبية‬ ‫المالحظات‬)
‫الشبلونات‬ ‫عن‬ ‫فنية‬ ‫بيانات‬
Master template drawings
‫الشبلونات‬ ‫قائمة‬ ‫مدون‬ ‫للجيك‬ ‫الرئيسى‬ ‫المجمع‬ ‫رسومات‬ ‫من‬template‫المخطط‬ ‫الدورى‬ ‫التفتيش‬ ‫المطلوب‬/‫غير‬
‫المخطط‬
‫نهاية‬ ‫و‬ ‫بداية‬ ‫الجيك‬ ‫على‬ ‫الشبلونة‬ ‫تركيب‬ ‫كيفية‬
‫التفاصيل‬ ‫بكل‬ ‫جيد‬ ‫الشبلونات‬ ‫رسم‬ ‫قرائة‬ ‫يجب‬(‫هامة‬ ‫جميعها‬ ‫الموضحة‬ ‫االبعاد‬ ‫و‬ ‫الجانبية‬ ‫المالحظات‬)
Assembly jigs
Periodical inspection
July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬
‫التجميع‬ ‫جيك‬ ‫تحضير‬/‫الماستر‬
/‫الشبلونات‬ ‫الشبلونات‬/‫االجه‬ ‫و‬ ‫العدد‬‫زة‬
Preparation of assembly jig / Master jig
/ template / tools and Equipment
Assembly jigs
Periodical inspection
July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬
‫جيك‬ ‫تحضير‬‫التجميع‬assembly jig preparation
•‫الزيوت‬ ‫و‬ ‫الشحوم‬ ‫من‬ ‫الجيك‬ ‫تنظيف‬cleanings
•‫تفتيش‬‫التجميع‬ ‫جيك‬ ‫لفحص‬ ‫ظاهرى‬visual inspection
•‫الجيك‬ ‫من‬ ‫اجزاء‬ ‫فك‬(‫الجيك‬ ‫على‬ ‫الماستر‬ ‫تثبيت‬ ‫متطلبات‬ ‫دراسة‬ ‫بعد‬)
•disassembly some parts of the jig if needed
‫تحضير‬‫الماسىتر‬preparationMaster jig
‫الماستر‬ ‫تنظيف‬master‫الزيوت‬ ‫و‬ ‫الشحوم‬ ‫من‬cleanings
‫لفحص‬ ‫ظاهرى‬ ‫تفتيش‬visual inspection
Assembly jigs
Periodical inspection
July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬
‫القياس‬ ‫ادوات‬ ‫و‬ ‫االجهزة‬ ‫تحضير‬standard measurements tools
‫التيوديوليت‬theodolite
‫البكوليس‬vernier caliper
‫الميكرومتر‬micrometer
‫القدمة‬(‫حديد‬ ‫مسطرة‬30‫اخرى‬ ‫و‬ ‫سم‬10‫اخرى‬ ‫و‬ ‫سم‬100‫سم‬)steel ruler
High gauge
Standard pins ‫قياسية‬ ‫بنوز‬
‫الجناح‬ ‫و‬ ‫للجسم‬ ‫الرئيسية‬ ‫التجميع‬ ‫الجيكات‬ ‫فى‬ ‫خاصة‬ ‫مساطر‬‫فقط‬special rulers and tools
‫النقل‬ ‫و‬ ‫التحميل‬ ‫معدات‬ ‫تحضير‬handling equipments
‫المخزن‬ ‫من‬ ‫الماستر‬ ‫لنقل‬ ‫صغيرة‬ ‫سيارة‬car
‫النقل‬ ‫او‬ ‫السيارة‬ ‫الى‬ ‫المخزن‬ ‫من‬ ‫للماستر‬ ‫للتحميل‬ ‫كالرك‬‫بالكالرك‬forklift
‫الونش‬ ‫مع‬ ‫للمساعدة‬ ‫الكالرك‬ ‫استخدام‬ ‫يمكن‬ ‫و‬ ‫الجيك‬ ‫على‬ ‫الماستر‬ ‫لتعليق‬ ‫ونش‬crane
Handling technicians ‫عمالة‬‫تحميل‬
Assembly jigs
Periodical inspection
July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬
‫الدورى‬ ‫للتفتيش‬ ‫العام‬ ‫العمليات‬ ‫مخطط‬‫التجميع‬ ‫لجيك‬
General flow chart of assembly jig periodical inspection
Assembly jigs
Periodical inspection
July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬
Prepare tool
Measure tool
Is the jig
Features
satisfy the
requirements
In spec?
Return tool to
production
Rework
/repair
No
Yes

More Related Content

Similar to Aircraft assembly jigs Periodical inspection 3

Design and analysis of drill jig
Design and analysis of drill jigDesign and analysis of drill jig
Design and analysis of drill jigKARTIKEY VERMA
 
Study of jig design its types.
Study of jig design its types.Study of jig design its types.
Study of jig design its types.Umair Raza
 
IRJET - GVT, Updating and Correlation on Scale Aircraft Model
IRJET - GVT, Updating and Correlation on Scale Aircraft ModelIRJET - GVT, Updating and Correlation on Scale Aircraft Model
IRJET - GVT, Updating and Correlation on Scale Aircraft ModelIRJET Journal
 
IRJET- Modelling and Analysis of Two Wheeler Suspension System
IRJET- Modelling and Analysis of Two Wheeler Suspension SystemIRJET- Modelling and Analysis of Two Wheeler Suspension System
IRJET- Modelling and Analysis of Two Wheeler Suspension SystemIRJET Journal
 
IRJET- Design, Development and Manufacturing of Dedicated Fixture for the...
IRJET-  	  Design, Development and Manufacturing of Dedicated Fixture for the...IRJET-  	  Design, Development and Manufacturing of Dedicated Fixture for the...
IRJET- Design, Development and Manufacturing of Dedicated Fixture for the...IRJET Journal
 
Computer aided fixture design for machining of key ways
Computer aided fixture design for machining of key waysComputer aided fixture design for machining of key ways
Computer aided fixture design for machining of key waysLaukik Raut
 
IRJET- Design and Thermal Analysis of Fixture Assembly and Base Plate for...
IRJET-  	  Design and Thermal Analysis of Fixture Assembly and Base Plate for...IRJET-  	  Design and Thermal Analysis of Fixture Assembly and Base Plate for...
IRJET- Design and Thermal Analysis of Fixture Assembly and Base Plate for...IRJET Journal
 
Defect Evaluation in Rolling Element Bearings Using Frequency Domain Analysis
Defect Evaluation in Rolling Element Bearings Using Frequency Domain AnalysisDefect Evaluation in Rolling Element Bearings Using Frequency Domain Analysis
Defect Evaluation in Rolling Element Bearings Using Frequency Domain AnalysisIRJET Journal
 
IRJET- Review on Computer Aided Fixtre Design
IRJET- Review on Computer Aided Fixtre DesignIRJET- Review on Computer Aided Fixtre Design
IRJET- Review on Computer Aided Fixtre DesignIRJET Journal
 
Assembly drawings.pdf
Assembly drawings.pdfAssembly drawings.pdf
Assembly drawings.pdfEshantiwari6
 
IRJET- Modelling & Analysis of Drill Bit with Different Materials
IRJET-  	  Modelling & Analysis of Drill Bit with Different MaterialsIRJET-  	  Modelling & Analysis of Drill Bit with Different Materials
IRJET- Modelling & Analysis of Drill Bit with Different MaterialsIRJET Journal
 
IRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET Journal
 
Departments of mechanical engineering
Departments of mechanical engineeringDepartments of mechanical engineering
Departments of mechanical engineeringALEMNEW DESALEGN
 
ZYBODY Semi Mass Production & Prototype Introduction
ZYBODY Semi Mass Production & Prototype IntroductionZYBODY Semi Mass Production & Prototype Introduction
ZYBODY Semi Mass Production & Prototype IntroductionStitch Overseas
 
Design of an accuracy control system in ship building industry
Design of an accuracy control system in ship building  industryDesign of an accuracy control system in ship building  industry
Design of an accuracy control system in ship building industryGopalakrishnan P
 

Similar to Aircraft assembly jigs Periodical inspection 3 (20)

Design and analysis of drill jig
Design and analysis of drill jigDesign and analysis of drill jig
Design and analysis of drill jig
 
Study of jig design its types.
Study of jig design its types.Study of jig design its types.
Study of jig design its types.
 
Jigs and Fixture
Jigs and FixtureJigs and Fixture
Jigs and Fixture
 
IRJET - GVT, Updating and Correlation on Scale Aircraft Model
IRJET - GVT, Updating and Correlation on Scale Aircraft ModelIRJET - GVT, Updating and Correlation on Scale Aircraft Model
IRJET - GVT, Updating and Correlation on Scale Aircraft Model
 
IRJET- Modelling and Analysis of Two Wheeler Suspension System
IRJET- Modelling and Analysis of Two Wheeler Suspension SystemIRJET- Modelling and Analysis of Two Wheeler Suspension System
IRJET- Modelling and Analysis of Two Wheeler Suspension System
 
IRJET- Design, Development and Manufacturing of Dedicated Fixture for the...
IRJET-  	  Design, Development and Manufacturing of Dedicated Fixture for the...IRJET-  	  Design, Development and Manufacturing of Dedicated Fixture for the...
IRJET- Design, Development and Manufacturing of Dedicated Fixture for the...
 
Jigs & Fixtures
Jigs & FixturesJigs & Fixtures
Jigs & Fixtures
 
Computer aided fixture design for machining of key ways
Computer aided fixture design for machining of key waysComputer aided fixture design for machining of key ways
Computer aided fixture design for machining of key ways
 
Presentation of Engineering Services
Presentation of Engineering ServicesPresentation of Engineering Services
Presentation of Engineering Services
 
IRJET- Design and Thermal Analysis of Fixture Assembly and Base Plate for...
IRJET-  	  Design and Thermal Analysis of Fixture Assembly and Base Plate for...IRJET-  	  Design and Thermal Analysis of Fixture Assembly and Base Plate for...
IRJET- Design and Thermal Analysis of Fixture Assembly and Base Plate for...
 
Defect Evaluation in Rolling Element Bearings Using Frequency Domain Analysis
Defect Evaluation in Rolling Element Bearings Using Frequency Domain AnalysisDefect Evaluation in Rolling Element Bearings Using Frequency Domain Analysis
Defect Evaluation in Rolling Element Bearings Using Frequency Domain Analysis
 
IRJET- Review on Computer Aided Fixtre Design
IRJET- Review on Computer Aided Fixtre DesignIRJET- Review on Computer Aided Fixtre Design
IRJET- Review on Computer Aided Fixtre Design
 
Assembly drawings.pdf
Assembly drawings.pdfAssembly drawings.pdf
Assembly drawings.pdf
 
IRJET- Modelling & Analysis of Drill Bit with Different Materials
IRJET-  	  Modelling & Analysis of Drill Bit with Different MaterialsIRJET-  	  Modelling & Analysis of Drill Bit with Different Materials
IRJET- Modelling & Analysis of Drill Bit with Different Materials
 
Jig
JigJig
Jig
 
IRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel Equipment
 
Departments of mechanical engineering
Departments of mechanical engineeringDepartments of mechanical engineering
Departments of mechanical engineering
 
REPORT
REPORTREPORT
REPORT
 
ZYBODY Semi Mass Production & Prototype Introduction
ZYBODY Semi Mass Production & Prototype IntroductionZYBODY Semi Mass Production & Prototype Introduction
ZYBODY Semi Mass Production & Prototype Introduction
 
Design of an accuracy control system in ship building industry
Design of an accuracy control system in ship building  industryDesign of an accuracy control system in ship building  industry
Design of an accuracy control system in ship building industry
 

More from gamalgendy

فكرة عامة عن الطيران و المبادى الهندسية الاولية
فكرة عامة عن الطيران  و المبادى الهندسية  الاوليةفكرة عامة عن الطيران  و المبادى الهندسية  الاولية
فكرة عامة عن الطيران و المبادى الهندسية الاوليةgamalgendy
 
فكرة عامة عن الطيران و المبادى الهندسية الاولية
فكرة عامة عن الطيران  و المبادى الهندسية  الاوليةفكرة عامة عن الطيران  و المبادى الهندسية  الاولية
فكرة عامة عن الطيران و المبادى الهندسية الاوليةgamalgendy
 
فكرة عامة عن الطيران و المبادى الهندسية الاولية
فكرة عامة عن الطيران  و المبادى الهندسية  الاوليةفكرة عامة عن الطيران  و المبادى الهندسية  الاولية
فكرة عامة عن الطيران و المبادى الهندسية الاوليةgamalgendy
 
OPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part3.pdf
OPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part3.pdfOPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part3.pdf
OPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part3.pdfgamalgendy
 
OPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part2.pdf
OPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part2.pdfOPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part2.pdf
OPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part2.pdfgamalgendy
 
OPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part 1.pdf
OPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part 1.pdfOPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part 1.pdf
OPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part 1.pdfgamalgendy
 
aircraft manufacturing workshops hangars part4.pdf
aircraft manufacturing workshops hangars part4.pdfaircraft manufacturing workshops hangars part4.pdf
aircraft manufacturing workshops hangars part4.pdfgamalgendy
 
aircraft manufacturing workshops hangars part3.pdf
aircraft manufacturing workshops hangars part3.pdfaircraft manufacturing workshops hangars part3.pdf
aircraft manufacturing workshops hangars part3.pdfgamalgendy
 
flight history الطيران حلم قديم قدم الزمن راود الانسان
flight history   الطيران حلم قديم قدم الزمن راود الانسانflight history   الطيران حلم قديم قدم الزمن راود الانسان
flight history الطيران حلم قديم قدم الزمن راود الانسانgamalgendy
 
aircraft manufacturing workshops hangars part2.pdf
aircraft manufacturing workshops hangars part2.pdfaircraft manufacturing workshops hangars part2.pdf
aircraft manufacturing workshops hangars part2.pdfgamalgendy
 
aircraft workshops hangars part1.pdf
aircraft workshops hangars part1.pdfaircraft workshops hangars part1.pdf
aircraft workshops hangars part1.pdfgamalgendy
 
شيخوخة الطائرات.pdf
شيخوخة الطائرات.pdfشيخوخة الطائرات.pdf
شيخوخة الطائرات.pdfgamalgendy
 
aircraft aging study by Adel.pdf
aircraft aging study by Adel.pdfaircraft aging study by Adel.pdf
aircraft aging study by Adel.pdfgamalgendy
 
دليل دراسة حوادث الطائرات.pdf
دليل دراسة حوادث الطائرات.pdfدليل دراسة حوادث الطائرات.pdf
دليل دراسة حوادث الطائرات.pdfgamalgendy
 
aircraft hydraulic symbol 2.pdf
aircraft   hydraulic symbol     2.pdfaircraft   hydraulic symbol     2.pdf
aircraft hydraulic symbol 2.pdfgamalgendy
 
اساسيات منظومات الهيدروليك للطائرات الجزء الاول .pdf
اساسيات منظومات  الهيدروليك للطائرات  الجزء الاول  .pdfاساسيات منظومات  الهيدروليك للطائرات  الجزء الاول  .pdf
اساسيات منظومات الهيدروليك للطائرات الجزء الاول .pdfgamalgendy
 
aircraft manufacture part5.pdf
aircraft manufacture  part5.pdfaircraft manufacture  part5.pdf
aircraft manufacture part5.pdfgamalgendy
 
aircraft manufacture part4 .pdf
aircraft manufacture  part4    .pdfaircraft manufacture  part4    .pdf
aircraft manufacture part4 .pdfgamalgendy
 
aircraft manufacture part3 .pdf
aircraft manufacture  part3 .pdfaircraft manufacture  part3 .pdf
aircraft manufacture part3 .pdfgamalgendy
 
aircraft manufacture part2 .pdf
aircraft manufacture  part2 .pdfaircraft manufacture  part2 .pdf
aircraft manufacture part2 .pdfgamalgendy
 

More from gamalgendy (20)

فكرة عامة عن الطيران و المبادى الهندسية الاولية
فكرة عامة عن الطيران  و المبادى الهندسية  الاوليةفكرة عامة عن الطيران  و المبادى الهندسية  الاولية
فكرة عامة عن الطيران و المبادى الهندسية الاولية
 
فكرة عامة عن الطيران و المبادى الهندسية الاولية
فكرة عامة عن الطيران  و المبادى الهندسية  الاوليةفكرة عامة عن الطيران  و المبادى الهندسية  الاولية
فكرة عامة عن الطيران و المبادى الهندسية الاولية
 
فكرة عامة عن الطيران و المبادى الهندسية الاولية
فكرة عامة عن الطيران  و المبادى الهندسية  الاوليةفكرة عامة عن الطيران  و المبادى الهندسية  الاولية
فكرة عامة عن الطيران و المبادى الهندسية الاولية
 
OPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part3.pdf
OPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part3.pdfOPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part3.pdf
OPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part3.pdf
 
OPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part2.pdf
OPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part2.pdfOPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part2.pdf
OPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part2.pdf
 
OPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part 1.pdf
OPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part 1.pdfOPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part 1.pdf
OPTICAL CHARACTERISTICS OF AIRCRAFT TRANSPARENCIES bible part 1.pdf
 
aircraft manufacturing workshops hangars part4.pdf
aircraft manufacturing workshops hangars part4.pdfaircraft manufacturing workshops hangars part4.pdf
aircraft manufacturing workshops hangars part4.pdf
 
aircraft manufacturing workshops hangars part3.pdf
aircraft manufacturing workshops hangars part3.pdfaircraft manufacturing workshops hangars part3.pdf
aircraft manufacturing workshops hangars part3.pdf
 
flight history الطيران حلم قديم قدم الزمن راود الانسان
flight history   الطيران حلم قديم قدم الزمن راود الانسانflight history   الطيران حلم قديم قدم الزمن راود الانسان
flight history الطيران حلم قديم قدم الزمن راود الانسان
 
aircraft manufacturing workshops hangars part2.pdf
aircraft manufacturing workshops hangars part2.pdfaircraft manufacturing workshops hangars part2.pdf
aircraft manufacturing workshops hangars part2.pdf
 
aircraft workshops hangars part1.pdf
aircraft workshops hangars part1.pdfaircraft workshops hangars part1.pdf
aircraft workshops hangars part1.pdf
 
شيخوخة الطائرات.pdf
شيخوخة الطائرات.pdfشيخوخة الطائرات.pdf
شيخوخة الطائرات.pdf
 
aircraft aging study by Adel.pdf
aircraft aging study by Adel.pdfaircraft aging study by Adel.pdf
aircraft aging study by Adel.pdf
 
دليل دراسة حوادث الطائرات.pdf
دليل دراسة حوادث الطائرات.pdfدليل دراسة حوادث الطائرات.pdf
دليل دراسة حوادث الطائرات.pdf
 
aircraft hydraulic symbol 2.pdf
aircraft   hydraulic symbol     2.pdfaircraft   hydraulic symbol     2.pdf
aircraft hydraulic symbol 2.pdf
 
اساسيات منظومات الهيدروليك للطائرات الجزء الاول .pdf
اساسيات منظومات  الهيدروليك للطائرات  الجزء الاول  .pdfاساسيات منظومات  الهيدروليك للطائرات  الجزء الاول  .pdf
اساسيات منظومات الهيدروليك للطائرات الجزء الاول .pdf
 
aircraft manufacture part5.pdf
aircraft manufacture  part5.pdfaircraft manufacture  part5.pdf
aircraft manufacture part5.pdf
 
aircraft manufacture part4 .pdf
aircraft manufacture  part4    .pdfaircraft manufacture  part4    .pdf
aircraft manufacture part4 .pdf
 
aircraft manufacture part3 .pdf
aircraft manufacture  part3 .pdfaircraft manufacture  part3 .pdf
aircraft manufacture part3 .pdf
 
aircraft manufacture part2 .pdf
aircraft manufacture  part2 .pdfaircraft manufacture  part2 .pdf
aircraft manufacture part2 .pdf
 

Recently uploaded

Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 

Recently uploaded (20)

Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 

Aircraft assembly jigs Periodical inspection 3

  • 1. July 2018 Assembly jigs Periodical inspection ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬ ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬
  • 2. July 2018 Assembly jigs Periodical inspection ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬ •‫مقدمة‬ •‫جيك‬ ‫لكل‬ ‫الفنية‬ ‫المستندات‬ ‫تحضير‬ •‫التجميع‬ ‫جيك‬ ‫تحضير‬/‫الماستر‬/‫الشبلونات‬/‫االجهزة‬ ‫و‬ ‫العدد‬ •‫النظرية‬ ‫الفنية‬ ‫الدراسة‬ •‫الدورى‬ ‫للتفتيش‬ ‫العام‬ ‫العمليات‬ ‫مخطط‬‫التجميع‬ ‫لجيك‬ • Introduction • Documents Prepare technical documents for each assembly jig • Preparation of assembly jig / Master jig / template / tools and and Equipment • Technical Theoretical study • General flow chart of assembly jig periodical inspection
  • 3. Assembly jigs Periodical inspection July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬ Introduction ‫مقدمة‬
  • 4. Assembly jigs Periodical inspection July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬ Aircraft assembly tooling Aircraft assembly tooling is employed for holding the aircraft parts in space during assembly. Tooling is divided into two different principal groups: fixtures ( position and hold parts during assembly) Jigs not only position CLAMP (NOSE) AND NORMALITY, Lateral and Rotational Alignment ,Location pin receptacle, Hooks and hold parts during assembly but are also used to guide cutting tools. As aircraft parts have been attached to the fixture clamps, the assembly process is engaged. The assembly process is basically carried out by drilling holes followed by fastening. The joining elements used in the aircraft assemblies are rivets. In detail a typical airframe assembly process can be structured according to: 1. Pre-assembly 2. Drilling 3. Temporary fastening 4. Deburring 5. Sealant application 6. Fastening
  • 5. Assembly jigs Periodical inspection July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬ Periodic inspection of an assembly tool Jigs receiving inspection All jigs and tools used in manufacturing, shall be inspected prior to use for completeness, freedom from damage and shall establish procedures to register, assure safe storage and periodically recertify all jigs and tools, including those manufactured by the supplier in support of work carried out.
  • 6. Assembly jigs Periodical inspection July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬ Periodic inspection of an assembly tool Monitoring displacements and shape change of deformation bodies The importance of deformation monitoring is an a give an expectation of the likely behavior of the object being measured The subsequence analysis approach may differ depending on whether the aim of measurements is to establish the change in the shape of a body which expected to deform ( for deformation modeling ) to determine if the deformation has occurred in an object which assumed to be stable ( jig) in an age forming tool for tools for the aircraft wing ( single point displacements and localize shape changes with respect to stable base) In the most tooling application the deformation measurement type is absolute , since there is virtually always a stable set of master tooling points of known coordinate against which the movements of the individual locator points is referred . Stability of the tool is generally assumed , and of the critical importance is the localization of the single and multiple point
  • 7. Assembly jigs Periodical inspection July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬ ‫الفنية‬ ‫الدراسة‬‫النظرية‬ Technical Theoretical study
  • 8. Assembly jigs Periodical inspection July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬ ‫النظرية‬ ‫الفنية‬ ‫الدراسة‬ •‫لمجمع‬‫النتاجه‬ ‫الجيك‬ ‫يستخدم‬ ‫الذى‬ ‫الطائرة‬ •Aircraft subassembly which is produced by this jig •‫النتاجه‬ ‫الجيك‬ ‫يستخدم‬ ‫الذى‬ ‫الطائرة‬ ‫مجمع‬ ‫وظيفة‬ •The function of this aircraft subassembly •‫الرسومات‬(‫لمجمع‬‫النتاجه‬ ‫الجيك‬ ‫يستخدم‬ ‫الذى‬ ‫الطائرة‬) •The drawings of the subassembly explain the reference lines ‫المرجعية‬ ‫الخطوط‬ ‫عليها‬ ‫المبين‬ ‫النظرية‬ ‫التصميمية‬ ‫الرسومات‬reference lines Horizontal reference line‫افقى‬ ‫مستوى‬ Symmetric reference line‫التماثل‬ ‫مستوى‬ ‫الرسومات‬‫الهيكلية‬construction drawing ‫الهامة‬ ‫النقاط‬main support points •‫التجميع‬ ‫خطوات‬‫المرت‬ ‫االخرى‬ ‫المجمعات‬ ‫رسومات‬ ‫و‬ ‫السابق‬ ‫و‬ ‫االعلى‬ ‫التجميع‬ ‫رسم‬ ‫من‬ ‫السابقة‬ ‫و‬ ‫االعلى‬‫بطة‬ (….,…. .. flap – aileron) the assembly points between these subassembly and others subassembly /* assembly tolerance */ ‫للجناح‬ ‫التجميع‬ ‫رسومات‬ ‫من‬(‫الجيك‬ ‫هذا‬ ‫منتج‬)‫يمك‬ ‫االعلى‬ ‫المجع‬ ‫رسم‬ ‫و‬ ‫االخرى‬ ‫الفرعية‬ ‫المجمعات‬ ‫رسومات‬ ‫و‬‫ن‬ ‫و‬ ‫معا‬ ‫التجميع‬ ‫كيفية‬ ‫و‬ ‫الرفض‬ ‫و‬ ‫القبول‬ ‫سماحيات‬ ‫مدى‬ ‫تحدد‬ ‫الى‬ ‫الفنية‬ ‫المعلومات‬ ‫من‬ ‫كثير‬ ‫على‬ ‫الحصول‬‫االبعاد‬ ‫هى‬ ‫ما‬ ‫الحاكمة‬
  • 9. Assembly jigs Periodical inspection July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬ Prepare technical Documents for each jig ‫المستندات‬ ‫تحضير‬‫الفنية‬‫جيك‬ ‫لكل‬
  • 10. Assembly jigs Periodical inspection July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬ ‫التجميع‬ ‫جيك‬ ‫عن‬ ‫فنية‬ ‫بيانات‬technical informationassembly jig ‫الجيك‬ ‫رسومات‬assembly jig drawings and operation manual ‫الماسىتر‬ ‫عن‬ ‫فنية‬ ‫بيانات‬Master jig Master jig drawings and operation manual ‫الماسىتر‬ ‫قائمة‬ ‫مدون‬ ‫للجيك‬ ‫الرئيسى‬ ‫المجمع‬ ‫رسومات‬ ‫من‬Master jig‫المطلوب‬‫الدوري‬ ‫للتفتيش‬ ‫البنوز‬ ‫او‬ ‫المسامير‬ ‫الى‬ ‫اشارة‬ ‫يوجد‬ ‫ال‬ ‫لكن‬ ‫و‬ ‫االتصال‬ ‫نقط‬ ‫و‬ ‫عام‬ ‫رسم‬ ‫الجيك‬ ‫على‬ ‫الماستر‬ ‫تركيب‬ ‫كيفية‬pins ‫التفاصيل‬ ‫بكل‬ ‫جيد‬ ‫الماستر‬ ‫رسم‬ ‫قرائة‬ ‫يجب‬(‫هامة‬ ‫جميعها‬ ‫الموضحة‬ ‫االبعاد‬ ‫و‬ ‫الجانبية‬ ‫المالحظات‬) ‫الشبلونات‬ ‫عن‬ ‫فنية‬ ‫بيانات‬ Master template drawings ‫الشبلونات‬ ‫قائمة‬ ‫مدون‬ ‫للجيك‬ ‫الرئيسى‬ ‫المجمع‬ ‫رسومات‬ ‫من‬template‫المخطط‬ ‫الدورى‬ ‫التفتيش‬ ‫المطلوب‬/‫غير‬ ‫المخطط‬ ‫نهاية‬ ‫و‬ ‫بداية‬ ‫الجيك‬ ‫على‬ ‫الشبلونة‬ ‫تركيب‬ ‫كيفية‬ ‫التفاصيل‬ ‫بكل‬ ‫جيد‬ ‫الشبلونات‬ ‫رسم‬ ‫قرائة‬ ‫يجب‬(‫هامة‬ ‫جميعها‬ ‫الموضحة‬ ‫االبعاد‬ ‫و‬ ‫الجانبية‬ ‫المالحظات‬)
  • 11. Assembly jigs Periodical inspection July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬ ‫التجميع‬ ‫جيك‬ ‫تحضير‬/‫الماستر‬ /‫الشبلونات‬ ‫الشبلونات‬/‫االجه‬ ‫و‬ ‫العدد‬‫زة‬ Preparation of assembly jig / Master jig / template / tools and Equipment
  • 12. Assembly jigs Periodical inspection July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬ ‫جيك‬ ‫تحضير‬‫التجميع‬assembly jig preparation •‫الزيوت‬ ‫و‬ ‫الشحوم‬ ‫من‬ ‫الجيك‬ ‫تنظيف‬cleanings •‫تفتيش‬‫التجميع‬ ‫جيك‬ ‫لفحص‬ ‫ظاهرى‬visual inspection •‫الجيك‬ ‫من‬ ‫اجزاء‬ ‫فك‬(‫الجيك‬ ‫على‬ ‫الماستر‬ ‫تثبيت‬ ‫متطلبات‬ ‫دراسة‬ ‫بعد‬) •disassembly some parts of the jig if needed ‫تحضير‬‫الماسىتر‬preparationMaster jig ‫الماستر‬ ‫تنظيف‬master‫الزيوت‬ ‫و‬ ‫الشحوم‬ ‫من‬cleanings ‫لفحص‬ ‫ظاهرى‬ ‫تفتيش‬visual inspection
  • 13. Assembly jigs Periodical inspection July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬ ‫القياس‬ ‫ادوات‬ ‫و‬ ‫االجهزة‬ ‫تحضير‬standard measurements tools ‫التيوديوليت‬theodolite ‫البكوليس‬vernier caliper ‫الميكرومتر‬micrometer ‫القدمة‬(‫حديد‬ ‫مسطرة‬30‫اخرى‬ ‫و‬ ‫سم‬10‫اخرى‬ ‫و‬ ‫سم‬100‫سم‬)steel ruler High gauge Standard pins ‫قياسية‬ ‫بنوز‬ ‫الجناح‬ ‫و‬ ‫للجسم‬ ‫الرئيسية‬ ‫التجميع‬ ‫الجيكات‬ ‫فى‬ ‫خاصة‬ ‫مساطر‬‫فقط‬special rulers and tools ‫النقل‬ ‫و‬ ‫التحميل‬ ‫معدات‬ ‫تحضير‬handling equipments ‫المخزن‬ ‫من‬ ‫الماستر‬ ‫لنقل‬ ‫صغيرة‬ ‫سيارة‬car ‫النقل‬ ‫او‬ ‫السيارة‬ ‫الى‬ ‫المخزن‬ ‫من‬ ‫للماستر‬ ‫للتحميل‬ ‫كالرك‬‫بالكالرك‬forklift ‫الونش‬ ‫مع‬ ‫للمساعدة‬ ‫الكالرك‬ ‫استخدام‬ ‫يمكن‬ ‫و‬ ‫الجيك‬ ‫على‬ ‫الماستر‬ ‫لتعليق‬ ‫ونش‬crane Handling technicians ‫عمالة‬‫تحميل‬
  • 14. Assembly jigs Periodical inspection July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬ ‫الدورى‬ ‫للتفتيش‬ ‫العام‬ ‫العمليات‬ ‫مخطط‬‫التجميع‬ ‫لجيك‬ General flow chart of assembly jig periodical inspection
  • 15. Assembly jigs Periodical inspection July 2018 ‫الدورى‬ ‫التفتيش‬‫لجيكات‬‫التجميع‬ Prepare tool Measure tool Is the jig Features satisfy the requirements In spec? Return tool to production Rework /repair No Yes