SlideShare a Scribd company logo
AHMED OMAR MOHAMED CONSTRUCTION MANAGER ENGINEER
Page 1 of 4
Over sixteen years of experience in design, detail engineering, (8 years with ECG) construction
supervision of architecture works for hotels, resorts, banks, museum, SPA, office building, and
airport terminal. Areas of expertise also include the preparation of Architectural shop
drawings, coordination activities, bill of quantities, and value engineering for projects.
NATIONALITY/AGE
Egyptian/38
DATE OF BIRTH
18/7/1978
LANGUAGES
Arabic, and English (Fluent).
Mobile: 0100 680 642 6 - 01028898873
E-mail: ahmed_rd2004@yahoo.com
EDUCATION AND PROFESSIONAL QUALIFICATIONS
 PHD, Architectual Engineering, Cairo University, Egypt, 2009.
An approach to activate the application of (Sustainable Building) through the
methodology of (Value Engineering) and (life cycle costing).
 Master Degree, Architectual Engineering, Cairo University, Egypt, 2004.
value engineering an approach for improving the design processes of middle class housing
models with special reference to the user’s needs
 Diploma, Architectual Engineering, Cairo University, Egypt, 2001. (V. good- the fifth)
 B.Sc. Architectural Engineering, Cairo University, Egypt, 2000. (v. good with honor degree-
the eighth), (Graduation project; Excellent).
 Member of (EPPMA) Engineering Planning & Project Management Association.
 Certified for 30 hours Occupational safety & health in OSHA construction Industry Safety
and Health.
EXPERIENCE:
 August, 2015- Date: REDCON construction
Group, Cairo, Egypt; Construction Manager
C.M. of ABC Bank (Main Office building) at
New Cairo, in a total built up area 35000 m2,
with total cost 190 million LE, main consltant
ECG, project manager HILL. Responsible for
managing all site activities, and coordination
between arch. And all trades.
AHMED OMAR MOHAMED CONSTRUCTION MANAGER ENGINEER
Page 2 of 4
 August, 2014- August, 2015: ECG Engineering
Consultants Group S.A., Cairo, Egypt; Senior Site
Engineer of Etsalat Masr (Main Office building)
at Smart Village, in a total built up area 87000
m2, with total cost 435 million LE, main
contractor Detac. Responsible for coordination
between arch. And all trades, review material
transmittal, and shop drawing, and supervision
upon all exterior and elevation finishing work and
related activities.
 November, 2012- August, 2014: ECG Engineering
Consultants Group S.A., Cairo, Egypt; Senior Site
Engineer of Cridit Agricol Bank (Main Office
building) at New Cairo, in a total built up area
56000 m2, with total cost 286 million LE, main
contractor Orascom. Responsible for coordination
between arch. And all trades, review material
transmittal, and supervision upon all finishing
work and related activities.
 March, 2012 – November, 2012: ECG Engineering
Consultants Group S.A., Cairo, Egypt; Senior Site Engineer
of Childeren Cancer Hospital (57357 Hospital - new
extension), in a total built up area 1800 m2, additional 30
bedrooms, with total cost 16 million LE, main contractor
Ginza. Responsible for coordination between arch. And all
trades, review arch. shop drawing, and material transmittal,
supervision upon finishing work and related activities.
 August, 2011- March, 2012: ECG Engineering
Consultants Group S.A., Cairo, Egypt; Senior Site
Engineer of EXXON MOBIL (Main Office building)
at cairo midtown, in a total built up area 3000 m2, with
total cost 11 million LE, main contractor Maiven U.K.
Responsible for coordination between arch. And all
trades, review arch. shop drawing, and material
transmittal, supervision upon finishing work and related
activities.
 February, 2010- August, 2011: ECG
Engineering Consultants Group S.A., Cairo,
Egypt; Senior Site Engineer of SFTB
(Seasonal Flights Terminal Building) at cairo
Airport, in a total built up area 45 000 m2,
with total cost 165 million LE, main contractor
Orascom. Responsible for coordination between
arch. And all trades, review arch. shop drawing,
and material transmittal, supervision upon finishing work and related activities.
AHMED OMAR MOHAMED CONSTRUCTION MANAGER ENGINEER
Page 3 of 4
 November,2008- February,2010: ECG
Engineering Consultants Group S.A., Cairo,
Egypt; Senior Site Engineer of Le
MERIDIEN Pyramids Hotel, in total area
1630 m2/floor, with total cost 104 million LE,
Consist of typical floors for guest rooms, SPA
floor (Sauna, Steam, Treatment rooms, Fitness,
Gem, beauty center,….), mechanical floor, and
outside pool area with surrounding landscape.
Responsible for coordination between arch.
and all trades, review arch. shop drawing, and
material transmittals, supervision upon
finishing work and related activities, and make
Value Engineering study for the whole finishing material.
 April,2008- November,2008: ECG Engineering Consultants Group S.A., Cairo, Egypt;
Senior Site Engineer of BILL AIR Compound, in total area 80,000 m2/floor, with total
cost million LE, Consist of residential villas, town house, commercial center, and
outdoor landscape. Responsible for supervision upon finishing work and related activities.
 June,2005- April,2008: Precious Company, Cairo, Egypt; Owner, and executive manager,
Responsible for supplying and applying specialized items of finishing materials (Sub
contractor) for the following projects in Egypt:
Public buildings:
-HSBC bank in Gameat el dwal st.
-HSBC bank Abu dawood al zahri st.
-The Arabian company for cement in Maady.
-The office building in Al Wrood city (October).
- Goldi, customer service department in (tower of el Ttbikeen in El Abasia).
- La Roma coffe (El Gzerh club), as a main contractor.
- La Roma coffe (Silver Star malll, 5th
Settlement), as a main contractor.
- La Roma main kitchen, La Roma store, as a main contractor.
Residential buildings:
- More than 12 villas, as a main contractor. Responsible for the design, coordinating with
all the disciplines, and execution for all finishing items.
- Residential multi store building, El Mohandsin, Responsible for the design, coordinating
with all the disciplines, and execution for all finishing items for 8 apartments.
- More than 6 residential apartments, Responsible for the design, coordinating with all the
disciplines, and execution for all finishing items.
- Residential Palace at Obour (Sauidi El Samar), Responsible for execution all finishing
items
 January,2003-June,2005: Oasis Company, Cairo, Egypt; Site Engineer for several public&
residential projects such as optical center (multi stores), El Manar Hotel, shops in Hilton
Ramses hotel (extension), and many residential multi stores building and villas.
AHMED OMAR MOHAMED CONSTRUCTION MANAGER ENGINEER
Page 4 of 4
 March,2002- January,2003: Interconsult office (Dr. Ali Rafat), Cairo, Egypt; Site
Engineer for the museum of El Gezirah and the Egyptian civilization. Responsible for
coordination between arch. and all trades, supervision upon finishing work and related
activities
COMPUTER SKILLS
 MS Office Package
 AutoCAD
 Photo Shop
 Movie Maker, Acobat reader
 Internet applications

More Related Content

What's hot

Gerges Gad-Resume Jan2017
Gerges Gad-Resume Jan2017Gerges Gad-Resume Jan2017
Gerges Gad-Resume Jan2017Gerges Gad
 
Baher Massoud - Structural Engineer-
Baher  Massoud - Structural Engineer-Baher  Massoud - Structural Engineer-
Baher Massoud - Structural Engineer-baher massoud
 
Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3Mohamed Sayed
 
Gamal Hadad (Architect)
Gamal Hadad (Architect)Gamal Hadad (Architect)
Gamal Hadad (Architect)Gamal Hadad
 
CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)MAHMOUD SAYED
 
Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)
Mohamed Ahmed
 
Ahmed serag 5-1-2017
Ahmed serag 5-1-2017Ahmed serag 5-1-2017
Ahmed serag 5-1-2017Ahmed Serag
 

What's hot (20)

Sabri CV
Sabri CVSabri CV
Sabri CV
 
Gerges Gad-Resume Jan2017
Gerges Gad-Resume Jan2017Gerges Gad-Resume Jan2017
Gerges Gad-Resume Jan2017
 
Baher Massoud - Structural Engineer-
Baher  Massoud - Structural Engineer-Baher  Massoud - Structural Engineer-
Baher Massoud - Structural Engineer-
 
ENG Gamal CV
ENG Gamal CVENG Gamal CV
ENG Gamal CV
 
Curriculum_Vitae
Curriculum_VitaeCurriculum_Vitae
Curriculum_Vitae
 
Engr.Fadwa - CV
Engr.Fadwa - CVEngr.Fadwa - CV
Engr.Fadwa - CV
 
My cv 2
My cv 2My cv 2
My cv 2
 
mamoud hamdi (1)
mamoud hamdi (1)mamoud hamdi (1)
mamoud hamdi (1)
 
Cv update
Cv updateCv update
Cv update
 
Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3
 
Gamal Hadad (Architect)
Gamal Hadad (Architect)Gamal Hadad (Architect)
Gamal Hadad (Architect)
 
CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)
 
Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)
 
Ahmed serag 5-1-2017
Ahmed serag 5-1-2017Ahmed serag 5-1-2017
Ahmed serag 5-1-2017
 
kareem zeyada CV
kareem zeyada CVkareem zeyada CV
kareem zeyada CV
 
haitham cv
haitham cvhaitham cv
haitham cv
 
Khaled-Fahmy
Khaled-FahmyKhaled-Fahmy
Khaled-Fahmy
 
cv
cvcv
cv
 
Aly Ammar1
Aly Ammar1Aly Ammar1
Aly Ammar1
 
Omar Ahmed
Omar AhmedOmar Ahmed
Omar Ahmed
 

Similar to Ahmed CV

Omar Khattab_CVECG
Omar Khattab_CVECGOmar Khattab_CVECG
Omar Khattab_CVECGOmar Khattab
 
Mechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingMechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingHazem Mahdy
 
Ahmed fergany CV 2642016
Ahmed fergany CV 2642016Ahmed fergany CV 2642016
Ahmed fergany CV 2642016Ahmed Fergany
 
Hossam resume 12 2016
Hossam resume 12 2016Hossam resume 12 2016
Hossam resume 12 2016
Hossam A.Aziz
 
Ahmed Adel EL-HENNAWY summary CV V1.0
Ahmed Adel EL-HENNAWY summary CV V1.0Ahmed Adel EL-HENNAWY summary CV V1.0
Ahmed Adel EL-HENNAWY summary CV V1.0Ahmed El-Hennawy
 
NASEERCV UPDATED IN SEPT 2015
NASEERCV UPDATED IN SEPT 2015NASEERCV UPDATED IN SEPT 2015
NASEERCV UPDATED IN SEPT 2015NASEER HUSAIN
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTareq Eladawi
 
Personal Profile April 2015
Personal Profile April 2015Personal Profile April 2015
Personal Profile April 2015Khaled Elagroudy
 
Eng. Hesham Abd El Gawad CV - Oct. 2016
Eng. Hesham Abd El Gawad CV - Oct. 2016Eng. Hesham Abd El Gawad CV - Oct. 2016
Eng. Hesham Abd El Gawad CV - Oct. 2016Hesham Mostafa
 
CV_Ashraf Nazme_2016 -1
CV_Ashraf Nazme_2016 -1CV_Ashraf Nazme_2016 -1
CV_Ashraf Nazme_2016 -1ASHRAF NAZME
 
C.V@ Haytham2015 final
C.V@ Haytham2015 finalC.V@ Haytham2015 final
C.V@ Haytham2015 finalHaytham Taalab
 
Ibrahim al kishki -cv
Ibrahim al kishki -cvIbrahim al kishki -cv
Ibrahim al kishki -cv
ibrahim alkishki
 
Mina Safwat Mounir Aziz R 2016
Mina Safwat Mounir Aziz  R 2016Mina Safwat Mounir Aziz  R 2016
Mina Safwat Mounir Aziz R 2016TKXE
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed El Banna
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
Ayman Mitkees
 

Similar to Ahmed CV (20)

Omar Khattab_CVECG
Omar Khattab_CVECGOmar Khattab_CVECG
Omar Khattab_CVECG
 
Mechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingMechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire Fighting
 
Ahmed fergany CV 2642016
Ahmed fergany CV 2642016Ahmed fergany CV 2642016
Ahmed fergany CV 2642016
 
Hossam resume 12 2016
Hossam resume 12 2016Hossam resume 12 2016
Hossam resume 12 2016
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
Ahmed Adel EL-HENNAWY summary CV V1.0
Ahmed Adel EL-HENNAWY summary CV V1.0Ahmed Adel EL-HENNAWY summary CV V1.0
Ahmed Adel EL-HENNAWY summary CV V1.0
 
NASEERCV UPDATED IN SEPT 2015
NASEERCV UPDATED IN SEPT 2015NASEERCV UPDATED IN SEPT 2015
NASEERCV UPDATED IN SEPT 2015
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - Final
 
Personal Profile April 2015
Personal Profile April 2015Personal Profile April 2015
Personal Profile April 2015
 
Ahmed Zahran C.V
Ahmed Zahran C.VAhmed Zahran C.V
Ahmed Zahran C.V
 
C.V mr.srdc@yahoo.com DCM
C.V mr.srdc@yahoo.com DCMC.V mr.srdc@yahoo.com DCM
C.V mr.srdc@yahoo.com DCM
 
Eng. Hesham Abd El Gawad CV - Oct. 2016
Eng. Hesham Abd El Gawad CV - Oct. 2016Eng. Hesham Abd El Gawad CV - Oct. 2016
Eng. Hesham Abd El Gawad CV - Oct. 2016
 
CV MZ
CV MZCV MZ
CV MZ
 
Resume (final cv)
Resume (final cv)Resume (final cv)
Resume (final cv)
 
CV_Ashraf Nazme_2016 -1
CV_Ashraf Nazme_2016 -1CV_Ashraf Nazme_2016 -1
CV_Ashraf Nazme_2016 -1
 
C.V@ Haytham2015 final
C.V@ Haytham2015 finalC.V@ Haytham2015 final
C.V@ Haytham2015 final
 
Ibrahim al kishki -cv
Ibrahim al kishki -cvIbrahim al kishki -cv
Ibrahim al kishki -cv
 
Mina Safwat Mounir Aziz R 2016
Mina Safwat Mounir Aziz  R 2016Mina Safwat Mounir Aziz  R 2016
Mina Safwat Mounir Aziz R 2016
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
 

Ahmed CV

  • 1. AHMED OMAR MOHAMED CONSTRUCTION MANAGER ENGINEER Page 1 of 4 Over sixteen years of experience in design, detail engineering, (8 years with ECG) construction supervision of architecture works for hotels, resorts, banks, museum, SPA, office building, and airport terminal. Areas of expertise also include the preparation of Architectural shop drawings, coordination activities, bill of quantities, and value engineering for projects. NATIONALITY/AGE Egyptian/38 DATE OF BIRTH 18/7/1978 LANGUAGES Arabic, and English (Fluent). Mobile: 0100 680 642 6 - 01028898873 E-mail: ahmed_rd2004@yahoo.com EDUCATION AND PROFESSIONAL QUALIFICATIONS  PHD, Architectual Engineering, Cairo University, Egypt, 2009. An approach to activate the application of (Sustainable Building) through the methodology of (Value Engineering) and (life cycle costing).  Master Degree, Architectual Engineering, Cairo University, Egypt, 2004. value engineering an approach for improving the design processes of middle class housing models with special reference to the user’s needs  Diploma, Architectual Engineering, Cairo University, Egypt, 2001. (V. good- the fifth)  B.Sc. Architectural Engineering, Cairo University, Egypt, 2000. (v. good with honor degree- the eighth), (Graduation project; Excellent).  Member of (EPPMA) Engineering Planning & Project Management Association.  Certified for 30 hours Occupational safety & health in OSHA construction Industry Safety and Health. EXPERIENCE:  August, 2015- Date: REDCON construction Group, Cairo, Egypt; Construction Manager C.M. of ABC Bank (Main Office building) at New Cairo, in a total built up area 35000 m2, with total cost 190 million LE, main consltant ECG, project manager HILL. Responsible for managing all site activities, and coordination between arch. And all trades.
  • 2. AHMED OMAR MOHAMED CONSTRUCTION MANAGER ENGINEER Page 2 of 4  August, 2014- August, 2015: ECG Engineering Consultants Group S.A., Cairo, Egypt; Senior Site Engineer of Etsalat Masr (Main Office building) at Smart Village, in a total built up area 87000 m2, with total cost 435 million LE, main contractor Detac. Responsible for coordination between arch. And all trades, review material transmittal, and shop drawing, and supervision upon all exterior and elevation finishing work and related activities.  November, 2012- August, 2014: ECG Engineering Consultants Group S.A., Cairo, Egypt; Senior Site Engineer of Cridit Agricol Bank (Main Office building) at New Cairo, in a total built up area 56000 m2, with total cost 286 million LE, main contractor Orascom. Responsible for coordination between arch. And all trades, review material transmittal, and supervision upon all finishing work and related activities.  March, 2012 – November, 2012: ECG Engineering Consultants Group S.A., Cairo, Egypt; Senior Site Engineer of Childeren Cancer Hospital (57357 Hospital - new extension), in a total built up area 1800 m2, additional 30 bedrooms, with total cost 16 million LE, main contractor Ginza. Responsible for coordination between arch. And all trades, review arch. shop drawing, and material transmittal, supervision upon finishing work and related activities.  August, 2011- March, 2012: ECG Engineering Consultants Group S.A., Cairo, Egypt; Senior Site Engineer of EXXON MOBIL (Main Office building) at cairo midtown, in a total built up area 3000 m2, with total cost 11 million LE, main contractor Maiven U.K. Responsible for coordination between arch. And all trades, review arch. shop drawing, and material transmittal, supervision upon finishing work and related activities.  February, 2010- August, 2011: ECG Engineering Consultants Group S.A., Cairo, Egypt; Senior Site Engineer of SFTB (Seasonal Flights Terminal Building) at cairo Airport, in a total built up area 45 000 m2, with total cost 165 million LE, main contractor Orascom. Responsible for coordination between arch. And all trades, review arch. shop drawing, and material transmittal, supervision upon finishing work and related activities.
  • 3. AHMED OMAR MOHAMED CONSTRUCTION MANAGER ENGINEER Page 3 of 4  November,2008- February,2010: ECG Engineering Consultants Group S.A., Cairo, Egypt; Senior Site Engineer of Le MERIDIEN Pyramids Hotel, in total area 1630 m2/floor, with total cost 104 million LE, Consist of typical floors for guest rooms, SPA floor (Sauna, Steam, Treatment rooms, Fitness, Gem, beauty center,….), mechanical floor, and outside pool area with surrounding landscape. Responsible for coordination between arch. and all trades, review arch. shop drawing, and material transmittals, supervision upon finishing work and related activities, and make Value Engineering study for the whole finishing material.  April,2008- November,2008: ECG Engineering Consultants Group S.A., Cairo, Egypt; Senior Site Engineer of BILL AIR Compound, in total area 80,000 m2/floor, with total cost million LE, Consist of residential villas, town house, commercial center, and outdoor landscape. Responsible for supervision upon finishing work and related activities.  June,2005- April,2008: Precious Company, Cairo, Egypt; Owner, and executive manager, Responsible for supplying and applying specialized items of finishing materials (Sub contractor) for the following projects in Egypt: Public buildings: -HSBC bank in Gameat el dwal st. -HSBC bank Abu dawood al zahri st. -The Arabian company for cement in Maady. -The office building in Al Wrood city (October). - Goldi, customer service department in (tower of el Ttbikeen in El Abasia). - La Roma coffe (El Gzerh club), as a main contractor. - La Roma coffe (Silver Star malll, 5th Settlement), as a main contractor. - La Roma main kitchen, La Roma store, as a main contractor. Residential buildings: - More than 12 villas, as a main contractor. Responsible for the design, coordinating with all the disciplines, and execution for all finishing items. - Residential multi store building, El Mohandsin, Responsible for the design, coordinating with all the disciplines, and execution for all finishing items for 8 apartments. - More than 6 residential apartments, Responsible for the design, coordinating with all the disciplines, and execution for all finishing items. - Residential Palace at Obour (Sauidi El Samar), Responsible for execution all finishing items  January,2003-June,2005: Oasis Company, Cairo, Egypt; Site Engineer for several public& residential projects such as optical center (multi stores), El Manar Hotel, shops in Hilton Ramses hotel (extension), and many residential multi stores building and villas.
  • 4. AHMED OMAR MOHAMED CONSTRUCTION MANAGER ENGINEER Page 4 of 4  March,2002- January,2003: Interconsult office (Dr. Ali Rafat), Cairo, Egypt; Site Engineer for the museum of El Gezirah and the Egyptian civilization. Responsible for coordination between arch. and all trades, supervision upon finishing work and related activities COMPUTER SKILLS  MS Office Package  AutoCAD  Photo Shop  Movie Maker, Acobat reader  Internet applications